San Joaquin Delta College
Science & Math Punch/Warranty Completion Bid No. LA-8600-11
The Contractor shall review the Bid/Contract Documents and field conditions, and shall include all required labor, materials, equipment and incidentals, etc. in its bid as necessary to complete each item of work as described herein, whether specifically identified, or not. The Contractor is advised that classes will be in session for the duration of the Project, and that the Contractor shall include all costs in its bid as necessary to coordinate its work as to not disrupt classes, including but not limited to removing materials and cleaning-up after each shift for items of work that may require multiple shifts to complete.
Item Location Room No. Description Scope Clarification Exhibit Quantity
1 A Roof Damaged condenser fins at CU-1, CU-1A, and CU-2A. Rake all condenser fins at CU-1, CU-1A, and CU-2A. 66 3 units
2 A Roof Unacceptable/damaged paint finish at sheet metal parapet cap flashing and expansion joint flashing
Sand/re-paint entire length of parapet flashing and wall-to-curb expansion joint flashing from parapet wall to parapet wall
68 See Descrip. 3 A Roof Exterior refrigerant lines are improperly jacketed/insulated. Scope of work is to replace/correct existing jacketing/insulation at the
exterior refrigerant lines servicing data/electrical room fan coils at Wing A roof per Specification Section 23 07 00
219 3 units
4 A Roof (W) Improperly sealed/set threshold at door to elevator machine room
Remove existing door threshold and re-set in bed of sealant 220 1 Location 5 A1 107 Aircuity power supply incorrectly mounted (laying on the
floor)
Provide metal shelf system sufficient to support power supply; Provide surface mounted unistrut backing to support shelf; backing to span a minimum of two (2) studs; paint backing and metal shelf to match wall
6 1 Location
6 A1 109 (W) Water damaged ceiling tiles Replace water damaged ceiling tile (2 locations); Ceiling tile specification: 2 x 4 Kinetics Noise Control system (gypboard back tile) with Armstrong Ultima Beveled Tegular #1914 face tile. Contractor shall purchase full carton of ceiling tile and return unused tile to the Owner for stock.
221 See Descrip.
7 A1 Tape and glue/adhesive at elevator doors Remove tape and glue/adhesive from doors/frames; Scope limited to 3 openings at Wing A elevator
15 3 Openings
8 A1 Missing/incomplete window system Repair/replace loose window mullion at type A3 window near GL 7 @ E
(Wing A east side)
16 1 Location 9 A1 Fasteners/fastener holes in exterior finish due to incorrectly
anchored downspout
Remove screws as applicable; Provide caulk/sealant at holes and paint to match existing finish
17 1
Downspout location
10 A1 Missing/incomplete window system Repair/replace missing window mullion at south end of A3 window type near
GL 1.4 @ E.
18 1 Location
11 A2 203 Missing corner trim at FRP Furnish and Install corner trim at FRP; match existing 22 1 Location
12 A2 204 Electrical covers at ceiling not painted Paint electrical box covers/plates at ceiling to match ceiling color 23 2 locations
13 A2 Incomplete paint at bottom of Stairs Cut-in paint at bottom side of second floor landing where it meets the south wall/soffit of Wing A; match existing
46 See Descrip.
WORK SUMMARY
San Joaquin Delta College
Science & Math Punch/Warranty Completion Bid No. LA-8600-11
The Contractor shall review the Bid/Contract Documents and field conditions, and shall include all required labor, materials, equipment and incidentals, etc. in its bid as necessary to complete each item of work as described herein, whether specifically identified, or not. The Contractor is advised that classes will be in session for the duration of the Project, and that the Contractor shall include all costs in its bid as necessary to coordinate its work as to not disrupt classes, including but not limited to removing materials and cleaning-up after each shift for items of work that may require multiple shifts to complete.
Item Location Room No. Description Scope Clarification Exhibit Quantity
WORK SUMMARY
April 17, 2015
14 A2 220C Missing locks at access door Provide new locks at access panel or procure new access panel with key lock at Contractor's option. Model: non-fire rated flush steel door and flanged frame for gyp board wall. Milcor, Inc. Model "DW" or equal; paint to match
40 See Descrip.
15 A2 220G Dented Door Frame Door frame may be replaced in its entirety, or the damaged section may be removed
and replaced at the Contractors option. Paint frame to match existing and patch/repair wall as necessary.
43 1 Location
16 A3 304 (W) Water leak at in-slab trap primer to floor drain Provide all demolition & repair/replacement of finishes as required to properly repair the in-slab leak of the trap primer servicing the floor drain. Remove and replace damaged/moldy section of gypboard ceiling below leak (Room A204) and refinish ceiling
222 See Descrip.
17 A3 306 Crack in gypboard wall above door Repair crack and refinish/paint to match 56 1 Location
18 A3 309 (W) Water damaged ceiling tile & HVAC diffuser Replace water damaged ceiling tile (3 locations); Replace rusted HVAC diffuser (1 location); Ceiling tile specification: Armstrong Ultima Beveled Tegular #1914. Contractor shall purchase full carton of ceiling tile and return unused tile to the Owner for stock. Diffuser Specification: Price Model 530, louvered face return grille, steel construction, 45 degree deflection, 3/4" blade spacing, standard B12 white finish
223 See Descrip.
19 A3 310 Crack in gypboard wall above door Repair crack and refinish/paint to match 58 1 Location
20 A3 311 (W) Missing masonite cabinet backing Provide 1/4" masonite cabinet backing; cut-to-fit; mechanically fasten 224 1 Location
21 A3 314 Missing handle at fire extinguisher cabinet Provide missing handle at fire extinguisher cabinet 206 1 Location
22 A3 308, 309,
310, 311, 312, 313
Unfinished/exposed gypboard corner at perimeter window heads
Properly finish exposed, unfinished gypboard corner typical at interior window heads; Scope limited to 4 rooms on the 3rd level of Wing A; All window openings in these 4 rooms require correction; At Contractor's option, corner may be finished with sheet metal angle flashing; painted to match walls.
64 4 Rooms
San Joaquin Delta College
Science & Math Punch/Warranty Completion Bid No. LA-8600-11
The Contractor shall review the Bid/Contract Documents and field conditions, and shall include all required labor, materials, equipment and incidentals, etc. in its bid as necessary to complete each item of work as described herein, whether specifically identified, or not. The Contractor is advised that classes will be in session for the duration of the Project, and that the Contractor shall include all costs in its bid as necessary to coordinate its work as to not disrupt classes, including but not limited to removing materials and cleaning-up after each shift for items of work that may require multiple shifts to complete.
Item Location Room No. Description Scope Clarification Exhibit Quantity
WORK SUMMARY
April 17, 2015
24 B Roof (W) Improperly sealed pipe penetration through concrete topping slab/waterproof membrane at elevator lobby
Saw-cut & remove concrete section (approximately 24" x 24"); re-apply waterproof membrane and seal waterproof membrane to pipe penetration per manufacturer's specifications (Contractor responsible for ensuring compatibility of waterproof membrane); water test penetration to Owner' satisfaction; patch back concrete (3,000psi) to match existing; wipe clean (approx. 32 lf, for the full width of the corridor) the interior (ceiling space) and exterior surface of metal ceiling at the level below the elevator lobby to remove surface stains/mildew. Waterproofing Specification: Grace Products, Bituthene 3000 system
225 See Descrip.
25 B1 143 Dirt marks/stains/streaks on wall Re-paint entire wall elevation 79 1 wall
26 B1 143 Missing sealant at wall to floor sink Provide sealant between wall and floor sink 80 1 sink
27 B1 143 Incomplete FRP trim installation at around floor sink Provide missing FRP trim; caulk/seal joint 81 1 sink
28 B1 155 Paint / texture overspray at west end door Remove overspray/texture; replace aluminum door stop as necessary 87 1 door
30 B1 Missing/incomplete window system Repair/replace loose window mullion above spandrel at type B13 type
window just west of GL 6
90 1 Location 31 B1 132 Projector screen conflicts with door in open position Relocate door stop to eliminate conflict with projection screen. Relocated
stop must allow for door to open a minimum of 90 degrees. If relocated stop is not able to cover existing hole in carpet, carpet must be patched/repaired. Carpet Specification: Tandus C+A Explorer 'Sunscape'
73 1 Location
32 B2 Tape/glue at window Remove tape / glue at window area just west of GL 5 103 1 Location
33 B2 Damaged stucco finish Repair cement board stucco system at window jamb just east of GL 5; paint
to match
104 1 Location 34 B3 337 (W) Water damaged ceiling tiles Replace water damaged ceiling tiles at 3 locations. Ceiling tile specification:
Armstrong Ultima Beveled Tegular #1914. Contractor shall purchase full carton of ceiling tile and return unused tile to the Owner for stock.
San Joaquin Delta College
Science & Math Punch/Warranty Completion Bid No. LA-8600-11
The Contractor shall review the Bid/Contract Documents and field conditions, and shall include all required labor, materials, equipment and incidentals, etc. in its bid as necessary to complete each item of work as described herein, whether specifically identified, or not. The Contractor is advised that classes will be in session for the duration of the Project, and that the Contractor shall include all costs in its bid as necessary to coordinate its work as to not disrupt classes, including but not limited to removing materials and cleaning-up after each shift for items of work that may require multiple shifts to complete.
Item Location Room No. Description Scope Clarification Exhibit Quantity
WORK SUMMARY
April 17, 2015
35 C Roof Unacceptable/incomplete finish at corner of parapet wall Provide galvanized sheet metal corner flashing; paint to match adjacent surface; secure with sheet metal screws in sealant to existing corner flashing; extend flashing behind stucco bead/edge cap, under cap flashing, and seal/caulk transitions for weathertight installation
208 1 Location
36 C Roof Clogged canopy drains at two locations Disassemble/re-assemble as necessary to unclog/clear screens and remove debris
187 2 locations 37 C Roof Exhaust Fans EF-1C and EF-2C are not provided with labels. Provide permanent equipment tags similar to existing equipment 189 2 locations
38 C Roof Damaged fins at condenser units Rake all condenser fins of CU-1C, CU-2C, and CU-3. 190 3 units
39 C Roof Exterior refrigerant lines are improperly jacketed/insulated. Scope of work is to replace/correct existing jacketing/insulation at the exterior refrigerant lines servicing data/electrical room fan coils at Wing C roof per Specification Section 23 07 00.
227 3 units
40 C Roof (W) Failed sealant joint at fire sprinkler pipe penetration Remove failed sealant and replace with appropriate backer/sealant; paint to match
228 1 Location 41 C Roof (W) Improperly sealed/set threshold at door to elevator
machine room
Remove existing door threshold and re-set in bed of sealant 220 1 Location 42 C Roof (W) Improperly sealed pipe penetration through concrete
topping slab/waterproof membrane at elevator lobby
Saw-cut & remove concrete section (approximately 24" x 24"); re-apply waterproof membrane and seal waterproof membrane to pipe penetration per manufacturer's specifications (Contractor responsible for ensuring compatibility of waterproof membrane); water test penetration to Owner' satisfaction; patch back concrete (3,000psi) to match existing; wipe clean (approx. 32 lf, for the full width of the corridor) the interior (ceiling space) and exterior surface of metal ceiling at the level below the elevator lobby to remove surface stains/mildew. Waterproofing Specification: Grace Products, Bituthene 3000 system
San Joaquin Delta College
Science & Math Punch/Warranty Completion Bid No. LA-8600-11
The Contractor shall review the Bid/Contract Documents and field conditions, and shall include all required labor, materials, equipment and incidentals, etc. in its bid as necessary to complete each item of work as described herein, whether specifically identified, or not. The Contractor is advised that classes will be in session for the duration of the Project, and that the Contractor shall include all costs in its bid as necessary to coordinate its work as to not disrupt classes, including but not limited to removing materials and cleaning-up after each shift for items of work that may require multiple shifts to complete.
Item Location Room No. Description Scope Clarification Exhibit Quantity
WORK SUMMARY
April 17, 2015
44 C1 161 Incomplete caulk/sealant at window system Caulk gaps between window sills and jambs 131 10 locations
45 C1 161 Unacceptable/incomplete finish Repair/refinish gypboard at emergency light fixture; paint to match adjacent
surface
132 1 Location
46 C1 161 Unacceptable/incomplete finish Repair/refinish wall at screw pops at gypsum wall near clock at east wall 133 1 Location
47 C1 162 Incomplete caulk/sealant between store front window system and wall
Entire perimeter; north, south and west storefront window systems; provide backer rod/caulk/sealant;
138 See Descrip. 48 C1 162 Exposed mecho shade cabling at north and south storefront Provide Wiremold brand or equal system to "hide" exposed cabling at
window systems; system shall be finished/painted to match color of window system. Alternate solutions may be proposed after bid, however
Contractor's base bid shall be based upon a Wiremold system.
140 2 elevations
49 C1-C3 Flashing over restroom vents on exterior wall not painted as specified
Paint galvanized flashing to match existing wall color 149 3 locations 50 C2 271 Unacceptable/incomplete finish at window sills Provide caulk/sealant at transition between window sill and jamb 156 4 locations
51 C2 271 Incomplete anchorage at metal hand/guard rails Furnish & install single missing expansion bolt; cut all bolts flush; paint all bolts for entire length of rail to match
157 See Descrip.
52 C2 273 Unacceptable finish at metal hand/guard rails Cut all bolts flush; remove rust; prepare surfaces as necessary prior to painting; paint all exposed bases for full length of rail to match
San Joaquin Delta College
Science & Math Punch/Warranty Completion Bid No. LA-8600-11
The Contractor shall review the Bid/Contract Documents and field conditions, and shall include all required labor, materials, equipment and incidentals, etc. in its bid as necessary to complete each item of work as described herein, whether specifically identified, or not. The Contractor is advised that classes will be in session for the duration of the Project, and that the Contractor shall include all costs in its bid as necessary to coordinate its work as to not disrupt classes, including but not limited to removing materials and cleaning-up after each shift for items of work that may require multiple shifts to complete.
Item Location Room No. Description Scope Clarification Exhibit Quantity
WORK SUMMARY
April 17, 2015
53 C2 273 Unacceptable gypboard finish at the the FP1 flush-wall mounted steplights mounted on the North and South walls in this Lecture Room
Scope of work is to re-finishing/paint gypboard at 1 light fixture location per Exhibit.
210 1 Location
54 C3 355 Incomplete anchorage at metal hand/guard rails Furnish & install two (2) missing bolts; Cut all bolts flush and paint all bolts the entire length of handrail to match
174 See Descrip. 55 C3 356 Unacceptable finish at metal hand/guard rails Paint and touch up hand rail post/ base for full length of rail 182 See Descrip. 56 C3 Exterior Incomplete caulk/sealant at exterior lights Provide caulk/sealant at holes and paint to match existing finish 183 4 locations 57 C3 Exterior (W) Incomplete sealant joint at exterior finish Provide backer/sealant (color to match existing) at exterior joint located at
Wing C, 3rd level, West Elevation at North Canopy
230 1 Location 58 General Exterior Incorrectly installed fire extinguisher signs Remove wall anchors/inserts, caulk/seal holes, refinish & paint at 5 sign locations;
mechanically fasten signs at 4 locations
194 See Descrip. 59 General Exterior Unacceptable building finish Scope limited to the refinish of 2 wall areas as identified per Exhibit; paint finish shall
be feathered as necessary to blend in with adjacent wall finish
196 2 walls 60 General Exterior Unacceptable finish at stair guardrails Re-finish (grind / remove surface rust / prep & re-paint) transition from guardrail
posts to stair stringer at the Wing A, C-South and B stairways; all levels. Only one (1) stair may be completed at at time and the Contractor is responsible for installing barriers/signage as necessary to re-direct the public. Contractor shall complete a single mid-level guardrail as a "mock-up" for District approval, prior to proceeding with repairs. Paint shall be compatible with existing powdercoat finish.
San Joaquin Delta College
Science & Math Punch/Warranty Completion Bid No. LA-8600-11
The Contractor shall review the Bid/Contract Documents and field conditions, and shall include all required labor, materials, equipment and incidentals, etc. in its bid as necessary to complete each item of work as described herein, whether specifically identified, or not. The Contractor is advised that classes will be in session for the duration of the Project, and that the Contractor shall include all costs in its bid as necessary to coordinate its work as to not disrupt classes, including but not limited to removing materials and cleaning-up after each shift for items of work that may require multiple shifts to complete.
Item Location Room No. Description Scope Clarification Exhibit Quantity
WORK SUMMARY
April 17, 2015
61 General Various Phoenix valve system labels/thermostats need to be updated with new room numbers.
Re-label thermostats at all locations with correct room numbers; reference ASI 57
218 97
locations 62 Roof Clogged canopy drains at the southeast corner canopy Disassemble/re-assemble as necessary to unclog/clear screens and remove
debris
201 2 locations 63 Site Unacceptable/damaged concrete at corners of vault box
toward north end of west side access road. (2 corners)
Saw-cut & replace damaged concrete at 2 corners of vault lid; smooth epoxy-set dowels shall be provided to existing concrete edges; replacement concrete shall be 3500 psi, colored concrete ("Light Bark") to match existing. Existing concrete was supplied by 711 Materials
202 2 locations
64 Site Unused precast manhole rings Scope of work limited to loading and properly disposing 3 circular precast concrete manhole extensions from the C5 parking lot
207 See Descrip. 65 Site Incomplete drain composite board (detail 10/L7.1) behind
Art Yard retaining wall
Remove/replace soil/landscape as necessary; provide composite drain board along length of wall to a depth of approximately 18-24"