2014 MIDAS Technical Seminar

(2)

The recent years have seen tremendous advances in High-Rise Building design in India. Structures such as the World One Tower (442m), Oasis Tower (372m) etc., have pushed the envelope like never before. As such, it becomes imperative for practicing engineers to be up to speed with all the latest developments in the field of High-Rise Buildings.

Today even the design codes have become demanding in terms of detailed and precise design. Understanding of behavior of structure and designing for safety brings in more concerns that should be addressed. Additionally, everything needs to be done quickly and efficiently. This creates a need for a powerful tool that addresses all the above issues. midas Gen has the strong ability to help engineers to perform modeling, analysis and design of structures. The software has been successfully applied to numerous projects thereby demonstrating creditability and stability.

This seminar will focus on familiarizing the structural analysis as well as design of buildings. midas Gen models are also compatible with major BIM tools which have gained a lot of importance recently.

About Seminar

MIDAS

TECHNICAL

SEMINAR

Programs

Time

Sessions

9:30 - 10:00 Registration 10:00 - 10:30 Opening Remark

10:30 - 11:20 Important criteria to be considered for high-rise building design report. Prof. M. A. Chakrabarti, VJTI, (Former Member of High-rise Building Committee)

11:20 - 11:50 Refreshment Break

11:50 - 12:40 Modeling Issues in high-rise buildings Vinayak Naik, Sterling Engineering Consultancy Services

12:40 - 2:00 Lunch break

2:00 - 2:50 Effect of wind loading on tall buildings Prof. Tanuja Bandivadekar, SP College of Engineering

2:50 - 3:40 Foundations for tall buildings Jaydeep Wagh, Geocon International

3:40 - 4:00 Refreshment Break

4:00 - 4:50 Column shortening analysis for high-rise building Ravi Kiran Anne, MIDAS

4:50 - 5:30

Introduction to MIDAS

- Introduction to midas Gen by Shayan Roy, MIDAS - Case studies by Raajesh Ladhad, Structural Concept 5:30 - 5:40 Closing Remark & Lucky Draw

2014 Challenges & Solutions for Tall Building Design

The Institution of Engineers (India, MSC) November 15th, 2014 (Saturday)

(3)

2014 Challenges & Solutions for Tall Building Design

Presenters

Speaker’s Profile

Ravi Kiran is high-rise building design and finite element analysis specialist and technical director with 10 years’ experience in high-rise buildings & infrastructure projects.

Erection Engineering of high-rise building

- Column shortening analysis for high-rise building

by Ravi Kiran Anne, MIDAS

Effect of wind loading on tall buildings

by professor Tanuja Bandivadekar, SP College

Foundations for tall buildings

by Jaydeep D. Wagh, Geocon International Modeling Issues in tall buildings

by Vinayak Naik, Sterling Engineering Consultancy Services Pvt. Ltd.

Important criteria to be considered for high-rise building design report.

by Professor M. A. Chakrabarti, VJTI

Former Member of High-rise Building Committee

• Geotechnical consultant for over 10,000 projects across India. • Completed projects in numerous countries of the world, including

USA, Dubai, Nepal, Shri Lanka, and several countries in Africa. • Geotechnical consultant for the tallest buildings in almost all metro cities of India, including Mumbai (6B+130 floors), Delhi (3B+85 floors), Kolkata (65 floors), Bangalore (3B+52 floors)(1997 - Present)

Vinayak Naik has designed number of ROB’s, fly-overs (a notable

example is the Dadar T. T. flyover in Mumbai, Winner of Special Award by Indian Institute of Bridge Engineers for Year 2000), mass housing

projects, tall buildings, Loco car sheds for Railways (Precast / Prestressed), subways (a notable example is CST subway, Mumbai).

Area of Interest

• Vibration control using passive dampers for structures • Vibration control using passive dampers for bridges • Multiple tuned mass dampers

• Mass excited structure, vibration control. • Admixtures for high performance concrete. Area of Interest

• Reliability engineering and system safety • Non-linear dynamic analysis/system • Self Repairable Concrete System

Raajesh Ladhad has designed tall residential buildings, corporate office buildings, commercial buildings, and hospitals. He has personally trained and guided junior and senior engineers to develop structural designs and details in RC and steel structures.

Case Studies using midas Gen

by Raajesh K. Ladhad, Structural Concept Design

The Institution of Engineers (India, MSC) November 15th, 2014 (Saturday)

(4)

01

Introduction to MIDAS

Shayan Roy, MIDAS

2014 MIDAS Technical Seminar

(5)

1 Introduction and Objective

Introduction to midas Gen

MIDAS IT

Welcomes you to its

2014 Technical Seminar

Shayan Roy

MIDAS IT

Introduction to midas Gen

Introduction and Objective

Contents

01

Opening Remarks

02

Introduction to MIDAS

03

Design of High-Rise Building

04

Interaction / Q&A

(6)

3 Introduction and Objective

Introduction to midas Gen

3

Objective

01. Introduction to Midas

Introduction and Objective

Introduction to midas Gen

About MIDAS

01. Introduction to Midas

No. 1 Market Share

in Civil Engineering Software Solutions

450 Engineers & Professionals

120

Distribution in over 120 Countries

10,000

Number of Clients

(7)

5 Introduction and Objective

Introduction to midas Gen

5

Global Network

01. Introduction to Midas

Introduction and Objective

Export to more than 90 countries worldwide through distributors in 28 countries

Retains the largest CAE market share

Introduction to midas Gen

Business Areas

Bridge & Civil Structures

Building & Plant Structures

Geotechnical Analysis

Mechanical Analysis

Bridge Engineering

Building Engineering

Geotechnical Engineering

Mechanical Engineering

Software

Developments

Engineering

Consultancy

(8)

7 Introduction and Objective

Introduction to midas Gen

Business Areas

7 Introdu 7 7 Intro

Optimal Solution

for

Practical Engineering

Building Structures

Plant Structures

Civil Structures

CAE Technology & Development

Engineering Consulting Service

P

5[PGTI[

Introduction to midas Gen

Product Line

midas

FX+

midas NFX

Mechanical

Engineering

General Pre & Post Processor for Finite Element Analysis Integrated Design System

for Building and General Structures

midas

Gen

midas DShop

Building & Structural

Engineering

2D / 3D Geotechnical and Tunnel analysis System

midas

GTS

SoilWorks

Geotechnical

& Tunnel

Engineering

midas

Civil

midas

FEA

Bridge & Civil

Engineering

Integrated Solution System for Bridge and Civil Structures

Advanced Nonlinear and Detail Analysis System

Total Solutions for True Analysis-driven Design

Geotechnical Solutions for Practical Design

midas Design+

Structural Component Design & Detailing

Auto-Drafting Module to generate Structural Drawings and Bill of Materials

(9)

9 Introduction and Objective

Introduction to midas Gen

Key Clients

International Indian

ACKG HDR Parsons Brinckerhoff AFCONS Arun Gokhale & Associates

AECOM HNTB Ramboll Gruppen CDM Smith DCIPL

ARCADIS Hyder Royal Haskoning CES J+W Consultants

ARUP Hyundai Engineering SMEC EGIS India Milind Kulkarni ATKINS INGEROP SNC-Lavalin International L&T Mahimatura Beca Group Italferr SpA Thornton Tomasetti Louis Berger Group Nagarjuna Constructions

Bechtel Jacobs URS Mott MacDonald Navinnavare

Black & Veatch Korea Power Engineering WSP Group Phiske Consultant Satish Marathe Consultants

CH2M HILL Langan Pragati Consultants Sunil Mutalik

COWI Louis Berger Group S.N.Bhobe & Associates S.W.Mone & Associates

CTI Engineering Michael Baker Corp. STUP Consultants Structus Consultants

Dar Al-Handasah MMM Group Shrikande Consultants Vastec

DHV Group Mott MacDonald Tandon Consultants

GHD Mouchel PWD, Navi Mumbai

Golder Associates MWH Global RDSO

Halcrow Parsons Western Railway

Introduction to midas Gen

Structural Engineering

Burj Khalifa (UAE)

Kingdom Tower (Saudi Arabia)

Beijing Olympic (China)

(10)

11 Introduction and Objective

Introduction to midas Gen

Structural Engineering

9 All types of buildings (RC, Steel, Composite)

9 Plant structures, Airport & Hangars

9 Stadiums, arenas & gymnasiums

9 Column shortening prediction and design

9 Post-tension and pre-stressed concrete analysis

9 Nonlinear seismic performance evaluation

9 Structural safety checks through detail analysis

Application Areas

Introduction to midas Gen

Tall Building Projects

Kingdom Tower (Saudi Arabia)

World’s Tallest Building

(11)

13 Introduction and Objective

Introduction to midas Gen

Tall Building Projects

g

j

Burj Khalifa (UAE)

The World’s Tallest Building

Introduction to midas Gen

Tall Building Projects

Tall Building Projects

Moscow City Palace Tower (Russia)

(12)

15 Introduction and Objective

Introduction to midas Gen

Tall Building Projects

3URMHFW1DPH10)%%QTRQTCVG1HHKEG0CXK/WODCK

'HVLJQHGE\5VTWEVWTCN%QPEGRV0CXK/WODCK

M

HHK

K

D K

Introduction to midas Gen

Tall Building Projects

3URMHFW1DPH-CTPCNC

+P

VGTPCVKQPCN5EJQQN&TQPCIKTK

'HVLJQHGE\5VTWEVWTCN%QPEGRV0CXK/WODCK

(13)

17 Introduction and Objective

Introduction to midas Gen

Tall Building Projects

3URMHFW1DPH'NGTTQ(KGUVC5CPRCFC

'HVLJQHGE\5VTWEVWTCN%QPEGRV0CXK/WODCK

Introduction to midas Gen

Tall Building Projects

3URMHFW1DPH/CTKPG#ECFGO[2CPXGN

(14)

19 Introduction and Objective

Introduction to midas Gen

Tall Building Projects

3URMHFW1DPH4GNKCDNG6GEJ2CTM0CXK/WODCK

'HVLJQHGE\5VTWEVWTCN%QPEGRV0CXK/WODCK

 4GNKCDNG 6GEJ 2CTM 0CXK /WODCK

Introduction to midas Gen

Speciality Projects

peciality Projects

Beijing National Stadium (China)

(15)

21 Introduction and Objective

Introduction to midas Gen

Speciality Projects

Temietto di Villa Barbaro (Italy)

Structural Evaluation of Vulnerable Historic

Introduction to midas Gen

(16)

23 Introduction and Objective

Introduction to midas Gen

Bridge Engineering

Sutong Cable-stayed Br. (China)

Russky Island Br. (Russia)

Sunda Strait Br. (Indonesia)

Introduction to midas Gen

Bridge Engineering

9

Conventional bridges (skewed slab, frame & culvert)

9 Curved steel girders, composite, integral bridges

& PC girder bridges

9 Segmental post-tensioning (BCM, ILM, MSS & FSM)

9 Cable stayed bridges & extradosed bridges

9 Suspension bridges (Earth-anchored & Self-anchored)

9 Fatigue check and seismic performance evaluation

9 Wind evaluation (CFD analysis)

9

9

9

i

l b id

( k

k

(17)

25 Introduction and Objective

Introduction to midas Gen

Cable Stayed Bridges

able Stayed Bridges

Russky Island Bridge (Russia)

The World’s Longest & Tallest Cable Stayed Bridge

Introduction to midas Gen

Cable Stayed Bridges

Santra Market Bridge, Nagpur

(18)

27 Introduction and Objective

Introduction to midas Gen

Cable Stayed Bridges

Tapi Cable Stayed Bridge, Surat

S. N. Bhobhe Consultants, Mumbai

Introduction to midas Gen

Metro Rail

Hyderabad Metro

L&T Rambol, Chennai

Hyderabad Metro

L&T Rambol, Chennai

(19)

29 Introduction and Objective

Introduction to midas Gen

Metro Rail

Navi Mumbai Metro

Louis Berger Group, Mumbai

Introduction to midas Gen

Special Structures

Mumbai Monorail Station

(20)

31 Introduction and Objective

Introduction to midas Gen

Geotechnical Engineering

Kingdom Tower (Saudi Arabia)

New York Subway (USA)

King’s Cross Station (UK)

Introduction to midas Gen

Geotechnical Engineering

9

Deep foundations & Soil-Structure Interaction

9 Deep excavation and temporary structures

9 Underground structures (subway & disposal facilities)

9 Unconventional tunnel intersections

9 Slope stability and embankments

9 Groundwater Flow and Coupled Analyses

9 Vibration analysis for earthquake & blasting

9

9

9

(21)

33 Introduction and Objective

Introduction to midas Gen

Geotechnical Engineering

SoilWorks

Introduction to midas Gen

Tunnel & Underground Structures

Posiva’s ONKALO (Finland)

(22)

35 Introduction and Objective

Introduction to midas Gen

Tunnel & Underground Structures

Trans-Hudson Express (U.S.A)

Stability Evaluation for Station Complex

Introduction to midas Gen

Excavations & Foundations

Dubai Tower (Qatar)

(23)

37 Introduction and Objective

Introduction to midas Gen

Introduction

Æ Stadiums Æ Power Plants Æ Hangar Æ Airport Æ Transmission Towers Æ Cranes Æ Pressure Vessels Æ Machine Structures Æ Underground Structures …

Specialty Structures Applications

Beijing National Stadium Beijing National Aquatic Center Beijing Olympic Basketball Gymnasium

Seoul World Cup Stadium JeonJu World Cup Stadium DeaJeon World Cup Stadium

USA Pavilion China Pavilion German Pavilion

Introduction to midas Gen

Why midas Gen

3UDFWLFDO

(DV\WR8VH

5HOLDEOH

*RRG6XSSRUW

(24)

39 Introduction and Objective

Introduction to midas Gen

Reliable

Buildings

Plant Structures

Æ 50 countries, 6500 copies

Æ Partial List of Client

ƒ URS Corp. ƒ Parsons Brinckerhoff ƒ TY LIN ƒ Ove Arup Gr. ƒ Jacobs Engineering ƒ RMJM

ƒ Imbsen & Associates ƒ Michael Baker Jr.

ƒ R.W. Armstrong and Associates ƒ Hewson Consulting Engineers

Ltd

ƒ Samsung Engg. & Construction ƒ POSCO Steel & Construction ƒ CALTRANS (California Dept. of

Transportation)

ƒ Oregon Dept. of Transportation ƒ Pennsylvania Dept. of Transportation ƒ US Army …

Various Project

Applications

50 countr

rio

rio

pl

pl

Æ Æ 50 cou

Var

Var

App

App

1

Spatial Structures Specialty Structures

Introduction to midas Gen

Reliable

Æ MQC System

(midas Quality Control System)

Æ Bug Reporting System

QA & QC System

MQC Sys

A &

Æ MQC S

QA

2

MQC System Bug Reporting System

Verification

Examples

rif

rif

am

am

Ver

Ver

Exa

Exa

3

Æ More than 100 Verification Examples

(25)

41 Introduction and Objective

Introduction to midas Gen

What Gen can Do

Static Analysis

Dynamic Analysis

Geometric Nonlinear Analysis

Buckling Analysis

Heat of Hydration Analysis

Construction Stage Analysis

Boundary Change Analysis

Inelastic Time History Analysis

P-Delta Analysis

Material Nonlinear Analysis

Static Seismic Analysis Response Spectrum Analysis

Time History Analysis

Boundary Nonlinear Analysis

Damper, Isolator, Gap, Hook

Settlement Analysis

Large Displacement Analysis

Structural Masonry Analysis

Time Dependent Material Column Shortening Analysis

Pushover Analysis

RC, Steel, SRC, Masonry With and Without Pipe Cooling

Introduction to midas Gen

What Gen can Do

RC Design Steel Design SRC Design

ACI318 AISC-LRFD SSRC79

Eurocode 2, Eurocode 8 AISC-ASD JGJ138

BS8110 AISI-CFSD CECS28

IS:456 & IS:13920 Eurocode 3 AIJ-SRC

CSA-A23.3 BS5950 TWN-SRC

GB50010 IS:800 (1984 & 2007) AIK-SRC

AIJ-WSD CSA-S16-01 KSSC-CFT

TWN-USD GBJ17, GB50017 Footing Design

AIK-USD, WSD AIJ-ASD ACI318

KSCE-USD TWN-ASD, LSD BS8110

KCI-USD AIK-ASD, LSD, CFSD

Slab Design KSCE-ASD

(26)

43 Introduction and Objective

Introduction to midas Gen

(27)

02

Column shortening analysis

for high rise building using midas Gen

Ravi Kiran Anne, MIDAS

2014 MIDAS Technical Seminar

(28)

midas Gen – One Stop Solution for Building and General Structures

Construction Stage Analysis with Special

Emphasis on Column Shortening

midas Gen – One Stop Solution for Building and General Structures

Principal Axis of Building

Why Construction Stage Analysis Column Shortening & Related Issues Effects of Column Shortening Procedure for Accounting Compensation at Site

Lotte World Tower Case Study Q&A

(29)

One Stop Solution for Building and General Structures

2014 Technical Seminar Auto Search Principal Axis

Response Spectrum Analysis

- In Irregular Structures, one directional response spectrum results may include a

different

direction’s response.

- When it occurs, the base shear force from the response spectrum analysis is

remarkably smaller than the base shear force calculated from static seismic analysis.

- This causes the scale factor to be very large, also causing an overestimation for the

design.

X

Y

R

x

R

Y

R

xx

R

Y

One Stop Solution for Building and General Structures

2014 Technical Seminar Auto Search Principal Axis

Response Spectrum Analysis

¾ Principal axis

“ Principal Axes of a building are generally two mutually perpendicular horizontal directions in

a plan of a building along which the geometry of the building is

oriented”

“ Direction in which the seismic load has the largest influence on the structure.”

¾ Ways to Find Principal axis

1. Establishment of the Reaction Direction of the 1st Mode to Principal Axis after Modal Analysis. E.L.Wilson. “Three-Dimensional Static and Dynamic Analysis of Structures”, Computer and Structures, 2002.

2. Finding the Critical Angle Using Modal Analysis Method’s Fundamentals and CQC Theory, Trial and Error Method.

O.A.Lopez and R. Torres. “The Critical Angle of Seismic Incidence and the Maximum Structure Response”, EESD, 1997 3. Trial and Error Method: Practical Approach.

(30)

One Stop Solution for Building and General Structures

2014 Technical Seminar Auto Search Principal Axis

Response Spectrum Analysis

¾Auto Search Principal axis

X

Y

midas Gen – One Stop Solution for Building and General Structures

Why Construction Stage Analysis

Column Shortening & Related Issues Effects of Column Shortening Procedure for Accounting Compensation at Site

Lotte World Tower Case Study Q&A

(31)

One Stop Solution for Building and General Structures

2014 Technical Seminar

In general structures are analyzed assuming that the structure is built and loaded in a moment.

Construction of structures is a time taking process and during this period Material Properties,

Loads and Boundaries conditions may change.

Construction Stage Analysis

Why Construction Stage (CS) Analysis

Construction Sequence

Self weight of slab Other Dead Loads (Partions, Finishes)

Completed Structure

Dead Load + Live Load Wind

Earthquake

LL,WL,EQ Acts

One Stop Solution for Building and General Structures

2014 Technical Seminar Construction Stage Analysis

Conventional Analysis Vs. Construction Stage Analysis

Case 1 – ConventionalAnalysis Case 2 – CS Analysis

(32)

One Stop Solution for Building and General Structures

2014 Technical Seminar Construction Stage Analysis

Conventional Analysis Vs. Construction Stage Analysis

Case 1 – ConventionalAnalysis Case 2 – CS Analysis

One Stop Solution for Building and General Structures

2014 Technical Seminar Construction Stage Analysis

Conventional Analysis Vs. Construction Stage Analysis

Stage 2

(33)

One Stop Solution for Building and General Structures

2014 Technical Seminar Construction Stage Analysis

Conventional Analysis Vs. Construction Stage Analysis

Stage 2

= +

One Stop Solution for Building and General Structures

2014 Technical Seminar Construction Stage Analysis

Where CS Analysis is Required

Long Span Trusses

Long Span Slabs, Beams constructed in multiple stages

Prestressed concrete Structures

CS analysis should be performed for all structures where there is a change in

Support Conditions, Loading and varying material properties (Concrete).

(34)

midas Gen – One Stop Solution for Building and General Structures

Construction Stage Analysis

Column Shortening & Related Issues

Effects of Column Shortening Procedure for Accounting Compensation at Site

Lotte World Tower Case Study Q&A

Contents

One Stop Solution for Building and General Structures

2014 Technical Seminar

Column Shortening and Related Issue

σ

When any member is loaded with Axial Load, it undergoes axial deformation

E

= (σ / ε)

ΔL

= (PL/A E)

Why is this

Important

(35)

One Stop Solution for Building and General Structures

2014 Technical Seminar

P1,

ΔL1

P2,

ΔL2

The differential shortening happening between the vertical members may cause

additional forces and stress in Beams and Slabs

Column Shortening and Related Issue

Column Shortening

One Stop Solution for Building and General Structures

2014 Technical Seminar

Steel Structures

- Linear elastic Behavior

Stress ∞Strain

Strain is constant for a given Stress during loading & unloading

E = (σ / ε)

ΔL

= (PL/A E)

σ

Column Shortening and Related Issue

(36)

One Stop Solution for Building and General Structures

2014 Technical Seminar

Concrete Structures

- Nonlinear Inelastic Behavior

- But in general analysis and design behavior of concrete is treated as Linear Elastic Material

Neither Stress ∞Strain

Nor Strain is constant for a given Stress During loading & unloading

Elastic Strain

+

Inelastic Strain

Column Shortening and Related Issue

Column Shortening

One Stop Solution for Building and General Structures

2014 Technical Seminar

Concrete Structures

Elastic

Shortening

Modulus of Elasticity changes with time.

E

i

= (σ / ε)

ΔL

= (PL/A E

i

)

Inelastic

Shortening

σ

σ

Creep Shortening. Shrinkage Shortening.

Column Shortening and Related Issues

(37)

One Stop Solution for Building and General Structures

2014 Technical Seminar

With increased height of structures the effect of column shortening (Elastic & Inelastic)

take on added significance and need special consideration in design and construction.

Elastic Shortening of 80 Storey Steel Structure ~ 180 mm to 255 mm.

Elastic Shortening of 80 Storey Concrete Structure ~ 65 mm.

Total Shortening of 80 Storey Concrete Structure ~ 180 to 230 mm.

Inelastic Shortening ~ 1 to 3 times Elastic shortening.

Column Shortening and Related Issue

Column Shortening

One Stop Solution for Building and General Structures

2014 Technical Seminar

Column Shortening and Related Issue

™

Two basic prerequisites for accurately and efficiently predicting these effects

are

9

Reliable Data for the creep and shrinkage characteristics of the particular concrete mix

9

Analytical procedures for the inclusion of these time effects in the design of structure.

™

Some of the popular predictive methods for predicting creep and shrinkage

strains are

9

ACI 209 -92

9

Bazant – Bewaja B3

9

CEB – FIP (1978, 1990)

9

PCA Method (Mark Fintel, S.K.Ghosh & Hal Iyengar)

9

GL 2000 (Gardner and Lockman)

9

Eurocode

(38)

One Stop Solution for Building and General Structures

2014 Technical Seminar

Column Shortening and Related Issue

™

The total strain at any time t may be expressed as the sum of the

instantaneous, creep and shrinkage components:

Where,

ε

e

(t) = Instantaneous strain at time t,

ε

c

(t) = Creep strain at time t,

ε

sh

(t) = Shrinkage strain at time t.

Column Shortening

One Stop Solution for Building and General Structures

2014 Technical Seminar

Column Shortening and Related Issue

™

The instantaneous strain in concrete at any time t is expressed by

Where,

σ (t) = stress at time t,

E

c

(t) = Elastic modulus of concrete at time t, given by

f

ct

= Compressive strength at any time t, given by

α & β are constants depending on Type of Cement & Type of Curing

(39)

One Stop Solution for Building and General Structures

2014 Technical Seminar

Column Shortening and Related Issue

Inelastic

Shortening =

Creep

+

Shrinkage

Shrinkage

Creep

Shrinkage is the time-dependant decrease in concrete volume compared with the original placement volume of concrete.

¾Drying Shrinkage is due to moisture loss in concrete.

¾Autogenous Shrinkage is caused by hydration of cement.

¾Carbonation shrinkage results as the various cement hydration products are carbonated in the presence of CO

Creep is time-dependent increment of strain under sustained stress.

¾Basic creep occurs under the condition of no moisture movement to and from the environment.

¾Drying creep is the additional creep caused by drying. Drying creep has its effect only during the initial period of load.

Column Shortening

One Stop Solution for Building and General Structures

2014 Technical Seminar

Column Shortening and Related Issue

Inelastic

Shortening =

Creep

+

Shrinkage

Shrinkage

Creep

As per ACI 209R-92 the creep coefficients are predicted as =

As per the ACI 209R-92, shrinkage can be predicted by

Where,

t = time in days after loading.

vu = Ultimate creep coefficient = 2.35 Jc

Jc = Product of applicable correction factors

After 7 days for moisture cured concrete

After 1-3 days for steam cured concrete

Where,

t = time in days after the end of Initial Curing (Hsh)

u = Ultimate Shrinkage Coefficient = 780 Jsh x 10 -6 m/m

Jsh = Product of applicable correction factors

(40)

One Stop Solution for Building and General Structures

2014 Technical Seminar

Column Shortening and Related Issue

Factors affecting the Creep & Shrinkage of Concrete

Concrete (Creep & Shrinkage)

Concrete Composition

Cement Paste Content Water – Cement ratio Mixture Proportions Aggregate Characteristics Degrees of Compaction

Initial Curing

Length of Initial Curing Curing Temperature Curing Humidity

Member Geometry and Environment

(Creep & Shrinkage) Environment

Concrete Temperature Concrete Water Content

Geometry Size and Shape

Loading (Creep Only)

Loading History

Concrete age at load Application During load Period

Duration of unloading Period Number of load Cycles Stress Conditions

Type of Stress and distribution across the Section

Stress/Strength Ratio

Column Shortening

midas Gen – One Stop Solution for Building and General Structures

Construction Stage Analysis

Column Shortening & Related Issues

Effects of Column Shortening

Procedure for Accounting Compensation at Site Live Demonstration

Lotte World Tower Case Study Q&A

(41)

One Stop Solution for Building and General Structures

2014 Technical Seminar

Effects of Column Shortening

™

Absolute shortening is rarely of practical interest.

™

Differential shortening between adjacent vertical elements is the most important factor for

engineer.

™

Axial Shortening of vertical elements

will not effect those elements very much,

horizontal elements like beams and slabs

and non structural elements are affected.

Column Shortening

One Stop Solution for Building and General Structures

2014 Technical Seminar

Effects of Column Shortening

¾

Cracks in Partition Walls.

¾

Cracks in Staircases

¾

Deformation of Cladding.

¾

Mechanical Equipment.

¾

Architectural Finishes.

¾

Built in Furnishings.

These non structural elements are not

intended to carry vertical loads and are

therefore not subjected to shortening.

¾

Slabs may not be truly horizontal after some time.

¾

Beams could be subjected to higher bending moments.

¾

Load transfer.

Structural Effects

Non Structural Effects

(42)

One Stop Solution for Building and General Structures

2014 Technical Seminar

Effects of Column Shortening

Deformation and breakageofFacades, windows & Parapet walls…

Reverse Inclination of Drainage Piping System

Deformation of Vertical Piping System Deformation and breakage of internalpartitions

Column Shortening

midas Gen – One Stop Solution for Building and General Structures

Construction Stage Analysis

Column Shortening & Related Issues Effects of Column Shortening

Procedure for Accounting

Compensation at Site

Lotte World Tower Case Study Q&A

(43)

One Stop Solution for Building and General Structures

2014 Technical Seminar

Procedure for Accounting Column Shortening

Column Shortening

One Stop Solution for Building and General Structures

2014 Technical Seminar

Procedure for Accounting Column Shortening

?

Folpdwlf# Frqglwlrq# Frqglwlrqv# Ordglqj# Frqglwlrq# Frqvwuxfwlrq# Surjuhvv# Rwkhu# Frqglwlrqv# Pre-Analytical Prediction & Continuous Monitoring Experimental Measurements & Construction Survey

Precise prediction

of shortening

Fruuhfwlr

q#

Column Shortening

(44)

One Stop Solution for Building and General Structures

2014 Technical Seminar

Procedure for Accounting Column Shortening

Analytical Measurement

Reflection of physical properties in calculation from material experiment:

Young’s Modulus, Poisson’s Ratio, Mean Compressive strength, Volume to Surface ratio, Shapes, sizes etc.

Reflection of effects of Climate on shortening:

AverageTemperature , RH etc.

Construction Sequence:

Stage duration, Additional Steps, Member Age, Load activation age, Boundary activation age etc.

Reflection of the above effects on site master-schedule.

Installation of sensors or gages in members for determining the actual shortening.

Understanding and noting the following:

Curing procedure / Temperature, Actual Shortening,

Change in Ambient Temperature (Important), Actual Humidity,

Deviation from Defined Construction Stages,

Manipulation of factors in analytical Calculation, Re-Analysis…

Experimental Measurement

Using Software or Manually (Manual calculation is almost impossible)

Field Measurements

Method has Limitation

Column Shortening

One Stop Solution for Building and General Structures

2014 Technical Seminar

Procedure for Accounting Column Shortening

͵ΖΥΖΣΞΚΟΒΥΚΠΟ͑ΠΗ͑ͺΟΤΥΒΝΝΒΥΚΠΟ͑ΝΠΔΒΥΚΠΟ͑ ͺΟΤΥΒΝΝΒΥΚΠΟ͑ΠΗ͑͸ΒΦΘΖ͑ ͲΗΥΖΣ͑ͺΟΤΥΒΝΝΒΥΚΠΟ͑

ͲΗΥΖΣ͑͑ͺΟΤΥΒΝΝΒΥΚΠΟ͑ΠΗ͑͸ΒΦΘΖ͑ ͲΗΥΖΣ͑ʹΒΤΥΚΟΘ͑ΠΗ͑ʹΠΟΔΣΖΥΖ͑ ͷΚΖΝΕ͑ΕΒΥΒ͑ΔΠΝΝΖΔΥΚΠΟ͑

Field Measurements

(45)

One Stop Solution for Building and General Structures

2014 Technical Seminar

Procedure for Accounting Column Shortening

0DQLSXODWLRQRIWKHFRQVWUXFWLRQVWDJHDV SHUVLWHFRQGLWLRQ &RQVWUXFWLRQVWDJHRIHDFKJURXS $FWLYDWLRQRI&RQVWUXFWLRQVWDJHV 3HUIRUP'&6$QDO\VLV

Engineering Re-Analysis

Column Shortening

One Stop Solution for Building and General Structures

2014 Technical Seminar

Procedure for Accounting Column Shortening

Column Shortening

Preliminary Analysis

Material / Section Properties Applied Load, Schedule

Main analysis

•Updating material properties from experiments

•Construction sequence considering the field condition

1st, 2nd, 3rd Re-Analysis

Suggestion of compensation and details for non-constructed part of structure

Final Report

Shortening, result from test, measurement Review

Material Experiment

•Compressive strength •Modulus of elasticity •Creep & Shrinkage

Measurement

Measurement of strain for Column & Wall

Design with Additional Force Applying Compensation to in-situ structure Pre-Analysis Main Analysis, Construction & Re-Analysi

s

0.0E+00 1.0E-04 2.0E-04 3.0E-04 4.0E-04 0 50100150200250300350 Str ain Day Back Analysis Output (103-1F-01) Strain Gauge Output (103-1F-01)

(46)

midas Gen – One Stop Solution for Building and General Structures

Construction Stage Analysis

Column Shortening & Related Issues Effects of Column Shortening Procedure for Accounting

Compensation at Site

Lotte World Tower Case Study Q&A

Contents

One Stop Solution for Building and General Structures

2014 Technical Seminar

Compensation at Site

Column Column 1st correction 2nd correction 1st correction Column Shortening

(47)

One Stop Solution for Building and General Structures

2014 Technical Seminar

Movement Related to Construction Sequence

Column Shortening

Depending on the stage of construction:

Pre-slab installation shortenings

– Shorteningstaking place up to the time of slab installation

Post-slab installation shortenings

– Shortenings taking place after the time of slab installation

Depending on the construction material:

Reinforced Concrete Structure

– Pre-slab installation shortenings has no importance – Compensation by leveling the forms

– Post-slab installation shortenings due to subsequent loads and creep/shrinkage

Steel Structure

– Columns are fabricated to exact length. – Attachments to support the slabs

– Pre-slab installation shortenings need to be known.

– Compensation for the summation of Pre-installation and Post-installation shortenings





One Stop Solution for Building and General Structures

2014 Technical Seminar Column Shortening

Compensation at Site

zshiG{orUG iGOdGoŒŽ›G–G Š–™™ŒŠ›–•G ہۄۇۇۀۍG

oŒŽ›G–GŠ–™™ŒŠ›–•G

GG j–“œ”•GyŒ‰ˆ™G

jvuNjGjˆš›•ŽGˆŠŒ

G

‰ࣜThe order of construction#

installation of column forms

insertion of FILLER

insertion of correcting FILLER

Installation of SLAB forms

(48)

midas Gen – One Stop Solution for Building and General Structures

Construction Stage Analysis

Column Shortening & Related Issues Effects of Column Shortening Procedure for Accounting Compensation at Site

Lotte World Tower Case Study

Q&A

Contents

L

Lotte World Tower

Overview

.QECVKQP -DPVLO6HRXO6RXWK.RUHD *GKIJV 4QQHėP#PVGPPC5RKTGėP 0QQH(NQQTU  (NQQT#TGC P )XQFWLRQ8VDJH 2IILFH5HVLGHQWLDO+RWHO2EVHUYDWLRQ'HFN P  6WUXFWXUH7\SH 5HLQIRUFHG&RQFUHWH6WHHO /DWHUDOORDG UHVLVWLQJV\VWHP &RUH:DOO2XWULJJHU7UXVV%HOW7UXVV )RXQGDWLRQ7\SH 0DW)RXQGDWLRQ %QPUVTWEVKQP2GTKQF 0DUFKa

.QVVG9QTNF6QYGT

(49)

43

L

Lotte World Tower

Construction Site Structural Schematic

L

Lotte World Tower

Overview

೗ ݡɻ ʾ˒ ೗ ೗

Initial Curing <Elastic> <Inelastic>

Con’c Vertical Member

Pre-slabInstallationshortening

Core wall Column

Core Shortening Column Shortening < Deferential Deformation > Deferential Shortening (FOFSBM ↟)FJHIUNGMPPST Tower Deformation ↟%FGPSNBUJPOPGUIFUPXFSJTBOBUVSBMMZPDDVSSJOHEFQFOEJOHPONBUFSJBM  DPOTUSVDUJPONFUIPE ↟7FSUJDBM%FGPSNBUJPO 7FSUJDBM4IPSUFOJOH4FUUMFNFOU$POTUSVDUJPO&SSPST ↟)PSJ[POUBM%FGPSNBUJPO %JGGFSFOUJBM4IPSUFOJOH4FUUMFNFOU 6OFWFOMPBEEVFUPDPOTUSVDUJPONFUIPE "TZNNFUSJDGMPPSQMBO$POTUSVDUJPOFSSPST Horizontal Deformation Vertical Deformation With Time

(50)

45

L

Lotte World Tower

Pre-Analysis - Deformations

Vertical deformation Differential Shortening Horizontal deformation Differential settlement

Deferential shortening btw Core & Column ֜ Steel column: Max 55mm

֜ Mega column: Max 65mm

• Top of tower

֜ Steel Frame: 368.7 mm ֜ Core wall: 314.0 mm

• Top of mega column

֜ Mega Col: 297.8 mm ֜ Core wall: 232.8 mm

A BOVE F IRE SHUTTERA BOVE A BOVE F IRE SHUTTERA BOVE

:&KT ;&KT 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 • Prediction X dir: 27.2mm Y dir: 115.5mm Safety check Æ Elevator’s rails Æ Vertical Pipes X Y .&(" $0- $03&8"--'06/%"5*0/ .&(" $0- .&(" $0- $03&8"--'06/%"5*0/ .&(" $0- <initial> <Complete>

֜ Core wall settlement: 35mm ֜ Column settlement: 16mm

Core wall Column

Core

Shortening Column Shortening

Deferential Shortening

Lantern & Core

L

Lotte World Tower

Pre-Analysis - Deformations

Outrigger’s additional stress Slab’s additional stress

Podium’s additional stress

Differential Deformation btw Slab-Column Æ Slab has additional stress

• Additional stress btw tower & podium

Æ Max 100 ton.m

Æ Require Settlement

Joint & Safety check

• Additional Stress without Delay Joint

֜ 1st outrigger (L39~L43): 3,600 tons

֜ 2nd outrigger (L72~L75): 4,700 tons

֜ required a delay joint installation

• Additional Stress with Delay Joint

֜ 1st outrigger (L39~L43): 1,700 tons ֜ 2nd outrigger (L72~L75): 2,000 tons Podium

Towe

r

connection L87~L103 L72~L75 L39~L43 B06~B01

(51)

47

L

Lotte World Tower

Pre-Analysis – Compensation

- Core Wall: Absolute correction for securing design level

- Column: Relative correction for deferential shortening

Relative correction between core and column

correction due to measurement

pre-Analysis Analysis Re-analysis 1~6 times Material Test Measurement 1st correction 2nd correction Additional correction for unconstructed B06 L01 L40 L20 L10 L30 L50 L60 L70 L80 L90 L100 L110 L120 TOP 2nd O/R 1st O/R Lantern 1st B/T 2nd B/T

)ORRU &RUH &ROXPQ

// 'HVLJQOHYHOPP 6WHHOFROXPQV // 'HVLJQOHYHOPP 6WHHOFROXPQV // 'HVLJQOHYHOPP &RUHOHYHOPP // 'HVLJQOHYHOPP &RUHOHYHOPP // 'HVLJQOHYHOPP &RUHOHYHOPP // 'HVLJQOHYHOPP &RUHOHYHOPP // 'HVLJQOHYHOPP &RUHOHYHOPP // 'HVLJQOHYHOPP &RUHOHYHOPP // 'HVLJQOHYHOPP &RUHOHYHOPP // 'HVLJQOHYHOPP &RUHOHYHOPP // 'HVLJQOHYHOPP &RUHOHYHOPP // 'HVLJQOHYHOPP &RUHOHYHOPP // 'HVLJQOHYHOPP &RUHOHYHOPP // 'HVLJQOHYHOPP &RUHOHYHOPP // 'HVLJQOHYHOPP &RUHOHYHOPP // 'HVLJQOHYHOPP &RUHOHYHOPP // 'HVLJQOHYHOPP &RUHOHYHOPP // 'HVLJQOHYHOPP &RUHOHYHOPP // 'HVLJQOHYHOPP &RUHOHYHOPP // 'HVLJQOHYHOPP &RUHOHYHOPP // 'HVLJQOHYHOPP &RUHOHYHOPP %/ 'HVLJQOHYHOPP &RUHOHYHOPP

L

Lotte World Tower "OBMZTJT$POEJUJPOBOE"TTVNQUJPO "

Analysis Tool: midas/GEN

Outrigger Installation Condition: After completion of frame construction, 1st & 2nd outrigger installation

Environment: Average relative humidity 61.4%

- 3D Structural Analysis with changes of material properties Material properties

- Regression analysis results from the material test data (6 month )

- Comparing to pre-analysis results, 32~33% in creep deformation, 39~42% in shrinkage deformation

- Relative humidity of average 5 years Target period of shortening

- Safety verification: 100years after (ؒultimate shortening) - Service verification: 3years after (95% of ultimate shortening) Loading Condition

- Dead Load & 2nd Dead Load: 100%, Live Load: 50% foundation/ground analysis results Apply soil stiffness from

(52)

49

L

Lotte World Tower

Material Test Results

Material test results for re-analysis

<Comparison Graph of Shrinkage>

Pre-analysis Re-analysis Design Strength Ultima te S hrink a g e S tra in (με )

<Comparison Graph of Specific Creep>

Pre-analysis Re-analysis Design Strength Sp ecif ic C reep

<Comparison Graph of Elastic Modulus>

Re-analysis (Material Test) Pre-analysis (Theoretical Eq.)

Concrete Age (Day)

Elastic M odulus 28 days    

L

Lotte World Tower /% . 29  . /% . /% . /% . /% . /% . /% . /% . 29 . 29 . 29 . 29  . 29 . 29 . 29 . 2 9 . 2 9 . 29 . +9 . +9 . +9 . +9 . %QN/+0 9CNN/+0 %QN/#: 9CNN/#: 29  . 29  . 2 9 . 2 9 . 4IPSUFOJOH3FTVMUTm.FHB$PMVNO4IPSUFOJOH #_- 4I

ƒ Target Period: 3years

- 3 years was determined as the optimal time of target serviceability application.

ƒ Maximum shortening of mega column

- SubTo: 131.4~137.2mm (L65, L69)

(80~83% of pre-analysis)

ƒShortening of core walls

- SubTo: 74.1~85.9mm (L71)

(77~78% of pre-analysis)

ƒ Differential shortening between column-core

- 53.1~60.9mm (L65)

ƒ Settlement Shortening

- Mega column: 21.2~25.5mm (B6) - Core wall: 23.6~29.1mm (B6)

(53)

51

L

Lotte World Tower 4IPSUFOJOH3FTVMUTm4UFFM$PMVNO4IPSUFOJOH -_- 4I

ƒ Target Period: 3years

- 3 years was determined as the optimal time of target serviceability application.

ƒ Maximum shortening of steel

column

- SubTo: 110.4~136.9mm (L76)

(80% of pre-analysis)

- Total: 260.7~286.1mm (L76)

(80% of pre-analysis) ƒShortening of core walls

- SubTo: 67.8~81.0mm (L76)

(65~70% of pre-analysis)

- Total: 162.9~213.6mm (L76)

(67~70% of pre-analysis)

ƒ Differential shortening between

Column-core - 40.1~44.5mm (L76) 5% . 5% . 5% . 5% . 5% . 5% . 5% . 5% . 5% . 5% . 5% . 5% . 5% . 5% . 5% . 5% . 5% . 5% . 5% . 5% . 5% . 5% . 5% . 5% . 5% . 5% . %QN/+0 9CNN/+0 %QN/#: 9CNN/#: 29  . 29 . 29 . 29 . 29  . 29 . 29 . 29 . 2 9 . 2 9 . 29 . +9 . +9 . +9 . +9 . 29  . 29  . 2 9 . 2 9 .

Re-analysis Results

L

Lotte World Tower

Vertical Shortening Measurement

B06 L01 L38 L18 L10 L28 L50 L60 L70 L76 L90 B03 Foundation settlement 400 gauges (30~60 per floor)

A BOVE F IRE SHUTTERA BOVE A BOVE F IRE SHUTTERA BOVE

: Mega Column : External Core : Internal Core

Gauges Location in Plan

Gauges Location of settlement

: Load cell : Level surveying : Strain Gauge : B006~L070 A˅ A-A˅ ௏যஏ ৻Ҙஏ : B006~L050 A

(54)

53

L

Lotte World Tower

Compensation due to core and column differential shortening C

)ORRU &RUH &ROXPQ

// 'HVLJQOHYHOPP 'HVLJQOHYHOPP / 'HVLJQOHYHOPP 'HVLJQOHYHOPP / 'HVLJQOHYHOPP 'HVLJQOHYHOPP / 'HVLJQOHYHOPP 'HVLJQOHYHOPP / 'HVLJQOHYHOPP 'HVLJQOHYHOPP ಹ ಹ ಹ / 'HVLJQOHYHOPP 'HVLJQOHYHOPP / 'HVLJQOHYHOPP 'HVLJQOHYHOPP / 'HVLJQOHYHOPP 'HVLJQOHYHOPP / 'HVLJQOHYHOPP 'HVLJQOHYHOPP / 'HVLJQOHYHOPP 'HVLJQOHYHOPP / 'HVLJQOHYHOPP 'HVLJQOHYHOPP / 'HVLJQOHYHOPP 'HVLJQOHYHOPP / 'HVLJQOHYHOPP 'HVLJQOHYHOPP / 'HVLJQOHYHOPP 'HVLJQOHYHOPP / 'HVLJQOHYHOPP 'HVLJQOHYHOPP / 'HVLJQOHYHOPP 'HVLJQOHYHOPP / 'HVLJQOHYHOPP 'HVLJQOHYHOPP /%  

Re-analysis Results

L

Lotte World Tower

z Additional stress due to differential shortening

between core & column

z Provide outrigger delay joint

཰ Steel Outrigger Delay Joint ཱ Steel Outrigger Adjustment Joint

(Securing safety under construction)

Outrigger Structural Safety issues and alternatives proposed

Effect & Safety Measure

Ⴃ 2nd Outrigger (L72~L75)

(55)

55

L

Lotte World Tower

Midas Gen – One Stop Solution for Building and General Structures

Construction Stage Analysis

Column Shortening & Related Issues Effects of Column Shortening Procedure for Accounting Compensation at Site

Lotte World Tower Case Study Some Useful Features in the software Q&A

Contents

One Stop Solution for Building and General Structures

2014 Technical Seminar

Material Stiffness Changes for Cracked Sections

Useful Features in midas Gen

” Specific stiffness of specific member types may be reduced such as the case where the flexural stiffness of lintel beams and walls may require reduction to reflect cracked sections of concrete.

” Section stiffness scale factors can be included in boundary groups for construction stage analysis. The scale factors are also applied to composite sections for construction stages.

(56)

One Stop Solution for Building and General Structures

2014 Technical Seminar

Spring Supports for Soil Interaction

Useful Features in midas Gen

”Point Spring Support (Linear, Comp.-only, Tens.-only, and Multi-linear type)

”Surface Spring Support (Nodal Spring, and Distributed Spring)

”Springs can be activated / deactivated during construction stage analysis.

[Nonlinear point spring support]

[Nodal Spring and Distributed Spring] [Surface Spring Support]

[Pile Spring Support]

One Stop Solution for Building and General Structures

2014 Technical Seminar

Detailed Design Reports

(57)

midas Gen – One Stop Solution for Building and General Structures

(58)

2014 MIDAS Technical Seminar

Challenges & Solution for Tall Building Design

03

Project Applications

using midas Gen

(59)

Structural Concept Designs Pvt., Ltd.

Project Applications using midas Gen

- Challenges & Solutions of Tall Building Design -

Raajesh K. Ladhad

Structural Concept Designs Pvt., Ltd.

- Project Applications using midas Gen-

2014 Challenges & Solutions of Tall Building Design

Elerro Fiesta, Sanpada, 2012

(60)

 - Project Applications using midas Gen-

2014 Challenges & Solutions of Tall Building Design



Marine Academy, Panvel, 2010

 - Project Applications using midas Gen-

2014 Challenges & Solutions of Tall Building Design



Pot 5, Sector 11, Ghansoli

(61)

 - Project Applications using midas Gen-

2014 Challenges & Solutions of Tall Building Design



Bhagwati Tower, Ghansoli

G+40, Shear Wall System,

- Project Applications using midas Gen-

2014 Challenges & Solutions of Tall Building Design

(62)

 - Project Applications using midas Gen-

2014 Challenges & Solutions of Tall Building Design

Kesar group Matunga,

G+20, Shear Wall and partial Braced

 - Project Applications using midas Gen-

2014 Challenges & Solutions of Tall Building Design

Dimension Paradise Group, Kharghar

G+20, Shear Wall and partial Braced

g

g

(63)

 - Project Applications using midas Gen-

2014 Challenges & Solutions of Tall Building Design

               

Sai World City, Kharghar

G+45, Shear Wall

- Project Applications using midas Gen-

2014 Challenges & Solutions of Tall Building Design

Plot No. 22, Sector 4, Sanpada

G+16, Shear Wall

ada

ada

(64)

 - Project Applications using midas Gen-

2014 Challenges & Solutions of Tall Building Design

K12 Taloja, Y column

 - Project Applications using midas Gen-

2014 Challenges & Solutions of Tall Building Design

(65)

Thank you

Raajesh K. Ladhad

(66)

04

Important criteria to be considered

for tall building design report

Prof. M. A. Chakrabarti, VJTI

2014 MIDAS Technical Seminar

(67)

TALL BUILDING DESIGN

DR.M.A.CHAKRABARTI

Professor

Structural Engineering Department, VJTI

TALL BUILDING- HISTORY

• Park Row Building, New York, 1899 30 storeys

• 102 storeyed Empire State Building 1931, New

York

• Latest Bhurj Khalifa, Dubai

• Many more to come

(68)

WHY DIFFERENT?

• Not only high gravity loads

• Lateral loads are important

• Evolution of structural systems to resist lateral

loads

• Aerodynamic forms and shapes for better

performance

• Damping to reduce drifts

SEISMIC LOADS

• Unified approach everywhere

• Three earthquake levels to be examined

• E1 frequent , low intensity, return period 72 years

• E2 lesser frequent, medium intensity, return period

475 years

• E3 least frequent, high intensity, return period 2475

years

• Elastic response spectrum

• Accelerograms available or can be generated for a

site

(69)

FAILURE MODES

• Experiments upto failure of tall building

models on shake table have shown that

• Elastoplastic deformation and energy

dissipation takes place before collapse

• During collapse there is rigid body movement,

structural element fracture and contact and

collision of structural fragments

ASEISMIC DESIGN

• Seismic performance objectives

• Analysis and design requirements

• Classification of buildings

• High rise and low to medium rise

• Height measured from lowest ground level

• Exclude basements completely underground

(70)

PERFORMANCE LEVELS

• Immediate Occupancy-Minimum damage

• Life safety – Controlled damage

• Collapse prevention – Extensive damage

• The regions in between these levels are

performance ranges

• Graph of strength v/s deformation

PERFORMANCE OBJECTIVES

Building

Occupancy

Class

Earthquake

Level E1

Earthquake

Level E2

Earthquake

Level E3

Normal

IO

LS

CP

Special

-

IO

LS

(71)

PLANNING REQUIREMENTS

• Building and structural systems

• Structural simplicity

• Uniformity, symmetry and redundancy

• Adequate resistance and stiffness

• Similar resistance and stiffness in both main

directions

• Adequate torsional resistance and stiffness

• Diaphragm action

• Proper foundation design

PLANNING REQUIREMENTS

• Compliance of regularity requirements in plan

and elevation

• Torsional irregularity

• Floor discontinuities

• Projections in plan

• Interstorey strength irregularity

• Interstorey stiffness irregularity

(72)

PLANNING REQUIREMENTS

• Primary seismic members

• Secondary seismic members

SELECTION OF ANALYSIS

• Multimode response spectrum analysis

• Linear response history method

• Nonlinear response history method

• Consideration of vertical component of

earthquake

• Consideration of seismic forces on basements

• Directional combination of simultaneous

(73)

LIMIT STATE COLLAPSE

• Strength verification – Capacity design

• Avoid any brittle or sudden failure from

ocurring

• Structural elements

• Relevant non structural elements

• Connections

• Load combinations

• Second order effects

LIMIT STATE SERVICEABILITY

• Damage limitation

• Limitation of storey drifts

• Seismic joints

• Proper detailing for ductility

• Proper schemes of splicing reinforcement

• Nonstructural elements

(74)

PERFORMANCE BASED DESIGN

• Design stage 1-A

• Design stage 1-B

• Design stage 2

• Design stage 3

(75)

PHENOMENON OF WIND

• Complex phenomenon

• Composed of numerous eddies of different

sizes and rotational characteristics

• Eddies give wind its gusty character

• Gustiness with interaction with surface

features

• Average wind speed over a time period of 10

minutes increases with height while gustiness

reduces with height

PHENOMENON OF WIND

• Wind vector is the sum of mean vector component

(static part) and a dynamic or turbulent component

• Dynamic wind loads depend on size of eddies

• Large ones whose dimensions are comparable with

those of the structure give pressures as they envelop

the structure

• Small ones result in pressures on various parts of the

structure that are uncorrelated with the distance of

separation

• Tall and slender structures respond dynamically to

the effects of wind

(76)

EDDIES

(a) Elevation (b) Plan

Figure 1: Generation of eddies.

References

Related documents

Then we discussed the different components of starting hand strength (high card strength, straight strength, flush strength), and noted that the value of a starting hand in a

1) PIR sensoris used to find any animals fall inside the dust bin to eat the waste food in the dustbin. Then the Buzzer will ring. When hear the buzzer sound then the animal get

As such, the paper presents the elected oligarchy as an alternative channel through which private investments are crowded out by the political strategy of the

The most important predictors for treatment evaluation by physicians were treatment break off as reason for termination (p&lt;0.0001), psychological improvement throughout

It is expected that an estimated one crore children, who have either dropped out of school or who have never been to any educational institution or school will get free

In addition to the reduced spectra, it is a requirement of the ESO public survey agreement for VANDELS that the team provide spectroscopic redshift measurements for each of the

331 Year 1884 1885 1886 Name Offence Court Sentence Billy Neil Obscene language Toowoomba 3 months HL Jemmy Assault and larceny Rockhampton 2 months HL Ned Aggravated

In the bottom-up approach we will take a look at the application’s source code, and apply aspect mining tech- niques in order to find crosscutting concerns.. We discuss how

In this section we modify the selective refinement algorithm proposed in [ 8 ] for computing failure probabilities (instead of quantiles) and for quantifying the error using the

The proposed method aims to optimize high-rise residential building design using modular units and components for maximizing the energy efficiency and sustainability of buildings..

Abstract: High rise buildings (tall building) investment projects represent a component of the country’s economy power and a sign of advantage to the country. So many countries

The Roman site was originally interpreted as a small harbour town founded probably in the second half of the 2nd century AD, but the presence of stone walls belonging to the early

Currently, this cooperation is most active in the areas of Earth remote sensing (under the European programme Copernicus), space navigation (under the European

To elucidate the selected shapes of finite mounds, we consider a suitably defined net flux of adatom attachment at steps summed over a mound side between valley and peak.. This

• If antiseptic solutions are used, chlorhexidine (2%) and povidone iodine (10%) solutions have been most investigated; hydrogen peroxide, rubbing alcohol, and detergents cause

6. the operation in business premises pursuant to point I/1, the operation of which is not prohibited, with the exception of the vehicles of taxi services or

Participants who report that they pour grease into a sealable metal container and throw container in trash when full (mean = 3.42) have a higher average response on Item 4 than

The prospective model the data owner encrypted file will be uploading to the cloud storage to enable high level data security in the cloud network.. Hashemi, “Security Challenges

On Inference Based Procedures for Lexical Disambiguation O n I n f e r e n c e B a s e d P r o c e d u r e s for L e x i c a l D i s a m b i g u a t i o n J i i r g e n W e d e k i n d I

Si Advances in Difference Equations 2014, 2014 308 http //www advancesindifferenceequations com/content/2014/1/308 R ES EARCH Open Access Existence of analytic invariant curves for

https://www.teacherspayteachers.com/ Store/Charlottes-Clips-4150 https://www.teacherspayteachers.com/ Store/Zip-a-dee-doo-dah-Designs

detail of the light curve and fit (middle) and spectrum (bottom) of SMC3-5. b) Fourier spectrograms illustrating the prewhitening process for SMC3-5. The dotted line indicates