(1)

*

Subject to current fuel cost adjustment.

EPB Retail Rate Summary

Effective October 1, 2015

Customer Rate Class

Charge Type

Monthly

Rate

Residential Customer Charge

Usage Charge (per kWh)

$9.36 $0.07817 *

Small Commercial (GSA1)

Demand of 50 kW or less

Metered Accounts Non-Metered Accounts

Customer Charge Usage Charge (per kWh) Customer Charge Usage Charge (per kWh)

Seasonal Usage Charge (per kWh)

$15.90 $0.09049 * $2.94 $0.09049 * $0.10079 * Commercial (GSA2)

Demand greater than 50 kW, but not more than 1,000 kW

Customer Charge

Kilowatt Demand Charge above 50 kW Usage Charge (per kWh) – 1st 15,000 kWh

Usage Charge (per kWh) – above 15,000 kWh

Seasonal Demand Charge above 50 kW (not to exceed 2,500 kW) Seasonal Usage Charge (per kWh) – up to 15,000 kWh

$15.90 $15.29 $0.09049 * $0.03793 * $18.38 $0.10079 * Commercial/Manufacturing (GSA3)

Demand greater than 1,000 kW, but not more than 5,000 kW

Customer Charge

Kilowatt Demand Charge for the first 1,000 kW Kilowatt Demand Charge above 1,000 kW Usage Charge (per kWh)

Seasonal Demand Charge First 1,000 kW

Seasonal Demand Charge above 1,000 kW (not to exceed 2,500 kW)

SIC codes 20 – 39 receive a Manufacturing Credit

$190.63 $15.18 $17.53 $0.03793 * $18.27 $20.62

TDHUD Commercial (TDGSA)

Demand greater than 1,000 kW, but not more than 5,000 kW

Customer Charge Administration Charge

Summer Kilowatt Demand Charge

Onpeak Maximum Winter Kilowatt Demand Charge

Onpeak Maximum Transition Kilowatt Demand Charge

Onpeak Maximum Summer Usage Charge (per kWh)

Onpeak Offpeak First 200 Hours Offpeak next 200 Hours Offpeak Excess of 400 Hours Winter Usage Charge (per kWh)

Onpeak Offpeak First 200 Hours Offpeak next 200 Hours Offpeak Excess of 400 Hours

$1560.00 $350.00 $10.17 $5.17 $9.27 $5.17 $9.27 $5.17 $0.07611 * $0.04499 * $0.00553 * $0.00271 * $0.06190 * $0.04775 * $0.00553 * $0.00271 *

(2)

*

Subject to current fuel cost adjustment.

Customer Rate Class

Charge Type

Monthly

Rate

Transition Usage Charge (per kWh)

Onpeak Offpeak First 200 Hours Offpeak next 200 Hours Offpeak Excess of 400 Hours Facilities Rental Charge at 12 kV

First 10,000 kW of Demand Over 10,000 kW of Demand Facilities Rental Charge at 46 kV

$0.04885 * $0.04885 * $0.00553 * $0.00271 * $0.93 $0.73 $0.36 Large Commercial (GSB)

Demand greater than 5,000 kW but not more than 15,000 kW

Customer Charge Administration Charge

Summer Kilowatt Demand Charge

Onpeak Maximum Winter Kilowatt Demand Charge

Onpeak Maximum Transition Kilowatt Demand Charge

Maximum Offpeak Summer Usage Charge (per kWh)

Onpeak Offpeak First 200 Hours Offpeak next 200 Hours Offpeak Excess of 400 Hours Winter Usage Charge (per kWh)

Onpeak Offpeak First 200 Hours Offpeak next 200 Hours Offpeak Excess of 400 Hours Transition Usage Charge (per kWh)

Onpeak Offpeak First 200 Hours Offpeak next 200 Hours Offpeak Excess of 400 Hours Facilities Rental Charge at 12 kV

First 10,000 kW of Demand Over 10,000 kW of Demand Facilities Rental Charge at 46 kV

$1560.00 $350.00 $10.12 $5.17 $9.22 $5.17 $9.22 $5.17 $0.07298 * $0.04974 * $0.00658 * $0.00341 * $0.06237 * $0.05182 * $0.00658 * $0.00341 * $0.04946 * $0.04946 * $0.00658 * $0.00341 * $0.93 $0.73 $0.36

Very Large Commercial (GSC)

Demand greater than 15,000 kW but not more than 25,000 kW

Customer Charge Administration Charge

Summer Kilowatt Demand Charge

Onpeak Maximum Winter Kilowatt Demand Charge

Onpeak Maximum Transition Kilowatt Demand Charge

Onpeak Maximum Summer Usage Charge (per kWh)

Onpeak Offpeak First 200 Hours Offpeak next 200 Hours Offpeak Excess of 400 Hours

$1560.00 $350.00 $10.12 $4.84 $9.22 $4.84 $9.22 $4.84 $0.07298 * $0.04974 * $0.00658 * $0.00341 *

(3)

*

Subject to current fuel cost adjustment.

Customer Rate Class

Charge Type

Monthly

Rate

Winter Usage Charge (per kWh)

Onpeak Offpeak First 200 Hours Offpeak next 200 Hours Offpeak Excess of 400 Hours Transition Usage Charge (per kWh)

Onpeak Offpeak First 200 Hours Offpeak next 200 Hours Offpeak Excess of 400 Hours Facilities Rental Charge at 12 kV

First 10,000 kW of Demand Over 10,000 kW of Demand Facilities Rental Charge at 46 kV

$0.06237 * $0.05182 * $0.00658 * $0.00341 * $0.04946 * $0.04946 * $0.00658 * $0.00341 * $0.93 $0.73 $0.36

Extra Large Commercial (GSD)

Demand greater than 25,000 kW

Customer Charge Administration Charge

Summer Kilowatt Demand Charge

Onpeak Maximum Winter Kilowatt Demand Charge

Onpeak Maximum Transition Kilowatt Demand Charge

Onpeak Maximum Summer Usage Charge (per kWh)

Onpeak Offpeak First 200 Hours Offpeak next 200 Hours Offpeak Excess of 400 Hours Winter Usage Charge (per kWh)

Onpeak Offpeak First 200 Hours Offpeak next 200 Hours Offpeak Excess of 400 Hours Transition Usage Charge (per kWh)

Onpeak Offpeak First 200 Hours Offpeak next 200 Hours Offpeak Excess of 400 Hours Facilities Rental Charge at 12 kV

First 10,000 kW of Demand Over 10,000 kW of Demand Facilities Rental Charge at 46 kV

$1560.00 $350.00 $10.12 $4.95 $9.22 $4.95 $9.22 $4.95 $0.07271 * $0.04947 * $0.00525 * $0.00314 * $0.06210 * $0.05155 * $0.00525 * $0.00314 * $0.04919 * $0.04919 * $0.00525 * $0.00314 * $0.93 $0.73 $0.36

TDHUD Manufacturing (TDMSA)

Demand greater than 1,000 kW but not more than 5,000 kW

(SIC Codes 20-39)

Customer Charge Administration Charge

Summer Kilowatt Demand Charge

Onpeak Maximum Winter Kilowatt Demand Charge

Onpeak Maximum Transition Kilowatt Demand Charge

Onpeak Maximum $1560.00 $350.00 $9.52 $3.51 $8.63 $3.51 $8.63 $3.51

(4)

*

Subject to current fuel cost adjustment.

Customer Rate Class

Charge Type

Monthly

Rate

Summer Usage Charge (per kWh)

Onpeak Offpeak First 200 Hours Offpeak next 200 Hours Offpeak Excess of 400 Hours Winter Usage Charge (per kWh)

Onpeak Offpeak First 200 Hours Offpeak next 200 Hours Offpeak Excess of 400 Hours Transition Usage Charge (per kWh)

Onpeak Offpeak First 200 Hours Offpeak next 200 Hours Offpeak Excess of 400 Hours Facilities Rental Charge at 12 kV

First 10,000 kW of Demand Over 10,000 kW of Demand Facilities Rental Charge at 46 kV

$0.05266 * $0.02943 * $0.00395 * $0.00157 * $0.04205 * $0.03149 * $0.00395 * $0.00157 * $0.03230 * $0.03230 * $0.00395 * $0.00157 * $0.93 $0.73 $0.36 Large Manufacturing (MSB)

Demand greater than 5,000 kW but not more than 15,000 kW

(SIC Codes 20-39)

Customer Charge Administration Charge

Summer Kilowatt Demand Charge

Onpeak Maximum Winter Kilowatt Demand Charge

Onpeak Maximum Transition Kilowatt Demand Charge

Onpeak Maximum Summer Usage Charge (per kWh)

Onpeak Offpeak First 200 Hours Offpeak next 200 Hours Offpeak Excess of 400 Hours Winter Usage Charge (per kWh)

Onpeak Offpeak First 200 Hours Offpeak next 200 Hours Offpeak Excess of 400 Hours Transition Usage Charge (per kWh)

Onpeak Offpeak First 200 Hours Offpeak next 200 Hours Offpeak Excess of 400 Hours Facilities Rental Charge at 12 kV

First 10,000 kW of Demand Over 10,000 kW of Demand Facilities Rental Charge at 46 kV

$1560.00 $350.00 $9.52 $2.29 $8.63 $2.29 $8.63 $2.29 $0.05476 * $0.03153 * $0.00395 * $0.00157 * $0.04416 * $0.03361 * $0.00395 * $0.00157 * $0.03442 * $0.03442 * $0.00395 * $0.00157 * $0.93 $0.73 $0.36

Very Large Manufacturing (MSC)

Demand greater than 15,000 kW but not more than 25,000 kW

(SIC Codes 20-39)

Customer Charge Administration Charge

Summer Kilowatt Demand Charge

Onpeak Maximum $1560.00 $350.00 $9.52 $1.97

(5)

*

Subject to current fuel cost adjustment.

Customer Rate Class

Charge Type

Monthly

Rate

Winter Kilowatt Demand Charge

Onpeak Maximum Transition Kilowatt Demand Charge

Onpeak Maximum Summer Usage Charge (per kWh)

Onpeak Offpeak First 200 Hours Offpeak next 200 Hours Offpeak Excess of 400 Hours Winter Usage Charge (per kWh)

Onpeak Offpeak First 200 Hours Offpeak next 200 Hours Offpeak Excess of 400 Hours Transition Usage Charge (per kWh)

Onpeak Offpeak First 200 Hours Offpeak next 200 Hours Offpeak Excess of 400 Hours Facilities Rental Charge at 12 kV

First 10,000 kW of Demand Over 10,000 kW of Demand Facilities Rental Charge at 46 kV

$8.63 $1.97 $8.63 $1.97 $0.05371 * $0.03048 * $0.00526 * $0.00526 * $0.04311 * $0.03255 * $0.00526 * $0.00526 * $0.03337 * $0.03337 * $0.00526 * $0.00526 * $0.93 $0.73 $0.36

Extra Large Manufacturing (MSD)

Demand greater than 25,000 kW (SIC Codes 20-39)

Customer Charge Administration Charge

Summer Kilowatt Demand Charge

Onpeak Maximum Winter Kilowatt Demand Charge

Onpeak Maximum Transition Kilowatt Demand Charge

Onpeak Maximum Summer Usage Charge (per kWh)

Onpeak Offpeak First 200 Hours Offpeak next 200 Hours Offpeak Excess of 400 Hours Winter Usage Charge (per kWh)

Onpeak Offpeak First 200 Hours Offpeak next 200 Hours Offpeak Excess of 400 Hours Transition Usage Charge (per kWh)

Onpeak Offpeak First 200 Hours Offpeak next 200 Hours Offpeak Excess of 400 Hours Facilities Rental Charge at 12 kV

First 10,000 kW of Demand Over 10,000 kW of Demand Facilities Rental Charge at 46 kV

$1560.00 $350.00 $9.52 $2.05 $8.63 $2.05 $8.63 $2.05 $0.05139 * $0.02816 * $0.00346 * $0.00293 * $0.04079 * $0.03022 * $0.00346 * $0.00293 * $0.03103 * $0.03103 * $0.00346 * $0.00293 * $0.93 $0.73 $0.36

(6)

*

Subject to current fuel cost adjustment.

Customer Rate Class

Charge Type

Monthly

Rate

Seasonal Large Commercial (SGSB)

Demand greater than 5,000 kW but not more than 15,000 kW

* Availability ends September 30, 2017

Customer Charge Administration Charge Kilowatt Demand Charge

Summer Winter Transition Usage Charge (per kWh)

Summer Winter Transition Facilities Rental Charge at 12 kV

First 10,000 kW of Demand Over 10,000 kW of Demand Facilities Rental Charge at 46 kV

$1560.00 $350.00 $19.73 $16.64 $13.58 $0.03086 * $0.02645 * $0.02545 * $0.93 $0.73 $0.36

Seasonal Very Large Commercial (SGSC)

Demand greater than 15,000 kW but not more than 25,000 kW

* Availability ends September 30, 2017

Customer Charge Administration Charge Kilowatt Demand Charge

Summer Winter Transition Usage Charge (per kWh)

Summer Winter Transition Facilities Rental Charge at 12 kV

First 10,000 kW of Demand Over 10,000 kW of Demand Facilities Rental Charge at 46 kV

$1560.00 $350.00 $19.40 $16.31 $13.25 $0.03028 * $0.02577 * $0.02480 * $0.93 $0.73 $0.36

Seasonal Extra Large Commercial (SGSD)

Demand greater than 25,000 kW

* Availability ends September 30, 2017

Customer Charge Administration Charge Kilowatt Demand Charge

Summer Winter Transition Usage Charge (per kWh)

Summer Winter Transition Facilities Rental Charge at 12 kV

First 10,000 kW of Demand Over 10,000 kW of Demand Facilities Rental Charge at 46 kV

$1560.00 $350.00 $19.51 $16.42 $13.36 $0.02771 * $0.02377 * $0.02289 * $0.93 $0.73 $0.36

Seasonal Large Manufacturing (SMSB)

Demand greater than 5,000 kW but not more than 15,000 kW

* Availability ends September 30, 2017

Customer Charge Administration Charge Kilowatt Demand Charge

Summer Winter Transition Usage Charge (per kWh)

Summer Winter Transition $1560.00 $350.00 $16.50 $13.43 $10.37 $0.02180 * $0.01681 * $0.01564 *

(7)

*

Subject to current fuel cost adjustment.

Customer Rate Class

Charge Type

Monthly

Rate

Facilities Rental Charge at 12 kV First 10,000 kW of Demand Over 10,000 kW of Demand Facilities Rental Charge at 46 kV

$0.93 $0.73 $0.36

Seasonal Very Large Manufacturing (SMSC)

Demand greater than 15,000 kW but not more than 25,000 kW

* Availability ends September 30, 2017

Customer Charge Administration Charge Kilowatt Demand Charge

Summer Winter Transition Usage Charge (per kWh)

Summer Winter Transition Facilities Rental Charge at 12 kV

First 10,000 kW of Demand Over 10,000 kW of Demand Facilities Rental Charge at 46 kV

$1560.00 $350.00 $16.18 $13.11 $10.05 $0.02095 * $0.01628 * $0.01515 * $0.93 $0.73 $0.36

Seasonal Extra Large Manufacturing (SMSD)

Demand greater than 25,000 kW

* Availability ends September 30, 2017

Customer Charge Administration Charge Kilowatt Demand Charge

Summer Winter Transition Usage Charge (per kWh)

Summer Winter Transition Facilities Rental Charge at 12 kV

First 10,000 kW of Demand Over 10,000 kW of Demand Facilities Rental Charge at 46 kV

$1560.00 $350.00 $19.38 $16.31 $13.24 $0.01306 * $0.00931 * $0.00838 * $0.93 $0.73 $0.36

Pumping Station Customer Charge

Usage Charge (per kWh)

$9.90 $0.03628 *

Outdoor Lighting

(Street and Park Lighting Systems, Traffic Signal Systems, and Athletic Field Lighting Installations)

Customer Charge

(Traffic Signal Systems and Athletic Field Lighting Installations Only)

Usage Charge (per kWh)

$2.94 $0.04882 *

(8)

*

Subject to current fuel cost adjustment.

Additional Rate Information

Investment Credit

The Investment Credit (IC) is an economic development incentive program jointly offered by TVA and

EPB. IC offers financial incentives to qualifying power customers who contribute to the economic

devel-opment of the seven-state Tennessee Valley region and complement TVA’s power system resources.

Customers whose facilities meet the following program qualifiers may apply to be evaluated for an IC

award:

Minimum 1,001 kW peak monthly demand

Minimum of 25 employees or 5 year growth of 25 million kWh

Financially

sound

Projected capital investment over a five year period of 50% of an existing facility’s book value or

$100 million in a new facility

Standard power contract with a remaining term at least as long as the five year IC award period

Award amounts are based on a customer’s five year projection and actual performance in the following

categories: capital investment, jobs added or retained, average wages paid, energy efficiency, load factor

and coincident load factor.

VII awards are subject to the availability of budgeted funds and will be paid as monthly power bill credits

over a five year period.

Interruptible Pricing

For customers who qualify, EPB offers interruptible demand credits in exchange for the customer’s ability

to suspend using specified amounts of power upon five or thirty minutes’ notice. The products are known

as IP5 and IP30 and require a demand of at least 1,000 kW and at least a 50% load factor to be eligible.

Please contact an EPB Key Customer Engineer for details.

Time of Use Rate

EPB offers restrictive time of use rates. Please contact an EPB Key Customer Engineer for details.

Complete Rate Information

This Retail Rate Summary is a condensed version of the official October 2015 rate schedules and is only

intended to be used for summary informational purposes. For more complete and specific details, please

call EPB at 648-1EPB (1372) to request the more comprehensive Rate Schedules for October 2015.

Please note that all bills are calculated based on the official rate schedule and electric service is subject

to EPB’s rules and regulations.

References

Related documents

This paper weakens the size and moment conditions needed for typical block bootstrap methods (i.e. the moving blocks, circular blocks, and stationary boot- straps) to be valid for

FY 2008 was witness to many outstanding program ac complishments supporting ICRMP objectives including an archaeological investigation to support a daunting, $3.7M in-house

Trademark Insider Awards are determined by calculating the number of times an individual law firm and/or attorney is listed in the Correspondent field of all USPTO

Poly-Formalism Agent-Landscape Model Architecture agent Discrete-event, Rules-based Models landscape Discrete-time,. Cellular

The interception capacity and efficiency of a grate inlet depends on the amount of water flowing over the grate, the size and configuration of the grate and the velocity of flow

We give algorithms based on linear programming for various hyperplane stabbing problems where the ob- jects are line segments or convex polyhedra.. Computational

The IEEE Type 2 off-line 50/60 Hz partial discharge diagnostic test, otherwise known as defect specific diagnostics (DSD), offers a major advantage over traditional

These are (1) current reliable assessment and diagnostics being limited to laboratory settings; (2) investigations focusing on single parameters; (3) shortcomings of current