• No results found

Process & Product Audit Check Sheet

N/A
N/A
Protected

Academic year: 2021

Share "Process & Product Audit Check Sheet"

Copied!
6
0
0

Loading.... (view fulltext now)

Full text

(1)

DEPARTMENT

DEPARTMENT / / AREA AREA Date Date of of AuditAudit DDOOC C NNOO. . :: IIQQAA//CCSS//1111 A

Auuddiittoorr((ss)): : AAuuddiitteeee:: REV NOREV NO./DAT./DATE :E : 00 / DE00 / DEC'06C'06 Description of Process Audited:

Description of Process Audited: AAPPPP. . BBY Y :: UUnniit t HHeeaadd S

S..NNoo.. CCHHEECCK K PPOOIINNTT SSCCOORREE AAUUDDIITTOOR R OOBBSSEERRVVAATTIIOONN RREEMMAARRKKSS  Availability of Con

 Availability of Control Plan & Work Instructiotrol Plan & Work Instruction / Workn / Work standard.

standard.  Availability of

 Availability of MonitorinMonitoring and Meg and Measureing asureing Devices.Devices.

Calibration status of monitoring and Measuring Devices. Calibration status of monitoring and Measuring Devices.

Doing monitoring and Measuring of product and process Doing monitoring and Measuring of product and process characteristics at defined frequency and their compliance. characteristics at defined frequency and their compliance. Preventive maintenance status of Machine

Preventive maintenance status of Machine

History of tooling (Jig, Fixture and gauges) History of tooling (Jig, Fixture and gauges)

Doing the Process by using specified process Equipment Doing the Process by using specified process Equipment Handling, Preservation and movement of product. Handling, Preservation and movement of product. Set up Approval (where needed).

Set up Approval (where needed). 9 9 10 10 6 6 7 7 8 8

MANUFACTURING PROCESS & PRODUCT AUDIT

MANUFACTURING PROCESS & PRODUCT AUDIT

House keeping & cleanliness. House keeping & cleanliness. 1 1 2 2 3 3 4 4 5 5

(2)

DEPARTMENT

DEPARTMENT / / AREA AREA Date Date of of AuditAudit DDOOC C NNOO. . :: IIQQAA//CCSS//1111 A

Auuddiittoorr((ss)): : AAuuddiitteeee:: REV NOREV NO./DATE :./DATE : 00 / DEC00 / DEC'06'06 Description of Process Audited:

Description of Process Audited: AAPPPP. . BBY Y :: UUnniit t HHeeaadd S

S..NNoo.. CCHHEECCK K PPOOIINNTT SSCCOORREE AAUUDDIITTOOR R OOBBSSEERRVVAATTIIOONN RREEMMAARRKKSS

MANUFA

MANUFACTURING PROCESS

CTURING PROCESS & PRODUCT

& PRODUCT AUDIT

AUDIT

Competence level of operator and Line Competence level of operator and Line Leader Leader 

Identification of the product including Nonconforming Identification of the product including Nonconforming  product

 product

Validation / Revalidation of Processes. Validation / Revalidation of Processes.

Process capability analysis Process capability analysis

Use of personel protective equipment. Use of personel protective equipment.

Monitoring & Measuring of the Product. Monitoring & Measuring of the Product.

 Availability of reworks instructio  Availability of reworks instructions.ns.

 Adherence to sampling Plan & methed  Adherence to sampling Plan & methed

Knowledge of statistical techniques (optional). Knowledge of statistical techniques (optional).

20 20 12 12 13 13 14 14 15 15 16 16 17 17 18 18 19 19 Corrective Action. Corrective Action. 11 11

(3)

DEPARTMENT

DEPARTMENT / / AREA AREA Date Date of of AuditAudit DDOOC C NNOO. . :: IIQQAA//CCSS//1111 A

Auuddiittoorr((ss)): : AAuuddiitteeee:: REV NO.REV NO./DATE :/DATE : 00 / DEC00 / DEC'06'06 Description of Process Audited:

Description of Process Audited: AAPPPP. . BBY Y :: UUnniit t HHeeaadd S

S..NNoo.. CCHHEECCK K PPOOIINNTT SSCCOORREE AAUUDDIITTOOR R OOBBSSEERRVVAATTIIOONN RREEMMAARRKKSS

MANUFACTURING PROCESS & PRODUCT AUDIT

MANUFACTURING PROCESS & PRODUCT AUDIT

Continual Improvement. Continual Improvement.

Production Rate / Productivity Production Rate / Productivity

 Awareness

 Awareness to the Operators abto the Operators about their roles &out their roles & responsibility.

responsibility. 24

24 AwaAwarenreness ess aboabout ut the the QuaQualitlity y objobjectectiveives.s. 25

25 AwaAwarenreness ess aboabout ut the the defdefectects & s & thetheir ir effeeffect.ct. 26

26 OtOtheher plr pleaease sse spepecicififieses.. 27

27 ProduProduct Chct Characaracterstterstics & ics & specispecificatfication aion at mat manufacnufacturinturing prog processcess step step a) a) b) b) c) c) d) d) 21 21 22 22 23 23

(4)

DEPARTMENT

DEPARTMENT / / AREA AREA Date Date of of AuditAudit DDOOC C NNOO. . :: IIQQAA//CCSS//1111 A

Auuddiittoorr((ss)): : AAuuddiitteeee:: REV NOREV NO./DA./DATE :TE : 00 / DEC'000 / DEC'066 Description of Process

Description of Process Audited:Audited: AAPPPP. . BBY Y :: UUnniit t HHeeaadd S

S..NNoo.. CCHHEECCK K PPOOIINNTT SSCCOORREE AAUUDDIITTOOR R OOBBSSEERRVVAATTIIOONN RREEMMAARRKKSS

MANUFACTURING PROCESS & PRODUCT AUDIT

MANUFACTURING PROCESS & PRODUCT AUDIT

e) e) f) f) g) g) PAGE 4 OF 6 PAGE 4 OF 6 Maximum Attainable Scores

Maximum Attainable Scores

Scores Attained Scores Attained

% Score % Score

(5)

DEPARTMENT

DEPARTMENT / / AREA AREA Date Date of of AuditAudit DDOOC C NNOO.. IIQQAA//CCSS//1111

Auditor(s): Auditee:

Auditor(s): Auditee: RREEV NV NOO..//DDAATTE :E : 000 / 0 / DDEECC''0066 Description of Process

Description of Process Audited:Audited:  APP. BY APP. BY Unit HeadUnit Head

The Line or its member is not familiar with requirements of the elements and has The Line or its member is not familiar with requirements of the elements and has nono relevant source or information for its plans, strategies etc to undertake its

relevant source or information for its plans, strategies etc to undertake its implementation.

implementation.

0

0

The Line and its member is aware with the requirements of the elements and The Line and its member is aware with the requirements of the elements and implementation for the requirements has progressed (0-50%)

implementation for the requirements has progressed (0-50%) and there is preliminaryand there is preliminary evidence of the relevant results.

evidence of the relevant results.

0.5

0.5

Full (100%) implementation of the requirements of the elements. The members are Full (100%) implementation of the requirements of the elements. The members are aware on the concept of the requirements

aware on the concept of the requirements

1

1

Overall Performance

Overall Performance

% Range% Range V VeerryyPPoooorr 00 -- 2255 P Poooorr 2266 -- 4400  Average  Average 40 40 - - 5050 G Goooodd 5511 -- 6655 V VeerryyGGoooodd 6666 -- 8899 E Exxcceelllleenntt 9900 -- 110000

Evaluation

Evaluation Procedure for

Procedure for Using variable

Using variable Score Method

Score Method

To Evaluate Overall Performance of the Line the score are added up and

To Evaluate Overall Performance of the Line the score are added up and percentage is calculated onpercentage is calculated on maximum attainable score

maximum attainable score

MANUFA

(6)

D

DEEPPAARRTTMMEENNT T / / AARREEA A DDaatte e oof f AAuuddiitt IQA/CS/11IQA/CS/11

A

Auuddiittoorr((ss)):: AAuuddiitteeee:: 00 / DEC'0600 / DEC'06

Description of Process Audited:

Description of Process Audited:  APP. BY : APP. BY : Unit HeadUnit Head

S.No.

S.No. Trg. DateTrg. Date

Date Date DOC NO. : DOC NO. :

Action Plan

Action Plan

Auditee- Action Plan

Auditee- Action Plan Auditors- RemarkAuditors- Remark REV NO./DATE :

REV NO./DATE :

S I G N S I G N  Auditee

 Auditee Auditor Auditor 

MANUFACTURING PROCESS & PRODUCT AUDIT MANUFACTURING PROCESS & PRODUCT AUDIT

References

Related documents

Favor you leave and sample policy employees use their job application for absence may take family and produce emails waste company it discusses email etiquette Deviation from

Again… deep vascular loss – not typical of glaucoma.. Glaucoma as a diagnosis of exclusion. ▪ Glaucoma defined as a disease of the

Furthermore, while symbolic execution systems often avoid reasoning precisely about symbolic memory accesses (e.g., access- ing a symbolic offset in an array), C OMMUTER ’s test

The purpose of this study is to determine if adults seeking care in Grady Memorial Hospital’s emergency department for dental reasons are different than those seeking care for

Of course, in the standard ultimatum game it is impossible to tell whether preferences are strictly convex or simply linear, since in both models there should be a critical offer

Unfinished downloads and your express free atms not to make smarter security benefits to your lyft direct debit or your itin.. Appears on atm fees for more about how to verify your

In Germany, these include subsidies to the hard coal industry; “eco-taxes” that are to increase energy taxes 10% during 2001–2004 (although, in late 2001, the chancellor’s

Penelitian sebelumnya juga menemukan bahwa store name, brand name dan harga (price discount) dimana produk itu dijual dapat mempengaruhi evaluasi konsumen sebelum