• No results found

Recent Advances in Automatic Control, Information and Communications

N/A
N/A
Protected

Academic year: 2021

Share "Recent Advances in Automatic Control, Information and Communications"

Copied!
12
0
0

Loading.... (view fulltext now)

Full text

(1)

Proposal of the improvement of actual ITIL version based on

comparative IT Service Management methodologies and standards –

The implementation of IT Service Management frameworks and

standards

Anel Tanovic*, Fahrudin Orucevic**

*Department for management of access networks and terminal devices, BH Telecom d.d. Sarajevo

Obala Kulina Bana 8, Sarajevo 71000, Bosnia and Herzegovina

** Department of Computer Science and Informatics University of Sarajevo, Faculty of Electrical

Engineering

Zmaja od Bosne bb, Sarajevo 71000, Bosnia and Herzegovina

[email protected], [email protected]

Abstract: - CobiT is framework which is responsible for IT governance. PRINCE2 is responsible for project

management. eTOM is the most popular standard for the management of IT services in telecommunication industry. ISO/IEC 20000 is the first international standard for IT service management. ISO/IEC 27000 is a standard responsible for design and maintenance of information security management systems. The implementation of each of these frameworks or standards and ITIL 2011 framework is based on description of key goals, key activities, key performance indicators and critical success factors for each process and function of these frameworks and standards. The result of this paper are implemented all IT service management frameworks and standards in a reference model of IPTV/VoIP service. The next step after implementation are the measurements of implemented frameworks and standards.

Key-Words: -

CobiT, PRINCE2, eTOM, ISO/IEC 20000, ISO/IEC 27000, Service Catalogue Management, Define and manage service levels, Managing a Stage Boundary, Billing & Revenue Management Resource Management & Operations, Release and Deployment Management, Ensure objective.

1 Introduction

The main goal of this research is to improve the existing model of ITIL 2011 framework through comparative analysis with other IT service management frameworks and standards. The result of comparative analysis should be new models of ITIL framework for which will be done new measurements of the implementation. These results will be compared and based on this will be chosen new improved model of ITIL framework. The results of the comparative analysis may serve as a basis for future research related to the improvement of each of the frameworks or standards which are mentioned in this paper. Recent research in this area show that there are many disadvantages in the existing ITIL 2011 framework especially in Service Operation phase which is responsible for the relationship with end users.

This research is divided into five parts. The first part describes previous research, research methodology and test environment. The second part of research describes the implementation of all IT Service Management frameworks and standards in

a test environment. The third part describes a comparative analysis of results and gives a proposal for new models. The fourth part of the research describes measurements of final models for ITIL and the election of the improved model for ITIL 2011 framework. The last part of the research describes in details the improved model of ITIL 2011 framework and shows future directions of research. This paper is the second part of the research.

Section 2. of the paper describes complementary IT Service Management frameworks and standards: CobiT, PRINCE2, eTOM, ISO/IEC 20000 and ISO/IEC 27000. Section 3. of the paper describes the implementation of each of six complementary ITSM frameworks and standards in a reference model of IPTV/VoIP service. Section 4. is the conclusion in which are described key principles of implementation of each IT Service Management framework or standard in a reference model and are described the principles of measurements of each implemented model.

(2)

2

Complementary

IT

Service

Management

frameworks

and

standards

Control Objectives for Information and Related Technology (CobiT) is a framework that allows managers to bridge the gap between control requirements, technical issues and business risks. The framework provides good practices across a domain and process framework [17]. CobiT is intended for translating business requirements from the management of the company to the IT department. Many organizations today implement CobiT in combination with ITIL framework. Figure 1. shows the process model for Control Objectives for Information and Related Technology framework. CobiT is a process model which contains four phases:

Plan and Organize – This phase includes processes for the planning and design of the organization which are intended to achieving business goals of the organization [18]. The processes which are included in this phase are: Define a strategic IT plan, Define the information architecture, Determine technological direction, Define the IT processes, organization and relationships, Manage the IT investment,

Communicate management aims and

direction, Manage IT human resources, Manage quality, Assess and manage IT risks and Manage projects.

Acquire and Implement – This phase includes the processes related to the procurement and development of IT solutions and to the management of changes [17]. These processes are included in this phase: Identify automated solutions, Acquire and maintain application software,

Acquire and maintain technology

infrastructure, Enable operation and use, Procure IT resources, Manage changes and Install and accredit solutions and changes.

Deliver and Support – This phase includes the processes related to the current deliveries of IT services to the organization [17]. These processes are part of this phase: Define and manage service levels, Manage third-party services, Manage performance and capacity, Ensure continuous service, Ensure systems security, Identify and allocate costs, Educate and train users, Manage service desk and incidents, Manage the configuration, Manage problems,

Manage data, Manage the physical environment and Manage operations.

Monitor and Evaluate – This phase includes the processes for regular checking of IT processes and their success in achieving the goals of IT controls [18]. The processes which are included in this phase are: Monitor and evaluate IT performance, Monitor and evaluate internal control, Ensure regulatory compliance and Provide IT governance.

PRINCE2 (Projects in a Controlled Environment) is a structured project management method based on experience drawn from thousands of projects [14], [16]. Projects are the means by which we introduce change – and, while many of the skills required are the same, there are some crucial differences between managing business as usual and managing project work [15]. The PRINCE2 components describe aspects of project management that must be addressed continually. Figure 2. shows the components for Projects in Controlled Environments2 framework. The total number of components is seven [14]:

Business Case - The purpose of this componente is to establish mechanisms to judge whether the project is viable, desirable and achievable as a means to support decision making in its investment.

Organization – The purpose of this componente is to define and establish the project’s structure of accountability and responsibilities.

Quality - The purpose of this componente is to define and implement the means by which the project will create and verify products that are fit for purpose.

Plans – The purpose of this componente is to facilitate communication and control by defining the means of delivering the products.

Risk – The purpose of this componente is to identify, assess and control uncertainty and, as a result, improve the ability of the project to succeed.

Change – The purpose of this componente is to identify, assess and control any potential and approved changes to the baseline.

Progress – The purpose of this component is to establish mechanisms to monitor and compare actual achievements against those planned. The second purpose is to provide a

(3)

forecast for the project objectives and the project’s continued viability. The third purpose is to control any unacceptable deviations.

A process is a structured set of activities designed to accomplish a specific objective. It takes one or more defined inputs and turns them into defined outputs. The processes are presented in all seven components of PRINCE2. Figure 3. shows the processes for Projects in Controlled Environments2 framework [16]. There are seven processes in PRINCE2:

Starting up a Project – This process ensures that the prerequisites for Initiating a Project are in place by answering the question: do we have a viable and worthwhile project? The aim is to do the minimum necessary in order to decide whether it is worthwhile to even initiate the project.

Directing a Project – This process enables the Project Board to be accountable for the project’s success by making key decisions and exercising overall control while delegating day to day management of the project to the Project Manager.

Initiating a Project – This process is responsible for establishing solid foundations for the project, for enabling the organization to understand the work that needs to be done to deliver the project’s products before committing to a significant spend.

Controlling a Stage – The purpose of this process is to to assign work to be done, monitor such work, deal with issues, report progress to the Project Board, and take corrective actions to ensure that the stage remains within tolerance.

Managing Product Delivery – The purpose of this process is to control the link between the Project Manager and the Team Manager, by placing formal requirements on accepting, executing and delivering project work.

Managing a Stage Boundary – This process is responsible for giving a permission to the Project Board to be provided with sufficient information by the Project Manager so that it can review the success of the current stage, for giving an approval to the next Stage Plan, for reviewing the updated Project Plan, and for

giving a confirmation to continued business justification and acceptability of the risks.

Closing a Project – This process recognizes that objectives have been achieved in the original Project Initiation documentation.

eTOM is the most popular standard for the management of IT services in telecommunication industry. Many previous researches show that eTOM standard is very similar to the ITIL framework [12], [13]. The eTOM Business Process Framework represents the whole of a service provider's enterprise environment [12]. Figure 4. shows the process model for Enhanced Telecom Operations Map framework in which are processes placed in horizontal and vertical lines. At the overall conceptual level, the eTOM framework can be viewed as having three major process areas:

The Strategy, Infrastructure & Product Process Area includes processes that develop strategies and commitment to them within the enterprise; that plan, develop and manage the delivery and enhancement of infrastructures and products; and that develop and manage the Supply Chain. In the eTOM framework, infrastructure refers to more than just the resource (IT and network) infrastructure that directly supports products and services. It also includes the operational and organizational infrastructure required to support marketing, sales, service and supply chain processes – for example Customer Relationship Management (CRM) [11]. These processes direct and enable processes within the Operations process area.

The Operations Process Area is the traditional heart of the Service Provider enterprise, and of the eTOM standard. It includes all operations processes that support the customer (and network) operations and management, as well as those that enable direct customer operations with the customer. These processes include both day-to-day and operations support and readiness processes. The eTOM framework view of Operations also includes sales

management and Supplier/Partner

Relationship Management [13].

The Enterprise Management Process Area includes those basic business processes that are required to run and manage any large business. These generic processes focus on both the setting and achieving of strategic

(4)

corporate goals and objectives, as well as providing those support services that are required throughout an Enterprise. These processes are sometimes considered to be the corporate functions and processes, for example Financial Management or Human Resources Management [13]. Since Enterprise Management processes are aimed at general support within the Enterprise, they may interface as needed with almost every other process in the Enterprise, be they operational, strategy, infrastructure or product processes.

ISO/IEC 20000 is the first international standard for IT service management. ISO/IEC 20000 standard has emerged as a consequence of the need to present the recommendations of ITIL framework within one uniform standard. ISO/IEC 20000 standard has also emerged as a need of a large number of organizations that wanted to have implemented a standard in its business environment which will replace the existing ISO/IEC 9000 standard which is only focused in total quality management practices [7], [8]. ISO/IEC 20000 contains recommendations for ITIL framework that are displayed in the main processes that make up this standard. Figure 5. shows the process model for ISO/IEC 20000 standard. ISO/IEC 20000 contains four phases:

Service Delivery Processes – These processes are responsible for the management with: capacity, availability, continuity and information security of the service, and for the management with contracts and finances [9]. The processes that are presented in this phase are: Capacity Management, Service Continuity & Availability Management, Service Level

Management, Service Reporting,

Information Security Management and Budgeting & Accounting for services.

Relationship Processes – These processes are responsible for the management with suppliers and relationships which are the part of the organization [10]. Two processes which are the part of this phase are: Supplier Management and Business Relationship Management.

Resolution Processes – These processes are responsible for the management with: incidents, service requests and problems [9]. The processes which are the part of this phase are: Incident and Service Request Management and Problem Management.

Control Processes – These processes are responsible for the management with changes and for the design and implementation of the IT service. Three processes are the part of this phase:

Configuration Management, Change

Management and Release and Deployment Management [7].

ISO/IEC 27000 is part of a growing family of ISO/IEC Information Security Management Systems (ISMS) standards [20]. ISO/IEC 27001 is a standard from this group responsible for the design, implementation and testing of an information security management system and it is the most important project under ISO/IEC 27000. ISO/IEC 27001 formally specifies a management system that is intended to bring information security under explicit management control. Being a formal specification means that it mandates specific requirements [19]. Organizations that claim to have adopted ISO/IEC 27001 can therefore be formally audited and certified compliant with the standard [21]. Figure 6. shows the PDCA model for ISO/IEC 27001 standard which is the basic model for activities with design and maintenance of Information Security Management System (ISMS). The ISO 27001 adopts the process model “Plan-Do-Check-Act” (PDCA) which is applied to the structure of all the processes in ISMS:

Plan (establishing the ISMS) - Establish the policy, the ISMS objectives, processes and procedures related to risk management and the improvement of information security to provide results in line with the global policies and objectives of the organization [19]. The processes from this phase are: Define the scope of ISMS, Define information security policy, Undertake risk assessment, Select controls, Risk treatment plan and Prepare statement of applicability.

Do (implementing and workings of the

ISMS) - Implement and exploit the ISMS

policy, controls, processes and procedures [20]. The processes from this phase are: Execute risk treatment plan, Write controls and BCM, Implement policies and BCM, Implement training, Manage operation and resources and Implement procedure for security.

Check (monitoring and review of the

ISMS) - Assess and, if applicable, measure

the performances of the processes against the policy, objectives and practical

(5)

experience and report results to management for review [21]. The processes from this phase are: Execute operational plan, Regular reviews of the effectiveness of ISMS, Review the level of residual risk, Internal ISMS audit, Management review of ISMS and Record impact on ISMS.

Act (update and improvement of the

ISMS) - Undertake corrective and preventive actions, on the basis of the results of the ISMS internal audit and management review, or other relevant information to continually improve the same system [19], [20]. The processes from this phase are: Implement identified improvement, Take corrective and preventive action, Apply lesson learned, Communicate result, Ensure objective and Continue process.

3 Implementation

of

IT

Service

Management

frameworks

and

standards for the reference model

The configuration of ITIL 2011 framework is based on implementation of four different functions: Technical Management, Application Management, Service Desk and IT Operations Management [6]. The realization of each function is based on the implementation of all 26 processes in all five ITIL phases: Service Strategy [1], Service Design [2], Service Transition [3], Service Operation [4] and Continual Service Improvement [5]. That means that the total number of ITIL process implementations is 104. If we add the implementation of four functions, than the total number of ITIL implementations is 108. For each of independent implementation (process or function) it is needed to describe: key goals, key activities, key performance indicators and critical success factors. Key activities and critical success factors are placed under the principles of reference model. Table I. and II. show key goals, key activities, key performance indicators and critical success factors of Service Catalogue Management process at Application function [2]. The implementation of other processes and functions is done in the same way [1], [2], [3], [4], [5].

The configuration of CobiT framework is based on implementation of four phases: Plan and Organise, Acquire and Implement, Deliver and Support and Monitor and Evaluate. The first phase has 10 processes, the second phase has 7 processes, the third phase has 13 processes and the fourth phase has 4 processes [18]. That means that the total

number of CobiT process implementations is 34. If we add the implementation of four phases, than the total number of CobiT implementations is 38. For each of independent implementation (process or function) it is needed to describe: key goals, key activities, key performance indicators and critical success factors. Key activities and critical success factors are placed under the principles of reference model [17]. Table III. and IV. show key goals, key activities, key performance indicators and critical success factors of CobiT process Define and manage service levels. The implementation of other processes and phases is done in the same way. The configuration of PRINCE2 framework is based on implementation of seven phases: Business scenario, Organization, Quality, Plans, Risk, Change and Progress [15]. Each phase has seven different processes: Starting up a Project, Directing a Project, Initiating a Project, Controlling a Stage, Managing Product Delivery, Managing Stage Boundary and Closing a Project. That means that the total number of PRINCE2 process implementations is 49. If we add the implementation of seven phases, than the total number of PRINCE2 implementations is 56. For each of independent implementation (process or function) it is needed to describe: key goals, key activities, key performance indicators and critical success factors [16]. Key activities and critical success factors are placed under the principles of IPTV/VoIP reference model. Table V. and VI. show key goals, key activities, key performance indicators and critical success factors of PRINCE2 process Managing a Stage Boundary at component Risk. The implementation of other processes and phases is done in the same way

.

The configuration of eTOM standard is based on implementation of three phases: Strategy, Operation and Organization. The first phase has 12 processes, the second phase has 16 processes and the third phase has 7 processes. That means that the total number of eTOM process implementations is 35. If we add the implementation of three phases, than the total number of eTOM implementations is 38. For each of independent implementation (process or function) it is needed to describe: key goals, key activities, key performance indicators and critical success factors. Key activities and critical success factors are placed under the principles of IPTV/VoIP reference model [12], [13]. Table VII. and VIII. show key goals, key activities, key performance indicators and critical success factors of eTOM process Billing & Revenue Management Resource Management & Operations. The

(6)

implementation of other processes and phases is done in the same way.

The configuration of ISO/IEC 20000 standard is based on implementation of four phases: Service Delivery Processes, Relationship Processes, Resolution Processes and Control Processes. The first phase has 6 processes, the second phase has 2 processes, the third phase has 2 processes and the fourth phase has 3 processes. That means that the total number of ISO/IEC 20000 process implementations is 13. If we add the implementation of four phases, than the total number of ISO/IEC 20000 implementations is 17 [8]. For each of independent implementation (process or function) it is needed to describe: key goals, key activities, key performance indicators and critical success factors. Key activities and critical success factors are placed under the principles of reference model. Table IX. and X. show key goals, key activities, key performance indicators and critical success factors of ISO/IEC 20000 Release and Deployment Management process [9]. The implementation of

other processes and phases is done in the same way. The configuration of ISO/IEC 27000 standard is

based on implementation of four phases: Establish ISMS, Design and implementation of ISMS, Monitor and review ISMS and Maintain and improve ISMS. Each of these phases has 6 processes [20]. That means that the total number of ISO/IEC 27000 process implementations is 24. If we add the implementation of four phases, than the total number of ISO/IEC 27000 implementations is 28. For each of independent implementation (process or function) it is needed to describe: key goals, key activities, key performance indicators and critical success factors. Key activities and critical success factors are placed under the principles of IPTV/VoIP reference model [21]. Table XI. and XII. show key goals, key activities, key performance indicators and critical success factors of ISO/IEC

27000 Ensure objective process. The

implementation of other processes and phases is done in the same way.

4 Conclusion

The implementation of each IT Service Management framework or standard covers all their processes and functions. ITIL has 4 functions and 104 processes. CobiT has 4 phases and 34 processes. PRINCE2 has 7 phases and 49 processes. eTOM has 3 phases and 35 processes. ISO/IEC 20000 has 4 phases and 13 processes. ISO/IEC 27000 has 4 phases and 24 processes. It means that the total number of implementations that have been finished in this research are 268.

Each independent implementation required a description of key goals, key activities, key performance indicators and critical success factors for one function or process [1], [2], [3]. All key goals and key activities represent actions for the design, implementation and maintenance of systems for IPTV/VoIP service [4], [5], [6]. Key performance indicators and critical success factors are obtained directly from these defined key activities. All measurements, which will be described in part 3 of this project, are based on these real defined key performance indicators and critical success factors. In this paper is shown the implementation of one process for each IT Service Management framework or standard.

References:

[1] S.Taylor, M. Iqbal, and M. Nieves, “ITIL Version 3 Service Strategy”, The Office of Government Commerce, July 2011.

[2] S.Taylor, V. Lloyd, and C. Rudd, “ITIL Version 3 Service Design”, The Office of Government Commerce, July 2011.

[3] S.Taylor, S. Lacy, and I. Macfarlane, “ITIL Version 3 Service Transition”, The Office of Government Commerce, July 2011.

[4] S.Taylor, D. Cannon, and D. Wheeldon, “ITIL Version 3 Service Operation”, The Office of Government Commerce, July 2011.

[5] S.Taylor, G.Case, and G.Spalding, “ITIL Version 3 Continual Service Improvement”, The Office of Government Commerce, July 2011.

[6] R. A. Steinberg, “Measuring ITIL: Measuring, Reporting and Modeling – the IT Service Management Metrics That Matter Most to IT Senior Executives”, Trafford Publishing, January 2001.

[7] Van Haren Publishing, “Implementing ISO/IEC 20000 Certification – The Roadmap (ITSM Library)”, February 2008.

[8] M. Kunas, “Implementing Service Quality based on ISO/IEC 20000”, IT Governance Publishing, May 2011.

[9] L. Cooper, “A Guide to the New ISO/IEC 20000-1: The Differences Between the 2005 and the 2011 Editions”, BSI British Standards Institution, June 2011.

[10] Van Haren Publishing, “Implementing IT Service Management Aligning with ITIL and ISO/IEC 20000”, June 2011.

[11] H. Jiejin, “A Practical Approach to the Operation of Telecommunication Services driven by the TMF eTOM Framework”,

(7)

Universitat Poliecnica de Catalunya, September 2009.

[12] J. P. Reilly, M. Kelly, K. J. Willets, and M. Kreaner, “The eTOM – A Business Process Framework Implementer’s Guide”. TM Forum, April 2009.

[13] D. Byron, “An Assessment of the TeleManagement Forum’s eTOM Model”. TM Forum, March 2006.

[14] Central Computer and Telecommunications Agency, “Managing Successful Projects with PRINCE 2”, January 2009.

[15] The Office of Government Commerce, “Directing Successful Projects with PRINCE2”, January 2009.

[16] G. Williams, “APMP for PRINCE2

Practitioners”, The Office of Government Commerce, January 2010.

[17] IT Governance Institute, “IT Assurance Guide Using CobiT”, 2nd

Edition, May 2007.

[18] IT Governance Institute, “CobiT Control Practices: Guidance to Achieve Control Objectives for Successful IT Governance”, 2nd

Edition, May 2007.

[19] H. Baars, K. Hintzbergen, J. Hintzbergen, and A. Smulders, ”Foundations of Information Security Based on ISO27001 and ISO27002”, Van Haren Publishing, April 2010.

[20] E. Humphreys, “Implementing the ISO/IEC 27001 Information Security Management System Standard”, Artech Print on Demand, September 2007.

[21] S. T. Arnason and K. D. Willett, “How to Achieve 27001 Certification: An Example of Applied Compliance Management”, Auerbach Publications, November 2007.

Figure 2. Components for Projects in Controlled Environments2 (PRINCE2) framework

(8)

Figure 4. Process model for Enhanced Telecom Operations Map (eTOM) framework

Figure 5. Process model for ISO/IEC 20000 standard

(9)

Figure 1. Control Objectives for Information and Related Technology (CobiT) framework

TABLE I. KEY GOALS AND KEY ACTIVITIES FOR ONE SPECIFIED ITIL PROCESS

Key goals of the ITIL application Service Catalogue Management process for IPTV/VoIP service

Key activities of the ITIL application Service Catalogue Management process for IPTV/VoIP service

Defining a technical catalogue for the central application of the information system

Defining technical specifications for servers of central application of the information system and relationship with other systems

Defining a technical catalogue for the Provisioning System between central application of the information system and network elements for IPTV and VoIP

Defining technical specifications for servers of Provisioning system and relationship with other systems

Defining a technical catalogue for the Billing system Defining technical specifications for servers of Billing system and relationship with other systems

Defining a technical catalogue for the ERP system Defining technical specifications for servers of ERP system and relationship with other systems

TABLE II. KEY PERFORMANCE INDICATORS AND CRITICAL SUCCESS FACTORS FOR ONE SPECIFIED ITIL PROCESS

Key performance indicators of the ITIL application Service Catalogue Management process for IPTV/VoIP service

Critical success factors of the ITIL application Service Catalogue Management process for IPTV/VoIP service

The maximum allowed time for the preparation of technical documentation for the central application of information system after installing and releasing into production new servers of the same system

9 days

The maximum allowed time for the preparation of technical documentation for the Provisioning system after installing and releasing into production new servers of the same system

14 days The maximum allowed time for the preparation of technical

documentation for the Billing system after installing and releasing into production new servers of the same system

(10)

The maximum allowed time for the preparation of technical documentation for the ERP system after installing and releasing into production new servers of the same system

6 days

TABLE III. KEY GOALS AND KEY ACTIVITIES FOR ONE SPECIFIED COBIT PROCESS

Key goals of CobiT process Define and manage service levels for IPTV/VoIP service

Key activities of CobiT process Define and manage service levels for IPTV/VoIP service

Defining a technical catalogue for technical systems of IPTV/VoIP service

Defining technical specifications for servers of each technical system and their relationship with other systems

Defining a technical catalogue for application systems of IPTV/VoIP service

Defining technical specifications for servers of each application system and their relationship with other systems

Defining a technical catalogue for Service Desk systems of IPTV/VoIP service

Defining technical specifications for servers of each Service Desk system and their relationship with other systems

Defining a technical catalogue for operation systems of IPTV/VoIP service

Defining technical specifications for servers of each operation system and their relationship with other systems

Defining contracts for technical systems of IPTV/VoIP service Defining contracts with other companies which are responsible for the maintenance of technical systems

Defining contracts for application systems of IPTV/VoIP service Defining contracts with other companies which are responsible for the maintenance of application systems

Defining contracts for Service Desk systems of IPTV/VoIP service

Defining contracts with other companies which are responsible for the maintenance of Service Desk systems

Defining contracts for operation systems of IPTV/VoIP service Defining contracts with other companies which are responsible for the maintenance of operation systems

TABLE IV. KEY PERFORMANCE INDICATORS AND CRITICAL SUCCESS FACTORS FOR ONE SPECIFIED COBIT PROCESS

Key performance indicators of CobiT process Define and manage service levels for IPTV/VoIP service

Critical success factors of CobiT process Define and manage service levels for IPTV/VoIP service

The maximum allowed time for the preparation of technical documentation for technical system's servers

9 working days The maximum allowed time for the preparation of technical

documentation for application system's servers

17 working days The maximum allowed time for the preparation of technical

documentation for Service Desk system's servers

18 working days The maximum allowed time for the preparation of technical

documentation for operation system's servers

22 working days The highest average number of potential new contracts which are

signed for technical systems during one year

10 contracts The highest average number of potential new contracts which are

signed for application systems during one year

7 contracts The highest average number of potential new contracts which are

signed for Service Desk systems during one year

5 contracts The highest average number of potential new contracts which are

signed for operation systems during one year

14 contracts

TABLE V. KEY GOALS AND KEY ACTIVITIES FOR ONE SPECIFIED PRINCE2 PROCESS

Key goals of PRINCE2 process Managing a Stage Boundary at component Risk for IPTV/VoIP service

Key activities of PRINCE2 process Managing a Stage Boundary at component Risk for IPTV/VoIP service

Review and change the business scenario for development and extension of systems for IPTV/VoIP service if it is not matched with the current existing risks

Form expert team who should be responsible for the comparison of business scenario with risks which incurred during the development or expansion of individual systems

Form expert team who should be responsible for changing business scenarios for the development and expansion of systems of IPTV/VoIP service in the part connected to risks

Management with a system for monitoring the implementation of risks during the development and expansion of IPTV/VoIP service's systems

Form expert team which is responsible for monitoring the performance of individual employees, teams or extern companies that participate in the definition and monitoring of individual risks

Write on the integrated place results of the work of employees, teams or extern companies involved in the management and control of risks

Development of a central database in which are inserted reports about the work of employees, teams or extern companies Implementation of applications on the basis of which can be lifted out regular reports about the work of employees, teams or external companies and as such can be delivered to the project manager and executive manager

TABLE VI. KEY PERFORMANCE INDICATORS AND CRITICAL SUCCESS FACTORS FOR ONE SPECIFIED PRINCE2 PROCESS

Key performance indicators of PRINCE2 process Managing a Stage Boundary at component Risk for IPTV/VoIP service

Critical success factors of PRINCE2 process Managing a Stage Boundary at component Risk for IPTV/VoIP service

Maximum available percentage of business scenarios that need to

(11)

development or expansion of IPTV/VoIP system's service The largest available time which is needed to change business scenario during the occurrence of unplanned risks

15 working days The minimum allowed percentage of positive achieved results of

employees, teams and external companies which are responsible for managing with risks

90% The average allowed number of reports during one month to the

executive management about the work of all participants which are responsible for managing with risks

4 reports

TABLE VII. KEY GOALS AND KEY ACTIVITIES FOR ONE SPECIFIED ETOM PROCESS

Key goals of eTOM process Billing & Revenue Management Resource Management & Operations for IPTV/VoIP service

Key activities of eTOM process Billing & Revenue Management Resource Management & Operations for IPTV/VoIP service

Reviewing and resolving problems that are associated with the work of the module for the measurement of IPTV service consumption

Constant reviewing of modules for the measurement of IPTV service's consumption

Monitoring of the problems that occurred during the final calculation of consumption for IPTV service and checking whether the problem has to be forwarded to the appropriate supplier

Printing the entire consumption of IPTV service for the user who has invested a complaint to the account

Working on solving possible errors during the collection of all spending records for IPTV service for the user who has invested a complaint to the account

Reviewing and resolving problems that are associated with the work of the module for the measurement of VoIP service consumption

Constant reviewing of modules for the measurement of VoIP service's consumption

Monitoring of the problems that occurred during the final calculation of consumption for VoIP service and checking whether the problem has to be forwarded to the appropriate supplier

Printing the entire consumption of VoIP service for the user who has invested a complaint to the account

Working on solving possible errors during the collection of all spending records for VoIP service for the user who has invested a complaint to the account

TABLE VIII. KEY PERFORMANCE INDICATORS AND CRITICAL SUCCESS FACTORS FOR ONE SPECIFIED ETOM PROCESS

Key performance indicators of eTOM process Billing & Revenue Management Resource Management & Operations for IPTV/VoIP service

Critical success factors of eTOM process Billing & Revenue Management Resource Management & Operations for IPTV/VoIP service

The average number of allowed problems which are detected by monitoring of module for the calculation of IPTV consumption

5 problems The allowed percentage of problems in category of the total

number of problems that are connected with the module for the final calculation of IPTV consumption which can solve the staff of Telecom operator without the support of extern companies

60% The allowed percentage of problems in category of the total

number of problems in company that are connected with the module for the final calculation of IPTV consumption

20% The average number of allowed problems which are detected by

monitoring of module for the calculation of VoIP consumption

5 problems The allowed percentage of problems in category of the total

number of problems that are connected with the module for the final calculation of VoIP consumption which can solve the staff of Telecom operator without the support of extern companies

50%

The allowed percentage of problems in category of the total number of problems in company that are connected with the module for the final calculation of VoIP consumption

15%

TABLE IX. KEY GOALS AND KEY ACTIVITIES FOR ONE SPECIFIED ISO/IEC 20000 PROCESS

Key goals of ISO/IEC 20000 process Release and Deployment Management for IPTV/VoIP service

Key activities of ISO/IEC 20000 process Release and Deployment Management for IPTV/VoIP service

Implementation of hardware and software infrastructure of technical systems of IPTV/VoIP service

Implementation of hardware infrastructure of technical systems Implementation of software infrastructure of technical systems Implementation of relationship of technical systems with some other systems

Implementation of hardware and software infrastructure of application systems of IPTV/VoIP service

Implementation of hardware infrastructure of application systems Implementation of software infrastructure of application systems Implementation of relationship of application systems with some other systems

Implementation of hardware infrastructure of Service Desk systems

(12)

Implementation of hardware and software infrastructure of Service Desk systems of IPTV/VoIP service

Implementation of software infrastructure of Service Desk systems

Implementation of relationship of Service Desk systems with some other systems

Implementation of hardware and software infrastructure of operation systems of IPTV/VoIP service

Implementation of hardware infrastructure of operation systems Implementation of software infrastructure of operation systems Implementation of relationship of operation systems with some other systems

TABLE X. KEY PERFORMANCE INDICATORS AND CRITICAL SUCCESS FACTORS FOR ONE SPECIFIED ISO/IEC 20000 PROCESS

Key performance indicators of ISO/IEC 20000 process Release and Deployment Management for IPTV/VoIP service

Critical success factors of ISO/IEC 20000 process Release and Deployment Management for IPTV/VoIP service

The maximum allowed time which is needed for the implementation of hardware and software infrastructure of technical systems of IPTV/VoIP service

30 days The maximum allowed time which is needed for the

implementation of hardware and software infrastructure of application systems of IPTV/VoIP service

35 days The maximum allowed time which is needed for the

implementation of hardware and software infrastructure of Service Desk systems of IPTV/VoIP service

24 days The maximum allowed time which is needed for the

implementation of hardware and software infrastructure of operation systems of IPTV/VoIP service

14 days

TABLE XI. KEY GOALS AND KEY ACTIVITIES FOR ONE SPECIFIED ISO/IEC 27000 PROCESS

Key goals of ISO/IEC 27000 process Ensure objective for IPTV/VoIP service

Key activities of ISO/IEC 27000 process Ensure objective for IPTV/VoIP service

Checking the correctness of implemented information security procedures and their results in the production environment of IPTV/VoIP service

Checking the validity of implemented information security procedures in technical systems

Checking the validity of implemented information security procedures in application systems

Checking the validity of implemented information security procedures in Service Desk systems

Checking the validity of implemented information security procedures in operation systems

The analysis of do implemented security procedures can meet current business needs of IPTV and VoIP service

The detailed analysis of do each implemented security procedure can meet current business needs of technical systems

The detailed analysis of do each implemented security procedure can meet current business needs of application systems The detailed analysis of do each implemented security procedure can meet current business needs of Service Desk systems The detailed analysis of do each implemented security procedure can meet current business needs of operation systems

TABLE XII. KEY PERFORMANCE INDICATORS AND CRITICAL SUCCESS FACTORS FOR ONE SPECIFIED ISO/IEC 27000 PROCESS

Key performance indicators of ISO/IEC 27000 process Ensure objective for IPTV/VoIP service

Critical success factors of ISO/IEC 27000 process Ensure objective for IPTV/VoIP service

The average allowed time which is needed for checking the validity of implemented information security procedures in technical systems, the allowed percentage of realized security procedures for these systems that can meet the business needs of IPTV/VoIP service

2 months, 94%

The average allowed time which is needed for checking the validity of implemented information security procedures in application systems, the allowed percentage of realized security procedures for these systems that can meet the business needs of IPTV/VoIP service

3 months, 85%

The average allowed time which is needed for checking the validity of implemented information security procedures in Service Desk systems, the allowed percentage of realized security procedures for these systems that can meet the business needs of IPTV/VoIP service

3 months, 87%

The average allowed time which is needed for checking the validity of implemented information security procedures in operation systems, the allowed percentage of realized security procedures for these systems that can meet the business needs of IPTV/VoIP service

References

Related documents

If this value is set to 1 (the default), Flash Player allows the user to specify whether local files can be placed into the local-trusted sandbox, through the use of the

ITIL Overview Defining Your Service Catalog ISO/IEC 20000 Overview ITSM Roles and Responsibilities ISO/IEC 20000 Foundation Bridge Service Operation Overview. NextGen ITSM

Several avenues exist for additional research regarding physician assistant faculty worklife, extending the literature on predictors of physician assistant faculty intent to leave

The small beaker, the weighing bottle and the filter funnel are all rinsed with distilled water using a washing bottle, and the contents are transferred into the volumetric

Management is one of a number of processes that was not in the original core ITIL v2 books of Service Support and Service Delivery, but it is a distinct element of ISO/IEC 20000,

This guide can help service providers to understand standards such as the ISO/IEC 20000 series and how they fit with best practices such as ITIL and COBIT. It will also help people

The standard is published in two parts: ISO/IEC 20000-1 outlines requirements for developing and imple- menting an IT management system; and ISO/IEC 20000-2 explains best

R1.1 ISO/IEC 27000 DRAFT Information technology -- Security techniques - R1.1 ISO/IEC 27000 DRAFT Information technology Security techniques - Information security management