• No results found

Optimization under uncertainty: modeling and solution methods

N/A
N/A
Protected

Academic year: 2022

Share "Optimization under uncertainty: modeling and solution methods"

Copied!
23
0
0

Loading.... (view fulltext now)

Full text

(1)

Risk aversion Risk measures Ex post vs. ex ante

Optimization under uncertainty:

modeling and solution methods

Paolo Brandimarte

Dipartimento di Scienze Matematiche Politecnico di Torino

e-mail: [email protected] URL: http://staff.polito.it/paolo.brandimarte

Lecture 6: Risk measurement/management

P. Brandimarte – Dip. di Scienze Matematiche Optimization Under Uncertainty

(2)

Risk aversion Risk measures Ex post vs. ex ante

R EFERENCES

P. Artzner, F. Delbaen, J.-M. Eber, D. Heath. Coherent measures of risk. Mathematical Finance,9 (1999) 203-228.

D.E. Bell. Disappointment in decision making under uncertainty. Operations Research,33 (1985) 1-27.

P. Jorion. Value at Risk: The New Benchmark for Controlling Financial Risk, 3rd ed. McGraw-Hill, 2007.

P. Kouvelis, G. Yu. Robust discrete optimization and its applications. Kluwer Academic Publishers, 1996.

R.T. Rockafellar, S. Uryasev. Optimization of Conditional Value-at-Risk. The Journal of Risk,2 (2000) 21-41.

R.T. Rockafellar, S. Uryasev. Conditional Value-at-Risk for General Loss Distributions. Journal of Banking and Finance,26 (2002) 1443-1471.

A. Ruszczy ´nski, A. Shapiro. Stochastic programming models. In: A. Ruszczynski, A. Shapiro, A., (eds.).

Stochastic programming. Vol. 10 of Handbooks in Operations Research and Management Science.

Elsevier, 2003.

(3)

Risk aversion Risk measures Ex post vs. ex ante

O UTLINE

1

R

ISK AVERSION

2

R

ISK MEASURES

3

E

X POST VS

.

EX ANTE

P. Brandimarte – Dip. di Scienze Matematiche Optimization Under Uncertainty

(4)

Risk aversion Risk measures Ex post vs. ex ante

Choice under uncertainty Utility functions

C HOICE UNDER UNCERTAINTY

You are offered a lottery, linked to the flip of a fair coin. If the outcome is head, you wine10; in the case of tail, you lose e5. Do you accept?

You are offered a lottery, linked to the flip of a fair coin. If the outcome is head, you wine10million; in the case of tail, you losee5million. Do you accept?

What if you could repeat the game 1000 times, and settle the score only at the end?

(5)

Risk aversion Risk measures Ex post vs. ex ante

Choice under uncertainty Utility functions

U TILITY FUNCTIONS

In the microeconomics of uncertainty, the basic tool to represent risk aversion is a utility function u(·).

If π(x, ω) is the random monetary outcome of decision x, the model assumes that the expected utility is maximized:

max

x∈X Eω[u [π(x, ω)]] (1)

Risk aversion is related to the concavity of u(·); if this is just the identity function, we are risk neutral and care only about expected values.

For instance, let us compare

1 a lottery with equally likely outcomes µ − δ and µ + δ;

2 a certain (sure) amount µ.

A risk averse decision maker would not like the mean preserving spread δ.

P. Brandimarte – Dip. di Scienze Matematiche Optimization Under Uncertainty

(6)

Risk aversion Risk measures Ex post vs. ex ante

Choice under uncertainty Utility functions

U TILITY FUNCTIONS

u(x)

u(E[X]) E[u(X)]

x

 

 

Due to the concavity of u(·), for the risky lottery we have E[u(π)] = 1

2u(µ − δ) +1

2u(µ − δ) ≤ u(µ) = u(E[π]) This can be generalized to generic probabilities λ and 1 − λ, and to an arbitrary number of outcomes.

(7)

Risk aversion Risk measures Ex post vs. ex ante

Choice under uncertainty Utility functions

U TILITY FUNCTIONS

Several utility functions have been proposed in the literature.

Unfortunately, despite their theoretical appeal, utility functions have a few shortcomings:

It is difficult to specify a utility function for a single decision maker, even though there are procedures for its elicitation.

It is difficult to specify a utility function for a group of decision makers.

When you come up with a decision, it is difficult to justify it with your boss, since utility measures attitude towards risk, but not the risk itself.

The theoretical foundation of the approach is based on a set of axioms about preferences; some of these axioms have been questioned.

They are not quite consistent with observed behavior.

P. Brandimarte – Dip. di Scienze Matematiche Optimization Under Uncertainty

(8)

Risk aversion Risk measures Ex post vs. ex ante

Mean-risk models Mean-variance efficiency Expected shortfall Value at risk

Conditional value at risk

M EAN - RISK MODELS

Since utility functions may not be easy to use, a more practical approach is based on the definition of risk measures.

Formally, a risk measure is a function ρ(X ) mapping a random variable to a non-negative number.

Rather than just maximizing expected profit, we may trade off expected values and risk measures.

One possibility is to aggregate the two components into a single objective:

max

x∈X Eω[π(x, ω)] − λρ[π(x, ω)] (2)

where λ is a coefficient related to risk aversion.

(9)

Risk aversion Risk measures Ex post vs. ex ante

Mean-risk models Mean-variance efficiency Expected shortfall Value at risk

Conditional value at risk

M EAN - RISK MODELS

Alternatively, we may define a risk budget α and maximize expected profit:

max

x∈X Eω[π(x, ω)] (3)

s.t. ρ[π(x, ω)] ≤ α

Finally, we may define an expected profit target β and minimize risk:

minx∈X ρ[π(x, ω)] (4)

s.t. Eω[π(x, ω)] ≥ β

The choice of one of the three frameworks above depends on the difficulty in solving the problem and in selecting an appropriate value for the relevant parameter.

See (Ruszczy ´nski and Shapiro, 2003) for a discussion of mean-risk stochastic programming models.

P. Brandimarte – Dip. di Scienze Matematiche Optimization Under Uncertainty

(10)

Risk aversion Risk measures Ex post vs. ex ante

Mean-risk models Mean-variance efficiency Expected shortfall Value at risk

Conditional value at risk

M ARKOWITZ MEAN - VARIANCE EFFICIENCY

The prototypical mean-risk model is the Markowitz portfolio optimization model.

We have a set of n risky assets with random return Ri, i = 1, . . . , n, expected return µi, and covariance matrix Σ = [σij].

Given a portfolio represented by a vectorw of weights, its expected return and variance are:

µp=

n

X

i=1

µiwi= µTw, σ2p=

n

X

i=1 n

X

j=1

wiσijwj =wTΣw

Then, we solve the QP:

min wTΣw

s.t. µTw = rT, eTw = 1, w ≥ 0

where rT is a target expected return,e is a vector of ones, and the non-negativity constraints rule out short-selling.

(11)

Risk aversion Risk measures Ex post vs. ex ante

Mean-risk models Mean-variance efficiency Expected shortfall Value at risk

Conditional value at risk

M ARKOWITZ MEAN - VARIANCE EFFICIENCY

Note that we use standard deviation as a risk measure, but minimize variance for computational convenience.

By changing the target return, we may sweep the portfolio efficient frontier:

p

p

P. Brandimarte – Dip. di Scienze Matematiche Optimization Under Uncertainty

(12)

Risk aversion Risk measures Ex post vs. ex ante

Mean-risk models Mean-variance efficiency Expected shortfall Value at risk

Conditional value at risk

S TANDARD DEVIATION AS A RISK MEASURE

Standard deviation is an intuitive risk measure, as it measures the variability of the outcome.

The idea can also be applied outside the financial domain.

However, it has some pitfalls, as we do not distinguish the good and the bad tail of the distribution.

When we want to account for skewness, we may consider alternative risk measures, such as:

expected shortfall, value at risk (V@R),

conditional value at risk (CV@R).

(13)

Risk aversion Risk measures Ex post vs. ex ante

Mean-risk models Mean-variance efficiency Expected shortfall Value at risk

Conditional value at risk

E XPECTED SHORTFALL

Expected shortfall with respect to a profit target β is defined as Eω[max{0, β − π(x, ω)}] = Eω[β − π(x, ω)]+.

If we have a set of scenarios with probability psand let πs(x) be the profit under scenario s, we may consider the objective function

max X

s

psπs(x) − λX

s

psˆβ − πs(x)˜+

where λ is a risk aversion parameter.

This is easy to linearize by the introduction of auxiliary shortfall variables ws:

max X

s

psπs(x) − λX

s

psws

s.t. ws ≥ β − πs(x), ws ≥ 0, ∀s x ∈ X

P. Brandimarte – Dip. di Scienze Matematiche Optimization Under Uncertainty

(14)

Risk aversion Risk measures Ex post vs. ex ante

Mean-risk models Mean-variance efficiency Expected shortfall Value at risk

Conditional value at risk

V ALUE AT RISK

A widely used measure in financial engineering is Value-at-Risk (V@R).

V@R is a quantile-based risk measure, i.e., it is a quantile of the distribution of loss over a chosen time horizon, at some probability level.

Roughly speaking, if V@R with confidence level 99% over one day is x , we are “99% sure” that we will not lose more than x in one day.

V@R is widely used in banking and it has the advantage of intuitive appeal, as well as the ability to merge different kinds of risk in a sensible way; see (Jorion, 2007).

However, such a measure suffers from severe drawbacks:

1 it does not fully account for what may happen in the bad tail of the distribution,

2 it is not a coherent measure of risk,

3 it is hard to optimize within scenario-based optimization, because the resulting model need not be convex.

(15)

Risk aversion Risk measures Ex post vs. ex ante

Mean-risk models Mean-variance efficiency Expected shortfall Value at risk

Conditional value at risk

V ALUE AT RISK VS . TAIL EXPECTATION

What is the riskier loss distribution? Does V@R at 95% tell the difference?

V@R Loss Loss

(a) (b)

5%

V@R 5%

To appreciate the difference, we should take a conditional expectation of loss on the bad tail. This leads to the idea of Conditional V@R.

P. Brandimarte – Dip. di Scienze Matematiche Optimization Under Uncertainty

(16)

Risk aversion Risk measures Ex post vs. ex ante

Mean-risk models Mean-variance efficiency Expected shortfall Value at risk

Conditional value at risk

V ALUE AT RISK VS . TAIL EXPECTATION

In (Artzner et al., 1999) a set of properties characterizing a coherent measure of risk.

These properties include subadditivity:

ρ(X + Y ) ≤ ρ(X ) + ρ(Y ),

for any random variables X and Y , i.e., diversification cannot increase risk.

Exercise: Consider two zero coupon bonds, with face value 100, which may independently default with probability 96%. Prove that V@R at 95% for each position is 0, whereas V@R at 95% for the joint portfolio is 100.

(17)

Risk aversion Risk measures Ex post vs. ex ante

Mean-risk models Mean-variance efficiency Expected shortfall Value at risk

Conditional value at risk

C ONDITIONAL VALUE AT RISK

Conditional V@R (CV@R) is related to a conditional tail expectation.

Roughly speaking, it is the expected value of loss, conditional on being on the bad tail of the distribution; in other words, it is the expected loss if we are beyond the corresponding V@R, for a confidence level 1 − α.

Despite its apparent complexity, CV@R is nicer to optimize than V@R, and we often obtain convex, possibly linear programming problems.

Furthermore, it is a coherent risk measure.

NOTE. We are cutting a few corners here. Quantiles are trivial for continuous distributions with nice CDFs; however, when dealing with discrete

distributions some care is needed. See (Rockafellar and Uryasev, 2002) for the related technicalities.

P. Brandimarte – Dip. di Scienze Matematiche Optimization Under Uncertainty

(18)

Risk aversion Risk measures Ex post vs. ex ante

Mean-risk models Mean-variance efficiency Expected shortfall Value at risk

Conditional value at risk

CV A R OPTIMIZATION

Let f (x, ξ) be a loss function, depending on decision variable x and random variable ξ, and consider the function Fα(x, ζ) defined as

Fα(x, ζ) = ζ + 1 1 − α

Z

[f (x, ξ) − ζ]+gξ(y)dy, where gξ(y) is the PDF of ξ.

CVaR minimization is accomplished by the minimization of Fα(x, ζ) with respect to its arguments (Rockafellar and Uryasev, 2000).

In a stochastic programming model with discrete scenarios, where f (x, ξs) the loss in scenario s, we solve:

min ζ + 1 1 − α

X

s

pszs s.t. zs ≥ f (x, ξs) − ζ, ∀s

ζ ∈ R, zs≥ 0, ∀s

subject to the additional constraints depending on the specific model.

(19)

Risk aversion Risk measures Ex post vs. ex ante

Disappointment and regret Regret-based optimization models

R ATIONAL CHOICES

Consider the following decision tree (consisting of chance and decision nodes). What is your choice at node N1?

N1

N2

$3,000

$0

$4,000

0.2 0.8

P. Brandimarte – Dip. di Scienze Matematiche Optimization Under Uncertainty

(20)

Risk aversion Risk measures Ex post vs. ex ante

Disappointment and regret Regret-based optimization models

R ATIONAL CHOICES

And what would you choose in this case?

N1

N2

N3

$0

$4,000

0.8 0.2

$0

$3,000

0.75 0.25

(21)

Risk aversion Risk measures Ex post vs. ex ante

Disappointment and regret Regret-based optimization models

R ATIONAL CHOICES

In the following decision tree, before the random outcome at chance node N1

is realized, you have to state your choice at node N2.

N2 N3

N1

$4,000 0.8

0.2

$0

$0

$3,000

0.75 0.25

P. Brandimarte – Dip. di Scienze Matematiche Optimization Under Uncertainty

(22)

Risk aversion Risk measures Ex post vs. ex ante

Disappointment and regret Regret-based optimization models

T HE ROLE OF EMOTIONS IN DECISION MAKING

The above example, described in (Bell, 1985), points out an inconsistency in standard models of rational decisions.

The typical contradiction observed in decision makers may be explained in terms of emotions related to disappointment and regret.

Regret-based optimization models have been proposed as a robust decision making tool (Kouvelis, Yu, 1996).

Risk management policies should be evaluated ex ante, but sometimes managers are evaluated ex post. Regret is relevant in such a case.

(23)

Risk aversion Risk measures Ex post vs. ex ante

Disappointment and regret Regret-based optimization models

R EGRET - BASED OPTIMIZATION MODELS

If we knew which scenario ωswill be realized, we would just solve the scenario problem maxx∈Xπ(x, ωs)with optimal solutionxs and profit πs= π(xs, ωs).

In practice, since we cannot wait and see, we solve the here and now problem, whose solution isxh. The profit, if scenario s occurs, will be ˆ

πs = π(xh, ωs).

The regret, with respect to the optimal scenario s solution, is:

Rs= πs− ˆπs.

It is possible to optimize mean regret, maximum regret, or risk measures based on regret,

P. Brandimarte – Dip. di Scienze Matematiche Optimization Under Uncertainty

References

Related documents

This EXAMPLE event includes services like: Specialist office visits ( prenatal care). Childbirth/Delivery Professional Services Childbirth/Delivery

[ 3 ] In addition, we attempt to resolve the 3D surface displacements for the 23 October 2002, Nenana Mountain (Alaska) earthquake, which to our knowledge is the first earthquake

The decline in consumption of indigenous vegetables such as Amaranth by rural and urban communities has resulted in poor diets and increased incidenceof nutritional

Indeed, it is against this background, this study examines 1 the effects 1 of organisational culture and commitment to job satisfaction; a cross sectoral study of

44242 YMCFKOK Cartridge w/Cleaning Roller: Full-color ribbon with DTC-400 2 68,00 136,00. 2 resin black, fluorescing and clear

Hence, it was observed that treatment with test drug Dazzle ointment significantly reduced the rat paw volume as compared to control group.. There was no significant

Within this paper, I examine how credibility and psychological consistency play into the dimensions and techniques used to gain funding for nonprofit organizations, such as grant