Amphitheater Public Schools
Amphitheater High School
Roof Replacement
PROJECT NO:
DATE:
THIS DRAWING IS NOT TO BE USED FOR CONSTRUCTION PURPOSES UNTIL SEALED AND SIGNED BY ARCHITECTS OF BRECKENRIDGE GROUP INC. ARCHITECTS / PLANNERS, OR DESIGNATED CONSULTANTS. DRAWINGS ARE COPYWRITTEN BY BRECKENRIDGE GROUP ARCHITECTS / PLANNERS. ANY REPRODUCTION OR REUSE WITHOUT WRITTEN PERMISSION IS STRICTLY FORBIDDEN. R REVISION SCHEDULE:
APRIL 2018
17.14.06
# DATE DESCRIPTION ISSUED TO
DRAWN BY: CHECKED BY: KLINDT D. BRECKENRIDGE 1 AR I Z O N A D a te Si g n ed . A . . S U . . ... . ... .... . .... R F I T E I C E C TA C T I C R A R E T S I G E R E T ED H NO . 76 0 5
REGISTRATION EXPIRATION DATE: 3/31/2020 04 / 10
/18
Cover Sheet
AMPHITHEATER HIGH SCHOOL
ROOF REPLACEMENT
Amphitheater Public Schools
100% Construction Documents
April 2018
Amphitheater Public Schools
Amphitheater High School
Roof Replacement
PROJECT NO:
DATE:
THIS DRAWING IS NOT TO BE USED FOR CONSTRUCTION PURPOSES UNTIL SEALED AND SIGNED BY ARCHITECTS OF BRECKENRIDGE GROUP INC. ARCHITECTS / PLANNERS, OR DESIGNATED CONSULTANTS. DRAWINGS ARE COPYWRITTEN BY BRECKENRIDGE GROUP ARCHITECTS / PLANNERS. ANY REPRODUCTION OR REUSE WITHOUT WRITTEN PERMISSION IS STRICTLY FORBIDDEN. R REVISION SCHEDULE:
APRIL 2018
17.14.06
# DATE DESCRIPTION ISSUED TO
DRAWN BY: CHECKED BY: KLINDT D. BRECKENRIDGE 1 AR I Z O N A D a te Si g n ed . A . . S U . . ... . ... .... . .... R F I T E I C E C TA C T I C R A R E T S I G E R E T ED H NO . 76 0 5
REGISTRATION EXPIRATION DATE: 3/31/2020 04 / 10 /18
General
Information
EXTERIOR EXT. WITH WATER CLOSET VENT THRU ROOF VERTICALWEIGHT
WROUGHT IRON
WAINSCOT WALL CLEAN OUT
WINDOW WATER RESISTANT WATER PROOF WOOD
GYPSUM WALL BOARD WATER RESISTANT
-WELDED WIRE MESH VINYL COMPOSITION TILE NOMINAL NOT IN CONTRACT MULLION METAL MOUNTED MASONRY OPENING METAL LATH MISCELLANEOUS MINIMUM MANHOLE MANUFACTURER OVER OR ON PAVEMENT OPPOSITE OPENING OWNER FURNISHED OUTSIDE FACE OUTSIDE DIAMETER ON CENTER NOT TO SCALE NUMBER CONTRACTOR INSTALLED MEMBRANE NO. P OPNG. O.F.C.I. OPP. O/ O.D. O.C. O.F. N.T.S. MTD. N.I.C. NOM. MULL. MTL. MIN. M.L. MISC. MO M.H. MFG. MEMB. HOLLOW METAL H.M. INTERIOR INSULATION INFORMATION INSIDE FACE
INTEGRAL COLOR CONCRETE HOT WATER RETURN HOT WATER HEIGHT HORSEPOWER HORIZONTAL MECHANICAL MAXIMUM MATERIAL MASONRY LAVATORY JANITOR'S CLOSET MACHINE BOLT JOINT JOIST JUNCTION BOX
MASONRY CONTROL JOINT MECH. MAX. MAT. MCJ M.B. MAS. JT. LAV J.C. JST. J.B. I.F. INS. INT. INFO. ICC. HT. HWR H.P. H.W. HORIZ. FLOOR SINK FLUORESCENT FLOOR FLASHING FINISH FIRE EXTINGUISHER FOUNDATION FLOOR CLEAN OUT FLOOR DRAIN EXISTING GALVANIZED HARDWARE HOLLOW CORE HOSE BIB GLUE LAMB BEAM FURRING FOOTING
GAUGE GLASS FIBER
GYPSUM WALL BOARD FINISH FLOOR ELEVATION FIRE EXTINGUISHER CABINET
FT. FEET H.C. H.B. HDW. GLB GWB GALV. GFRC FTG. FURR. GA. FEC FLUOR. F.S. FLR. FIN. F.F.E. FLSH. (E) F.D. F.E. FDN. FCO WD. WDW. W.P. W.R. WCO WRGWB WSCT. W.W.M. WT. W.I. W/ W.C. VTR VERT. VCT PLASTER PLATE PIECE PLATE GLASS PERPENDICULAR PULL CHAIN PLASTIC LAMINATE PANEL PAIR PLYWOOD PARTITION PROJECT PHASE PAINTED PURLIN QUARRY TILE PUBLIC RADIUS RISER RECEPTACLE ROOF DRAIN RETURN AIR ROOM ROOFING REVISION REQUIRED REENFORCEMENT REGISTER RECESSED SECTION SHEET SQUARE FOOT SOLID CORE SCHEDULE SQUARE SIMILAR SERVICE SINK SPECIFICATIONS SHEET METAL SPEAKER ROUGH OPENING STEEL STRUCTURAL STANDARD STAINLESS STEEL STORAGE TREAD THICK THRESHOLD TOP OF BEAM TELEPHONE TUBE STEEL TELEVISION TOP OF WALL TOP OF MASONRY TOP OF FOOTING TYPICAL VENTILATE TOP OF CURB POLYVINYL CHLORIDE PRESSURE TREATED
VITRIFIED CLAY PIPE UNLESS NOTED OTHERWISE TELEPHONE TERMINAL BOARD SHORT LEG VERTICAL
TONGUE AND GROOVE SUSPENDED CEILING SOLID CORE WOOD DOOR
S.S. CPT. CARPET DRAWING DOOR DIMENSION DRINKING FOUNTAIN DETAIL COLD WATER CERAMIC TILE COUNTERSINK DOWN SPOUT DITTO DOWN EXPANSION EXISTING EXHAUST EACH WAY EQUIPMENT EQUAL ENTRANCE ELEVATION ELECTRICAL EXPANSION JOINT EACH FACE EACH
ELECTRIC WATER COOLER EXIST'G. EXP. E.W. EXH. EWC EQUIP. EQ. E.J. ELEV. ELEC. ENT. E.F. EA. DWG. DR. DO DN. D.S. DIM. D.F. DET. C.T. CSK. C.W. V OR VENT TYP. VCP U.N.O. T.S. TV T.T.B. T.O.W. T.O.F. T.O.M. T.O.C. T THR. T.O.B. TH. TEL. T&G STRUCT. SUSP. CLG. STL. STD. S.STL. STOR. CERAMIC CEMENT PLASTER CEMENT CATCH BASIN CABINET BUILT UP BETWEEN BASEMENT COLUMN CONTINUOUS CONSTRUCTION CONCRETE COMBINATION CEILING CENTER LINE CONTROL JOINT CIRCUIT CAST IRON CLEAN OUT CHANNELS
CONCRETE MASONRY UNIT CUBIC FEET PER MINUTE CONTRACTOR INSTALL CONTRACTOR FURNISH BEARING COL. CONST. CONT. CONC. COMB. C.O. CMU C.L. CLG. CIR. C.I. C.J. C.B. CEM. PLAS. CFM C.F.C.I. CER. CEM. CAB B.U. BTWN. BSMT. BRG. SPECS. SLV SPKR. S.M. SQ. SIM. SQ. FT. SCHED. SECT. SHT. SCWD. S.C. R.O. REC. REQ'D. RM. REINF. REV. RFG. REG. R.D. RCPT. R RAD. R.A. ALTERNATE ALLOWANCE ADJACENT AIR CONDITIONING ANCHOR BOLT ALUMINUM BOTTOM BLOCKING BUILDING BUILDING LINE BOARD AUTOMATIC ACOUSTICAL TILE ACCESS PANEL AMPERE BEAM
ABBREVIATIONS
ABOVE FINISH FLOOR AGGREGATE BASE COURSE
ALT BM. BOT. BLKG. BLDG. BD B.L. @ ALUM AUTO A.T. A.P. AMP AT ALLOW ADJ AFF A.C. A.B. A.B.C. PLAS. LAM. PUB. / O Q.T. PTD. PUR. PVC PLYWD. PTN. PR. PT PROJ. PNL. PL PL.GL. PLAS PE P.C. PERP.
ROUGH FRAMING
WELDED WIRE MESH
GYPSUM WALL BOARD
CEMENT PLASTER
RIGID INSULATION
ASPHALT
CEILING TILE
BATT INSULATION
STRUCTURAL STEEL
METAL STUDS (SECTION)
PLYWOOD
FINISH LUMBER
BLOCKING
X
CONCRETE MASONRY UNITS
WOOD STUDS
BRICK
CONCRETE
BASE COURSE
EARTH
NEW WALL (REFER TO KEYNOTE)
EXISTING WALL REMOVED
EXISTING WALL TO REMAIN
MATERIALS
STRUCTURAL STUDS
FULL HEIGHT INSULATION
ACID ETCHED CONCRETE A E C NUMBER SHEET
PROJECT TEAM
CONSTRUCTION NOTE
ROOM NUMBER
REVISION NUMBER
ELEVATION (plan)
ELEVATION (section)
OPENING SYMBOL
DEMOLITION NOTE
FIXTURE NOTE
DETAIL
WALL SECTION
BUILDING SECTION
EXTERIOR ELEVATION
INTERIOR ELEVATION
ScaleDetail or Section Name
Scale
Detail or Section Name
which section or
number or letter
section or detail
number of sheet on
referenced
condition is
sheet on which
detail is drawn
identification
North
Plan
AMPHITHEATER HIGH SCHOOL 125 W. YAVAPAI WAY
TUCSON, AZ 85705
Project Address
TITLESHEET N.T.S.
Campus Map
N.T.S.Location Map
C.BD. CEMENT BOARD INSIDE DIAMETER I.D. CULTURED MARBLE CM. THIS PROJECT C SITE1. PROJECT HAS BEEN DESIGNED TO COMPLY WITH 2012 INTERNATIONAL BUILDING CODE
(IBC) AND 2010 ADA STANDARDS FOR ACCESSIBLE DESIGN.
INDEX
SYMBOLS LEGEND
APPLICABLE CODES
OWNER FURNISHED OWNER INSTALLED O.F.O.I. REINFORCED CONCRETEA1.4 ROOF PLAN 800 BUILDING
A1.2 ROOF PLAN FINE ARTS ADDITION
A1.1 ROOF PLAN DANCE/WRESTLING
G1.0 COVER SHEET
G2.0 GENERAL INFORMATION
ARCHITECTURAL
A1.3 ROOF PLAN PANTHER HALL
Architect
BRECKENRIDGE GROUP, INC. 1735 E. FORT LOWELL ROAD #12
TUCSON, AZ 85719 SHANE CHISM, AIA, LEED AP PROJECT MANAGER 520.882.9944
Contractor
TBD
AMPHITHEATER PUBLIC SCHOOLS 701 W. WETMORE ROAD TUCSON, AZ 85705
Owner
Owner Contact
JAMES BURNS
EXECUTIVE MANAGER OF OPERATIONAL SUPPORT AMPHITHEATER PUBLIC SCHOOLS
520.696.5148 N.T.S.
Key Plan
A1.1
A1.3
A1.2
A1.4
DANCE /
WRESTLING
PANTHER
HALL
800 BLDG.
FINE ARTS
PRINCE ROAD
STONE AVE.
1 1 3 5 TYP. TYP. 2 TYP. 3 TYP. 9 4 TYP. 9 4 TYP. TYP. 1 3 9 4 TYP. 1 3 TYP. 5 9 TYP. 4 TYP. 7 7 6 6 14 17 16 22 22 10 11 11 10 10 1 1 12 12 3 2 9 TYP. 4 TYP. 4 TYP. 14 16 20 9 TYP. 20 21 1 1 1 4 TYP. 4 TYP. 4 TYP. 3 9 1 4 5 2 4 TYP. TYP. TYP. 9 TYP. 3 TYP. 5 2 4 TYP. 9 TYP. 15 TYP. 1 11 3 13 TYP. 19 18
Amphitheater Public Schools
Amphitheater High School
Roof Replacement
PROJECT NO:
DATE:
THIS DRAWING IS NOT TO BE USED FOR CONSTRUCTION PURPOSES UNTIL SEALED AND SIGNED BY ARCHITECTS OF BRECKENRIDGE GROUP INC. ARCHITECTS / PLANNERS, OR DESIGNATED CONSULTANTS. DRAWINGS ARE COPYWRITTEN BY BRECKENRIDGE GROUP ARCHITECTS / PLANNERS. ANY REPRODUCTION OR REUSE WITHOUT WRITTEN PERMISSION IS STRICTLY FORBIDDEN. R REVISION SCHEDULE:
APRIL 2018
17.14.06
# DATE DESCRIPTION ISSUED TO
DRAWN BY: CHECKED BY: KLINDT D. BRECKENRIDGE 1 AR I Z O N A D a te Si g n ed . A . . S U . . ... . ... .... . .... R F I T E I C E C TA C T I C R A R E T S I G E R E T ED H NO . 76 0 5
REGISTRATION EXPIRATION DATE: 3/31/2020 04 / 10 /18
Demolition
Roof Plans
0 16' 32' 1/16" = 1'-0"Demo Roof Plan - Panther Hall
0 16' 32'
1/16" = 1'-0"
Demo Roof Plan - 800 Building
0 16' 32'
1/16" = 1'-0"
Demo Roof Plan - Dance
0 16' 32'
1/16" = 1'-0"
Demo Roof Plan - Fine Arts
Construction Keynotes
1REMOVE PARAPET CAP 2
CUT OFF ALL CURB FLASHING 3 4 5 6 7 NOT USED 8
SAW-CUT 4" X 4" OPENING FOR THROUGH WALL SCUPPER OVERFLOW
9
REMOVE CANT STRIP
10 11 12
REMOVE ROOFING
13
Construction General Notes
REMOVE & REPLACE ROOF DRAIN STRAINER & CLAMPING RING REMOVE CRICKETS
REMOVE METAL ROOF REMOVE GUTTER
1. ALL ROOFING TO BE REMOVED AND REPLACED.
2. ALL ROOF EDGE FLASHING, COPINGS, BASE FLASHING, COUNTER FLASHING, PARAPET
SCUPPERS, AND CONDUCTOR HEADS TO BE REMOVED AND REPLACED.
3. REPLACE DAMAGED DRAIN ASSEMBLIES.
4. REUSE (E) DRAIN, REMOVE AND REPLACE ALL ROOF DRAIN STRAINERS WITH CAST IRON
STRAINERS.
5. REMOVE EXISTING SEALANT AT ALL WALL CONTROL JOINTS AND PROVIDE NEW
BACKER ROD AND SEALANT, CONTRACTOR TO FIELD VERIFY ALL LOCATIONS.
6. REMOVE ALL WOOD SLEEPERS AND REPLACE WITH RUBBER ROOF PIPE SUPPORTS.
7. REMOVE & REPLACE CURB CAP & RAISE ALL EQUIPMENT CURBS THAT ARE NOT HIGH
ENOUGH FOR PROPER FLASHING AS REQUIRED BY ROOFING MANUFACTURER.
8. REMOVE ALL PITCH PANS AND INSTALL LIQUID FLASHING AT ALL PIPE PENETRATIONS.
9. REMOVE ALL ABANDONED ELECTRICAL CONDUIT.
10. BUILDING & SITE WILL BE OCCUPIED DURING DEMOLITION & RE-ROOFING PHASES. 11. THE DEMOLITION PLAN & (E) CONDITIONS SHOWN ARE APPROXIMATE. CONTRACTOR
SHALL FIELD VERIFY ALL (E) CONDITIONS.
12. CONDITIONS SHOWN ARE FOR GUIDANCE & GENERAL INFORMATION ONLY. CONTRACTOR SHALL VISIT THE SITE & EVALUATE ALL (E) CONDITIONS IN THE FIELD AND PROVIDE FOR ALL COSTS RELATED TO ACCOMPLISHING THE WORK. NOTES SHOWN IN THE CONTRACT DOCUMENTS SHALL BE INCORPORATED INTO THE PROJECT AT ALL APPROPRIATE LOCATIONS, WHETHER OR NOT SPECIFICALLY REFERENCED.
13. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE DEMOLITION & REMOVAL OF ALL COMPONENTS, MATERIALS & EQUIPMENT AS REQUIRED TO BUILD, ERECT, INSTALL, OR ACCOMMODATE THE NEW CONSTRUCTION.
14. IN THE EVENT THAT THE CONTRACTOR ENCOUNTERS ON THE SITE MATERIAL REASONABLY BELIEVED TO BE LEAD BASED PAINT, OR ANY OTHER HAZARDOUS MATERIAL, THE CONTRACTOR SHALL IMMEDIATELY REPORT THE CONDITION TO THE ARCHITECT.
15. PROTECT EXISTING STRUCTURES AND UTILITIES THAT ARE NOT TO BE REMOVED FROM INJURY OR DAMAGE RESULTING FROM THE CONTRACTOR'S OPERATION. REPLACE DAMAGED IMPROVEMENTS AND UTILITIES IN KIND.
16. ALL TRASH & UNUSED MATERIALS SHALL BE PROPERLY DISPOSED OF TO AN OFF SITE LOCATION BY THE GENERAL CONTRACTOR.
17. ALL SURFACES THAT AN (E) ITEM IS REMOVED FROM SHALL BE PATCHED AND REPAIRED TO MATCH ORIGINAL CONDITION OF THE SURFACE. IF THE SURFACE WILL BE ALTERED OR CHANGED BY THE CONSTRUCTION, PATCH AND REPAIR SHALL MEET CONSTRUCTION REQUIREMENTS. ALL PATCHING AND REPAIR SHALL BE WITH MATERIALS TO MATCH (E) U.N.O.
18. CONTRACTOR SHALL LEAVE AREAS AFFECTED BY DEMOLITION AND SURROUNDING AREAS CLEAN AT THE END OF THE WORK DAY. SURROUNDING AREAS NOT INCLUDED IN THE SCOPE OR LIMITS OF WORK SHALL BE PROTECTED FROM DUST AND DEBRIS. 19. REMOVE ALL ABANDONED CURBS.
20. SUPPORT ALL CONDUITS, GAS LINES, AND DUCT SUPPORT FEET WITH C-PORT BLOCKING WITH APPROVED SLIP SHEET TO PROTECT THE ROOF SURFACE.
21. REMOVE ALL EXISTING PITCH PANS AND INSTALL LIQUID FLASHING AT ALL EXISTING PIPE PENETRATIONS.
REMOVE BUILDING CONSTRUCTION JOINT COVER
REMOVE GRAVEL DEMOLISH STRUCTURE
14 REMOVE & REPLACE WATER DAMAGED TONGUE & GROOVE DECKING
15 REMOVE & SALVAGE SKYLIGHTS FOR REINSTALLATION. REMOVE & REPLACE
SECTION OF DECK IF CORROSION HAS OCCURRED AROUND SKYLIGHTS.
16 REMOVE ROOFING, TREAT, PRIME AND PAINT ALL TONGUE & GROOVE WOOD
COMPONENTS.
17 REMOVE AND REPLACE PLYWOOD
18 REMOVE AND REPLACE CORRODED METAL DECK
19 CLEAN / BRUSH STEEL FASCIA
20
21 REMOVE & REINSTALL ELECTRICAL CONDUIT MOUNTED ON ROOFING SURFACE AS
REQUIRED FOR ROOFING REPLACEMENT
1 4/27/18 AMENDMENT 1 1
1
1
1
22 REMOVE CURB CAP
1 1
1
1 1 2 TYP. 3 TYP. 4 TYP. 5 TYP. 2 TYP. 3 TYP. 2 TYP. 5 1 3 TYP. 5 2 TYP. 3 TYP. 4 TYP. 2 TYP. 3 2 TYP. 6 4 6 7 TYP. 2 TYP. 8 TYP. 9 9 1 5 TYP.
2
A1.1 A2.1
TYP.
7
A1.1 A2.1
TYP.
6
A1.1 A2.1
TYP.
8
A1.1 A2.1
TYP.
6
A1.1 A2.1
TYP.
10
A1.1 A2.1
TYP.
5
A1.1 A2.1
TYP.
1
A1.1 A2.1
TYP.
42
A1.1 A2.1
TYP.
4
A1.1 A2.1
TYP.
8
A1.1 A2.1
TYP.
3
A1.1 A2.1
TYP.
7
A1.1 A2.1
TYP.
9
A1.1 A2.1
TYP.
12
A1.1 A2.1
TYP.
11
A1.1 A2.1
TYP.
1
A1.1 A2.1
TYP.
1
A1.1 A2.1
TYP.
10 11 8'-0" 8'-0" 15'-0" 12'-0" 12'-0" 12'-0" 12 13 14 15 TYP.Amphitheater Public Schools
Amphitheater High School
Roof Replacement
PROJECT NO:
DATE:
THIS DRAWING IS NOT TO BE USED FOR CONSTRUCTION PURPOSES UNTIL SEALED AND SIGNED BY ARCHITECTS OF BRECKENRIDGE GROUP INC. ARCHITECTS / PLANNERS, OR DESIGNATED CONSULTANTS. DRAWINGS ARE COPYWRITTEN BY BRECKENRIDGE GROUP ARCHITECTS / PLANNERS. ANY REPRODUCTION OR REUSE WITHOUT WRITTEN PERMISSION IS STRICTLY FORBIDDEN. R REVISION SCHEDULE:
APRIL 2018
17.14.06
# DATE DESCRIPTION ISSUED TO
DRAWN BY: CHECKED BY: KLINDT D. BRECKENRIDGE 1 AR I Z O N A D a te Si g n ed . A . . S U . . ... . ... .... . .... R F I T E I C E C TA C T I C R A R E T S I G E R E T ED H NO . 76 0 5
REGISTRATION EXPIRATION DATE: 3/31/2020 04 / 10
/18
0
1/8'' =1'-0" 8' 24'
Roof Plan - Dance/Wrestling
Roof Plan
Dance/Wrestling
Construction Keynotes
1 MODIFIED BITUMINOUS PROTECTED MEMBRANE ROOFING ON 1/2" COVER BOARD
ON 1-1/2" INSULATION
Construction General Notes
1. ALL ROOFING TO BE REMOVED AND REPLACED.
2. ALL ROOF EDGE FLASHING, COPINGS, BASE FLASHING, COUNTER FLASHING, PARAPET
SCUPPERS, AND CONDUCTOR HEADS TO BE REMOVED AND REPLACED.
3. REMOVE EXISTING SEALANT AT ALL WALL CONTROL JOINTS AND PROVIDE NEW
BACKER ROD AND SEALANT CONTRACTOR TO FIELD VERIFY ALL LOCATIONS.
2 3
4 PARAPET COPING CAP
5 6 7 8
RAISE EQUIPMENT CURB AND REPLACE CURB CAP 9
INSTALL PRE-MOLDED CURB FOR SWITCHGEAR SUPPORT ROOF DRAIN
CONSTRUCTION JOINT
FLASHING AT DUCTWORK PENETRATION CRICKETS
4" CANT STRIP
INSTALL TONGUE & GROOVE (T&G) WOOD DECK ON (E) STEEL BEAMS 10
INSTALL 5/8" TREATED PLYWOOD OVER (E) 2X TAPERED JOISTS 11
1 4/27/18 AMENDMENT 1 1
REPLACE CURB CAP 12
RAISE GAS LINE; SUPPORT WITH C-PORT BLOCKING. PENETRATE ROOF TO RE-CONNECT UNDER THE DECK.
13
1
1
ENLARGE CURB, (E) PIPE PENETRATION TO BE WITHIN THE CURB 14
APPLY SEALANT AT PIPE MOUNTING PENETRATIONS ON STUCCO WALL SURFACE 15
2 TYP. 3 TYP. 4 TYP. 5 TYP. 2 TYP. 10 TYP. 2 TYP. 3 TYP. 4 TYP. 5 TYP. 3 TYP. 4 TYP. 2 TYP. 5 TYP. 1 1 2 TYP. 2 TYP. 2 TYP. 3 TYP. 4 TYP. 5 TYP. 9 1 8 TYP. 1 1 5 TYP. 2 TYP. 3 TYP. 1
4
A1.2 A2.1
SIM.
6
A1.1 A2.1
TYP.
7
A1.2 A2.1
TYP.
15
A1.2 A2.1
7
A1.2 A2.1
TYP.
15
A1.2 A2.1
17
A1.2 A2.1
13
A1.2 A2.1
TYP.
4
A1.2 A2.1
SIM.
14
A1.2 A2.1
15
A1.2 A2.1
10
A1.2 A2.1
16
A1.2 A2.1
14
A1.2 A2.1
15
A1.2 A2.1
15
A1.2 A2.1
8
A1.2 A2.1
TYP.
12
A1.2 A2.1
TYP.
14
A1.2 A2.1
15
A1.2 A2.1
1
A1.2 A2.1
6
A1.1 A2.1
TYP.
11'-0" 11'-0" 7'-0" 7'-0" 6'-0" 16'-0" 6'-6" 6'-6" 11Amphitheater Public Schools
Amphitheater High School
Roof Replacement
PROJECT NO:
DATE:
THIS DRAWING IS NOT TO BE USED FOR CONSTRUCTION PURPOSES UNTIL SEALED AND SIGNED BY ARCHITECTS OF BRECKENRIDGE GROUP INC. ARCHITECTS / PLANNERS, OR DESIGNATED CONSULTANTS. DRAWINGS ARE COPYWRITTEN BY BRECKENRIDGE GROUP ARCHITECTS / PLANNERS. ANY REPRODUCTION OR REUSE WITHOUT WRITTEN PERMISSION IS STRICTLY FORBIDDEN. R REVISION SCHEDULE:
APRIL 2018
17.14.06
# DATE DESCRIPTION ISSUED TO
DRAWN BY: CHECKED BY: KLINDT D. BRECKENRIDGE 1 AR I Z O N A D a te Si g n ed . A . . S U . . ... . ... .... . .... R F I T E I C E C TA C T I C R A R E T S I G E R E T ED H NO . 76 0 5
REGISTRATION EXPIRATION DATE: 3/31/2020 04 / 10
/18
0
1/8'' =1'-0" 8' 24'
Roof Plan - Fine Arts Addition
Roof Plan
Fine Arts
Addition
Construction Keynotes
1Construction General Notes
1. ALL ROOFING TO BE REMOVED AND REPLACED.
2. ALL ROOF EDGE FLASHING, COPINGS, BASE FLASHING, COUNTER FLASHING, PARAPET
SCUPPERS, AND CONDUCTOR HEADS TO BE REMOVED AND REPLACED.
3. REMOVE EXISTING SEALANT AT ALL WALL CONTROL JOINTS AND PROVIDE NEW
BACKER ROD AND SEALANT CONTRACTOR TO FIELD VERIFY ALL LOCATIONS.
2 3
4 PARAPET COPING CAP
5 6 7
RAISE CURB AND REINSTALL SKYLIGHT 8
RAISE EQUIPMENT CURB 9
INSTALL PRE-MOLDED CURB FOR SWITCHGEAR SUPPORT
10
ROOF DRAIN
NOT USED IN THIS SHEET NOT USED IN THIS SHEET CRICKETS
4" CANT STRIP
MODIFIED BITUMINOUS PROTECTED MEMBRANE ROOFING ON 1/2" COVER BOARD ON 1-1/2" INSULATION
PAINT STEEL LADDER 11
1 4/27/18 AMENDMENT 1
1 1
1 12 1 3 TYP. 4 TYP. 2 TYP. 3 10 10 10 2 TYP. 11 11 12 73'-6" F.V. 3 8 11 3
22
A1.3 A1.3
TYP.
20
A1.3 A2.1
TYP.
19
A1.3 A2.1
TYP.
18
A1.3 A2.1
TYP.
23
A1.3 A1.3
TYP.
1
A1.3 A2.1
SIM
1
A1.3 A2.1
SIM
1
A1.3 A2.1
1
A1.3 A2.1
SIM
7
A1.3 A2.1
SIM
20
A1.3 A2.1
TYP.
6
A1.3 A2.1
TYP.
8'-0" 5'-0"21
A1.3 A1.3
TYP.
13 5 1417
A1.3 A2.1
SIM
23
A1.3 A1.3
TYP.
11 6 35
A1.3 A2.1
1
A1.3 A2.1
SIM
13 8" HEAD TRIM SEAM CAP PANEL CLIP PANEL SEALANT APPLIED @INTERSECTION OF HEAD CLOSURE TRIM TO VERTICAL PANEL LEG.
OFFSET CLEAT CHANNEL CLOSURE FASTEN AT EA.
SEAM & SEALED CONTINUOUS AT THE PANEL PERIMETER TO FORM A COMPLETE WATERTIGHT SEAL. (E) METAL WALL PANEL CUT BACK AS REQUIRED TO ACCEPT HEAD TRIM
3"
SILL TRIM, SLIDE BEHIND (E) WALL PANEL AND HOLD IN PLACE UNTIL HEAD TRIM IS INSTALLED
SEALANT
#44-1/8" S.S. RIVET SPACED @ 12" O.C. SILL COVER TO CONCEAL FIELD CUTS
CONTINUOUS SEALANT TAPE FLASHING PLY,
9" MIN. ON FIELD 4" CANT STRIP INSULATION,
STAGGER ALL JOINTS (E) ROOF DECK (E) MASONRY WALL
STANDING SEAM METAL ROOF METAL EDGE CONTINUOUS CLEAT FASTENED 6"O.C. GUTTER STRAP GUTTER BRACKET METAL FASCIA POLYURETHANE SEALANT COUNTERFLASHING FASTENED 8" O.C. THROUGH BUTYL TAPE
4" 5" THERMOPLASTIC MEMBRANE BASE FLASHING 1/2" RECOVERY BOARD INSULATION STAGGER ALL JOINTS BASE PLY 3 COURSE APPLICATION OF MASTIC METAL EDGE CONTINUOUS CLEAT FASTENED 6"O.C. GUTTER STRAP GUTTER BRACKET METAL FASCIA 4" 5" NOTES:
1. RUN BASE PLY OVER THE EDGE. ASSURE COVERAGE OF ALL WOOD NAILERS.
2. INSTALL METAL EDGE HOOKED TO CONTINUOUS CLEAT AND SET IN BED OF ROOF
CEMENT. FASTEN FLANGE TO WOOD NAILER EVERY 3 INCHES (76 MM) O.C. STAGGERED.
3. PRIME METAL EDGE AND ALLOW TO DRY. DO NOT PRIME FOR GREEN-LOCK SYSTEM
LIGHTLY SAND METAL TO IMPROVE BOND.
4. STRIP IN FLANGE WITH BASE FLASHING PLY COVERING ENTIRE FLANGE IN BITUMEN
WITH 6 INCHES (152 MM) ONTO THE FIELD OF THE BASE PLY. ASSURE PLY LAPS DO NOT COINCIDE WITH METAL LAPS.
5. THEN INSTALL THERMOPLASTIC CAP FIELD PLY RUN OVER THE BASE FLASHING PLY
IN BITUMEN OR FOAM ADHESIVE.
6. INSTALL A SECOND PLY OF THERMOPLASTIC FLASHING CAP PLY HEAT WELDED
OVER THE THERMOPLASTIC CAP PLY, 9 INCHES (228 MM) ON TO THE FIELD OF THE ROOF.
Amphitheater Public Schools
Amphitheater High School
Roof Replacement
PROJECT NO:
DATE:
THIS DRAWING IS NOT TO BE USED FOR CONSTRUCTION PURPOSES UNTIL SEALED AND SIGNED BY ARCHITECTS OF BRECKENRIDGE GROUP INC. ARCHITECTS / PLANNERS, OR DESIGNATED CONSULTANTS. DRAWINGS ARE COPYWRITTEN BY BRECKENRIDGE GROUP ARCHITECTS / PLANNERS. ANY REPRODUCTION OR REUSE WITHOUT WRITTEN PERMISSION IS STRICTLY FORBIDDEN. R REVISION SCHEDULE:
APRIL 2018
17.14.06
# DATE DESCRIPTION ISSUED TO
DRAWN BY: CHECKED BY: KLINDT D. BRECKENRIDGE 1 AR I Z O N A D a te Si g n ed . A . . S U . . ... . ... .... . .... R F I T E I C E C TA C T I C R A R E T S I G E R E T ED H NO . 76 0 5
REGISTRATION EXPIRATION DATE: 3/31/2020 04 / 10
/18
0
1/8'' =1'-0" 8' 24'
Roof Plan - Panther Hall
Roof Plan
Panther Hall
Construction Keynotes
1Construction General Notes
1. ALL ROOFING TO BE REMOVED AND REPLACED.
2. ALL ROOF EDGE FLASHING, COPINGS, BASE FLASHING, COUNTER FLASHING, PARAPET
SCUPPERS, AND CONDUCTOR HEADS TO BE REMOVED AND REPLACED.
3. REMOVE EXISTING SEALANT AT ALL WALL CONTROL JOINTS AND PROVIDE NEW
BACKER ROD AND SEALANT CONTRACTOR TO FIELD VERIFY ALL LOCATIONS.
2 3
4 PARAPET COPING CAP
5 6 7
STANDING SEAM METAL ROOF 8
NOT USED 9
INSTALL PRE-MOLDED CURB FOR SWITCHGEAR SUPPORT
10 ROOF DRAIN CONSTRUCTION JOINT NOT USED CRICKETS 4" CANT STRIP ROOF GUTTER 11 Scale : 3" = 1'-0"
Flashing at Roof to Sidewall
0 3" 9"
21
A1.3 A1.3Scale : 1-1/2" = 1'-0"
Roof to Sidewall & Gutter
0 9" 2'
22
A1.3 A1.3MODIFIED BITUMINOUS PROTECTED MEMBRANE ROOFING ON 1/2" COVER BOARD ON 1-1/2" INSULATION
THERMOPLASTIC MEMBRANE ROOFING ON 1/2" COVER BOARD ON TAPERED INSULATION 12 Scale : 1-1/2" = 1'-0"
Roof Gutter
0 9" 2'23
A1.3 A1.34" Ø STEEL TUBE DOWNSPOUT, ATTACH TO THE WALL WITH SLEEVE ANCHORS. PROVIDE CONCRETE SPLASH BLOCK.
13
SUPPORT ALL CONDUITS WITH C-PORT CLOCKING WITH APPROVED SLIP SHEET TO PROTECT THE ROOF SURFACE.
14 1 4/27/18 AMENDMENT 1 1 1 1 1 1
1 2 TYP. 8 TYP. 11
18
A1.4 A2.1
23
A1.4 A1.3
SIM.
12
A1.2 A2.1
TYP.
8
A1.4 A2.1
TYP.
12 TYP. OF 2Amphitheater Public Schools
Amphitheater High School
Roof Replacement
PROJECT NO:
DATE:
THIS DRAWING IS NOT TO BE USED FOR CONSTRUCTION PURPOSES UNTIL SEALED AND SIGNED BY ARCHITECTS OF BRECKENRIDGE GROUP INC. ARCHITECTS / PLANNERS, OR DESIGNATED CONSULTANTS. DRAWINGS ARE COPYWRITTEN BY BRECKENRIDGE GROUP ARCHITECTS / PLANNERS. ANY REPRODUCTION OR REUSE WITHOUT WRITTEN PERMISSION IS STRICTLY FORBIDDEN. R REVISION SCHEDULE:
APRIL 2018
17.14.06
# DATE DESCRIPTION ISSUED TO
DRAWN BY: CHECKED BY: KLINDT D. BRECKENRIDGE 1 AR I Z O N A D a te Si g n ed . A . . S U . . ... . ... .... . .... R F I T E I C E C TA C T I C R A R E T S I G E R E T ED H NO . 76 0 5
REGISTRATION EXPIRATION DATE: 3/31/2020 04 / 10
/18
0
1/8'' =1'-0" 8' 24'
Roof Plan - 800 Building
Roof Plan
800 Building
Construction Keynotes
1Construction General Notes
1. ALL ROOFING TO BE REMOVED AND REPLACED.
2. ALL ROOF EDGE FLASHING, COPINGS, BASE FLASHING, COUNTER FLASHING, PARAPET
SCUPPERS, AND CONDUCTOR HEADS TO BE REMOVED AND REPLACED.
3. REMOVE EXISTING SEALANT AT ALL WALL CONTROL JOINTS AND PROVIDE NEW
BACKER ROD AND SEALANT CONTRACTOR TO FIELD VERIFY ALL LOCATIONS.
2 3
4 NOT USED IN THIS SHEET
5 6 7 8 9
INSTALL PRE-MOLDED CURB FOR SWITCHGEAR SUPPORT
10
CRICKETS
NOT USED IN THIS SHEET
ROOF GUTTER 11
NOT USED IN THIS SHEET NOT USED IN THIS SHEET NOT USED IN THIS SHEET
NOT USED IN THIS SHEET NOT USED IN THIS SHEET
MODIFIED BITUMINOUS PROTECTED MEMBRANE ROOFING ON 1/2" COVER BOARD ON 1-1/2" INSULATION
4" X 4" STEEL TUBE DOWNSPOUT 12
(E) BRICK COPING
THERMOPLASTIC
MEMBRANE FLASHING PLY, 9" MIN. ON FIELD
4" CANT STRIP
INSULATION, STAGGER ALL JOINTS
(E) ROOF DECK (E) MASONRY WALL
POLYURETHANE SEALANT COUNTERFLASHING FASTENED 8" O.C. THROUGH BUTYL TAPE POLYURETHANE SEALANT TERMINATION BAR FASTENED 8" O.C. THROUGH BUTYL TAPE BASE PLY 3 COURSE APPLICATION OF MASTIC CONTINUOUS SEALING MATERIAL ON PERIMETER REPLACE SHEET METAL CURB CAP WHERE REQUIRED (E) WOOD NAILER COUNTERFLASHING THERMOPLASTIC MEMBRANE
BASE FLASHING PLY 6" MIN. ON FIELD 3 COURSE APPLICATION OF MASTIC MODIFIED MEMBRANE INSULATION, STAGGER ALL JOINTS 1" (E) MOUNTING CURB
BOLTS WITH NEOPRENE WASHERS
NEOPRENE PAD
FLASHING FASTENED 8" O.C. MTL. CAP SECURED 24" O.C. W/ FASTENERS & NEOPRENE WASHERS
PRE-MOLDED EQUIP. CURB THERMOPLASTIC MEMBRANE BASE FLASHING PLY 6" MIN. ON FIELD
BASE PLY
3 COURSE APPLICATION OF MASTIC
MODIFIED MEMBRANE INSULATION, STAGGER ALL JOINTS
8" MIN.
(E) METAL EXHAUST FAN COVER
FLASHING FASTENED THERMOPLASTIC MEMBRANE BASE FLASHING PLY 6" MIN. ON FIELD CANT STRIP 3 COURSE APPLICATION OF MASTIC MODIFIED MEMBRANE BASE PLY INSULATION,
STAGGER ALL JOINTS
8" MIN.
MASK TARGET AREA ON ROOF MEMBRANE WITH TAPE CLEAN ALL NON-POUROUS AREAS WITH ISOPROPYL ALCOHOL
APPLY 32 WET MIL BASE COAT OF FLASH OVER MASKED AREA EMBED GRIP POLYESTER FIRM
INTO BASE COAT
APPLY MINERALS IMMEDIATELY OR ALLOW FLASH TO CURE 15-30 DAYS, THEN INSTALL REFLECTIVE COATING COUNTERFLASHING FASTENED
8" O.C.
SET METAL FLANGE IN ROOF CEMENT AND PRIME PRIOR TO STRIPPING
THERMOPLASTIC MEMBRANE, 3" MIN ON FIELD, HEAT WELD BASE FLASHING PLY 6" MIN. ON FIELD
THERMOPLASTIC FB MEMBRANE
BASE PLY
INSULATION, STAGGER ALL JOINTS
CANT STRIP
2"
16 GA. ANCHOR CHAIR 40 MIL. SELF ADHERING UNDERLAYMENT COPING COVER X 10'-0" 6" CONCEALED SPLICE PL. @ EA. JOINT (4) FASTENERS PER ANCHOR CHAIR THERMOPLASTIC
MEMBRANE FLASHING PLY, 9" MIN. ON FIELD
4" CANT STRIP
INSULATION, STAGGER ALL JOINTS
(E) MASONRY WALL
POLYURETHANE SEALANT COUNTERFLASHING FASTENED 8" O.C. THROUGH BUTYL TAPE POLYURETHANE SEALANT TERMINATION BAR FASTENED 8" O.C. THROUGH BUTYL TAPE BASE PLY 3 COURSE APPLICATION OF MASTIC BASE PLY 3 COURSE APPLICATION OF MASTIC 16 GA. ANCHOR CHAIR
COPING COVER X 10'-0" 6" CONCEALED SPLICE PL. @ EA. JOINT
EXTEND PLIES OVER BLOCKING FASTEN 8" O.C. (4) FASTENERS PER ANCHOR CHAIR THERMOPLASTIC
MEMBRANE FLASHING PLY, 9" MIN. ON FIELD 4" CANT STRIP INSULATION, STAGGER ALL JOINTS (E) WALL 1" MIN 4" MIN. RUBBER ASPHALT SEALANT
METAL EDGE SET IN ROOF CEMENT NAILED 3" O.C. STAGGERED PRIME METAL FLANGE PRIOR TO STRIPPING
CONTINUOUS CLEAT FASTENED 6" O.C. (E) STEEL BEAM
MODIFIED MEMBRANE FLASHING PLY 9" MIN. ON FIELD IN BITUMEN BASE FLASHING PLY 6" MIN. ON FIELD IN BITUMEN INSULATION STAGGER ALL JOINTS MODIFIED MEMBRANE BASE PLY REPLACED T&G DECKING
(E) STUCCO FINISH POLYURETHANE SEALANT TWO-PIECE
COUNTERFLASHING TERMINATION BAR BASE FLASHING PLY BASE PLY
3 COURSE APPLICATION OF MASTIC
THERMOPLASTIC
MEMBRANE FLASHING PLY, 9" MIN. ON FIELD 4" CANT STRIP INSULATION, STAGGER ALL JOINTS 8" MIN. PRE-MANUFACTURED EXPANSION JOINT COVER CHAMFER EA. SIDE OF WOOD CURB TO DRAIN COMPRESSIBLE INSULATION 3 COURSE APPLICATION OF MASTIC FLEXIBLE WATER MEMBRANE CLOSURE FLASHING FASTENED 8" O.C. MTL. CAP SECURED 12" O.C. W/ FASTENERS & NEOPRENE WASHERS THERMOPLASTIC MEMBRANE
BASE FLASHING PLY 6" MIN. ON FIELD MODIFIED MEMBRANE BASE PLY
CLAMPING RING (E) DRAIN
BASE FLASHING PLY BASE PLY
MODIFIED MEMBRANE CAST IRON STRAINER
MODIFIED MEMBRANE MIN. 48" LEAD FLASHING 30" SQ. MIN. SET IN MASTIC, WRAPPED DOWN 2" MIN. PRIME TOP SURFACE BEFORE FLASHING (E) PASSIVE VENT/ AIR
INTAKE
FLASHING FASTENED THERMOPLASTIC MEMBRANE BASE FLASHING PLY 6" MIN. ON FIELD CANT STRIP 3 COURSE APPLICATION OF MASTIC MODIFIED MEMBRANE BASE PLY INSULATION,
STAGGER ALL JOINTS
8" MIN.
MODIFIED MEMBRANE FLASHING PLY 9" MIN. ON FIELD IN BITUMEN BASE FLASHING PLY 6" MIN. ON FIELD IN BITUMEN INSULATION STAGGER ALL JOINTS MODIFIED MEMBRANE BASE PLY
(E) ROOF DECK RUBBER ASPHALT SEALANT
METAL EDGE SET IN ROOF CEMENT NAILED 3" O.C. STAGGERED PRIME METAL FLANGE PRIOR TO STRIPPING
CONTINUOUS CLEAT FASTENED 6" O.C. (E) METAL EDGE
SKYLIGHT
ALUMINUM FRAME 2"X10" MINIMUM
METAL COUNTERFLASHING FASTENED 8"O.C. WITH NEOPRENE WASHERS THERMOPLASTIC
MEMBRANE FLASHING PLY CANT FASTENED TO NAILER 3 COURSE APPLICATION MASTIC
MODIFIED MEMBRANE BASE PLY
THERMOPLASTIC
MEMBRANE FLASHING PLY, 9" MIN. ON FIELD
4" CANT STRIP
INSULATION, STAGGER ALL JOINTS
(E) METAL PANEL (E) SILL TRIM TWO PIECE
COUNTERFLASHING TERMINATION BAR FASTENED 8" O.C. THROUGH BUTYL TAPE BASE PLY
3 COURSE APPLICATION OF MASTIC
MODIFIED MEMBRANE FLASHING PLY 9" MIN. ON FIELD IN BITUMEN BASE FLASHING PLY 6" MIN. ON FIELD IN BITUMEN INSULATION STAGGER ALL JOINTS MODIFIED MEMBRANE BASE PLY
RUBBER ASPHALT SEALANT
METAL EDGE SET IN ROOF CEMENT NAILED 3" O.C. STAGGERED PRIME METAL FLANGE PRIOR TO STRIPPING
CONTINUOUS CLEAT FASTENED 6" O.C. METAL FASCIA (E) MASONRY WALL
POLYURETHANE SEALANT COUNTERFLASHING FASTENED 8" O.C. THROUGH BUTYL TAPE METAL TRIM
STANDING SEAM METAL ROOF ELASTOMERIC COATING BASE PLY 3 COURSE APPLICATION OF MASTIC 16 GA. ANCHOR CHAIR
COPING COVER X 10'-0" 6" CONCEALED SPLICE PL. @ EA. JOINT
EXTEND PLIES OVER BLOCKING FASTEN 8" O.C. (4) FASTENERS PER
ANCHOR CHAIR THERMOPLASTIC
MEMBRANE FLASHING PLY, 9" MIN. ON FIELD
4" CANT STRIP 1/2" RECOVERY BD OVER (E) ROOFING (E) MASONRY WALL
TERMINATION BAR FASTENED 8" O.C. INSTALL COVER STRIP WELD
1. SUMP ALL DRAINS
2. PLUG DRAIN TO PREVENT DEBRIS FROM ENTERING PLUMBING.
3. TAPER INSULATION TO DRAIN MINIMUM OF 24 INCHES (609 MM) FROM CENTER OF DRAIN.
4. RUN ROOF SYSTEM PLIES OVER DRAIN. CUT OUT PLIES INSIDE DRAIN BOWL.
5. SET LEAD/COPPER FLASHING (30 INCH SQUARE MINIMUM) IN 1/4 INCH BED OF MASTIC. RUN
LEAD/COPPER INTO DRAIN A MINIMUM OF 2 INCHES (50 MM). PRIME LEAD/COPPER AT A RATE OF 100 SQUARE FEET PER GALLON AND ALLOW TO DRY.
6. INSTALL BASE FLASHING PLY (40 INCH SQUARE MINIMUM) IN BITUMEN.
7. INSTALL MODIFIED MEMBRANE (48 INCH SQUARE MINIMUM) IN BITUMEN.
8. INSTALL CLAMPING RING AND ASSURE THAT ALL PLIES ARE UNDER THE CLAMPING RING.
9. REMOVE DRAIN PLUG AND INSTALL NEW CAST IRON STRAINER.
8" 8" 8"
ROOF MEMBRANE MASK TARGET AREA & REMOVE IMMEDIATELY AFTER APPLICATION
FABRIC OUTLINE 32 WET MIL BASE COAT OF LIQUID FLASHING MEMBRANE OVER MASKED AREA
48-64 WET TOP COAT OF LIQUID FLASHING OVER FABRIC EXTENDING 2" PAST THE SCRIM
EMBED GRIP POLYESTER FIRM INTO BASE COAT OF LIQUID FLASHING
Amphitheater Public Schools
Amphitheater High School
Roof Replacement
PROJECT NO:
DATE:
THIS DRAWING IS NOT TO BE USED FOR CONSTRUCTION PURPOSES UNTIL SEALED AND SIGNED BY ARCHITECTS OF BRECKENRIDGE GROUP INC. ARCHITECTS / PLANNERS, OR DESIGNATED CONSULTANTS. DRAWINGS ARE COPYWRITTEN BY BRECKENRIDGE GROUP ARCHITECTS / PLANNERS. ANY REPRODUCTION OR REUSE WITHOUT WRITTEN PERMISSION IS STRICTLY FORBIDDEN. R REVISION SCHEDULE:
APRIL 2018
17.14.06
# DATE DESCRIPTION ISSUED TO
DRAWN BY: CHECKED BY: KLINDT D. BRECKENRIDGE 1 AR I Z O N A D a te Si g n ed . A . . S U . . ... . ... .... . .... R F I T E I C E C TA C T I C R A R E T S I G E R E T ED H NO . 76 0 5
REGISTRATION EXPIRATION DATE: 3/31/2020 04 / 10
/18
Roof
Details
Scale : 1-1/2" = 1'-0"Parapet Wall Flashing
0 9" 2'
1
A2.1 A1.1 A1.2 A1.3 Scale : 1-1/2" = 1'-0"Parapet Coping Cap
0 9" 2'
2
A2.1 A1.1 Scale : 1-1/2" = 1'-0"Wall Flashing
0 9" 2'3
A2.1 A1.1 Scale : 1-1/2" = 1'-0"Metal Roof Edge
0 9" 2'
4
A2.1 A1.1 A1.2 Scale : 1-1/2" = 1'-0"Construction Joint
0 9" 2'5
A2.1 A1.1 A1.3 Scale : 1-1/2" = 1'-0"Roof Drain
0 9" 2'6
A2.1 A1.1 A1.2 A1.3 Scale : 1-1/2" = 1'-0"Through Wall Overflow
0 9" 2'
7
A2.1 A1.1 A1.2 A1.3 Scale : 1-1/2" = 1'-0"HVAC Curb
0 9" 2'8
A2.1 A1.1 A1.2 A1.4 Scale : 1-1/2" = 1'-0"Air Intake
0 9" 2'9
A2.1 A1.1 Scale : 1-1/2" = 1'-0"Exhaust Detail
0 9" 2'10
A2.1 A1.1 A1.2 Scale : 1-1/2" = 1'-0"Pipe Penetration
0 9" 2'11
A2.1 A1.1 Scale : 1-1/2" = 1'-0"Equipment Curb
0 9" 2'12
A2.1 A1.1 A1.2 NTSFlashing at I-Beam
13
A2.1 A1.2 Scale : 1-1/2" = 1'-0"Parapet Coping Cap
0 9" 2'
14
A2.1 A1.2 Scale : 1-1/2" = 1'-0"
Parapet Coping Cap
0 9" 2'
15
A2.1 A1.2 Scale : 1-1/2" = 1'-0"Skylignt
0 9" 2'16
A2.1 A1.2 Scale : 1-1/2" = 1'-0"Metal Roof Edge
0 9" 2'
17
A2.1 A1.2 Scale : 1-1/2" = 1'-0"
Metal Roof Edge
0 9" 2'
18
A2.1 A1.3 A1.4 Scale : 1-1/2" = 1'-0"Wall Flashing
0 9" 2'19
A2.1 A1.3 Scale : 1-1/2" = 1'-0"Flashing at Roof to Sidewall
0 9" 2'