• No results found

PP Master Data Configuration

N/A
N/A
Protected

Academic year: 2021

Share "PP Master Data Configuration"

Copied!
130
0
0

Loading.... (view fulltext now)

Full text

(1)

SAP PP/QM

Configuration

(2)

INDEX

1. OVER VIEW:- 4

2. GETTING INTO THE CONFIGURATION AREA OF SAP 8 3. MASTER DATA CONFIGURATION - BOM 12

3.1 Define BOM Usage 12

3.2 Define Default Values for item status 16 3.3 Define Allowed Material type for BOM Header 20

3.4 Define BOM Status 23

3.5 Define Item Category 26

3.6 Define Allowed item type for BOM Item 30 3.7 Define Explosion types 33 3.8 Define Order of Priority 36

3.9 Define Application 40

3.10 Define Alternative Determination for Multiple BOM 44 3.11 Alternative determination in related application Area 46

3.12 Define User-specific setting 47

4. WORK CENTER 50

4.1 Define Work center Category 51 4.2 Define Field Selection 54 4.3 Define Task List usage 58

4.4 Define Parameters 61

4.5 Define Standard Value 65

4.6 Determine Person Responsible 69

(3)

5. CAPACITY PLANNING 76

5.1 Define Capacity Category 76 5.2 Determine Capacity Planner 78

5.3 Define Shift Sequence 81

5.4 Define Formula Parameters for Work centers 88 5.5 Define Formula for Work centers 91 5.6 Define Factory calendar 95 5.7 Define Default Capacity 106 5.8 Define Work center screen sequence 109

6. ROUTING 112

6.1 Define Standard value description in operation over view 113 6.2 Define Routing Status 115 6.3 Define Task List usage 117 6.4 Define Reduction Strategy 119

6.5 Define User Fields 123

6.6 Define Routing Selection Automatic 127

(4)

1.

Over

view:-Production Planning module configuration and relevant reports are demonstrated in this book.

PP module contains three types of manufacturing methods. o Discrete

o Repetitive

o Process Industries. Discrete:

-Discrete production method is applicable to the manufacturing setup where small lots are manufactured with frequent changes in the settings.

Manufacturing is accounted through Production orders. Repetitive:

-This method is applicable, where products are manufactured with least change or no change in the manufacturing process over a long period of time.

Manufacturing is accounted through backflush. Process Industries:

-It is similar to the Discrete but instead of routing, -It uses master recipe where in Process messages are maintained.

It is more appropriate to the food industries and processing units where instructions are used during the process.

(5)

Manufacturing is accounted through process orders.

Configuration setting in PP module can be classified as below. • Master Data related settings

• Planning Related Settings

• Production Execution related settings

We will discuss about the Master data related configuration setting in detail.

Important Master data in PP module are • Bill Of Material

• Work center • Routing

Bill Of Material

(BOM):-BOM can be defined as “a list of required components along with the required quantity essential to make any product”. Important Technical details related to BOM are

Application of BOM Usage of BOM

Status of BOM Selection of BOM

(6)

Configuration setting related to BOM will enable to align the BOM master data in line with the business requirement blue print document.

Work

Center:-Machines, group of labour, processing unit are defined as work center in SAP.

Work center contains the Capacity Requirements Scheduling details

Costing details

Configuration setting related to work center will enable to define the SAP system according to the business requirement blue print document.

Routing:-Sequence of operation, work centers to be used and the duration required for each operation to manufacture the product is defined in routing.

Important Technical details related to Routing are Usage of Routing

Status of Routing Selection of Routing

(7)

Configuration settings related to Routing will enable to align the Routing master data in line with the business requirement blue print document.

Friends, the configuration settings related to each master data are explained in detail.

Example:-BOM

Item category configuration

Automatic alternate selection of BOM Configuration of BOM usage

Configuration of allowed item type for BOM Work Center

Configuration of field selection in work center

Configuration of formula to schedule and calculate cost Configuration of standard value key

Configuration of shift sequence Routing

Configuration of Automatic Routing selection Configuration of Routing usage

Configuration of reduction strategy

(8)

2.

Getting into the Configuration area of SAP

BACKGROUND

To make the configuration in SAP, one has to have authorization to perform transaction in configuration mode. It is the place where every details are maintained to make the transaction happen as per the business mapping.

SCENARIO

It is required to configure various settings in SAP. INSTRUCTIONS

To do configuration, first one has to logon to the system, and go to the IMG mode. How to logon to IMG mode is explained below. From next document onwards, it is mentioned as IMG. How to get in to the SAP IMG mode?

1. Type spro in the SAP main screen dialog box, 2. Click

(9)
(10)

Note:- Production related configurations are available under Node.

(11)

5. You are inside the IMG for Production Planning Module. If the menu path is mentioned as “IMG” in the further topics, you have to follow the above step to reach this place.

(12)

3.

Master Data Configuration - BOM

3.1 Define BOM Usage

BACKGROUND

This configuration setting enables to define Bill Of Material (BOM) usage.

BOM usage defines the usage of BOM in specific application area in the SAP.

Example, there can be a separate BOMs for Ø Design,

Ø Production Ø Costing.

In this way, each area is dealing only with the specific data it requires.

Example:

Ø The design BOM includes all the components of the product and their technical data from the design point of view. This BOM is generally not linked to any order.

Ø The production BOM contains all the items required from the production and assembly point of view. Only items relevant to production, for which production data (such as the issue storage location) can be entered, are required. A production BOM does not contain any packaging materials required in the shipping department.

(13)

SCENARIO

Create new BOM usage.

Note:-Standard BOM usage available with SAP is sufficient. However any new BOM usage can be created.

INSTRUCTIONS

Follow the Menu Path: IMG → Production → Basic data → Bill of materials → General data à BOM Usage à Define BOM Usage

1. Click

2. Click

3. Enter usage value; it can be either numeric or alphabet. It is suggested to be numeric.

(14)

4. Select +,- or . to indicate to which area this BOM is meant for like Production, Engineering, Spare, Plant Maintenance, Sales or for costing relevancy.

Note:-Based on this, during BOM explosion, entire dependent requirements are also planned,

5. Enter Usage text 6. Click Save

Impact of this configuration in Master Data /

Transaction

When creating the BOM, key defined here will appear in the BOM Usage field.

According to the requirement, BOM usage key has to be selected during BOM Creation.

Click Match code or F4 in BOM usage field, to select the desired BOM usage.

(15)
(16)

3.2 Define Default Values for item status

BACKGROUND

This configuration setting enables to define default values for item status.

Every item in the BOM can be defined whether it is subjected to

Costing Sales

Production Spare part

This configuration setting is used to indicate whether the BOM component along with the BOM usage.

Ø is to be considered for costing in this BOM or not, Ø is relevant to sales (normally used in Variant

configuration), Ø is a spare part

Ø is related to Production SCENARIO

Set the default value for items in BOM. INSTRUCTIONS

(17)

Follow the Menu Path: IMGàProductionàBasic dataàBill of materialsàGeneral dataàBOM usageàDefine default values for the item status

1. Click

2. Click

3. Enter Usage value

4. Update the following fields

Field Name Description Value BOM usage Field defining the

BOM usage

Enter value e.g. 1 Prod Indicating that the

BOM item is related to Production

Make tick in the check box

Eng/des Indicating that the BOM item is related to Engineering and Design

Leave blank.

PM Indicating that the

BOM item is related to Plant

(18)

Maintenance

Sales Indicating the item is related to Sales and it will appear in the sales order.

Leave blank. Normally used in variant

configuration.

Relevan Relevant to costing Select X , indicating relevant to costing. 5. Click Save .

Impact of this configuration in Master Data /

Transaction

Example:-BOM usage defined 1 indicating relevant to production. The item status as configured such that all items

Ø are relevant to production Ø can be relevant to costing

In this example, the indicators are checked as follows:

Ø The Indicator: item relevant to production cannot be deselected (required entry). In the BOM maintenance functions, this indicator is set automatically for all items and cannot be cancelled.

Since the item can be relevant to costing, the default value X (fully relevant to costing) can be set for the Indicator for relevance to costing. This value can be overwritten in the BOM maintenance functions.

BOM item level default setting will appear as per the setting done here.

(19)
(20)

3.3 Define Allowed Material type for BOM Header

BACKGROUND

This configuration setting enables to control the creation of BOM to the specific material types.

This configuration is done to the combination of BOM usage and Material type.

When a new bill of material is created, the system checks the material type as follows:

§ The fully qualified (non-generic) entries are checked first. The generic entries are checked afterwards.

§ You can define that the use of the material type in combination with Creation of BOM with respect to material type can be controlled.

Example, it may not be allowed to create BOM for Raw material. (Material type ROH).

Creation of BOM to material type ROH can be restricted in the system.

SCENARIO

Creation of BOM for Material type ROH should not be allowed. INSTRUCTIONS

Follow the Menu Path: IMGàProductionàBasic dataàBill of materialsà General dataàDefine allowed material type for BOM header

(21)

Click

(22)

1. Click

Update required and optional fields:

Field Name Description Value

BOM Usage ### BOM usage according to the application

1 for production BOM

Material type header

Header Material type to which BOM creation has to be restricted

Enter ROH

Allowed Select the symbol indicator to mention allowed or not allowed

Select Negative symbol to RESTRICT BOM creation.

### Generic entry “*” can be made instead of a specific BOM usage. This indicates, it is applicable to all possible BOM usages.

2. Click Save .

Impact of this configuration in Master Data /

Transaction

When a new bill of material is created, the system checks the material type as follows:

§ Non-generic entries are checked first. The generic entries are checked afterwards.

Error message will be displayed when creating BOM for RAW material.

(23)

3.4 Define BOM Status

BACKGROUND

This configuration setting enables to define BOM status.

BOM status is used to define whether the BOM can be used by any application area or not.

Example:

-Ø In the costing areas in a company, the BOM is exploded according to the application. While defining the BOM status, usage in costing area will be defined.

Ø In MRP, the following indicators are checked directly from the definition of the BOM status:

- Explosion in MRP - Released for orders

MRP only reads BOMs whose BOM status has at least one of these indicators.

BOM status defines whether

The BOM is active or inactive.

SCENARIO

BOM need to be created for certain for product whose BOM can be finalized only after some trial and error.

(24)

While it is in preparation it is required not to be used by any application. Status “In preparation” has to be created.

INSTRUCTIONS

Follow the Menu Path: IMGàProductionàBasic dataàBill of materialsà General dataàDefine BOM status

1. Click

…..continuation of the above screen’s right side balance portion

2. Click

(25)

4. Leave all the check box as EMPTY. 5. Mention description as “In preparation” 6. Click Save .

Impact of this configuration in Master Data /

Transaction

(26)

3.5 Define Item Category

BACKGROUND

This configuration setting enables to define item category.

The item category defines the attributes and functions of a BOM item. It controls field and screen selection for detail screens in BOM maintenance.

BOM can contain different type of items related to manufacture the finished product. There are

Ø Pipeline items – i.e. items which are received through a pipeline from supplier not related to inventory

Ø Stock items – i.e. materials are always issued from stock which are relate to inventory

Ø Document item – i.e. Documents are referred in the BOM as a item trough the Document Management System (DMS)

Ø Text item – i.e. brief note about the material usage can be maintained as a Text item. This will be useful in a long BOM to indicate any specific assembly.

The above different items are defined through item category in the BOM.

(27)

SCENARIO

Define item category to meet the situation as per the below example.

Example: - An Item code may be defined as a normal item in the material master. The same item code for one specific BOM has to be treated as a phantom material.

In such a situation, item category inside the item detail of the BOM will be mentioned as a phantom assembly. It is now applicable only to this BOM.

Let’s look at the standard setting for item category.

Item categories defined by SAP will be sufficient in most of the cases. If required, any new item category can be created.

INSTRUCTIONS

Follow the Menu Path: IMGàProductionàBasic dataàBill of materialsà Item dataàDefine item category

(28)

2. click

3. Update the following fields Field Name Description

Item category Desired item category to be mentioned in the BOM

Inv.Mgmt Relevant to Inventory management

TxtItem It is text item Vsl Variable size item Document Item To mention Document

Cls Item To mention as Class item, used in Variant configuration PM Str To mention as PM structure

element

IntraM To mention Intra Material normally used in Master Recipe-PPPI

+/- sign Negative value allowed in the BOM or not? This is required to indicate the by product. SubI To indicate sub items are

supported.

Item Ctrl Sequence of Item detail screen.

4. Select check boxes according to the business requirement

5. Mention Item category Text

(29)

Impact of this configuration in Master Data /

Transaction

While creating the BOM, required item category may be selected.

(30)

3.6 Define Allowed item type for BOM Item

BACKGROUND

This configuration setting enables to control the item type which can be entered as a component in the BOM.

Restriction to BOM item level can be done.

Example: - It may be required NOT to allow any Finished Goods material type (FERT) to be a member of the BOM.

SCENARIO

It is required to restrict FERT material to be the member of the BOM.

INSTRUCTIONS

Follow the Menu Path: IMGàProductionàBasic dataàBill of materialsà Item dataàDefine allowed material type for BOM items

(31)

2. Click

3. Update the following fields Field Name Description

BOM usage BOM usage to define the application area

Mat tpe header Header material type to which this restriction is to be applicable

Material type BOM item

Item type inside the BOM to be restricted.

Allowed + sign to permit and –sign NOT to permit

4. Click Save .

Impact of this configuration in Master Data /

Transaction

(32)

While creating the BOM, only allowed component type in this setting are allowed to be a member of the BOM item.

(33)

3.7 Define Explosion types

BACKGROUND

This configuration setting enables to define how the component in Bill Of Material is to be exploded during processing.

This configuration setting governs BOM Component • To be considered for planning or not

• To be considered in Long Term Planning or not • Phantom assembly is to be planned or not • Direct production should be activated or not

SCENARIO

For Long term planning, by default all the BOM items are considered.

If there are more items in a BOM and it is required to plan only very specific items in the LTP.

Then at BOM level against the item, LTP off indicator can be set. Now during LTP run, only relevant items are planned in LTP and all items are planned in MRP run.

(34)

Follow the Menu Path: IMGàProductionàBasic dataàBill of materialsà Item dataàDefine Explosion types.

1. Click

Follow the below steps to create new entries.

2. Click

3. Update the following fields Field Name Description

Explosion type BOM Explosion type, free entry.

Description Description of the Explosion type key.

(35)

Phan.off Phantom assembly is not applicable to this item if this indicator is set.

Plng off Material components are not planned till the Sales order is created to this BOM item if this indicator is set

DP Off Direct production functions are switched off if this indicator is set.

LTP Off This will exclude the item in LTP calculation if this indicator is set.

Indi/Coll It is to specify, whether to group the dependant requirement together or not

4. Maintain the entries in the check box as per the requirement

5. Click Save

Impact of this configuration in Master Data /

Transaction

BOM Item level explosion type can be defined. Key defined here will appear in the screen to select.

(36)

3.8 Define Order of Priority

BACKGROUND

This configuration setting enables to define order of priority for Bill Of Material to be selected during MRP and Production or process order creation.

Different Bill Of Material can be created for • Production

• Costing

• Engg / Design

Selection priority must be defined to pickup the right Bill Of Material to the right application.

Link between this configuration and Master Data is established as

below:-• Selection priority will be defined through selection id. • Selection id will have the sequence of BOM usage. • BOM usage will be mentioned in the BOM

• Selection id of BOM will be mentioned in the order type and MRP plant Parameter.

(37)

SCENARIO

There are more than one BOM (BOM usage) They are 1 for Production,

2 for Engg/Design 3 for Costing.

It is required to define the order of selection for BOM. INSTRUCTIONS

Follow the Menu Path: IMGàProductionàBasic dataàBill of materialsà Alternative determinationàDefine order of priority for BOM usage.

(38)

Click to create additional order of priority for BOM usage.

2. Update the Following fields

Field Description

Selection Id Selection ID numeric number to be entered. Selection Priority With in this selection

ID, priority to be mentioned

BOM usage With in this selection ID and Priority, relevant BOM usage to

(39)

be selected. 3. Click Save .

Impact of this configuration in Master Data /

Transaction

During MRP run, production order or process order creation BOM selected according to this selection id priority.

(40)

3.9 Define Application

BACKGROUND

This configuration setting enables to define BOM Application. BOM application controls use of BOM in a specific area.

Areas like MRP run, cost estimate calculation etc.. will use the BOM of its own respective BOM application.

SCENARIO

BOM display at multiple levels (transaction code CS12) can be done for different BOM application. It is required to display only the costing BOM to certain users. Separate BOM application to be created to display the BOM related only to costing.

Note: - BOM with usage for costing should be available. i.e. with the right usage for costing.

INSTRUCTIONS

Follow the Menu Path: IMGàProductionàBasic dataàBill of materialsà Alternative determinationàDefine Applications

(41)

To view the details, select the line and click

2. Update the Following fields

(42)

BOM Application Enter any four digit BOM application area

Description Enter description

Selectin ID Selection ID through which BOM selected

Alternative Det.Multi.BOM To select for alternative BOM if multiple BOM is available. Tick this check box

Production Version If there is a production version, that is used as a selection criteria.

MRP explosion Leave Blank Rel planned orders Leave Blank

Release costing Tick this check box Other check boxes Leave Blank

3. Click Save .

Impact of this configuration in Master Data /

Transaction

When displaying the BOM through transaction code CS12, Right BOM usage will be displayed according to the settings maintained here. In this example, with BOM application, only the costing BOM will be displayed.

(43)

Press F4 in BOM application, where all the available setting will be displayed.

(44)

3.10 Define Alternative Determination for

Multiple BOM

BACKGROUND

This configuration setting enables to define automatic selection of right Bill Of Material during MRP and production order or process order creation, when there are more than one Bill Of Material to a material.

SCENARIO

Specific alternative BOM for some materials are to be exploded during the MRP and other production order process for specific duration.

INSTRUCTIONS

Follow the Menu Path: IMGàProductionàBasic dataàBill of materialsà Alternative determinationàDefine alternative determination for multiple BOM.

(45)

Follow the below steps to create new entries.

2. Update the Following fields

Field Description

Material Enter material code number to which alternate BOM is to be exploded

Plant Plant where it is applicable

BOM Usg BOM usage

Valid From From date of BOM explosion

Alt BOM Alternate BOM number which

is to be exploded. 3. Click Save .

Impact of this configuration in Master Data /

Transaction

Right BOM according to the setting here will be exploded during MRP and Production processing.

(46)

3.11 Alternative determination in related

application Area

BACKGROUND

Similar to the above alternate defining in production area, for other areas like Inventory, MRP, Costing, Sales and Distribution and Plant Maintenance can be maintained.

Only the menu path is given here and the rest of the settings are similar to above.

INSTRUCTIONS

Follow the Menu Path: IMGàProductionàBasic dataàBill of materialsà Alternative determinationàAlternate determination in related application area

àDefine alternate determination for inventory àProduction

àMRP àCosting

àSales and distribution and àPlant maintenance

(47)

3.12 Define User-specific setting

BACKGROUND

This configuration setting enables to configure the parameters specific to the user.

Following parameters Item category Item increment

BOM Reporting specification are can be set for a specific user.

INSTRUCTIONS

Follow the Menu Path: IMGàProductionàBasic dataàBill of materialsà Define user-specific settings

Click

To view more details, select the required row and click Click to create new entries

(48)

Select the entries and tick the check box as shown above. Field name Field value and description

User Name of the user to whom the

default settings are to be done.

Item increment While creating the BOM, incremental number to be displayed.

Mat. Item cat. Item category to be displayed by default.

(49)

list query, this check box in the selection box will appear as ticked by default.

While using the where used list query, this check box in the selection box will appear as ticked by default.

Click

Impact of this configuration in Master Data /

Transaction

User SAPUSER when creating the BOM, this default setting will appear. This will help to reduce BOM creation time.

(50)

4.

Work Center

Machines may be referred as work center. It is defined as the place where operations are carried out.

Apart from machine, group of persons (e.g. in maintenance department, certain group of people may be employed for any machinery movements etc.) may be treated as a labor work center.

Data in work center used for

Ø Scheduling – start and end of operation Ø Costing – Cost incurred during production

Ø Capacity planning - to plan the required capacity Let’s see the configuration related to Work center.

(51)

4.1 Define Work center Category

BACKGROUND

This configuration setting enables to define work center category.

Work center category is the major classification of work center by SAP. E.g. Machine, processing unit, labor are defined as a different work center category.

Work center category controls the field selection inside the work center.

SCENARIO

Create a work center category to mention skilled labor work center category.

INSTRUCTIONS

Follow the Menu Path: IMGàProductionàBasic dataàWork centerà General Data àDefine work center category.

(52)

2. Click

3. Update the Following fields

Field Description

Cat Capacity category. Any new

value may be entered. E.g. ZLAB

Description Description of the desired capacity category. E.g. Skilled Labour category

Field Selection Contains the fields required to this capacity category. Enter standard SAP value according to the capacity category. E.g. 0001

Screen sequence Sequence of tab screen to be appeared in the work center master data. Enter the standard SAP value. E.g. 0001 4. Click Enter

(53)

5. Select Created capacity category 6. Double Click

7. Click

8. Enter Application – Area in SAP where this work center category can be used. E.g. P – Routing; C - Master Recipe; Q - Quality task list etc.

9. Note:- If this work center category is to be applicable to all, maintain all the entry in this application field.

10. Click .

Impact of this configuration in Master Data /

Transaction

When creating the work center for skilled labor, work center category is to be mentioned as it is a mandatory entry.

(54)

4.2 Define Field Selection

BACKGROUND

This configuration setting enables to make the field in work center master data as

Mandatory Optional Highlight Hide

Field selection will be used to make certain field as mandatory entry or to hide certain fields during creation of work center master data.

SCENARIO

Make field person responsible for work center category 0007 as mandatory field.

INSTRUCTIONS

Follow the Menu Path: IMGàProductionàBasic dataàWork centerà General Data àDefine field selection.

(55)

2. Double click Basic data

3. Double click Person responsible

4. Click Field selection Req. radio button for the required work center category. Contents column indicate the work center category.

(56)

Note:- From this screen it may be noted that person responsible entry is mandatory for work center category 0001,0002 and 0008

5. Click to add more entry.

6. Enter content 0007 or any work center category. 7. Click radio button Req.

(57)

8. Click 9. Click

Impact of this configuration in Master Data /

Transaction

When work center with category 0007 is created, person responsible field become mandatory.

(58)

4.3 Define Task List usage

BACKGROUND

This configuration setting enables to define the task list usage to the work center.

Usage of work center specific to the task list (i.e. only in the master recipe or Routing) can be defined to restrict its usage. SCENARIO

Define the task list usage to the work center category 0007 to be used in Routing and in Reference Operations set only.

INSTRUCTIONS

Follow the Menu Path: IMGàProductionàBasic dataàWork centerà General Data àDefine task list usage.

(59)

2. Select

3. Double click Task list type 4. Click

(60)

5. Update the Following fields

Field Description

Task List type N for Routing and S for Reference Operation set 6. Click Save .

Impact of this configuration in Master Data /

Transaction

When creating Work center usage is to be mentioned as 001. Once this is maintained, then it will not be possible to use this Work center in Master Recipe or in Rate routing.

(61)

4.4 Define Parameters

BACKGROUND

This configuration setting enables to define Parameter (activities) for formula.

Parameter is one of the required settings to calculate the conversion cost incurred in the Work center during manufacturing.

Work center while in use can consume • Power

• Labour • Setup time • Depreciation • Steam etc.

The above costs incurred during conversion will be captured through the activity. Parameter is the structure to capture this activity.

This will be assigned to the standard value key. Standard value key will be assigned in the work center.

SCENARIO

Create a Parameter. Note:- Standard SAP setting is sufficient. Let us discuss the creation of new parameter.

(62)

INSTRUCTIONS

Follow the Menu Path: IMGàProductionàBasic dataàWork centerà General Data àStandard ValueàDefine Parameters.

1. Click

(63)

3. Update the Following fields

Field Description

Parameter Parameter to hold the value. Any alphanumeric six digit may be entered. E.g. LABOUR Origin Place where from the value is

to be taken. E.g. To indicate value to be taken from task list maintain 2 in this field. Short key word Short description

Key work Key word to identify

Dimension Dimension of the parameter. E.g. Any thing related to Duration may have TIME as dimension.

Standard Value Unit Unit of this parameter. E.g. Time dimension may have unit as MIN.

Note: - If any parameter for which there is no unit, it may be mentioned as no unit.

(64)

4. Click Save .

Impact of this configuration in Master Data /

Transaction

Link between the parameter and the master data is as below. a. This parameter will be assigned to the standard value

key.

b. Standard value key will be attached with the work center. c. Work center will be attached in the task list. I.e. in the

routing or in the master recipe.

d. Standard value (i.e. duration of labour hours required) will be maintained in the task list as a master data.

(65)

4.5 Define Standard Value

BACKGROUND

This configuration setting enables to define the standard value key.

Standard value key is very essential to capture the cost incurred in the work center.

Standard value key will contain the activities. One standard value key can contain up to six activities. Each activity refers to the cost. Example:-• Production cost • Set up cost • Labour cost • Quality Cost • Power cost • Steam cost

One work center can have only one standard value key. SCENARIO

Create a standard value key to have the activities of setup, machine, labor, and over head.

(66)

INSTRUCTIONS

Follow the Menu Path: IMGàProductionàBasic dataàWork centerà General Data àStandard ValueàDefine standard value key.

1. Click

(67)

3. Update the Following fields

Field Description

Standard value key Enter any alpha numeric to indicate standard value key. E.g. STD1

Description Maintain standard value key description. E.g. setup/machine/labor/Power Parameter Maintain the parameters. Up

to six parameters can be maintained.

Tick this check box to generate formula.

(68)

Impact of this configuration in Master Data /

Transaction

When creating the work center, standard value key STD1 to be mentioned.

(69)

4.6 Determine Person Responsible

BACKGROUND

This configuration setting enables to define the person responsible for work center.

Every work center will have a responsible person to schedule the work load to that machine and to monitor the working hours and output from that work center.

This field can be used for reporting purpose also. SCENARIO

Create a work center responsible person. INSTRUCTIONS

Follow the Menu Path: IMGàProductionàBasic dataàWork centerà General Data àDetermine person responsible

Click Click

(70)

Update the Following fields

Field Description

Plant Name of the plant e.g. IND6

Person Responsible Three digit alpha numeric entry to mention the responsible person to the work center. E.g. INP

Person responsible description Detailed description of the person responsible. E.g. In-charge Processing Unit

Click Save .

Impact of this configuration in Master Data /

Transaction

When creating the work center, person responsible has to be entered.

(71)

4.7 Define Control Key

BACKGROUND

This configuration setting enables to define control key. Control key governs

• Scheduling of operation

• Cost calculation for an operation • Capacity calculation for an operation • Confirmation for an operation

Control key is mapped with the work center in the task list (i.e. in the routing and in the master recipe).

SCENARIO

Create a control key with confirmation as mandatory and it should calculate the cost and capacity, it should also schedule the operation.

INSTRUCTIONS

Follow the Menu Path: IMGàProductionàBasic dataàWork centerà Routing Dataà Define control key

(72)
(73)

3. Update the Following fields

Field Description

Control Key Enter any alphanumeric four digit key. E.g. YP01

Description Maintain description of this control key. E.g. Sch/Cost/Capreq/Confreq/AutoGR Indicators Tick the check box as shown above

in the screen.

Tick in the Check box will perform the respective function to the operation / phase which is having this control key.

(74)

5. Click to maintain any long text to this control key.

6. Maintain the long text.

7. Click Save . 8. Click

9. Click if you get the Other language screen. 10. Click Save .

Impact of this configuration in Master Data /

Transaction

Link between control key and

Transaction:-Control key is attached in the task list with work center for each operation

(75)

While performing order creation, confirmation, MRP run system will behave according to this configuration setting.

(76)

5.

Capacity Planning

5.1 Define Capacity Category

BACKGROUND

This configuration setting enables to define the capacity category.

Capacity category will differentiate the type of capacity used in the work center.

Capacities can be • Machine • Labor

• Processing unit

Capacity category and capacity details are assigned to the work center.

SCENARIO

Create a capacity category. INSTRUCTIONS

Follow the Menu Path: IMGàProductionàBasic dataàWork centerà Capacity Planningà Define capacity category

1. Click 2. Click

(77)

3. Update the Following fields

Field Description

Category Capacity category. E.g 001 Description Description of capacity

category e.g. machine

4. Click Save .

Impact of this configuration in Master Data /

Transaction

Capacity category is to be mentioned in the capacity header detail in the work center.

(78)

5.2 Determine Capacity Planner

BACKGROUND

This configuration setting enables to define the capacity planner.

Capacity planner is the person who is responsible to plan and schedule the specified capacity.

SCENARIO

Create a capacity planner. INSTRUCTIONS

Follow the Menu Path: IMGàProductionàBasic dataàWork centerà Capacity Planningà Determine capacity planner

(79)

2. Click

3. Update the Following fields

(80)

Planner Enter capacity planner. E.g. IN6

Description Enter capacity planner

description. E.g. Processing unit plan

4. Click Save .

Impact of this configuration in Master Data /

Transaction

Capacity planner is to be mentioned in the capacity header detail in the work center.

(81)

5.3 Define Shift Sequence

BACKGROUND

This configuration setting enables to define shift sequence. Shift sequence is used to define the specific working pattern. I.e. weekly holidays, number of shift and working hours of each shift.

Work center capacity is calculated from its working hours defined in the capacity header details of the work center.

There are mainly three ways to define capacity for each work center.

• Normal capacity

• Available Interval capacity • Interval and shifts

Normal capacity is defined through the working hrs and break in the capacity header

Available interval capacity is the capacity available for any specific duration; it is defined at the capacity header detail Interval and shifts is defining the shifts in which the machine or industry works.

SCENARIO

Create a shift sequence with two shifts a day and Thursday and Friday as weekly holiday.

(82)

INSTRUCTIONS

Follow the Menu Path: IMGàProductionàBasic dataàWork centerà Capacity Planningà Available capacityà Define shift sequence

1. Click

2. Click

3. Update the Following fields

(83)

Grouping Enter shifting grouping. E.g. SG

Description Enter description E.g. Special Grouping

4. Click two times 5. Select the Grouping 6. Double Click

7. Click

8. Update the Following fields

Field Description

Break Enter the Break name. E.g.

IN6B

Break Number Enter the break number E.g. 1 Description Description of break. E.g.

First shift break

Start Break start time

End Break end time

9. Click (Complete all the break required as explained above)

(84)

10. Click

11. Select the break 1 line 12. Double click

13. Click

14. Update the Following fields

Field Description

Shift Enter shift name. E.g.1SHF

(85)

First shift

Start date Starting date of the shift End date End date of the shift Start time Starting time of the shift End Time End time of the shift

Break Enter the Break schedule. E.g. IND6

15. Click

16. Select the 1SHT line 17. Double click

(86)

19. Update the Following fields

Field Description

Sequence Enter the sequence No. E.g. 01

Shift No. Shift number in the sequence. E.g. 1

Description Description of the shift sequence. E.g. Two shift per day

Day1 to Day 7 Maintain the desired shift definition the day to follow. E.g. 1SHT and 2SHT in all days except Thursday and Friday.

20. Click

21. Click Save .

Impact of this configuration in Master Data /

Transaction

This shift sequence can be maintained as an interval of available capacity.

(87)

This can be maintained in the work center capacity header detail.

Once this is assigned, working days and hours to this work center will be as per this shift sequence.

(88)

5.4 Define Formula Parameters for Work centers

BACKGROUND

This configuration setting enables to define the parameter for the formula.

Formulas are to be defined to calculate Cost

Capacity requirements Schedule the operation

Formula parameter will be used in the formulas. Formulas are used in the work center capacity view, scheduling view and costing view to

Calculate capacity Schedule the operation Calculate the activity cost.

Note:-This configuration is similar to defining the parameter explained above. However it is reproduced for your quick reference here also.

SCENARIO

(89)

INSTRUCTIONS

Follow the Menu Path: IMGàProductionàBasic dataàWork centerà Capacity Planningà Work center formulasà Define formula parameter for work center

1. Click 2. Click

3. Update the Following fields

Field Description

Parameter Parameter to hold the value. Any alphanumeric six digit may be entered. E.g. LABOUR Origin Place where from the value is

to be taken. E.g. To indicate value to be taken from task list maintain 2 in this field. Short key word Short description

Key work Key word to identify

Dimension Dimension of the parameter. E.g. Any thing related to Duration may have TIME as dimension.

(90)

Time dimension may have unit as MIN.

Note: - If any parameter for which there is no unit, it may be mentioned as no unit.

4. Click Save .

Impact of this configuration in Master Data /

Transaction

(91)

5.5 Define Formula for Work centers

BACKGROUND

This configuration setting enables to define the formulas. Formulas are used in

• Calculate capacity requirement

• Schedule the start and end of the operation • Calculate the cost

Formulas will be assigned in the work center capacity view, scheduling view and in costing view.

SCENARIO

Create the formula to calculate the machining time.

Note: - standard formula given by SAP will meet many requirements. Let’s discuss the creation of formula.

INSTRUCTIONS

Follow the Menu Path: IMGàProductionàBasic dataàWork centerà Capacity Planningà Work center formulasà Define formula parameter for work center

(92)

2. Click

3. Update the Following fields

Field Description

Formula Key Enter formula key. E.g. SAP002

Description of the formula key Enter description

Formula Maintain the formula. Mostly SAP defined formula would be sufficient. Let us discuss the SAP Standard formula and understand it. Any new formula can be created similar to it.

(93)

4. Parameter defined here are

SAP_02 Machine value from routing

SAP_09 Operation quantity- value from routing field operation qty.

SAP_08 Base Quantity – value from routing field base quantity

SAP_11 Operation split – value from routing field split Above formula defined to calculate the machining time,

Machine time * Operation Quantity / Base quantity / Operation Split

5.

Indicators:-Field name Field description and value Tick in this check box indicates, this formula is generated in the system.

Tick in this check box indicates, this formula can be

(94)

used to calculate cost.

Tick in this check box indicates, this formula can be used to calculate capacity requirements in MRP.

Tick in this check box indicates, this formula can be used to calculate PRT requirements.

Tick in this check box indicates, this formula can be used for scheduling operations.

Impact of this configuration in Master Data /

Transaction

Formula is used in work center capacity, scheduling and costing views.

(95)

5.6 Define Factory calendar

BACKGROUND

This configuration setting enables to define the Factory calendar.

Factory calendar will contain the entire working day and holiday details for a specific plant.

Factory calendar will be attached to the capacity header. Factory calendar will be referred while scheduling the operations.

SCENARIO

Define factory calendar for plant IND6. INSTRUCTIONS

Follow the Menu Path: IMGàGeneral settings à Maintain Calendar

Note: - Factory calendar will be defined directly in the client. It will not be captured and transported through Transport Management.

(96)

First Holiday calendar has to be maintained. There are two holiday calendar,

1. Public holidays

2. Specific Holiday calendar Steps involved in Calendar maintenance are

• Create public holidays

• Create Holiday calendar and assign the public holiday in the holiday calendar

• Create Factory calendar and assign the Holiday calendar in the factory calendar.

Then the holiday calendar will be assigned to the factory Calendar.

(97)

Select Radio button Public holidays Click

(98)

Select Click

(99)

Click

Create all public holiday by repeating the above explained steps.

Click Select Click

(100)

Enter calendar id. E.g. I6 to indicate it is for IND6 Plant

Enter description of the calendar. E.g. Holiday Calendar for IND6 plant.

(101)

Click

Select the required public holidays to be assigned to the holiday calendar.

(102)
(103)

Note: - Whenever the calendar maintenance are saved, system will give the message as shown above.

Click

Note: - To delete the assignment select the required holiday and click

Click two times Click

(104)
(105)

Maintain the entry as above. Click

Click

(106)

5.7 Define Default Capacity

BACKGROUND

This configuration setting enables to define the default capacity category for a plant.

By defining the default capacity, for work center and resource, if the capacity is not defined, system will consider this default capacity detail.

SCENARIO

Define default capacity category for plant IND6. INSTRUCTIONS

Follow the Menu Path: IMGàProductionàBasic dataàWork centerà Capacity Planningà Define default capacity

(107)

Update the Following fields

Field Description

Plant Enter the name of the plan.

E.g. IND6

Category Capacity category. E.g. 001 Click

(108)

Note: - this is the master data can be maintained inside the each resource or work center in capacity header details.

(109)

5.8 Define Work center screen sequence

BACKGROUND

This configuration setting enables to define the screen sequence for work center.

Screen sequence setting controls the sequence of appearance of screen while creating the work center master data.

Work center contains the following important tab screens • Basic view • Default values • Capacity • Scheduling • Costing SCENARIO

Create a different screen sequence for work center category ZLAB.

INSTRUCTIONS

Follow the Menu Path: IMGàProductionàBasic dataàWork centerà Setup work center screen sequence

(110)

2. Enter work center category ZLAB 3. Click

Field Description

No Sequence number in which

tab screens are to be displayed

Man Mandatory. Entry to be made

in this tab screen if this check box is ticked.

Note: - Normally this setting is not at all disturbed, except making some tab screen as mandatory.

(111)

Impact of this configuration in Master Data /

Transaction

While creating the work center the sequence of Tab screen will appear as per the configuration setting done here.

(112)

6.

Routing

Routing explains how the product is to be manufactured. It may be compared to a process sheet in the conventional system. It contains

Ø Operations to be carried out during manufacturing Ø Use of material during production

Ø Use of work centers

(113)

6.1

Define Standard value description in

operation over view

BACKGROUND

This configuration setting enables to define a key to hold the standard text to be used in the routing operation.

If any common operation description is to be referred in the task list (routing or in the master recipe), a standard key containing the text can be used.

SCENARIO

Create a standard value key text for Routing. INSTRUCTIONS

Follow the Menu Path: IMGàProductionàBasic dataàRoutingà Control dataà Define standard value description in operation over view

1. Click

2. Enter task list type N for routing 3. Click

4. Click

5. Update the Following fields

Field Description

(114)

1st SV Txt upto 6th SVTxt

value

First standard value text up to 6th standard value text value.

Text entered will appear in the routing operation.

6. Click Save .

Impact of this configuration in Master Data /

Transaction

While confirming the operation these texts will appear against the activity type.

(115)

6.2 Define Routing Status

BACKGROUND

This configuration setting enables to define the routing status. Routing status helps to use the routing only for specified purpose. I.e. Routing use can be restricted only for costing purpose till the costing trial is completed.

Routing status can be In Process

Released for costing only Released for production

Selection of routing during production order or process order creation is based on the routing selection.

Routing status has to be maintained in the routing header. SCENARIO

Create a routing status. INSTRUCTIONS

Follow the Menu Path: IMGàProductionàBasic dataàRoutingà General dataà Define routing statuses

(116)

2. Click

3. Update the Following fields

Field Description

Status number Enter numeric value

Description Description of the status number. E.g. Under creation, or only for costing.

RelInd Released Indicator, when this is set, routing will be used in Orders.

Costing Indicates, task list is released for costing.

Consistency Chk Consistency check is carryout automatically when saving. 4. Click Save .

Impact of this configuration in Master Data /

Transaction

(117)

6.3 Define Task List usage

BACKGROUND

This configuration setting enables to define task list usage. Task list usage defines the specific purpose of routing. There are four important usage of Routing.

• Production usage • Costing only

• Sales and Distribution • Universal ( all purpose)

It is possible to control the usage of routing according to its usage.

SCENARIO

Define routing usage for multi purpose usage. INSTRUCTIONS

Follow the Menu Path: IMGàProductionàBasic dataàRoutingà General dataà Define routing usage

(118)

2. Click

3. Update the Following fields

Field Description

Usage Enter the usage number. Any

numeric number. E.g. 1

Description Description of the usage. E.g. Universal

4. Click Save .

Impact of this configuration in Master Data /

Transaction

(119)

6.4 Define Reduction Strategy

BACKGROUND

This configuration setting enables to define reduction strategy. Reduction strategy defines the sequence of compressing the time or duration to meet the production dates.

Reduction strategy can reduce the following times which are involved in scheduling

• Queue time • Move time • Over lapping • Split

Reduction strategy will be employed when the calculated lead time in scheduling is longer than the time between the basic dates (required start date and finish date is the basic date), the system will carry out reduction measures to reduce the lead time.

Reduction is carried out step by step. After each reduction measure, the system checks whether the calculated dates are within the basic dates. If this is the case, no further reduction measures are carried out.

SCENARIO

(120)

INSTRUCTIONS

Follow the Menu Path: IMGàProductionàBasic dataàRoutingà Operation dataà Define reduction strategy

1. Click

2. Click

3. Update the Following fields

Field Description

Plant Enter the plant to which

reduction strategy is to be created. E.g. IND6

Reduction strategy key Any number to identify the reduction strategy. E.g. 1

Reduction strategy Description of Reduction strategy. E.g. Over al reduction for IND6

(121)

5. Select the Reduction strategy key entered above 6. Double click

7. Click

8. Update the Following fields

Field Description

Re Reduction Level. E.g. 1

Reduction Queue Enter the % of reduction in queue time

Transport Tick the check box to indicate the reduction in move time Overlap Tick the check box to indicate

the reduction in move time Split Tick the check box to indicate

the reduction in move time Note: - Repeat the above step as different level as shown below.

(122)

9. Click Save .

Impact of this configuration in Master Data /

Transaction

(123)

6.5 Define User Fields

BACKGROUND

This configuration setting enables to define user fields.

User field can be used in the operation heading in the task list to define your own reference data.

Maximum of six fields can be defined through the user field. SCENARIO

Create user defined field. INSTRUCTIONS

Follow the Menu Path: IMGàProductionàBasic dataàRoutingà Operation dataà Define user fields

(124)

2. Click

3. Update the Following fields

Field Description

Field Key Enter the name of the field. E.g. OPERDT

Description of the field key Enter the description. E.g. Operation detail user field

(125)

Maintain the text field as shown above

Impact of this configuration in Master Data /

Transaction

User field may be maintained at Routing operation header level. Below screen shows the user field, where the details of created by and other details can be maintained.

(126)
(127)

6.6 Define Routing Selection Automatic

BACKGROUND

This configuration setting enables to configure the automatic selection of routing (Task list).

Task list has to be selected automatically during • Production order creation (Routing)

• Process order creation (Master recipe) • Cost estimate calculation

• MRP run

Routing is essential to

• Calculate the conversion cost

• Calculate the capacity requirements • Schedule the operation

• To schedule the material at right time in MRP SCENARIO

Define Automatic routing selection. INSTRUCTIONS

Follow the Menu Path: IMGàProductionàBasic dataàRoutingà Routing selectionà Select automatically

(128)

1. Click

2. Click

3. Update the Following fields

Field Description

ID Selection id. E.g. 01

Selection Priority Priority of selection in this ID. E.g. enter from 1,2 …

Task List type Mention the task list type. E.g. N for routing, 2 for master recipe

Usage Enter the Usage of this task

list. E.g. 1

Status Enter the status of this task list. E.g. 4

(129)

Impact of this configuration in Master Data /

Transaction

In the order type dependant parameter and MRP plant parameter configuration

Selection id 01 will be mentioned.

While performing the transaction (creation of process order or production order or MRP run), automatic selection of routing will be performed in the following sequence:

• First system will search task list type routing as per the sequence 1

• System will search for routing with usage 1 • System will search for routing with status 4

If the above search fails, system will go to the next sequence in the same selection id. I.e. sequence no. 2 in our above shown screen shot.

• system will search task list type routing as per the sequence 2

• System will search for routing with usage 1 • System will search for routing with status 2

(130)

7.

Summary:-We have discussed the Master data related configuration settings.

You must be able to configure master data in SAP according to the business requirement in the following areas

Bill Of Material Work center Routing

Friends, please note that the most of the configuration settings related to master data are common to manufacturing types

Discrete PPPI

Repetitive

The terminology only differs in the various processes. For E.g. Routing is called as master recipe in PP-PI and in repetitive routing is called as rate routing.

Discrete PPPI Repetitive Routing Master Recipe Rate Routing Work center Resource Production line

References

Related documents

In addition, if I marked "Yes" to any of the above questions, I hereby authorize release of information from my Department of Transportation regulated drug and alcohol

Eprints Metadata re-use permitted for not-for-profit purposes; Re-use of full data items permitted for not-for-profit purposes; Content policies explicitly undefined ;

[r]

In a sidebar, it notes that filters required by CIPA not only block access to legitimate learning content and tools, but also that CIPA requirements create a significant

We discussed many examples of this interaction, for different types of institutions (such as political and legal institutions, regulation, and the welfare state) and

The PROMs questionnaire used in the national programme, contains several elements; the EQ-5D measure, which forms the basis for all individual procedure

–  Use Apex code to access external REST API’s –  Can be used to send data out or pull data in to/.. from an

The consultation ‘agenda’ document cited household income, consumption expenditure, material deprivation indicators and subjective satisfaction measures as four of the main