• No results found

PROJECT REFERENCE LIST

N/A
N/A
Protected

Academic year: 2021

Share "PROJECT REFERENCE LIST"

Copied!
5
0
0

Loading.... (view fulltext now)

Full text

(1)

Underground Utility Contractor

23435 Hall Road ♦ Sedalia, MO 65301 660-826-0274 ♦ Fax: 660-829-0889

E-mail: [email protected] ♦www.SprayComUtilitiesInc.co

m

PROJECT REFERENCE LIST

1 Whiteman Air Force Base, Missouri Storm Drainage Project

Project # F25606-94-C0020 September 94 - November 95

This project involved the installation of 8500 LF of storm drainage with 103 inlets, grading, seed and sod. The project was performed in the base housing area. ($789,000)

Contract Inspector: Roy Thomas 816-687-6281 2 Whiteman Air Force Base, Missouri Manhole Rehabilitation Project Project # F23606-96-C0013 March 96 - June 97

The contract was for the rehabilitation of 334 manholes, new frame/covers, and the replacement of existing manholes using the Permacast/Permaform process. ($739,000)

Contract Inspector: Roy Faulkner 816-687-6285

3 City of Topeka, Kansas Manhole Rehabilitation Project Project # 29089

April 97 - July 97

This contract was for the rehabilitation of 28 manholes using Permacast Cementitious liner, renewal of 16 manholes using the Permaform process of placing steel forms inside the existing manholes, wrapping the forms with PVC T-Lock lining, and pouring high strength fiber reinforced concrete.

($232,000)

Project Engineer: White, Martin, and Assoc. Robert A. Koopman, P.E. 913-233-8300

4 Jefferson County, Kansas Manhole Rehabilitation Project Lakeshore Estates-Perry Lake, Kansas September 97 - April 98

The rehabilitation of 129 manholes using the Permacast cementitious liner process. ($132,000) Project Engineer BG Consultants Inc.

Mark Bachamp, P.E. 913-537-7448 5 City of San Diego, CA.

Repair Sewer Manholes (So. of PS #1) JOC # 97-00006

October ‘97 to March ‘98

This project was for the renewal of 10 manholes using the Permaform steel forms process and PVC T-Lock lining. Special conditions: This project was conducted in existing manholes over an active Eight foot interceptor line. Safety platforms where placed over the large diameter pipe to allow crews

(2)

To work safely inside the manholes. Additional S.C.B.A. and Confined Space training/certification Was required. ($310,000)

Project Engineer: Harry L. Herman Jr., C.E. Public Works Division City of San Diego, CA 619- 654-422

6 City of Hermann, MO. Manhole Rehab # 98-10 September 98 - October 98

Work consisted of the renewal of 26 manholes with Permacast cementitious liner. ($43,000) Public Works Director: Wayne Bruckerhoff

573-486-5400 7 City of Lexington, MO.

Manhole Rehab, Phase 1, Project # 98-PF-19 February 99 to August 99

The rehabilitation of 85 manholes with Permacast cementitious liner, the rehab of 10 manholes that was structurally unsound with Permaform steel forms and PVC liner, epoxy of 7 manholes that had high concentrations of hydrogen sulfide gases. ($238,000)

City Engineer: Kenny Maib, P.E. 1-660-259-4633

Project Engineer: George Butler Associates J. Thad May, P.E. 913-492-0400 8 City of Sioux Falls, SD

Tuthill Lift Station Rehabilitation Project C461232-14 September 99 - October 99

The rebuilding of the effluent rectangular conduit by removal of the old concrete structure and forming and pouring a new concrete conduit with a PVC T-Lock liner to resist against Hydrogen sulfide gases. Special conditions: The project required bypass pumping of seven million gallons of affluent per day for 17 days. ($192,000)

Project Engineer: Larry Fassett P.E. 605-367-7048 9 City of Farmington, MO. October 99 - December 99

Renewal of 53 manholes with Permacast cementitious liner. Grade adjustment of 5 frames & covers. This work was sub contracted through the eastern Missouri licensee. ($45,000.)

Specialty Sewer Services Inc. Norm Sirna

314-731-7784 10 City of St. Louis, MO. January 00-Feburary 00

Renewal of 33 manholes with Permacast cementitious liner. These manholes where rehabilitated as Part of a pipelining project with Insituform Inc. ($39,000)

Specialty Sewer Services Inc.

Norm Sirna

314-731-7784 11 City of Des Moines, IA

April 00-May 00

Rehabilitation of large containment chambers at the main treatment plant with Permacast Cementitious liner, Fortified with Conshield. ($87,000)

Project Engineer: Jeff Hanson P.E. City of Des Moines, IA 515-283-4014

(3)

12 City of Saint Louis, MO (MSD) October 00-November 00

Rehab of three concrete shafts over main interceptor line. Maline Drop Shafts where 8x9ft and 54 ft deep. Interior walls had serious deterioration due to heavy concentration of hydrogen sulfide. Rebuilt to original thickness using Permacast Construction Grout and cementitious liner, all fortified with Conshield. ($96,548.)

Project Engineer: Gary Buchanan

Bessell WWTP-Lift Station Division City of Saint Louis, MO

314-436-8773

13 Whiteman Air Force Base, MO. Storm Drainage Project

Project # YWHG 95-2003 December 00-December 01

Work consisted of excavation and installation of 7,150 ft of drainage pipe, 112 drop inlets, 80 under street or driveway bores, and 70,000 yd of grading/seed/sod. ($562,517)

Project Inspector: Gary Hall

660-687-6281 14 Whiteman Air Force Base, MO.

Storm Drainage Project Project #YWHG 94-9103R2 March 01-December 01

Work consisted of excavation and installation of 2,203 ft of storm drainage pipe, 36 drop inlets, 12 under street or driveway bores, and 27,000 yd of grading/seed/sod. ($314,380.)

Project Inspector: Gary Hall 660-687-6281 15 City of Kansas City, MO

May 02 - February 03

City Wide Manhole Rehabilitation-Phase 7: Buckeye Creek Project # 757

This contract was for the replacement of 671 frame & covers, 6290 vertical feet of Permacast Cementitious liner (671 manholes), 205 vertical feet of epoxy liner (17 manholes). ($1,017,123.) Project Engineer: Joseph H. Engleman, G.E.

816-513-2207

16 Whiteman Air Force Base, MO. April 02 – November 02

Repair Sewer Laterals for family Housing DO# 7130

Project # 060100

The work consists of excavation, replacement or lining of existing sewer laterals, seed and sod, within the base family housing area. ($292,890)

Base Civil Engineer: Ernie Macios 660-687-6295 17 Whiteman Air Force Base, MO.

March 03 – June 04

Repair Sewer System/Lateral Lines DO # 5001 & 5002

The Work consisted of Excavation & Replacement, CIPP Lining, CCTV Inspection, of Sewer Mains and Laterals in Base Housing. This is a Current IDIQ Project. ($695,000).

Base Civil Engineer: Ernie Macios 660-687-6295 18 Whiteman Air Force Base, MO

February 04 – December, 04 Erosion Control, North Bowl DO # 7274

(4)

Work Consists of Excavation and Installation of 1750 lineal feet of Storm Drainage Pipe and concrete Structures along the Airfield Taxi and Runway areas, to include approximately 3.5 Acres of reshaping and Seeding. ($180,000)

Project Manager: Mark Newby

Centennial Contractors Inc

660-563-6307

19 Whiteman Air Force Base, MO July 04 – June 06

DO # 5003, 5004, 5005, 5006, 5007, 5008, 2009 and 5010

These projects where for the Repair and/or Replacement of Sewer Mains and Laterals Base wide. Includes Excavation, Cured-in-Place Pipe (CIPP) Lining, Closed Circuit Televised (CCTV) Inspection, Pipe Cleaning, Pipe and Manhole Installation. ($1,047,053)

Base Civil Engineer: Ernie Macios 660-678-6295 20 City of Osage Beach, MO

Oct 06 - May 07

Project: Tan-tar-a Sewer Rehab Phase 1

This project was for rehabilitation of manholes by Cementitious Lining and Permaform, Relining of the Sewer Mains by Cured-in-Place Pipe (CIPP), and Frame & Cover Replacement. ($103,906)

Project Engineer: Phillip Alton

573-302-2000 ext. 291 21 Burlington Northern Santa Fe Railroad Clovis, N Mexico

Jan 01 – Feb 01

The work consisted of lining new Diesel Refueling structures by Appling Cementitious material and Epoxy Coating. ($78000)

Project Engineer: Kinley Construction

Dennis Hemmingway, P.E. 817-461-2100

22 Whiteman Air Force Base, MO 06 March – 06 Sept

Project: Houx Lake- Erosion Control

This was a combined Erosion Control and Beautification Project in the Houx area Watershed. The work Consisted of Grubbing, Demolition of Sewer, Water, and Electrical Mains and Relocation around the area That was designated for a New Lake. This included the Building of a Concrete Drop Overflow Connected To the Bridge Concrete Conduit under Houx Avenue, an Island with Crossover Walk Bridges, and a Walking Trail. ($374,540)

Base Civil Engineer: Ernie Macios 660-678-6295

23 Whiteman Air Force Base, MO 06 Oct – 07 Sept

Project: Bomb Rack Assembly Building

This consisted of the Excavation, Forming of Foundation Pad and Approaches, Concrete and Reinforcement, Water, Drainage, Grading and Sod. ($121,396)

Base Civil Engineer: Ernie Macios 660-678-6295

24 City of Osage Beach, MO 07 Feb - 07 May

Project: OB06-011

Woodland Shores Sewer Rehab

Project: The work was for the Installation of a new Sewer System in place of the old Septic Units, the installation of a Forced Main Lift Station, and the Reconnection of the Existing Sewer Laterals. ($148,905)

(5)

Project Engineer: Phillip Alton

573-302-2000 ext. 291 25 Whiteman Air Force Base, MO

06 March – December 07

Fine Grading in New Housing, Phase 1& 2

Project: This Project was the Backfilling, Tillage, and Grading to Elevation of Topsoil in Preparation of Seeding and Sod to the new Housing Projects. ($343,889)

Mid America Turf: Tim Stroh 660-747-8873 26 Whiteman Air Force Base, MO

06 Nov – December 07 Base Housing Demolition

Project: This work Consisted of Delivery of Backfill Material to 96 Basement Sites, Backfilling, compaction Grading to the proper elevation, and seeding in Preparation of the next Phase of New Housing to be built. ($271,403)

Parsons Evergreene: Carlos Salcedo 660-563-3289

27 Tipton, Missouri 07 Nov – October 08

Project: Clean & Televise (CCTV) Sewer Main Pipeline & Root Control. This included furnishing Videos and Data for Evaluation. ($176,018)

Project Engineer: Allgeier Martin & Associates: Eugene Spears 417-6245703

28 Whiteman Air Force Base, Missouri 07 November – 08 October

BRAC Squadron Building

Project: This work Consisted of Demolition of Base Utilities within the Work Site Area, Clearing and Grubbing, Earthwork, Excavation of the Foundation and Basement Floor, Backfill and Compaction, Installation of to Lift Stations, Sanitary and Storm Sewer installation, and new Parking Area. ($926,000). General Contractor: Mason and Hangar

Richard Cox 913-681-2323

References

Related documents

We assumed that, all the participants at the beginning were consistently adherent to certain beneficial weight loss behaviors (such as dietary self-monitoring in our study) and

Hotelling yang ditampilkan pada Gambar 4. diketahui bahwa proses produksi transformator hermetically sealed 100 kVA belum terkendali secara statistik dalam mean

That small scale productions are praised by critics becomes apparent when reading the Press Cuttings Books of the Royal Shakespeare Company, The Royal National

convex A set is called convex if the connecting line between any two points in the set is also in the set; a function is called convex if the connecting line between any two points

Recurrent neural network (RNN) is one powerful method to extract and update the correlations of sequential data, owing to its structure by augmenting recurrent links to hidden

If the contractor provides similar services independently to the general public, but does not satisfy these conditions, refer to Finance who may apply to the relevant Commissioner

H1: SMEs representing individual clusters (based on the use of marketing communication tools and their intended use) in terms of selected attributes (enterprise size,

Alternately, one may follow Incurvati and Schlöder (ibid.) in putting public speech acts first. To assert ‘It might be that p’ is to commit to ruling out adding ~p to