Knowledge Based on Exercises in TSCM50
1. MySAP Business Suite & My SAP SCM Solution
• MySAP Business Suite is a complete package of open company solutions that connect all people information, and processes, therefore increasing the effectivity of the business relationships. Suite incorporates cross-industry solutions, industry business solutions, technological infrastructure, and services.
•
SAP product strategy ( R/2 (mainframe)-> R3 (integrated bus process) ->SAP Netweaver, mysap bus suite, Sap X Apps (enterprise service architecture/ web services)•
mySAP Business Suite is built on SAP NetWeaver, an open, scalable infrastructure that allows integration within heterogeneous environments (SAP and non-SAP components).•
The SAP Customer Services Network includes: - Consulting for business solutions (design of business solutions, project management, business improvement). - Services for solution operations (technical implementation and ongoing optimization). –Training, - Support (24x7 support, EarlyWatch, GoingLive).•
MySAP ERP consist of SAP R/3 enterprice, SAP Netweaver, My SAP FI, MySAP HR. ERP (Enterprise Resource Planning) functionality is a fundamental building block of all e-business solutions (enterprise centric functionality).•
Industry solution : Automotive,Oil, Cross industry solution : MySAP SCM, My SAP PLM…• Component My SAP Business Suite : BW, CRM, APO, SRM,SEM
•
SAP Enterprise Portal, users can access a wide range of applications (such as R/3, legacy systems, mySAP Business Intelligence (mySAP BI), and mySAP CRM. They can also use various Internet services.•
SAP NetWeaver is the first platform that makes an Enterprise Service Architecture (ESA) a reality. Enterprise Services Architecture provides a blueprint for services-based, enterprise-scale business solutions -- solutions that are adaptable, flexible, and open, for lower total cost of ownership.•
Technology SAP Netweaver : ESA, SAP xApps, SAP Costumer service network, SAP Global support (Support, Going live check, SAP early watch alert, SAP early watch check, SMA : SAP Solution Management Assistance), SMO (SAP Solution management Optimization), SAP Solman, SAP service market place.•
SAP Solution Manager is the platform that provides integratedcontent,tools, and methods needed to implement, support, and operate an SAP solution during all phases of the life cycle.
•
The main goals of Supply Chain Management include the reduction ofvcosts for procuring finished products and raw materials, the improvement of customer service, a dramatic reduction of warehouse stocks and the use of all resources to bring substantial advantages to the company.•
Aims of the mySAP SCM solution : Explain the main differences between mySAP SCM and the Logistics part within SAP R/3, in particular:-
mySAP SCM is based on different SAP components such as SAP R/3, SAP APO and SAP BW-
mySAP SCM was developed to control Logistics in international companies with several plants, whereas SAP R/3 concentrates on the optimization of individual plants.Navigation
•
SAP logon : GUI : General front end program to acess SAP. When you call upSAP Logon, it displays a list of SAP systems for which you can start the
logon process, ex Sap logon Mulia, Pertamina,..ICP, SG, KS.
• Can log in many language, depends on your installment.
•
Log on screen (input client, user name, pass..), bias dicustom untuk ditempatkan text SAP Note 205487.• Admnistrator can mange how many permissible session.
• User master record client specific (misal user ID TRAIN, hanya ada di client 100), can be set for multiple log on
•
Screen structure (SAP Eas Acces= menu standar SAP), di kanan bisa diinput company Logo (di system adminitrator setting)• Screen element
Command field : You can start applications directly by entering their
transaction code in the command field (this is hidden as default).
Menu bar : The menu bar is the top line of any primary window in the
SAP system. These menus may also contain cascading menus.
Standard toolbar : The pushbuttons in the standard toolbar are
shown on every SAP screen.
Title bar : The title bar names the function that you are currently in. Application toolbar : This shows the pushbuttons available in the
application that you are currently in.
Checkboxes : Checkboxes allow you to select several options from a
group of fields.
Radio buttons : You can only select one option.
Tab : This allows you to organize several screen areas to improve
clarity.
. Status bar : The status bar displays information on the current
system status, such as warnings and errors.Favorite List ansactions that they have authorization for.
The role-based user menu is created according to the role(s) assigned to
the user and is transferred to the front end.
Calling Function :
/n : cancel the current transaction
/o : display an overview of sessions
/o#### :call transaction #### in a new session directly from
another transaction
/nend : end the logon session with a confirmation dialog box /nex : end the logon session without a confirmation dialog box
/i : delete the session you are currently using
search_sap_menu or search_user_menu in the command field, you
can search either the SAP standard menu or your user menu for a string or transaction code of your choice
Getting Help : F1 : Display technical information, online help SAP library; F4 : Display information on possible input value2. Basic Procurement Process Organizational structure in Logistics
Client: An organizational unit within SAP R/3 that holds its own data, master records, and set of tables. A client ID consists of a unique 3-character key. Reflects a corporate group in business viewpoint. Highest hierarchical level. Acces authorization, user master, data processing adan evaluation is client specific basis.
Company Code: The smallest org. unit that holds its own independent accounting unit. It is also considered as a legal entity that produces B/S, P + L statements required by law.Organization accounting unit which has finally statements of a account (BS, P&L), tax reporting. Config : Address, COA, BA (differentiate area responsibility company). Sales Org always asigned to CC
.
company code representsan independent unit producing its own balance sheet, for example, A company within a corporate group (client).
4 char alphanumeric
Controlling Area
Organitation Unit has complete, self contained cost accounting can be carried out (P&L)
CC diassign ke COA
Plant: The organizational unit, where materials are produced or goods and services are provided. It also considered as a logistical org. unit that structures the enterprise from the perspective of prod, proc, PM, and materials planning.1 plant can only ever belong to one single company code in SAP R/3. Config :
1 BA = 1 Plant & Div
1 Pl = N Sales Org/Dist chan combination 1 Pl = N shipping point, 1 Ship point = N Pl
Pl = has address & language, own mat master data, data plant level : Purch, MRP, storage, Work sched, Production, Controlling, SD, QM.
Can be : Production facility, Distribution center, Regional sales office, Corporate headquarters, Maintenance location
4 char alphanumeric
Storage Location: An org. unit that allows the differentiation of material stocks within a plant. Physical inventory and IM on a quantity basis is carried out at SLoc level.Physically location managed stock, Stock take, stock managed only in qty not value (Kalo GR 561, masukin sloc dan harga maka nanti harga di level plant otomatis dirata2kan).
Same Sloc key, can be used for many plants. 1 or N address for 1 Sloc => delivery address in PO. Several storage locations may be assigned to a plant, but a certain storage location can only belong to one plant only. Storage locations are defined especially for a plant and are thus assigned to this plant. The key of a storage location need only be unique within a plant. Within a client, the same key can be used for different storage locations, since when you specify a storage location you always have to specify the plant too.
4 char alphanumeric Valuation area
Org unit subdevides enterprise for the purpose of uniform & complere valuation of material stock
Val area = CC, Price control material applyed per CC, uniform all plant
Val area =Pl, Pcice control appllied per Pl, Diferentiate among plant => mandatory if using PP.
Valuation category ; misal digunakan jika ingin dibekakan barang di produksi dgn yag di subcont melalui val type
Organizational structure in Purchasing/Procurement
Purchasing Org.: An org. unit that responsible for negotiating conditions of purchase with vendors for one or more plant. Its legal responsible is producing purchasing contracts.Org unit within logistic that subdivide comp according req purchasing. Responsible for all purch activity (procure mat & service, negotiation with vendor)
Form of Purch Org :
Corporate group/ cross CC POrg : 1 POrg = N CC (Central Porg = tdk ada assign POrg -> CC) (1 Porg for all CC within 1 client). Do not assign a company code to purch org, but specify the company code concerned for each individual purchasing transaction. You assign plants from different company codes to the purch org.
Company specific/ cross plant : 1 CC = N POrg, 1 POrg = N Pl Caranya assign plant to CC, lalu asign plant ke P Org => Fig 29 (1 Porg for 1 CC), atau sebaliknya 1 plant = N P Org
Plant specific : 1 CC= 1 POrg = 1 Pl ( 1 POrg for 1 plant). Assign a company code to the purch org.
1 Purch Org = Own condition Price determination, Vendor master data (Purch & partner role), evaluation vendor eval, authorization, Transaction, Selection criteria reporting.
Asignment : POrg -> CC -> Plant, Porg-> Pl. Harus assign Porg keCC & Plant Purch Org bs centeralize/ desectrilize/ mix in your campany. 1 Purch org bs dilink ke 1 atau lebih purch org lainnya, mix purch org structure (=ref purch org). Memungkinkan 1 ref purch org to access the contracts and conditions of another, term negotiated oleh 1 purc org, sehingga bs dipakai tuk purchasing org lainnya. Assign desired purch org to a reference purch org tetapi setiap purch org sebaiknya hanya diassign ke satu ref purch org.
Setiap purch org has its own info records, conditions for pricing and vendor master data.
Setiap purch org mengevaluasi vendornya menggunakan MM Vendor Evaluation.
Authorizations diassign di level purch org.
Purchasing Group: The key person for a buyer or group of buyers responsible for certain purchasing activities. Internally responsible : Buy Mat & Service, External reponsible : contact person vendor). Pgr, No link to Porg, Pl, To differentiate -> Authorization Reference Puchasing organization = Central Purch org, can access all contract and condition by ref Porg. Ref purch Org beda kode dgn purh Org biasa. Vendor di assign di purch org biasa dan ref purch org. Contract under purch org ref . Ref purch org di assign ke comp code
Working with a reference purchasing organization saves time and effort in maintaining data because purchasing organization data for vendor master records and purchasing info records only has to be created by the reference purchasing organization. Other purchasing organizations that are linked to the latter via Customizing can use this data without having to maintain data themselves.
Reference purchasing organization hanya dapat membuat kontrak yang tidak ditentukan bagi plant tertentu, dan dia tidak bisa membuat purchase order. Standard Purchasing Organization : N Purch Org = 1 Pl (GI => transact
pipeline, proc ; Source determnation => consign, Stock trsf
Procurement cycle
Determination of requirements: A form of request sends to the purchasing department. The document used in this stage is purchase requisition. It can be created manually (through manual creation of PR) or automatically (through MRP execution).
Source determination: The system helps the buyer determine possible sources of supply. Documents created are RFQ and quotations. Master data used are source list, quota arrangements, info records, outline agreement. Can refer purchase orders, contracts and conditions that already exist in the system.
Vendor selection: System makes price comparisons between the variousquotations from various vendors. System automatically chooses the best vendor and sends rejection letters to the others automatically.
PO processing: System facilitates data entry by providing entry aids when you are entering purchase orders. PO is created at this stage.
PO monitoring: User can monitor the current status of the PO online, and determine whether goods or invoice have been received for the relevant PO item. Can also You can remind the vendors of outstanding deliveries
GR: Goods are received, and system compares the actual quantity with the PO quantity. GR material document is issued, update PO history.
Invoice verification: Invoices from vendor are checked with the reference for accuracy of prices and contents. Can be create ref PO/ delivery
Payment processing: FI deals with vendor payments. Various financial docs. are produced. Payment program authorize payment to the vendor reliability. Can be run regulary.PO
PO is a formal request to a vendor to supply certain goods or services under stated conditions. It can be created with or w/o reference to a PR, a RFQ/ Quotation, or another PO, Contract. The material can be allocated for stock or for direct consumption. Usually GR and invoice verification referred to PO. The system will suggests default values to be included in the PO. These valuescan be taken from material master, other purchasing documents, quota arrangements, source lists, outline agreements, or info records.
PO can be send to a vendor or to carry out a stock transport order in other plant belonging to the same company.
Valuation price in PO are taken from info records, but the one in PR is take from material master.
Delivery date di PO default dari planned delivery time in info record.
When message in PO (can be imediate / later), can taken header text and item text and ctandard text for printItem Category
Enable to replicate, different procurement process. It defines whether an item requires and/or can have a material number, account assignment, GR, and/or IR. It depends on the document type. The item categories:
o
Standard: for material procured externallyo
Subcontract L: finished product is ordered from a vendor. The materials, which are from our company, are entered as “material to be provided”o
Consignment K: vendor places the materials in our premises, but liability only arises after the materials are withdrawn from the consignment stocko
Stock transport orders U: material is transferred from one plant to another planto
Third-party order S: the ordered material should be delivered directly to a third party. Invoice, from vendor, is sent to our companyo
Limit B : procure consumable mat/ service with value limitStd Limit Consign Subcont Stock trsf 3rd party Bs untuk Acc asign Perlu mat Bs mat no, Mat no Account
mat no, acc asign, GR, IR required, Ga bs GR, IR no, ga bs account asign dan IR acc asign,
GR, IR req, GR req asign & IR req
GR
Advantages of referencing GR to a PO:
o Easier to check whether the data in GR is the same as the one in PO o Default data from PO makes it easier to check over and under
deliveries when goods arrive
o PO history is automatically updated as a result of the deliveries. The purchasing dept can send a reminder for late deliveries.
o One accounting document, resulted from the creation of GR, can be referenced to PO. It will make PO settlement easier.
Material doc tercreate apabila ada qty update, acc doc tercreate bila ada value update (if mat valuated)
If no PO number is displayed within the delivery note, user can search the number by using vendor or material number.
Movement Type
It is a 3-digit key used to differentiate goods movements in the system. It affects the postings in the financial accounting system, and update for the stock fields in the material master. Movement type, has important role in automatic determinataion.
It determines which stock or consumption accounts are updated in financial accounting (among other things). The movement type also determines the layout of the screen for document entry or the updating of the quantity fields.Invoice Processing
In MM, procurement process is concluded by the invoice verification process. In invoice verification, contents and prices in received invoice are checked for accuracy (arithmatical correctness balance =0,the right price for the right material or service). Payment and evaluation are not part of MM; they are part of FI.
Invoices are checked to the referred PO and GR documents. If any differences arise, the system warns the use and blocks the invoice for payment. The posting of the invoice completes the verification process.
Invoice can be create ref PO, delivery note, Bill of lading (yg diinput saat GR), When create invoice, reference (vendor invoice No), input data material, qty, total price per item (=price x qty, bukan harga satuan), When invoice ref PO price from PO, Qty from GR qty. Post invoice will create invoice doc and acc doc.
Work list di MIRO hanya digunakan jk invoice di park/ hold
DI MIRO, dapat melakukan invoice untuk banyak ref doc dengan click more assignment criteria.
Header data : Doc date, Ref, invoice amount, tax amount (tax rate default value dari SPRO, tapi tax amount bisa diubah sesuai yg di incoice, bisa sebagai amount atau ratemya) , invoicing party (default dr PO tp bisa dichange misalnya ingin input vendor transportation), TOP default from vendor/PO
Creditor : detail data of vendor
PO structure : orang yg melakukan invoice dpt melihat PO history untuk PO item
Tick Ok hanya sbg informasi saja, bukan untuk memilih item yg diinvoice tapi bisa sbg infprmasi bahwa invoicenya sudah di check dan dipost.
Ketika clik simulate, line item di invoice yg bawah juga hrs di block shg jurnal akan lengkap dan balance = 0
3. Master Data Material Master
It is an organization’s source of material-specific data, and used by all components in the Logistics system. Data stored in a single database to avoid data redundancy.
Example of use:
o Purchasing data for ordering
o Inventory management data for posting goods movement and managing physical inventory
o Accounting data for material valuation o MRP data for MRP execution
Each view in the material master is provided to support each user department, and responsible for maintaining the data to support its function. Data maintained within a view might be valid for more than one organizational level.
Basic data: mat short text, desc, weight/volume
Sales : SO, pricing, (SO price, min order qty, responsible sales dept Purchasing : purch group, under over del tolerance
MRP : SS, PDT, ROP
Accounting : price control, previous and future price, current valuation
Storage : info related wh & storage (unit of issue, storage condition, packing dimension)
Forcast : info predicting mat req (how mat procured, forcast, past consumption/usage)
Not all data stored is used by all levels in an organization. Therefore, material data is sub-divided into several levels. The purpose is to avoid datasets overloaded with redundant info.
Data screen in material master : main data (screen view basic data, purch..), additional data (UOM, Mat PO text/ short text)
Material master: Organizational levels
o
Client level: general data that is valid for the whole company, eg. Material no, short text, mat group, unit of measure, storage condition(temperature, explosive), PO texto
Plant level: all data that is valid within a plant and for all storage locations in it, eg. Purchasing data(PO uit, autom PO, source list req, quota arrangement usage), MRP data, forecasting data, work scheduling datao SLoc level: data that is valid for a particular SLoc, eg. Picking area, storage bin desc
Screen step creating material master : 1 dislog box for view, 2 dialog box for org level, 3 aprear data screen
Data in material master can be maintain directly and automatically (whan good movement system update stock and consumption data). Also come data only for information (size, desc, dimension). Data can be conftol function (mrp type for MRP procedur, and price control)Material Type
It groups materials with similar characteristics/ same propertise, eg. Raw materials, semi-finished product, finished product. It controls:o The type of number assignment (in- or external) o Number range interval
o
Which view is suggested for entry (which user dept specific data is sugested)o Which screens are displayed and in which order o Which procurement type is permitted for a material
It also determines a material’s inventory management requirement (qty/value update). It also determines which accounts are posted when a material is posted to stock or leaves the warehouse Extend material master means data is stored either for further organizational levels or further user dept.
Mat type NLAG mat that are never ordered for stock, no automatic stock account det when create PO, PO item assigned to consumption account)
Industry Sector
The industry sectors control the screen displayed and in what order, and also which industry-specific fields are displayed on each screen. Assigned industry sector cannot be changed later on.
Vendor Master
It is the information related to the company’s crediting partner. It is recorded by Accounting and Purchasing department. Strong relation with the Accounts Payable in Accounting.
Data structure:
o
General data, valid all client: address, contact details, bank details, language communication with vendor. It is valid for the whole client. o Company code data : data payment transaction, reconciliation accountNo
o
Purchasing data: PO currency, incoterms, and tax data. It is maintained for each purchasing org, partner role (OA, GS, forwarder/carier, inv party), data for specific plant, vendor subrange. Also has important role Automatic settlement/ auto ES delivery, automatic PO, confirmation req, automatic PO from PR. Important data that can create only in plant level default value for release creation profile in sched agreement with release doc. Additional data in purchasing : Extras -> add -> purchasing datao
Accounting data (comp code level): reconciliation account and the payment method for automatic payment trans. It is maintained at the co code level. A vendor master is not valid if it is blocked in source list
Vendor master has control data : Vendor master dapat dimaintain centralize(XK01), atau desentralize (specific sesuai rolenya MK01)
One time vendor : vendors with whom you do business only once or very rarely. It enable works with such vendor without a seperate vendor specific master record. 1 One time vendor master can be used for several vendor= collective master record (contrast with mat master). Vendor name, addres (when purch doc) and bank details (when invoice) are stored for one-time vendor => input at document transaction only. Still can evaluate transaction form onetime vendor using serach term. Must be assigned account group one time vendor, that has vendor specific field that has suppresed
Blocking vendor can be used for procurement so when PO created can not be used thta vendor = MK05,block can be for 1 purch Org/ all. Can also block vendor for specific quality reasons if QM active for procurement (an be block fr RFQ, PO). Also can block for specific material using source list
Di control data vendor master dpt di set automatic PO, from requisitionVendor master: Account group Account group determines:
o Status (vendor or one-time vendor) o Field selection
o Partner schema
o Vendor sub-range or plant-specific data o Type of number assignment
o Number interval
Can be seen in vendor master => administrative data XK03
Reconciliation account for Vendor
When a vendor is created, a sub-ledger account for the vendor is also created (if the account group needs a sub-ledger). Depending on the account group, a unique number is automatically or manually allocated. Reconciliation account is a G/L account in G/L accounting that holds information on total liabilities for all vendors. The liabilities also recorded in the sub-ledger accounting for each vendor; the process is done in parallel with the recon account recording.
While invoice is created, system pulls reconciliation account from vendor master.
Partner role = various role in deling with your enterprise eg good recepient, supplier of goods, invoicing party, forwarder/carier. With partner role can definne different creditor as a freight forwarder for certain vendor.
Entry aids
Entry aids = function tro simplify data entry can be copy from ref/ mass maintenance (master data maintenance) = Mass maintenance vendor master and material master. Copy vendor : vendor specific data will not adopted (not adopted : vendor addres and bank data, indicator block vendor)
Entry aids material master : default value industry sector (lalu di hide), presetting view of mat type, copy reference mat master, using profiles which store data MRP and forcast parameter so can be used for other materialMMD1, Collective sloc data, mass maintenance matMM17, vendor XK99, info rec MEMASSIN, PO MEMASSPO, PR MEMASRQ
Collective entry Sloc data : Manual (MMSC) and automatically when fist GR (jika automatic Sloc di tick)
Mass maintenance can be background/online. Can choose some table to ensure consistency data, but reduce performance system
4. Procurement of Stock Material RFQ/Quotation
Several RFQ can be grouped together with a common collective number. It helps the speed of searching the documents. Coll no : 10 char and can be alphanumeirc
RFQ can be created manually or with reference to a PR, another RFQ, or an outline agreement. RFQ can be create with/w.o mat master. When create RFQ can input plant/ not. If not input plant when PO u can choose any plant but if plant input in RFQ, plant in PO can not be changed
In MM-PUR component, RFQs and Quotations are a single document. Quotation contains a vendor’s prices and conditions. Quotation can also be rejected, through the maintain transaction.
In Quotation process can tick info record update, bisa tick rejection letter sehingga akan otomatis kirim rejection. Message type rejection indicator ABSA akan otomatis ke assign jika tick rejection. Untuk print rejection ME9A = print RFQ
The prices in all of the quotations can be compared using ‘price comparison list’. The mean value of the quotations can be saved as the market price, and used as the basis for valuating the price level, in price comparison can display in detail item, update market price, change quotation (can not print rejection), can not create new RFQConditions
Conditions are stipulations agreement with vendors concerning prices, discounts, and surcharges, freight cost etc. The effective & net price in PO is determined on the basis of these conditions. (harga material + condition?)
Conditions can be maintained in quotation, info records (berlaku atas POdengan mat dan vendor di info record), outline agreement (contracts n sched agreement), as time-dependent conditions and time independent condition (in PO). Conditions in PO are time-independent. Also can create general condition at vendor level MEKA
Time-dependent conditions are also available for quotations, contract, info rec, scheduling agreements, general condition. They are only valid over a certain period of time. Time dep condition bisa input scale, misalnya qty tertentu harganya bisa beda (tdk bs langsung perkalian). Di doc type bs control time dep condition atau tdk untuk contract, quotation Time independent can not input validity period in PO. Condition can be specified in doc header dan item.
Conditions are used in PO to determine price. Conditions are used in Purchasing:
o Conditions in a contract apply to all contract release orders created with reference to this contract
o Conditions in an info record apply to all PO items that contain the material and vendor contained in the info record.
o Extended conditions are only included in the PO if they meet certain criteria. Eg. It is used to define vendor discount or include discounts for a material type.
Calculation Schema
Condition type : rules to determine purchase price, determine different price factor is calculated, bisa absolute, qty dependent, % : surcharge, gross price, discount,..It provides a framework for price determination. Scale can refer to qty, item val or weight. It defines:o The permitted condition types
o The order of the condition types for calculation of the net price o The conditions types for which subtotals are calculated
You can assign an access sequence to a condition type. It is a search strategy used to define the sequence in which condition records for a condition type are read.
Condition type that play role in the price determination are group together in a calculation schema. Calculation schema, determine sequence in which condition type are taken into account.
Calculation schema determine :
o
Subtotals are formed with which condition type(hanya PO) o which condition type are allowed in doc/ info reco sequence condition type in calculating net price,
o which condition type specified in message to the vendor,
o
apakah condition type manual/ tdk, basis in which reference level to calculate surcharge, diskon, the prerequisite have to be filled for specific condition type.Schema in standard PO : RM000 Element calculation schema :
o
Gross price (price w/o taking other condition like delivery cost, discount, surcharge) PB00o Net price (price taking disc and surcharge = vendor gross price exclude del cost),
o Effective price (net price –cash disc and including misc provisions, del cost, and non deductible tax)
Purchasing Info Records
It contains concise information on a vendor and the material you procure from this vendor (vendor specific information for a material. It is an important source of info for the buyer to find which vendors offer a particular material.
Information that can be stored and maintained are:
o
Current, delivery cost for responsible purch org/ plant, and future prices and conditionso No Last PO and /No info record (if info record automatic) o PO price history
o
Delivery data (tolerance limit, upper and over delivery)o
Vendor data (PDT, vendor eval data)o Texts
Info records can be maintained manually or automatically from quotations, POs, or outline agreements.
o Conditions: maintained manually in info records or automatically through quotations
o Last PO: the price used in the last transaction was registered in the info record.
Info records can have relationships with material that don’t have material master, eg. Material for direct consumption.
Info record can be stored for :o
all plant levelo
just 1 plant for a purch org.If info rec exist in purch org level this data will be pull in new PO for plant belonging to that purch org. If plant specific info record exist andin purch org specific, system will suggest data in plant specific info rec for PO with that plant.
Info record update :
In quotation indicator info update not tick -> condition will not update info record
In PO ref quotation lalu condition di change, info update tick -> info record dibuat w/o condition in PO
Info record type :o info record with mat no /service(stock item mat) -> mat/service +vendor
For Info rec that refrencing mat master, can specify per purch/ plant : Tick, No Mat text -> hanya PO text di info record yg ditampilin di print PO
No tick, No mat text -> PO text di info record dan PO text dr mat master akan di tampilkan di print PO
o
info rec w/o mat no (consumable material) -> mat group + vendor (saat buat PO di item overview search -> info record for mat group (order unit & mat group will be used as criteria checking). Short text & mat group -> in general data screen 1 info record No = combination vendor & material, ga mungkin ada beberapa no info record untuk vendor dan material yang sama
Di info record we can : define delivery (plan del date, tolerance), create current and future price, vendor sub range, description in vendor, number last PO, text
Info record cannot update for onetime vendor, DI info record bisa run simulation, misalnya buat PO system akan propose harga berapa kalo mau set condition in plant level bs config condition -> Define condition at plant level
1.Sbelumnya mat tersebut blum ada PO atau info rec. Lalu buat PO dengan tick info update
Muncul di info record
Last PO
Condition No price found, coz info record ini dibuat dari update price PO
2.Lalu buat info rec manual, maka No info rec yg tercreate = info rec yang sudah di peroleh dari PO tetapi harga yang net price yg di input di info record bukan dr PO
3.Buat PO lagi, awalnya price dari PO sebelumnya bukan dari info record yg sudah dibuat manual, tetapi akan di rewrite dengan price di condition (dr info record manual)
Untuk melihat condition ini dpt menggunakan ME1P => PO history
4. Create quotation lalu tick info update B. Di ME1P bisa terlihat net price menjadi 3, sesuai yang diinput di quotation
“ ”: The info record is not updated or created
“A”: If an info record exists at plant level, this is updated.
Alternatively, an info record is updated at purchasing organization level. If there is still no info record, the system creates it at purchasing organization level.
“B”: If plant conditions are allowed for the plant, an info record at plant level is updated or created.
“C”: If plant conditions are not required for the plant, an info record at purchasing organization level is updated or created.
5. Dan ketika dibuat PO lagi, maka akan menggunakan harga 3 sesuai dari quotation Purchase Order
Document overview, can be setting for bareakedown datanya, untuk kemudian bs save layoutnyaValuation
Valuation area is the organizational level at which material is valuated. It could be as a plant or a company code.
Valuation area at plant level allows material valuated with different prices at different plants. If the valuation area is located at co code level, a price of a material is applied for each company code
Valuation class is used to determine which stock account will be update while good movement. It combine materials for assigning G/L accounts so that you do not have to manage a separate stock account for each material. It is maintained in the accounting view of the material master. In acc data material master : currency (local curr comp code), val class, price control, total stock/ total value Valuation class is used to determine which stock account is to be updated upon goods movements.
Mat val is control by customizing (val area, mov type, posting GL), and mat master
Material valuation upon GR depends on the price control procedure (set in the material master). There are two types of price control: moving average price (V price) or standard price (S price)
In S price, system carries out all stock postings at a price defined in the material master and any variances (between transaction with mat master) are posted to price difference accounts. In acc view, eventhough using S, but we still can see MAP price
In V price, system automatically calculates the total value of stock by the total stock quantity. MAP = Total stock/ Tot Qty Stock value = stock qty x mat price
Goods movements
A material doc in SAP is used as a proof of transaction involving stock changes that is stored in the system. An accounting doc is attached to mat doc if the goods movement relevant to valuation. Goods movements are relevant to valuation when the company’s Accounting department is affected by them. For GR, there are three stock types to which a quantity is posted. The stocktype is for determining stock availability in Mat planning and withdrawals in IM. The stock types are:
Unrest = no usage restrction
QI = available for MRP, can not GI consumption
Block = not available for MRP, Can not GI for consumption QI & Block only can withdwar for sample, scrap, inventory diff
In Mat master, there is an indicator to post stock to QI area. It can be override by the indicator in PO, and override again in GR. Mat doc : uniq for mat doc & year
Acc doc : uniq for comp code, acc doc No, fiscal year
Acc doc header : doc date, posting date, posting period.=, currency Acc doc item level : GL, amount
The movement type use to post GR for a PO into valuated stock in 101. For this movement type, an accounting doc is created together with material doc. The effects of a GR:
o Stock and value updated
o PO and its history are updated
o Creation of an inspection lot to trigger a QI o Stock and consumption accounts updated o Transfer request to WM (if active)
o Notification of GR (optional)
o Hard copy of GR is produced (optional) Transfer postings
Withdrawals for consumption can be posts from unrestricted-use stock. From QI and blocked stock, you can only withdraw a sample, scrap a quantity, or post an inventory difference.
To withdraw goods from QI or blocked stock, a transfer posting into unrestricted-use must be carried out first.
After a transfer posting, the stock type, batch number, or material number is changed. It may also involve an actual physical goods movement. Not all transfer postings are actually involving physical goods movement; sometimes only the statuses are change.
A mat doc, resulting from transfer posting, not necessarily accompanied by an accounting doc. Accounting doc only produced when there is a change in valuation (eg. Stock transfer from plant to plant)
Movement type is used to control the stock types involved in the transfer.
Invoice verification
Logistics Invoice Verification creates a separate accounting doc in addition to the invoice verification doc. The accounting doc is use by FI to settle the invoice. Invoice doc : doc No, doc year
When posting invoice : create invoice doc, and acc doc (display in status bar, dgn SU01 tambahan parameter IVFDisplay dengan X)
Delivery costs
The delivery costs can be categorize into two type:
o
Planned delivery costs are arranged in advance with the other parties and the details are entered into conditions when creating PO. At GR, provision accounts are posted, which are then cleared when the invoice is received. Eg : forwarder/carier, customs office, assurance ( differentiate in diff cond type)o
Unplanned delivery costs: unknown delivery cost at the PO creation stage. The cost is entered when you receive the invoice. If required, the valuation carried out at GR is corrected.
The advantage of planned delivery costs is at GR the value for stock and delivery cost already separated. No adjustment needed for the material stock, later on when we receive the invoice. Jika pada saat invoice ternyata delvery cost beda dr yang sudah dipost bs membuat subsequent debit
Unplanned del cost input in Tab detail -> unplanned del cost, can config unplanned del cost can be distribute among invoice item/ to specific in GL
5. Procurement of Consumable Materials
Consumable materials = non procured for stock, value is recorded on cost element or asset account
They are materials that are procured directly for an account assignment object. They are not managed on a value basis in IM. Example: office material (to a cost center), computer systems (to an asset). The system automatically updates consumption for materials that have a mat master.
When procuring consumable materials that don’t have material master, you have to enter the account assignment category and: short text (description), material group, and order unit. With consumable materials with a material master, account assignment category needs to be specified.
Account assignment determine of the category of account assignment object that is to be charged, and which account assignment data to be debited when GR / invoice.
Account assign K : Required cost center & GL (GL bs set otomatic propose, dr OBYC account modif dari account assignment cat)Account assign A : asset & GL (GL otomatis proses from asset master tdk bs input manual)
1 item can has multiple account assignment dan bisa distribute ke beberapa account assignment ini in qty or % -> otomatis GR non valuated di tick
Material types for consumable materials:
o
UNBW (non-valuated material) – it is managed on a qty basis, but not on value. For materials that are low on value, whose stocks have to be monitored. Qty update ticko
NLAG (non-stock material) – it is not managed on qty and value basis. For consumable materials that are frequently used. Qty and value not ticko
Can be material with (not subject to qty & value, or not subject qty but to value only) or without mat No and also material for stock item. Order acknnowledement is send from vendor to be sure the requirement material can be delivered on desired date.
Can also purchase material trading, account assignment SO. Also can procure w/o material master -> eg procurement of service If there is partial invoice can choose : partial invoice distributed proportionally to account assignment item, can also distribute as progressive, missal progressive for invoice 1, then invoice 2, till it complete.
Purchase Requisition
PR : internal doc for asking purc dept to procure particular qty of mat or service on particular date.
Account assignment cat. U (hanya di PR, jk di PO hanya untuk service, limit dan blanket PO) : if you don’t know the account assignment objects for which the material is being procured. You don’t have to enter any further account assignment details (eg. valuation price). PR items with mat master: the valuation price is taken from the material master, if the material is valuated. If a release strategy has been defined, PO can’t be created until PR has been released.
PR can be create manual or otomatic (form MRP, PRO, network, MO), also form APO, BEP
PR doc : header only text, item overview, item detail, doc overview. PR items w/o mat master: the system can automatically suggest the valuation price. User has to manually enter the valuation price.
The costs on a PR can be distributed to several cost centers with using multiple account assignment. It can be distributed on a qty basis or as a %. For items w/ multiple account assignments, the system automatically sets the indicator for a ‘non-valuated GR’.
Can trace PR status , in detail item -> tab status (PR created PO created, uotline greement created, GR, and invoice created), if want to see, how PR is created -> tab contact person.
Convert PR
PR can be conver to PO(cqn be manual using ref PR or automatic with prerequisite source supply has assigned in PR, vendor & mat tick autom PO), contract release order, sched agrrement, RFQ Assign source supply can manual & automatic in PR.
Misal ada kontrak, ada 2 PO dgn vendor beda, maka vendor yg di propose di source supply ada adalah
Priority source determination :1. Quota arrangement, 2 Source List, 3 Outline agreement, 4. Info record
Order acknowledgement = confirmation direct in PO (Kaso info kapan mat yg dipesan akan tiba)
Can be create for PO or delivery schedule, using confirmation can notification vendor of estimated qty of ordered material (OA, loading/ transportaion confirm, shipping notif ( confirm in individual doc VL31N) Advatnage : plan MRP accurately coz, del time not form PR/PO but from confirmation (also can see time span between PO date and expected del date) also can monitor reeipt of desired confirmation.
OA : can send reminder to vendor when not yet received confirm from vendor by tick req indicator ME92L.Cna generate message type AUFB Dunning Order Confirmation When notif received from vendor, input data date, time, qty in confirmation tabProses create PO dgn confirm control OA, lalu PO harus diprint untuk bisa monitor PO confirm di ME2A
Muncul di vendor confirmation
OA, di terima dr vendor, misal memalui email menyatakan mat dtg pada qty dan tgl tertentu
Input di PO ???
Can monitor vendor confirmation ME2A
Valuated and non valuated GR
For consumable goods, can be valuated when GR or not in GR but in invoice. If goods is not non valuated GR, when invoice can change account asignment object
Blanket PO = posting when invoice to account assignment object
It is created to procure consumable materials or services for which it is not worth creating a separate PO for each procurement transaction. It usually valid for a longer period of time and only contains short text and validity period and value limit Characteristi :
The document type used is FO and item category B (limit). (header validity hrs diinput, dan limit dilevel item), Also using account assignment U is allowed, No GR/ service entry, No mat No (can not using mat No/servie No -> hanya text saja), accounting data in invoice, can multiple account assign di invoice, check validity dan limit di invoice verification. Tdk perlu input price, del date
Proces PO -> Invoice. Jurnal when invoice vendor D, Consumption account C
RFQ or contracts can’t be used together with blanket PO. No GR/ service entryneeds to be done. RFQ, quotation, and contract can’t be use. Account assignment need no to be done.
Co Blanket PO adalah PO untuk ongkos angkut melalui Shipment. 6. Procurement of External Service
Bus process : Determine req (PS/PM) – create service spec – source det – RFQ – Quotation – PO – Service entry – Service acceptance – Invoice Service spec : list all necessary services in detail. Can with/w/o service spec If thereis no PE for service can direct to RFQ
PO monitoring in PO history can monitor progress of service of procurement project
Service entry sheet only service that actually performed. Service entry and acceptance can be carried out by same individual/ dept in company
Invoice verification : check based on value basis that will be compared, if value in entry sheet > in invoice create message
Service master : master data that serves as source data that can be used to create service spec. Service master can be used in PM, PS, MM, CS. Consist information : - Service No - Service spec - Descriptive text - Base UOM - Mat group - Val class
Create change display service master AC03. Other service, hide show overview, display change, create new service. Service specification : can be consit 1/> line item service, dgn max 4 hierarchy level
Service condition: level can be service master ML45 (market price, own estimate depends on validity period) , Service master purch org & vendorML39, Service master vendor purchasing org & plant ML33.
ML45 => ML39 =>
ML33 =>
PO for service, prerequisite :- Item category D (service); in the item detail,
- Account assignment category U (unknown) is allowed
- At item level, only a brief description of the work to be completed using short text
- Servce number can with/w/o service specifications (SS); level item
- Value limit for unplanned services (untuk control cost unexpected service/ service can not be planned).
Copy serive number mana ajah dlm service spec yg mau di execute di PO, input pricenya
When create PO service can also input estimate working days, qty can be still unclearService speciification is consolidate in set of service spec, misal pekerjaan machine maintenance (wearing part replace, shutdown machine, remove wearing part, cleaning and installing wearing part).
1 service item must always have account assignment, only input shortext in item (general short text)
Using item cat D => have to input service spec & value limit
Service entry ML81N: can be 1/ 2 step (service entry & receipt in double transaction). Must be create in each service, can also input unplaned service (cek limit). If in PO acc assign U, whan SE must input account assignment. SE hanya bisa dilakukan per line item mat di PO (bisa langsung banyak line item service), ga bs langsung banyak line item di POnya
IF only save entry sheet -> muncul di PO history, tapi tanpa GR doc. When post acceptance : create acc doc, CO doc, GR doc otomatis (acceptance doc). Can set release procedure for service entry sheet.Transaction ML81N : Display PO, tree on off, display chnge, create entry sheet, copy entry sheet, accept, PO display
Service entrysheet can be create collectively release ML85, sperti release collective transaksi PO.
Creta SE ML81N -> pilih service spec
Account assignment U, sehingga hrs input specific account assignment (meskpun saat PO GR non val di tick)
Acceptance SE, dgn klik Release
Lihat di PO history, terlihat jika GR non val di tick muncul mat doc dgn value = 7.7.
Bag Kiri, meskipun di entry sheet ada 2 service No tapi coz assignment ke cost centernya sama maka mat doc hanya 1 line
Bag Kanan, GR non val di tick shr mat doc dgn value 0, ada 2 line coz beda cost center
Invoice verification : can be ref PO (semua entry sheet yg sdh accept akan muncul)/ entrysheet (per entrysheet). System compare price in entrysheet and invoice
Ketika invoice, jika dlm 1 PO ada beberapa entrysheet maka akan muncul seperti berikut
Ketika invoice, krn PO item 2, GR non val maka saat invoice bs
ubah cost centernya. Dan jurnalnya pun sesuai cost center yg
diubah
7. Automated procurement = simplify procurement
Can be MRP (simplify req det), automatic create PO from PR(automatic generate PO), Determination req with source determination & Contract, GR & ERS
To create automatic PO for PR/ create automatic PO for contract ME59N, the prerequisite is, source supply has assigned in PR (info rec, contract), in material master and vendor master automatic PO is tick.Grouping some item PR can group into some of PO, can be determine in selection screen ME59N (purc group, plant/ del date).
Item error when automatic generation: can be happen when item in PR is not complete (account assignment cat U, vendor in block, tax code missing for case ERS)
When generation can choose exclude item with errors and can show the error log or using do not exclude item with errors.
Source det, also can create automatic when planning run MRP that specified in item PR (if MRP run direct to PR not PLO). Prerequisite : source is in question can be determined unique, source list has maintain.
ERS. In ERS settlement invoice represent credit memo. Vendor inform message (credit memo) about settlement delivery.Advantages : ordering transaction more quickly, minimize error entry, qty & price variance will not happen.
Disadvantages : can not settle delivery cost, plan and unplanned del.
Vendor will not send invoice, but invoice is generate automatic by system ref PO and GR doc. If there is return goods, ERS will create credit memo.
Prerequisite : GR based IV & ERS set in vendor master, PO, maintain tax code for item, estimated price indicator in item details condition, GR is create ref PO, di info record No ERS indicator is not set.
To settle ERS MRRL, sebelum di settle dpt test run, bs juga run background program RMMR1MRS
MRP: main function to ensure mat is required in qty and right time, ensure mat availability. Can automate generate procurement proposal and prod.
Possible procurement element : PLO, PR, Sched agreement schedule line. PLOand PR :
Internal planning elements can be change, resched, delete at any time. MRP controller will check PLO that have to be convert to PR. Advantage of creating PLO is to check the execute of MRP contoller. In production planed order convert to prod order then system convert dep req in PLO into reservation in prod order.
Also can create schedule line, if scheduling agreement exist and MRP relevant in source list, shg setelah run planning bs tergenerate sched line (fix element, tdk bs diubah)
Prerequisite : Requiremen planning can be create in plant level/ MRP area. Misalnya ada sloc dlm plant itu yag tidak ingin di run, itu bs di define dlm MRP area (group together Sloc into MRP area). Using MRP are can differentiation material planning within a plant. 3 Different type MRP are : Plant, Sloc, Subcont MRP area
MRP Procedure : Consumption based(ROP, forcast based, Time phased), MRP based,
In MRP 2 -> procuremen type, if choose X (both inhouse and external prod, in house prod is applied first. Step MRP & CBP : Net req calculation, Lot size calculation, schedulling,
a.
Consumption Based planning
Based on previous mat consumption, historical value, use mat forcast and statistical procedure to determinew future req.
SO, PIR and Res not relevant with planning (not refer to prod planning. Net req not form PIR and dep req) Usually used in mat not in manuf plant but for mat with planning B & C material and operating supplies. Prerequisite : need upto date Inventory management. If working with forcast req, consumption history must be run according to certail legality
MRP type key to determine procedure to use for planning material and to determine MRP paremeter that must be enter during maintrnance mat master (MRP type tentuin master dta yg hrs dilengakpi di mat master, misal VB harus input forcast)
In scheduling, the system defines the date on which the material will be available from the date of the planning run. This procedure is called forward scheduling Schedulling => Forward sched = > start from current date (=order start date PLO, release date PR to convert to PO) Shortage qty date = date on planning run + (purch time purchasing + PDT (order finish date PLO) +GR Proc time= availability time) ROP
Cek stock available +fix receipt ( Open PO+ firm PR + firm PLO )< ROP ?
a.
Ya, case mat withdrawl -> Create PLO => Net req VB = ROP –(Wh stock +SS +firm PR, PLO + PO)
b.
No, case GR, eg material return at lead time -> Delete PLOc. Ga ada planned receipt lagi coz mat return -> system suggest cancle receipt
* fix receipt = on order stock
ROP can manual VB (SS & ROP manual in mat master) & automatic VM (pake forcast, perlu ROP awal, Service level)
ROP can use with external proc (artinya SO, manual Res, Order res, MO and relese PR can be used also for determination req). using it, can decide wheater external req is used in complete periode horizon or only in replenishment lead time.
Consideration ROP : SS, LT, present Consumption / future req
SS used to cover unplanned excess consumption & req coz delay delivery. SS part ROP
ROP composed expected average material consumption during replenish lead time and.
Proses in consumption based :
1. Create planning file of material that will be planned in planning run. 2. Calculate net req,
3. Lot sizing calculation,
PR -> Release date, delivery date PLO -> start date, end date
5.
Check procurement type (GR PRO/ GR PO) system determine source supply6. MRP controller check and edit new procurement proposal Forcast based
Future req using forcast as basis consumption value to estimate future req. Forcast is calculate at regular interval. Using backward schedulling
Time phased
Using data historical in mat forcast to determine future req. Forcast is executed according to predefined interval in rythme, example according delivery time.
Run MRP better for material with some rhytme (shifted according del time, vendor always deliver in particular week
Static Lot size : system not consider future req. Lot for lot : req based on shortage qtyFix lot size : req brp pun, akan tetap di propose yang fixed di mat master. If not enough system generate bebereapa order proposal
Replenish max stock level : system create order proposal to the amount required to bring stock level upto max stock level in mat master.
b. MRP based
Based on current and future req. PIR trigger requirement calculation. Requirement element : SO, PIR, Res,-> create dep req that BOM explosion create. Usually used for inhouse prod material, planning FG and assembly group such as component material A
MRP Type
MRP type is a key that controls the MRP procedures to be used for planning a material. It belongs to the plant-specific data (i.e. MRP are data of a material). MRP type controls which planning parameters must or can be entered when
maintaining the mat master MRP type controls:
o MRP Procedures (MRP, reorder point planning, forecast-based planning, time-phased materials planning, no materials planning)
o Firming type of planning result o MRP on regular basis?
o Forecast usage
Required/optional/no forecast? Unplanned/total consumption Unplanned/total requirement o Calculation of safety/reorder point stock o Screen sequence detailed header
Master data for MRP
MRP view is in plant level, but also can be MRP area level. Data in material master of MRP is devided into General data, data dependent MRP procedure, Data required for scheduling, Data required for lot size calculation.MRP-relevant data is stored at plant level in MRP 1-4, forecast, and purchasing view in mat master
You can plan SLoc for MRP separately. Settings in mat master at SLoc level in MRP 4 view.
MRP profile key of mrp parameter independent of mat master , Profile MMD1: collection information for configuration material master record. MRP profile is assigned when MM01, profile that already assigned cannot be changed. If data attribute is changed in profile, system will update it to all material that has assigned using background job program RMMM0001. Can see MRP pofile usage MMD7. Di MRP profile bs fix value, dan default value* Edit MRP profile, ketika MRP view sudah diisi lalu ingin di ubah dari MRP profile data
** Ketika MRP profile di change (sudah ada assignment ke mat) -> create background job to reassign new data/ start job profile.
Untuk lihat display change doc untuk material master bisa MM04
MRP profile specifies:
o Which fields filled with values when entering MRP data in mat master record
o What are the values entered in these fields
o Which of these values can be overwritten (default values) and which cannot (standard values)
Material status : restrict usability material determine which function in MM & PP (business usage intended to material) can contol result warning message. Mat status can be cross plant.Planning Run
Untuk dpt run planning MRP, maka req planning hrs di active -> SPRO -> CBP -> Planning -> Activate MRP. Also have to set plant parameter and have to maintain MRP data in material master. Planning file entry (GI, Res, ubah mat master, forcast dll), bisa juga di add manual.
1. Execute planning (online/background MDBT bisa single atau berulang regulary for 1 plant/MRP area): MD01 Total planning online , single object planning ( MD03 single level, single item (hanya level BOM yg dipilih atas 1 mat) also can single item multi level (level atas item yg dipilih dan lower BOM level), single item interactive (can detail check, for MPS item, di MD04 can see simulation run MRP)
Schedule run background depends on date specified in variant when execute background job.Result planning : Statistic of scope planning, exceptional, termination (bisa print log jika run background). Config to define scope of planning as a group, enter counter to specify sequence individual MRP unit (plant/MRP area)Sequence run planning, Plant MRP area, Sloc MRP area, Subcont MRP area. In scope of planning can restrict 1/ some MRP area or total planning run for this MRP area
2. Planning file entry, material relevant for planning run . Planning file control scope of planning and planning file entry = mat that are to be considered planned in different type of planning run are determined.Planning run type :
o
NEUPL : regenerative planning (only mat that include in planning file, if change data MRP type, lot sizing procedure/ purchasing proc time tdk muncul change indicator di planning file.o
NETCH : net change planning in total horizon.eg create PO (1 item, 1 level)o
NETPL : net change planning in planning horizon ( 1 item, 1 level) NETCH & NETPL u/ single item planningChanges relevant to planning can be :
change stock, PR-PO-PLO-sales req-forcast req,-dep req and reservation, field relevant to planning of these GR/ GI, Deletion GR GI
Define planning horizon can in plant level/ MRP group.
Display planning file MD21
Jika setelah di tandai di run, maka indicator X ini akan menjadi blank
Control parameter for the planning run creation indicator procurementproposal (direct PR or PLO) schedule line (syaratnya ada source list), creation indicator MRP list, plannin mode (specifies how non fix procurement proposal from the last planning run are tobe handled in next planning run whether the existing planning just needs to be adjusted, or whether BOM and routings need to be exploded again, or whether the planning should be recreated from scratch
)
, scheduling.The creation indicators of MRP lists, PR, and schedule lines can also be set in the MRP group.
Config exception message as a result in MRP list
Jika material master sudah ada sebelum MRP di aktifkan di plant, maka hrs generate planning file untuk material MDAB. Also need consistency check misalnya material yang sebelumnya udah ditandai untuk ikut di run MRP, kemudian ingin di exclude.
Priority MRP group to Plant => in total planning system will check mat group di assign to mat master, if yes system will read parameter in MRP group, but if No system will use parameter in plant. MRP group also can define for each with mat type
Stock req List : dynamic report to evaluate planning situation using current stock/req list MD04. Element MRP : PLO, PRO, PR, PO, Res, Plant stock, Sloc stock, SO, Forcast reqScreen area : header, item, mat tree
MRP list : tools to evaluate MRP that show result of last planning run, static. Change after planning run can not be seen
Source det :can using info record contract, Outline agreement item Planning Result
PLO, PR, Sched agreement, MRP list (Planning result material)
Planning situation or the result of a planning run can be evaluated using the two lists; individually or collectively.
Stock/requirements list is a dynamic list. It shows the present stock,
requirements, and receipts situation. Changes become obvious as soon as you call the current list, or choose refresh to read the elements from the database in the display of the list. Change made after planning date are displayed directly. MD04
MRP lists show the result of the most recent planning run and are therefore static: Changes made after the planning run are not shown. Has header and item (MRP element). Also can show material tree in MRP list. MRP list is store in the system until delete manually/ replace by new planning run. MD05 PLO can create manual/ automatic from planning run. Char PLO :
It is a procurement proposal in MRP for requirement coverage, an internal planning element. It is not binding so does not trigger procurement directly, just helps with planning.
It can be changed or deleted at any time.
It is still undecided as to whether in-house production or external procurement.
For in-house can be used in capacity calculation.
For in-house produced materials, it determines the basic dates for the production.
Option to convert PLO : individual MD14, collective MD15. PR that already converted from PLO is fixed automatically.
Personal setting
Header data : master dan transaction data Item : MRP element
Can use filter, comparison stock req list & MRP list, can display vendor/ cust, GR date,
User specific setting : Definition of settings to access the lists Definition of user-specific transaction calls Configuration of columns in the lists
Navigation between materials with material tree Definition of the traffic light value
Saving selection parameters for collective access into the MRP list.
Planning Evaluation Collective list
Can be seen for stock req list and MRP list. Traffic light indicator show how urgent material processing is and can setting for how to maintain traffic light. Can using search, sort, use graphical display changes to stock situation of 1 or