Capability Statement

PROVEN CONTRACT &

PROGRAM PERFORMANCE

(2)
(3)

CONSTRUCTION NATURAL RESOURCES MAIN ROADS GOVERNMENT PROPERTY DEVELOPMENT PLANT HIRE

Since 1970, we have provided

multi disciplined, integrated civil

engineering services to the civil

construction and mining industries.

AE Group has a strong track record of providing seamless project management and exceptional cost and operational efficiency. We take great pride in our ability to adapt our delivery approach and level of engagement to meet client requirements.

Our delivery model experience encompasses: • Alliancing and Early Contractor Involvement • Design and Construct

• Negotiated • Joint Venture • Construct only • Schedule of rates • Project sub-contractor • Cost plus basis

Vision

To be a leader and contractor of choice in the construction industry, recognised and valued for its uncompromised commitment to safety, integrity, quality, innovation and client satisfaction.

Commitment

• To ensure a safe working environment for our people, our clients and the communities in which we work

• To attract and retain a skilled, proactive and quality workforce

• To conduct ourselves with integrity and live our company values

• To deliver superior affordability, quality and program performance

• To go beyond our clients’ expectations and maintain strong, mutually beneficial relationships.

01

(4)
(5)

AE Group Civil & Mining, our employees and

subcontractors are guided by the following Values.

They describe our company as we want it to be. We want our decisions and actions to demonstrate these values.

We believe they underpin the way in which we conduct our business, interact with our clients and operate as individuals or teams within AE Group.

SAFETY

• Our number one priority • We will conduct ourselves

and perform our works safely to ensure the wellbeing of our people, our clients and the public

• We will abide by industry accepted practices and procedures and the rules of common sense

• Our unwavering goal? Zero accidents.

PEOPLE

• People are the heart of our business and are fundamental to our success

• We recognise that our strength and our competitive advantage is – and always will be – our people

• We aim to attract, develop and retain the best people; treating one another with honesty and respect and taking pride in the significant contributions that come from the diversity of individuals and ideas.

QUALITY

• We build quality and excellence into each project

• We take pride in providing a quality product on time, the first time

• Our commitment to providing the highest quality service to our clients will add value to their investment.

INTEGRITY

• We do the right thing – Always • We communicate honestly and

accurately to establish credibility and respect

• We deliver the services that we promise, to the high standards we set ourselves.

COMMITMENT

• We do what we say we are going to do, we create value • We are collaborative, solution

driven and are focused on serving our clients, listening to their requests and understanding their expectations

• We strive to exceed their expectations in affordability, quality and on-time delivery.

INNOVATION

• We constantly evaluate our processes, systems and methods to determine if more efficiency can be applied. Innovation gives us competitive advantage • We strive to find the best

solution for our clients, to construct projects more efficiently and take challenging problems and turn them into opportunities

• We seek to add value everywhere.

03

(6)

• A cohesive team of experienced, performance driven Project Managers, Civil Engineers and Senior Civil Superintendants • A fundamental differentiator

– our ability to self-perform our work

• Strong Project Management and Contract performance with single point accountability • Daily project monitoring

and real time management decisions through innovative business systems

• One of the largest and most diverse late model fleet of plant and machinery in the industry

We are top of mind for Australia’s leading civil

engineering firms, developers and companies like

Thiess, Leighton Contractors, John Holland, Glencore,

Peabody, Xstrata and Lend Lease because we offer:

More than half our business is repeat because we:

DELIVER THE BEST IN ACCOUNTABILITY AND GOVERNANCE

Our bespoke integrated management system enables seamless project management and underpins our ability to deliver project results beyond expectations. ASSURE THE HIGHEST STANDARDS OF QUALITY

Our Quality Assurance Management Plan defines and tailors the strategies and processes used to manage quality assurance and control for each project. MAINTAIN AN IMPECCABLE SAFETY RECORD We believe that quality, productivity, profitability and safety are mutually supportive objectives.

LOOK TO THE FUTURE WHEN WE TAKE ON A PROJECT

We don’t just look to the end result. Our

comprehensive environmental management practices have resulted in zero environmental incidents across all projects since the company’s inception.

(7)

CRAIG ‘SCRUFFY’ SHEEHAN

PRODUCTION EXCAVATOR OPERATOR 20 YEARS OF SERVICE WITH AE GROUP

05

aegroup.com.au

(8)

PROJECTS

VARSITY LAKES LANDFILL REMEDIATION

THIESS SERVICES

ROBINA VARSITY LAKES RAIL EXTENSION

TRACKSTAR ALLIANCE

GC09 RECLAMATION PROJECT

WICET

SWANBANK LANDFILL WASTE DISPOSAL FACILITY THIESS WASTE MANAGEMENT

SERVICES

600ML DAM BURDEKIN TO MORANBAH PIPELINE

MCCONNELL DOWELL

SPRINGFIELD FUTURE DAM

NEUMANN CONTRACTORS

WIVENHOE DAM NEW SPILLWAY

LEIGHTON CONTRACTORS

LAKE MANCHESTER NEW SPILLWAY

MCCONNELL DOWELL DAMS RESERVOIRS BULK EARTHWORKS LANDFILL REMEDIATION ROADWAYS BRIDGES RAIL INFRASTRUCTURE DRAINAGE INFRASTRUCTURE STRUCTURES & CONCRETE

We offer extensive experience

in the construction of public and

private sector projects, spanning

diverse sectors.

Our team works hand in hand with developers and program managers to deliver seamless project management. We deliver what we promise, and more. Our strong growth has been built on a foundation of consistently delivering project works to the highest standards.

(9)

GC09 RECLAMATION PROJECT WICET VALUE: $21 MILLION COMPLETED: SEPTEMBER 2012 07 aegroup.com.au

(10)

AE is a leading provider of contract services to the

natural resources sector. With a proven capacity

to safely deliver contracts that meet timeframes

and budgets, we have become the contractor

of choice for many of Australia’s leading natural

resource companies.

We have developed a strong reputation for delivering practical, sustainable and innovative solutions which contribute to long term profitability of our clients, who include Glencore, Xstrata, Anglo Coal, Minerva Coal JV, Stanwell Corporation, Middlemount Coal and CS Energy.

PROJECTS

MINE INFRASTRUCTURE WORKS YARRABEE COAL COMPANY RECLAIMED AREA A6 REHABILITATION

OAKY CREEK COAL MINE

OCN ROM POND XSTRATA COAL

13 MILE GULLY DIVERSION MIDDLEMOUNT COAL ASH STORAGE AREA EXTENSION PROJECT

STANWELL CORPORATION LIMITED

ASH LANDFORM REGRADING AND CAPPING CS ENERGY MAROON DAM UPGRADE PROJECT FULTON HOGAN WONARAH MINE PROJECT MINEMAKERS LIMITED HAY POINT COAL INFRASTRUCTURE ABIGROUP

DIVERSION DRAIN AND INFRASTRUCTURE MINERVA COAL JV ORMEAU QUARRY BORAL CONSTRUCTION MATERIALS

LAKE LINDSAY HAUL ROAD CONSTRUCTION ANGLO COAL KOGAN CREEK POWER STATION BULK EARTHWORKS

GOLDING CONTRACTORS

WEST BURLEIGH QUARRY BORAL CONSTRUCTION MATERIALS MILLENIUM OPEN CUT MINE RAIL LOOP BGC CONTRACTING STAPYLTON QUARRY BORAL CONSTRUCTION MATERIALS MINE INFRASTRUCTURE WORKS BOONAL JOINT VENTURE P/L

RECLAMATION / REHABILITATION MINING INFRASTRUCTURE TAILINGS DAM CONSTRUCTION QUARRYING HAUL ROAD CONSTRUCTION OVERBURDEN STRIPPING BULK DOZER PUSH MINE WATER DAMS CONCRETE WORKS DRAINAGE WORKS LEVEE BANK CONSTRUCTION CREEK DIVERSIONS CONTRACT MINING

(11)

13 MILE GULLY DIVERSION MIDDLEMOUNT COAL VALUE: $5 MILLION COMPLETED: JUNE 2014 09 aegroup.com.au

(12)

AE Group is a national prequalified

Contractor under the Austroads

National Prequalification system.

We have the experience, skills and resources to undertake complex infrastructure co-ordination and management – both in urban environments and remote locations – with a high degree of safety and environmental excellence.

PROJECTS

WATERFORD – TAMBORINE ROAD

TRANSPORT AND MAIN ROADS

COOROY TO CURRA

ABIGROUP CONTRACTORS

NORTHERN ACCESS ROAD PROJECT (QLD)

LEIGHTON CONTRACTORS

KEMPSEY BYPASS ALLIANCE (NSW)

LEIGHTON CONTRACTORS

SOUTH WEST TRANSIT CORRIDOR (SWTC) PACKAGE (B & C)

LEIGHTON CONTRACTORS QLD (TMR)

SOUTH WEST TRANSIT CORRIDOR PACKAGE (D)

FULTON HOGAN QUEENSLAND (TMR)

TINTENBAR TO EWINGSDALE (T2E) PACIFIC HIGHWAY UPGRADE (NSW)

BAULDERSTONE PTY LTD (RMS)

NEW ENGLAND HIGHWAY (CROWS NEST)

ROADS AND MARITIME SERVICES EARTHWORKS FORMATION ROAD CONSTRUCTION BRIDGE CONSTRUCTION OVERLAY ROAD WIDENING UNBOUND PAVEMENT STABILIZED PAVEMENT TRAFFIC CONTROL CONCRETE CULVERTS ROAD FURNITURE LIGHTING TRAFFIC SIGNALS LANDSCAPING

Main Roads

(13)

KEMPSEY BYPASSS ALLIANCE LEIGHTON CONTRACTORS VALUE: $11 MILLION COMPLETION: AUGUST 2011 11 aegroup.com.au

(14)

AE Group has worked on major national

and local government funded projects

– both for the Roads and Maritime

Services in NSW and Transport and

Main Roads in QLD. We have also

completed complex projects for the

Brisbane and Gold Coast City Councils.

We have the experience, resources and management systems in place to meet the most stringent

procurement policies and support key values around safety, environment, community and quality.

PROJECTS

LEGACY WAY PROJECT

TRANSCITY JV

SOUTH EAST QLD CORRECTIONAL PRECINCT

BAULDERSTONE QUEENSLAND

REEDY CREEK LANDFILL

GOLD COAST CITY COUNCIL

MERRIMAC WASTEWATER TREATMENT PLANT

JOHN HOLLAND

ROUND MOUNTAIN RESERVOIR

TENIX AUSTRALIA

STAPYLTON QUARRY

GOLD COAST CITY COUNCIL

WESTERN FREEWAY 6 LANE UPGRADE

TRANSCITY JV CIVIL INFRASTRUCTURE BULK EARTHWORKS LEVEL 1 COMPACTION SITE LEVELLING STORMWATER DRAINAGE ROADS RESERVOIRS QUARRYING LANDFILL TUNNELLING

Government

(15)

SOUTH EAST QLD CORRECTIONAL PRECINCT BAULDERSTONE QUEENSLAND VALUE: $34 MILLION COMPLETED: OCTOBER 2009 13 aegroup.com.au

(16)

AE Group is engaged by some of

Queensland’s leading developers such

as Sunland, Mirvac, Lend Lease and

Walker Corporation. Our collaborative

approach and commitment to

understanding our client’s key

objectives and has ensured our new

clients become repeat clients.

Our strength in delivery can be largely attributed to our core team’s extensive experience in construction. We deliver development projects in multiple

sectors including office, industrial, retail, residential and commercial.

PROJECTS

BONOGIN RD RESIDENTIAL DEVELOPMENT – 10 LOTS ALEXANDERSON HOLDINGS PTY LTD RADIUS INDUSTRIAL PARK LARAPINTA

THE GEORGE GROUP

SPRINGFIELD CONNECTION ROAD

DELFIN

LAKES ENTRANCE

DELFIN

SPRINGFIELD SHOPPING CENTRE & HOTEL

HIGHWAY COMMERCIAL

CLOVER HILL ESTATE (200 LOTS)

SUNLAND GROUP

INDUSTRIAL SUBDIVISION (10 ACRES)

BRB MODULAR

ROBINA LAND DEVELOPMENT

ROBINA LAND CORPORATION RESIDENTIAL COMMERCIAL INDUSTRIAL OFFICE GOLF COURSES RETAIL

Property

Development

(17)

BONOGIN RD RESIDENTIAL DEVELOPMENT – 10 LOTS ALEXANDERSON HOLDINGS PTY LTD

VALUE: $3 MILLION COMPLETED: MAY 2014

15 aegroup.com.au

(18)

AE group offers one of the largest and most

diverse fleet of mining and construction plant

and machinery in the industry, with around 200

equipment and plant items.

This extensive range ensures we always have the right resources available, whenever and wherever large earthmoving and specialist plant and equipment is required.

Our comprehensive range of plant – from pumps, mobile office and workshop facilities to lighting towers, cranes and site generators – also enables a high level of self reliance in remote locations where water, power and site amenities are minimal.

From large excavators, dozers, trucks, scrapers, graders and

compactors, we offer the very latest in plant technology. Whether you have a one-off requirement or need to set up a complete site for an extensive project, we guarantee the highest quality equipment – to exacting safety and environmental standards – every time.

CLIENTS WE HAVE PARTNERED WITH TO PROVIDE PLANT & EQUIPMENT LEIGHTON CONTRACTORS THIESS FULTON HOGAN LEND LEASE SUNLAND GROUP WALKER CORPORATION BMD JOHN HOLLAND GOLDING CONTRACTORS CS ENERGY STANWELL CORPORATION WORLEY PARSONS BAULDERSTONE PTY LTD OUR FLEET DOZERS TO 100 TONNE EXCAVATORS TO 120 TONNE GRADERS TO CAT 16M SCRAPERS CAT 657 & 631G REAR DUMP TRUCKS TO 60 TONNE

ARTICULATED DUMP TRUCKS TO 40 TONNE

COMPACTORS/ROLLERS SERVICING & MAINTENANCE FACILITIES (MOBILE WORKSHOPS) CRUSHERS/SCREENS MAJOR MINOR LONG TERM WET DRY CONTRACT HOURLY

Plant Hire

(19)

SOUTH WEST TRANSIT CORRIDOR PROJECT MAJOR PLANT HIRE

VALUE: $7 MILLION

COMPLETED: FEBRUARY 2008

17 aegroup.com.au

(20)

“We wish to thank you and your team for the outstanding effort and dedication to excellence on the 600ML Balancing Storage Project on the Burdekin to Moranbah

Pipeline. With an original duration of 25 weeks, and subsequent additional works your company managed to bring the

project to completion in less than 16 weeks, an outstanding effort.”

JIM CAMPBELL, CONSTRUCTION MANAGER BURDEKIN PIPELINE

“During the 18 month period on the project, AE Group’s management acted professionally, supporting our key values around safety, environment, community and quality. They provided a collaborative approach in dealing with issues. Highly recommended.”

CHRIS DAVIS, ROADWORKS MANAGER LEIGHTON CONTRACTORS

“AE Group has provided us with the resources we needed to enable the world record production that our tunnel boring machines have achieved. Both Transcity JV Management and I are delighted with the outcome, including an international Joint Venture executive who commented ‘this was the best spoil placement I have seen world-wide’.”

DAVID LANSDELL, WESTERN PORTAL AREA MANAGER LEGACY WAY TUNNEL, TRANSCITY JV

References

Related documents

Then, like the data from stage one, this data from stage two (approximated stress, audio pitch, audio volume) was divided into a training data set containing the first 2 3 and a

share the burden of higher taxes, the government is limited to highly inefficient and distortionary methods of public finance.7 In particular, monetization of

หน่วยงาน HPB ก าหนดให้มีโปรแกรม Healthy Choice Symbol (HCS) โดยใช้ Logo บนบรรจุภัณฑ์ให้เหมาะสมกับประเภทสินค้าแต่ละชนิด

E-mail list address or Internet address E-mail list address or Internet address Date accessed [in square brackets] Date accessed [in square brackets] Closed discussion list..

Firstly, I would like to express my sincere gratitude to my supervisors, Prof. Robert Knutsen and Prof. Bernhard Sonderegger, for their constant guidance, expertise, and

• 104 Senior Employment Advisers support staff members on a various of complex • 105 issues concerned with conditions of service.. Applicants must been educated to • 106 degree

2. Collect towels, creams polish and dish of hot soapy water. Set up manicure table. Inspect patrons hand and nails for disorders and cuts. Start with left little finger. Remove

By using literature review and case study analysis, the author analyses how financial regulation and supervision have failed to understand/manage the