A

10-01-2010

RL _______

MH ______

HM________

Issue for Information

CONTRACT NO.

xxxxxxxxxx

ITEM: EARTH WORKS

ORIGINATOR: TRANS MIDDLE EAST GENERAL

CONTRACTOR

PIL JOB No. xxxx

GULF CLASSIC Doc. No. xxxxx

WBS Code:

000

Contract No :

xxxxx

GASCO Doc. No. : xxxxxxxxxx

PROJ. N :

xxxxx

Page 1 of 10

Project No. xxxx

ASAB 3 (A3) PROJECT

Document No. xxxx

CONTRUCTION METHOD

STATEMENT

FOR

CABLE PULLING, LAYING, JOINTING

& TERMINATION

(2)

Rev.

Date

QA/QC

Engineer

ORIGINATOR

QA/QC

Manager

REVIEWED

Project

Manager

APPROVED

DESCRIPTION

(3)

Revision Description

Rev. No.

Section

Revision Description

A

All

Issue For Information

HOLDS

No.

Section

HOLD Description

DOCUMENT TITLE:

CONSTRUCTION METHOD

STATEMENT FOR CABLE PULLING,

LAYING, JOINTING & TERMINATION

Project No.: xxxxxx

GASCO DOC. NO.

xxxxxxx

REV.

A

DATE: 10-01-

2010

Page 3 of 10

(4)

INDEX

1. PURPOSE

2. SCOPE

3. REFERENCES

4. DEFINITIONS

5. RESPONSIBILITIES

6. PROCEDURE

7. TOOLS

8. SAFETY INSTRUCTIONS

(5)

1.

PURPOSE

T

HE PURPOSEOFTHISMETHODSTATEMENT ISTO PROVIDEGENERALGUIDELINES FORCABLE LAYING ANDCABLE TERMINATIONFOR CONTROLANDSIGNAL CABLESFOR TRIM

2

PHASEII PROJECTAT

GASCO.

2.

SCOPE

S

COPEOFTHISMETHODSTATEMENT COVERSTHEFOLLOWINGSACTIVITIES

.

M

ATERIAL

H

ANDLING

P

ROCEDURE

P

RECAUTION

T

ESTING

I

NSPECTION

3.

REFERENCES

T

HE FOLLOWINGDOCUMENTSARE CONSIDEREDAS REFERENCE DOCUMENTS

:

P

ROJECT

S

TANDARD INSTALLATIONDRAWINGS

P

ROJECT SPECIFICATIONS

P

ROJECT

Q

UALITY

P

LAN

(PQP)

I

NSPECTION AND

T

EST

P

LAN

4.

DEFINITIONS

C

LIENT

A

BU

D

HABI

G

AS

I

NDUSTRIES

, GASCO

C

ONTRACTOR

TMEGC / G

ULF

C

LASSIC

SE

S

ITE

E

NGINEER

SUP

S

UPERVISOR

ITP

I

NSPECTION AND

T

EST

P

LAN

E&I

E

LECTRICALAND

I

NSTRUMENT

PC

P

LANT

C

ONSTRUCTION

QA/QC

Q

UALITY

A

SSURANCEAND

C

ONTROL

MS

M

ETHOD

S

TATEMENT

IFC

I

SSUEFOR

C

ONSTRUCTION

PPE

P

ERSONAL

P

ROTECTION

E

QUIPMENT

HSE

H

EALTH

S

AFETY

& E

NVIRONMENT

DOCUMENT TITLE:

CONSTRUCTION METHOD

STATEMENT FOR CABLE PULLING,

LAYING, JOINTING & TERMINATION

Project No.: xxxxxx

GASCO DOC. NO.

xxxxxxx

REV.

A

DATE: 10-01-

2010

Page 5 of 10

(6)

5.

RESPONSIBILITIES

S

UPERVISOR

S

UPERVISORWILLCHECK CABLEROUTING AS PERPROJECTDRAWINGSAND SPECIFICATIONS

,

ALLCABLES

,

CONTROL ANDINSTRUMENT TOBE LAIDAND INSTALLEDAS PERABOVESTANDARDDETAILS

.

SE

S

ITE

E

NGINEER ISTOENSURE THATALLACTIVITIESMENTIONED ABOVE COMPLYWITHPROJECT DRAWINGS

,

SPECIFICATIONSANDSTANDARD DETAILS

PTW H

OLDER

GASCO W

ORKPERMIT SYSTEMWILL BEFOLLOWED

. W

ORK

-

PERMIT

COORDINATOR WILLBE RESPONSIBLEFOR THISANDTHEWORK

-

PERMITHOLDER WILL BERESPONSIBLE TOFOLLOW

GASCO

WORK

-

PERMITREQUIREMENTS

.

6.

PROCEDURE

6.1

RECEIPT AND STORAGE OF MATERIAL

T

HE MATERIAL RECEIVED FROM CLIENT SHALL BE STORED IN DESIGNATED AREA OF STORE

.

A

RRANGEMENTS SHALL BE MADE TO PROTECT AGAINST EFFECTS OF WEATHER AND ENVIRONMENT

.

6.2

ARRANGEMENT CABLE LAYING FOR TERMINATION

P

REPARATIONOFGLANDHOLEINBOTTOM PLATEOFGLANDBOX

.

M

ARKINGOF GLANDHOLEAS PERSIZE

.

U

SINGOFHOLESAWWITHDRILL MACHINE

.

F

ILINGOFSHARPEDGESOF GLANDHOLE

.

6.2.1 P

RE

-I

NSTALLATION

R

EQUIREMENTS

T

HE

S

ITE

E

NGINEER IS TO CHECK CONFORMITY WITH CABLE SCHEDULE

,

SUITABILITY OFCABLE ROUTEAND PREPAREA CABLE LAYINGPLAN

.

I

NSULATION RESISTANCE OF THE CABLES SHALL BE CHECKED BEFORE LAYING CABLES

.

6.2.2 P

REPARINGOF

L

AYING

C

ABLES ROLLERS ARE TO BE USED FOR LAYING CABLES OVER CABLE TRAYS TO REDUCE FRICTIONANDPREVENT DAMAGETOTHECABLES SHEATH

.

(7)

6.2.3 C

ABLE

L

AYING

C

ABLE DRUM IS TO BE SHIFTED TO SITE AND JACKED UP FOR LAYING OUT

. T

HE DRUM JACKING ARRANGEMENT IS TO BE SUITABLE FOR THE SIZE AND WEIGHT OF THEDRUM

. U

NROLLINGOF THECABLE IS ASPERDIRECTION SHOWNONDRUM

.

F

ORLARGE SIZECABLE

,

A PROPERSIZE CABLEPULLING SOCK SHALLBE USED

.

S

UFFICIENT

N

O

.

OF SKILLED

&

UNSKILLED

WORKERS ARE TO BE EMPLOYED TO LAY THECABLETAKING CAREOFTHEFOLLOWING

:-−

T

HE CABLE DOES NOT STRAY AWAY FROM THE ROUTE AND REMAINS ONTHEROLLERS

.

T

HE CABLE DOES NOT TOUCH OR SCRATCH AGAINST ANY OBJECT DAMAGINGITIN ANYWAY

.

T

HE CABLEIS PULLEDUNIFORMLYALLALONGTHEROUTE

.

6.2.4 C

ABLE

T

ERMINATION

A

LL

J

OINTING AND TERMINATION WORK SHALL BE CARRIED OUT BY TRAINED TECHNICIANS

,

EXPERIENCEDINSUCHWORK FORTHEOPERATING VOLTAGE CONCERNED

.

P

ROPER CRIMPINGTOOLSSHALLBEUSED FORCOMPRESSION TYPELUGS

.

A

LL CABLES ARE TO BE TERMINATED USED GLANDS OF PROPERTYPE AND SIZE AS PERAREA

CLASSIFICATION

.

T

HE GLAND SHALL BE ASSEMBLED STRICTLY IN ACCORDANCE WITH THE MANUFACTURER

S INSTRUCTION

,

PARTICULAR ATTENTION BEING PAID TO ENSURING GOOD MECHANICAL AND ELECTRICAL CONTACT BETWEEN PARTS WITH OUT EXCESSIVE STRAINORDISTORTIONOFCABLE

.

T

HE ENTIRE BODY OF THE CABLE MUST ENTER THE GLAND

. T

HE CABLE SHALL BE ONA STRAIGHT AXISFROM APOINT AT LEASTSIXDIAMETER BEFOREENTERINGTHE GLAND

. S

EALS SHALL BE CHECKED FOR CORRECT SIZE AT THE POINT OF APPLICATION

.

U

NUSED CABLE ENTRIES SHALL BE CLOSED WITH PLUG SUITABLE FOR THE DEGREE OFPROTECTION ANDCLASSIFICATION

.

6.2.5 C

IRCUIT

I

DENTIFICATION

P

ROPER IDENTIFICATION TAGS SHALLBE USEDFOR IDENTIFICATION OFTHECABLES

.

C

ABLES CORES SHALL BE POSITIVELY IDENTIFIED AT EVERY TERMINAL POINT

,

IN ACCORDANCE WITHTHEDRAWINGSANDSPECIFICATION

.

6.2.6 I

NSPECTION

I

NSPECTION AND

T

EST

P

LAN SPECIFIC TO PROJECT REQUIREMENTS SHALL BE FOLLOWEDANDINSPECTIONSACTIVITIES ARERECORDEDONTHEFORMATS

. .

DOCUMENT TITLE:

CONSTRUCTION METHOD

STATEMENT FOR CABLE PULLING,

LAYING, JOINTING & TERMINATION

Project No.: xxxxxx

GASCO DOC. NO.

xxxxxxx

REV.

A

DATE: 10-01-

2010

Page 7 of 10

(8)

6.3

PRECAUTIONS

6.3.1 E

XISTING

I

NSTALLATIONS

N

O WORK IN THE IMMEDIATE VICINITY OF EXISTING ELECTRICAL INSTALLATIONS SHALLBE ALLOWEDWITHOUTVALIDPERMIT TOWORK

.

W

HERE IT WOULD BE REQUIRED TO WORK IN THE VICINITY OF ELECTRICAL EQUIPMENT ALL NECESSARY PRECAUTION TO AVOID ACCIDENT CONTACT WITH LIVE CONDUCTORSETC

.

WOULDBETAKEN

.

A

COMPETENT QUALIFIED ELECTRICIAN SHALL CARRY OUT INSTALLATION MODIFICATIONORWORK INTHEIMMEDIATE VICINITYOFANY ELECTRICALEQUIPMENT UNDERFULL TIMESUPERVISION

.

6.3.2 N

EW

I

NSTALLATIONS

A

LLTHE PRE

-

ASSEMBLED RACKS

(PAR’

S

),

PRE

-

ASSEMBLED UNITS

(PAU’

S

)

AND VENDOR

-

ASSEMBLED UNITS

(VAU’

S

)

SHALL BE PRE

-

INSTALLED WITH THE SECONDARY LIGHTING SYSTEM

. O

NLY THE INTERCONNECTION TO BE CARRIED OUT AT SITE

.

A

LL THE MODULAR BUILDINGS

(VSD

AND

S

UBSATION

-11)

SHALL BE PRE

-INSTALLED WITH THE INTERNAL WIRING

,

ONLY THE INTERCONNECTION TO BE CARRIEDOUT ATSITE

.

C

ABLESIN CABLE TRAYS SHALLBE PROTECTEDFROMWELDING SPARKS ANDOTHER FALLINGOBJECTS BYUSING

GI S

HEET ETC

.

C

ABLES INSULATION SCRAPS SHALL BE REMOVED ON DAILY BASIS FROM PANELS

/

CONTROL ROOMS

.

6.3.3 S

CAFFOLDING

S

CAFFOLDING SHALL NOT BE DISTURBED OR ALTERED BY ANY UNAUTHORIZED PERSONS

. W

HERE ALTERATIONS ARE REQUIRED AN AUTHORIZED

S

CAFFOLDER WOULD BE USED TO CARRYOUT THE WORK UNDER COMPETENT SUPERVISION PER SAFETY

TAG

SYSTEM

.

W

HEREMATERIALS ARETO BEPOSITIONED ONSCAFFOLDING ITSHALLBE ENSURED THATTHESCAFFOLDING ISNOT OVERLOADED

.

(9)

STRUCTURE

,

OR THESE UNDER CONSTRUCTION

,

THE CLIENT

S REPRESENTATIVE SHALLBE CONSULTEDBEFOREPROCEEDINGWITHERECTION

.

7.

TOOLS

H

AND

D

RILL

M

ACHINE

H

OLE

S

AW

F

ILE

D

RUM

J

ACKS

A

XLE

C

ABLES ROLLERS

C

ERTIFIED

T

EST

E

QUIPMENT

.

C

ABLE

K

NIFE

C

ABLE

C

UTTER

L

UGS

P

RESS

S

IDE

C

UTTER

W

IRE

S

TRIPPER

I

NSULATION

T

APE

H

ACK

S

AW

8.

SAFETY INSTRUCTIONS

D

URINGTHE

I

NSTALLATION ALLMEASURESSHALLBEADOPTEDTO ENSURESAFE WORKING

.

C

LIENT SITEMANAGEMENTSYSTEMSHALLBE IMPLEMENTED

A

LL PERSONNELINVOLVEDSHALLUSENECESSARY

PPE.

A

LL EQUIPMENT WILL BE INSPECTED BY

HSE (TMEGC / GILF

CLASSIC)

PRIOR TOUSE

.

A

CCESSAND GOODHOUSEKEEPINGWILLBE MAINTAINED

.

F

IRE EXTINGUISHER WILL BE AVAILABLE AT ALL WORK FRONTS WHERE APPLICABLE

.

A

LL ACTIVITIES AT HEIGHTS WILL BE PROVIDED WITH SUITABLE WORKING PLATFORM

W

HEN WORKING AT HEIGHT PROPER FALL PROTECTION MEASURES SHALL BE TAKEN

.

DOCUMENT TITLE:

CONSTRUCTION METHOD

STATEMENT FOR CABLE PULLING,

LAYING, JOINTING & TERMINATION

Project No.: xxxxxx

GASCO DOC. NO.

xxxxxxx

REV.

A

DATE: 10-01-

2010

Page 9 of 10

(10)

A

LL ACCESS LADDERS AND SCAFFOLDING SHALL BE SECURED AND SAFETY TAGGED BEFOREUSE

.

W

ASTE MANAGEMENTSHOULDBE STRICTLY FOLLOWEDTO KEEPTHE JOBSITE NEAT ANDCLEAN

.

T

HE FOLLOWING PERSONAL PROTECTION WEARS SHALL BE USED SAFETY HELMET

,

SAFETYGOGGLES

,

SAFETYSHOES

,

HANDGLOVES

,

ANDGASMASK

.

References

Related documents

The strongest evidence against the attention hypothesis is the positive return predictability from retail buying, particularly in small stocks in which retail short selling

Several routing schemes have been proposed for particular graph classes: e.g., trees [FG01], bounded doubling dimension [AGGM06], ex- cluding a fixed graph as a minor [AG06],

Strong written and verbal communication skills; these include developing case studies, requirements.. specifications, user documentation, and technological

A previous study has shown that caffeic acid can induce apoptosis in MG63 osteosarcoma cells and show the presence of caspase-8, -9 and -3 in the induction of apoptosis.(11)

The KTC research team developed an accurate inventory of KYTC roadside lights and examined the performance differences of conventional and high-mast lighting. The findings

For the same reasons as those explained earlier for operating costs, administrative costs for the 195x35x12, the 130x35xlO deck barges, and the two self-unloading barges listed

Direct comparison of deuterium retention in the samples of tungsten and two grades of tungsten- tantalum alloys – W-1%Ta and W-5%Ta, exposed to deuterium plasma (ion flux ~10 24 m

In [3], [4], a distributed coordination algorithm for sensing agents was derived and analyzed based on the classic Lloyd algorithm [8], which requires the knowledge of the