• No results found

Please take note that only the document on paper support shall be considered as the authentic ACAE Certificate of conformity.

N/A
N/A
Protected

Academic year: 2021

Share "Please take note that only the document on paper support shall be considered as the authentic ACAE Certificate of conformity."

Copied!
5
0
0

Loading.... (view fulltext now)

Full text

(1)

MOD 137 E Revisione 01

Subject: Compact Disk (CD) of

ACAE Certificate of

conformity

Please take note that only the document on paper support shall be

considered as the authentic ACAE Certificate of conformity.

ACAE – General Secretary

Virginio Scarioni

(2)

C

E

ASSOCIAZIONE PER LA CERTIFICAZIONE

DELLE APPARECCHIATURE ELETTRICHE Via Tito Livio, 5

-

24723 BERGAMO (Italy)

Tel. +39 035 4775244 e-mail: [email protected]

A

This Certificate applies only to the apparatus tested. The responsibility for conformity of

an] apparatus having the same

designation with that tested rests \\ tth îhe manul'acturer or responsible vendor.

Onll integral reproduction of this Certificate or reproductions ofthis page accompanied by

an] page(s) on u'hich are stated the tests perlormed and the

a:signed rated characteristics of the apparatus tesied. are

permined * ilhout u ritten pennission tiom the ACAE.

Certificate

of

conformify

tro

A l3.02llf.

page

I

of

1

Apparatus: MV bushing "Plug-in inside cone"

24kV

-

250A for

MV/LV

transformers

Designation:

VEGA/S

3018

ENEL

Code 305631

Manufacturer or responsible

vendor:

ELETTRORESIN S.r.l.

Via 302 Zona Indus. Basso

Marino

- 63100 Ascoli Piceno

Product manufactured by ELETTRORESIN S.r.l. in the factory at Zona Industriale Basso Marino

-

Ascoli Piceno -Italv

Tested

for:

ELETTRORESIN S.r.l.

Tested

by:

Elettroresin S.r.l. Laboratory

ABB Sace S.p.A.

-

ACAE

IA

01 Laboratory

Omeco S.r.l. Laboratory

CMTE of "Dipartimento di Ingegneria

Elettrica"

-

Genova

University Laboratory

Standard and technical specification :

-ENEL DJ 11l

l

Ed.2 March 1994

-ENEL DJ 1561 Ed.ZMarch 1994

-ENEL DJ 4855 June 1994 draft

-ENEL Global Standard GSTOOI Rev.01 of 2012.10.31

This document certifies the compliance of the tested Apparatus with the above

mentioned Specifi cation and Standards.

This certificate is based on the ACAE "lnspection and evaluation repolt,' :

N.

RIV

13.06318Issue Date :23.04.2014 carried out according to the ENEL

Distribuzione S.p.A. procedure CERT/01

Ed.l-

September 2006.

PRD NOOTOB

Signatory of EA, IAF and ILAC Mutual Recognition Agreements

The General Secretary

Date:2014.04.23

(3)

ACAE

INSPECTION AND EVALUATION REPORT

Numero

Rtv

13.063/E Data 23.04.2014 Pagina 1

di3

1. 2. 3.

'4.

5. 6. 7. 8.

9.

lndice

Object

Place and date of the

inspections

Reference Specifi

cations

Verification

of

the

Laboratory

ability

Tests performed

ldentification

of the specimens Minutes of

the inspections

Non conformaty

Conformity

assessment of

the product

Emitted and verified by the ACAE Technical lnspector

Approved by the

ACAE

General Secretary

Emani Besana Virginio Scarioni

À

iÌtil['^i

ftS'î&r,rr*" É. Firmatslon. ...'....u...J....^

Vt"tt-rvtl

MOD 083 Revisione 00

(4)

ACAE

INSPECTION AND EVALUATION REPORT

Rtv

13.063/E

Data 23.04.2014

Pagina

2di3

1.

Object

This report is to show the ACAE operations canied-out

a@rding

to ENEL CERT/OIprocedure for

the

verification

of

the tests

canied-out

on the MV

bushing plug-in inside

@ne

24 kV

for

transformers MT/BT according to ENEL Specificatio DJ '1111 manufacÍured by Elettroresin SrL

The dimentions of the product are shown in the drawings VEGA/S3018 (Annex l),SCHER301B

(AnnexlA),SCHER301 B-T (Annex I B),GUAR301 B (Annex 1G)

This product was certfied by ACAE with number 409-034 and issue date 23.07.2009 The scope of this new certification is to verify the performance of the product without the

silver application on the surface of the conductor drawing PAS2G Mod-1 issue date 21.03.13

(Annex

2)

2.

Place and date of

the inspections

rhe

inspect'""-"

nil:,ffi:J"ffs:ffiY#-*"tJ'bn"ff:igre

Basso Marino 63100 Ascori piceno ABB Sace SpA-Via Baioni 35-24123 Bergamo

OMECO sd -Via Monviso 56-20052 Monza (Mi)

CMTE del Dipartimento di Ingegneria Elettrica dell'Università di Genova Via in the

ti,'.

ort;st

all:offir;

,l;?;n i:;J?.T8#ind

in

the

day 12.o4.2o13

3.

ReferenceSpecifications

.

Procedura per la certificazione dei materiali destinati

ad

Enel Distribuzione

CERT/01 Ed.1 Settembre 2006

.

Specifica ENEL DJ

1111Ed.2Marzo

1994 "lsolatore passante con presa a spina 24kV

250A per trasformatori MT/BT

.

Specifica ENEL DJ 't561 Éd-2Marzo 1994" Prescrizioni per il collaudo degli isolatori passanti con prese a spina 24kV,25OA per trasformatori MT/BT

.

Specifica

ENEL

DJ 4855 Bozza Giugno 1994 "Prescrizioni per le prove dei componenti degli accessori per cavi di energia"

.

Global standard ENEL GST001 "MV/LV Trasformers Rev.01 del 31 .10.2012

4.

Verificatio

of

the

Laboratory

ability

-The Laboratory ABB Sace SpA has been qualified by ACAE with number lA01.This Laboratory

is

also accreditated by SINAL with number 062

-The Laboratory Elettroresin srl is part of the factory operating in compliance of the standard

ISO 9001 accreditated with certificate number 9191 ELRE issue date 06.09.2006

-The Laboratory CMTE is part of Dipartimento di lngegneria Elettrica dell'Università degli Studi di

Genova

-The laboratory OMECO srl

is

accreditated by SINAL with number 0003.

The

ACAE

lnspector witnessed the tests canied-out in Elettroresin and CMT Laboratories.

5. Tests

performed

The product has been subjected to the type tests of the ENEL Specification DJ 1561. All the tests

A

ilt'-lt'^t

MOD 083 Revisione 00

ACA€

(5)

ACìAE

INSPECTION AND EVALUATION REPORT

Numero RIV 13_063/E Data 23.O4.20'14 Pagina

3di3

have been canied-out in the Laboratories of the point 2

The tests results are shown in the test reports

-Elettroresin srl 005/08 issue date

03.07.2009

Annex 3

-ACAE lA 01 08.178 issue date

2009.01.29

Annex 4

-CMTE I2ZCMTEST issue date

08.07.2009

Annex 5

-OMECO SPT/0834/09 issue

date17-07.2009

Annex 6

-Elettroresin srl 004/13 issue date

12.04.2013

Annex 7

ldentification

of the specimens

After the end of the tests the ACAE lnspector has verified the characferistics of the specimens The documentation is annexed to this report

-Documentation ENEL

A&B

Annex 8

-Photograph

documents

Annex 9

-Dimensionaland

electricalcharacteristics

Annexl0

-List of the

components

Annex f

I

-lnstructions for the

assembly

Annex

l2

-List of the

drawings

Annex 13

-Conformity

declaration

Annex f 4

All the documents and drawings have been stamped and signed by the ACAE Inspector and by the

technical responsible otf Elettroresin srl.One sample of the tested product will be kept by the manufacturer for the entire validity of the Certificate.

Minutes of the

inspections.

According to ACAE procedure,the tests in the Laboratories have been witnessed by the ACAE

lnspector who composed the minutes with description of the procedure and results of the tests.All the minutes will be kept in the ACAE archive.

Non

conformity

During and at the end of the tests the ACAE lnspector didn't find non conformity,

Conformity evaluation of the product

The positive results of the tests,the general performances and the verifìcations of the

characteristics made by the drawings and documentations certifies the compliance of the tested product to the mentioned ENEL Specifications.

lsptîT0 rEciltc0 6. 7. 8. 9-MOD 083 Revisione 00

Figure

ABB  Sace  S.p.A.  -  ACAE  IA  01  Laboratory

References

Related documents

Madeleine’s “belief” that she is Carlotta Valdez, her death and rebirth as Judy (and then Madeleine again) and Scottie’s mental rebirth after his breakdown.. All of these

Therefore, the fiscal policy objectives of the MPRRA to foster mineral beneficiation by allowing for reduced royalty rate for refined minerals, viewing from the

The aim of the module is to enable students to acquire the theoretical knowledge of strategy in an applied international context and to attain an understanding of

Product Name Technical Licences Technical Licenses Required/ Optional GIS 8.0 Required GIS_INTERACTIONSERVICE 8.0 Required ics_custom_media_channel 8.0

In this PhD thesis new organic NIR materials (both π-conjugated polymers and small molecules) based on α,β-unsubstituted meso-positioning thienyl BODIPY have been

Therefore, the purpose of the present study was to examine the relationship between the magnitude of the postoperative systemic inflammatory response and com- plication severity and

Among abstinent boys, those who planned to delay the onset of sexual activity over the subsequent year were more likely to report having moral concerns about having sexual

Since Vantage and Baton software will run on separate system servers the Vantage default store and the location of files passed to a Baton QC action must be shared to allow