DF001 SI GN . SI GN . SI GN .
CLIENT :
ADANI POWER LIMITED
2 x 330MW THERMAL POWER PLANT
MUNDRA SEZ, TUNDA, SIRACHA VILLAGE, KUTCHH DIST. GUJARAT
CONTRACT No.:
PROJECT :
400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT MUNDRA SEZ
CONSULTANT
FICHTNER
CONSULTING ENGINEERS (INDIA) PRIVATE LIMITED,
CHENNAI
TITLE :
AREVA T&D India Limited
A-7, SECTOR-65
NOIDA - 201301
T
h
is
d
ra
win
g
a
n
d
d
e
s
ig
n
is
t
h
e
p
ro
p
e
rt
y
o
f AREVA T
&
D
and must not be copi
ed or l
ent w
it
hout pri
o
r permi
ssi
on i
n
w
ri
ti
n
g
F ile: PG725000 -REV.B
DINESH 06/08/2008 06/12/2006 NameEMI-7604PG754-4-028
APPROVED400 KV CONTROL & INTERLOCK LOGIC DIAGRAM
TOTAL SHEET
92
001
APL / 130001 / VJ / 967 / 07 DATED 21.11.2007
STATUS DESCRIPTION FC DRAWN SHEETDRAWING NO.
CHECKED MHB Date Name Name Date Date Name Date Name Name Date Name Date Name Date Name Name Name Date 13/6/2006 RJR Date 06/08/2008 MHB Name Date 06/08/2008 REV. Name Name Date Date A B Date RSD Date UPDATED BASED UPON CUSTOMER'S COMMENTSFIRST ISSUE 06/12/2006 Date Name RJR FA
A B C D E F G H I A B C D E F G H I 001 X X 042 X X 002 X X 043 X X 003 X 044 X X 004 X 045 X X 005 X 046 X X 006 X 047 X X 007 X 048 X X 008 X 049 X X 008A X 050 X X 008B X 051 X X 008C X 052 X X 008D X 053 X X 009 X X 054 X X 010 X 055 X X 011 X X 056 X X 012 X 057 X X 013 X X 058 X X 014 X X 059 X X 015 X X 060 X X 016 X X 061 X X 017 X X 062 X X 018 X X 063 X X 019 X X 064 X X 020 X X 065 X X 021 X X 066 X X 022 X X 067 X X 023 X X 068 X X 023A X X 069 X X 024 X X 070 X X 025 X X 071 X X 026 X X 072 X X 027 X X 073 X X 028 X X 074 X 029 X X 075 X X 030 X X 076 X X 031 X X 077 X X 032 X X 078 X X 033 X X 079 X X 034 X X 080 X X 035 X X 081 X 036 X X 082 X 037 X X 083 X 038 X X 084 X 039 X X 085 X 040 X X 086 X 041 X X
INTERLOCK LOGIC FOR CLOSING OF CIRCUIT BREAKER IN TIE-1 (CONTD.)
CVT SELECTION LOGIC FOR CHECK SYNC OF CIRCUIT BREAKER IN O/G LINE-2
F ile : P G 725000-002.x ls T h is draw
ing and des
ign i s the property of A R EVA T & D and mus t not be c o pi ed or l ent w it hout pri o r permi s s ion i n w ri ti n g
CONTROL & INTERLOCK LOGIC FOR OPERATION OF EARTH SWITCHES IN TIE-2 CVT SELECTION LOGIC FOR CHECK SYNC OF CIRCUIT BREAKER IN TIE-2 INTERLOCK LOGIC FOR OPERATION OF ISOLATORS IN O/G LINE-2 (CONTD.) INTERLOCK LOGIC FOR OPERATION OF 400kV ISOLATORS IN O/G LINE-2
CONTROL & INTERLOCK LOGIC FOR OPERATION OF EARTH SWITCHES IN O/G LINE 2
003 INTERLOCK LOGIC FOR OPERATION OF ISOLATORS IN O/G LINE-1
INTERLOCK LOGIC FOR OPERATION OF ISOLATORS IN O/G LINE-1 (CONTD) CONTROL & INTERLOCK LOGIC FOR OPERATION OF EARTH SWITCHES IN O/G LINE 1
INTERLOCK LOGIC FOR CLOSING OF CIRCUIT BREAKER IN O/G LINE-1 INTERLOCK LOGIC FOR OPENING OF CIRCUIT BREAKER IN O/G LINE-1 INTERLOCK LOGIC FOR OPERATION OF 400kV ISOLATORS IN TIE-1 CONTROL & INTERLOCK LOGIC FOR OPERATION OF EARTH SWITCHES IN TIE-1
INTERLOCK LOGIC FOR CLOSING OF CIRCUIT BREAKER IN TIE-1
INTERLOCK LOGIC FOR OPERATION OF 400kV ISOLATORS IN TIE-2 PROTECTION TRIP LOGIC FOR GT PROTECTIONS(TYPICAL) PROTECTION TRIP LOGIC FOR ICT PROTECTIONS(TYPICAL)
CONTROL LOGIC FOR REMOTE CLOSING OF CIRCUIT BREAKERS FROM BCU/ BAY CONTROL & PROTECTION PANEL *
002 INTERLOCK LOGIC FOR OPENING OF CIRCUIT BREAKER IN TIE-1
INTERLOCK LOGIC FOR OPENING OF CIRCUIT BREAKER IN O/G LINE-2 INTERLOCK LOGIC FOR OPERATION OF ISOLATORS IN GT-3 INTERLOCK LOGIC FOR OPERATION OF ISOLATORS IN GT-3 (CONTD.) CONTROL & INTERLOCK LOGIC FOR OPERATION OF EARTH SWITCHES IN GT-3 CONTROL & INTERLOCK LOGIC FOR OPENING & CLOSING OF CIRCUIT BREAKER IN GT-3
CONTROL LOGIC FOR LOCAL OPERATION OF CKT. BKRS FROM EQP M. BOX CONTROL LOGIC FOR REMOTE OPENING OF CIRCUIT BREAKERS FROM BCU/BAY CONTROL & PROTECTION PANEL *
PROTECTION TRIP LOGIC FOR LINE PROTECTIONS(TYPICAL) PROTECTION TRIP LOGIC FOR TIE PROTECTIONS(TYPICAL)
CONTROL LOGIC FOR LOCAL OPERATION OF ISOLATORS FROM EQP M.BOX CONTROL LOGIC FOR REMOTE OPERATION OF ISOLATORS FROM BCU CONTROL LOGIC FOR REMOTE OPERATION OF ISOLATORS FROM HMI CONTROL LOGIC FOR REMOTE OPERATION OF ISOLATORS FROM SCADA
CONTROL & INTERLOCK LOGIC FOR OPERATION OF EARTH SWITCHES IN ICT-2 CVT SELECTION LOGIC FOR CHECK SYNC OF CIRCUIT BREAKER IN ICT-2 INTERLOCK LOGIC FOR CLOSING OF CIRCUIT BREAKER IN ICT-2
INTERLOCK LOGIC FOR CLOSING OF CIRCUIT BREAKER IN TIE-4 INTERLOCK LOGIC FOR OPENING OF CIRCUIT BREAKER IN TIE-4 INTERLOCK LOGIC FOR OPERATION OF 400kV ISOLATORS IN GT-4
IMPLEMENTATION OF AUTORECLOSE FUNCTION IN BCU
INTERLOCK LOGIC FOR OPERATION OF BUS-2 CVT ISOLATOR & EARTH SWITCH IMPLEMENTATION OF SYNCHROCHECK IN BCU
CONTROL & INTERLOCK LOGIC FOR OPERATION OF EARTH SWITCHES IN O/G LINE-3 INTERLOCK LOGIC FOR OPENING OF CIRCUIT BREAKER IN ICT-1
INTERLOCK LOGIC FOR OPERATION OF 400kV ISOLATORS IN O/G LINE-3 (CONTD.) INTERLOCK LOGIC FOR OPERATION OF 400kV ISOLATORS IN O/G LINE-3
CONTROL & INTERLOCK LOGIC FOR OPERATION OFEARTH SWITCHES IN TIE-3
INDEX
CVT SELECTION LOGIC FOR CHECK SYNC OF CIRCUIT BREAKER IN TIE-4 INTERLOCK LOGIC FOR CLOSING OF CIRCUIT BREAKER IN TIE-4
INTERLOCK LOGIC FOR CLOSING OF CIRCUIT BREAKER IN TIE-2 INTERLOCK LOGIC FOR OPENING OF CIRCUIT BREAKER IN TIE-2
INTERLOCK LOGIC FOR OPERATION OF 400kV ISOLATORS IN ICT-1 (CONTD.) INTERLOCK LOGIC FOR CLOSING OF CIRCUIT BREAKER IN O/G LINE-2
EMI-7604PG754-4-028
CVT SELECTION LOGIC FOR CHECK SYNC OF CIRCUIT BREAKER IN TIE-3 CONTROL & INTERLOCK LOGIC FOR OPERATION OF EARTH SWITCHES IN ICT-1 CVT SELECTION LOGIC FOR CHECK SYNC OF CIRCUIT BREAKER IN ICT-1
SHEET REVISION DESCRIPTION
FRONT SHEET INDEX
SHEET REVISION DESCRIPTION
SHEET NEXT SH.
AREVA
CLIENT : ADANI POWER LTD.
PROJECT : 400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT MUNDRA SEZ CONTROL LOGIC FOR REMOTE CLOSING OF CIRCUIT BREAKERS FROM SCADA
(LDC) *
B AREVA T&D India Limited
REV. INTERLOCK LOGIC FOR CLOSING OF CIRCUIT BREAKER IN O/G LINE-4 CVT SELECTION LOGIC FOR CHECK SYNC OF CIRCUIT BREAKER IN TIE-1
INTERLOCK LOGIC FOR OPERATION OF 400kV ISOLATORS IN O/G LINE-4 (CONTD.) CONTROL & INTERLOCK LOGIC FOR OPERATION OF EARTH SWITCHES IN O/G LINE-4 CVT SELECTION LOGIC FOR CHECK SYNC OF CIRCUIT BREAKER IN O/G LINE-4
INTERLOCK LOGIC FOR OPENING OF CIRCUIT BREAKER IN O/G LINE-4 CONTROL LOGIC FOR REMOTE OPENING OF CIRCUIT BREAKERS FROM HMI *
CONTROL LOGIC FOR REMOTE CLOSING OF CIRCUIT BREAKERS FROM HMI * CONTROL & INTERLOCK LOGIC FOR OPERATION OF EARTH SWITCHES IN O/G LINE 1
CONTROL LOGIC FOR REMOTE OPENING OF CIRCUIT BREAKERS FROM SCADA (LDC) *
INTERLOCK LOGIC FOR OPERATION OF400kV ISOLATORS IN ICT-1
INTERLOCK LOGIC FOR CLOSING OF CIRCUIT BREAKER IN ICT-1
CVT SELECTION LOGIC FOR CHECK SYNC OF CIRCUIT BREAKER IN O/G LINE-3 INTERLOCK LOGIC FOR CLOSING OF CIRCUIT BREAKER IN O/G LINE-3 INTERLOCK LOGIC FOR OPENING OF CIRCUIT BREAKER IN O/G LINE-3 INTERLOCK LOGIC FOR OPERATION OF 400kV ISOLATORS IN TIE-3
INTERLOCK LOGIC FOR CLOSING OF CIRCUIT BREAKER IN TIE-3 INTERLOCK LOGIC FOR OPENING OF CIRCUIT BREAKER IN TIE-3 INTERLOCK LOGIC FOR OPERATION OF 400kV ISOLATORS IN ICT-2 INTERLOCK LOGIC FOR OPERATION OF 400kV ISOLATORS IN ICT-2 (CONTD.)
INTERLOCK LOGIC FOR OPENING OF CIRCUIT BREAKER IN O/G ICT-2 INTERLOCK LOGIC FOR OPERATION OF 400kV ISOLATORS IN O/G LINE-4
INTERLOCK LOGIC FOR OPERATION OF 400kV ISOLATORS IN TIE-4
CONTROL & INTERLOCK LOGIC FOR OPENING & CLOSING OF CIRCUIT BREAKER IN GT-4 CONTROL & INTERLOCK LOGIC FOR OPERATION OFEARTH SWITCHES IN TIE-4
INTERLOCK LOGIC FOR OPERATION OF 400kV ISOLATORS IN GT-4 (CONTD.)
IMPLEMENTATION OF AUTORECLOSE FUNCTION IN BCU
CONTROL & INTERLOCK LOGIC FOR OPENING & CLOSING OF CIRCUIT BREAKER IN GT-4 INTERLOCK LOGIC FOR OPERATION OF BUS-1 CVT ISOLATOR & EARTH SWITCH
IMPLEMENTATION OF SYNCHROCHECK IN BCU
IMPLEMENTATION OF SYNCHROCHECK IN BCU IMPLEMENTATION OF SYNCHROCHECK IN BCU
DF003
CONTROL LOGIC FOR LOCAL OPERATION OF ISOLATORS FROM EQUIPMENT MARSHALLING BOX*
NOTE :
* IN THIS MODE, CONTROL FROM HIGHER LEVELS NAMELY BCU / HMI/ SCADA ARE DEFEATED AS LONG AS THE LOCAL/REMOTE SELECTOR SWITCH AT EQP MARSHALLING BOX IS IN LOCAL MODE.
** INTERLOCKS REQUIRED FOR CLOSING/OPENING OF ISOLATORS ARE VERIFIED IN THE RESPECTIVE BAY CONTROL UNIT AND A OUTPUT IS GENERATED FROM THE BCU WHEN THE INTERLOCKS ARE SATISIFIED. THE GENERATED OUTPUT IS HARDWIRED IN THE CONTROL CIRCUIT OF THE ISOLATOR. OPEN/CLOSE COMMANDS TO THE ISOLATOR ARE NOT EXECUTED UNLESS THE INTERLOCKS ARE SATISFIED.
OPERATION OF THE ISOLATORS EITHER FROM LOCAL/REMOTE WILL BE SUCCESFUL ONLY IF THE INTERLOCKS ARE THROUGH. INTERLOCKS CAN BE BYPASSED UNDER EMERGENCY CONDITIONS, BY AUTHORISED PERSONNEL ONLY. *** FOR DETAILED INTERLOCKS REFER THE INTERLOCKS FOR THE RESPECTIVE DETAILED INTERLOCKS.
CLIENT :
INTLK PERMISSIVE FROM RESPECTIVE BCU **
TO CLOSING CIRCUIT INTLK PERMISSIVE FROM
RESPECTIVE BCU ** CLOSE TO OPEN CIRCUIT OPEN REMOTE = BCU/HMI/SCADA SHEET
CONTROL LOGIC FOR LOCAL OPERATION OF
400kV ISOLATORS
400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT MUNDRA SEZ PROJECT : NEXT SH. 004 003
AREVA
AREVA T&D India Limited
REV.
EMI-7604PG754-4-028
A ADANI POWER LTD.LOCAL = EQP M.BOX
Fi le : PG 725000-003. x ls Thi s draw in g and des ig n i s the property of A R EVA T & D a n d m u s t n o t b e c o p ie d o r l e n t w it h o u t p ri o r p e rm is s io n i n w ri ti n g EQP LOCAL/REMOTE SELECTOR SWITCH AT EQP
MARSHALLING BOX
OPEN/CLOSE PUSH BUTTON CONTROLS AT EQP MARSHALLING BOX
&
DF003
CONTROL LOGIC FOR REMOTE OPERATION OF ISOLATORS FROM BCU*
NOTE :
* IN THIS MODE, CONTROL FROM HIGHER LEVELS NAMELY HMI/ SCADA ARE DEFEATED AS LONG AS THE LOCAL/REMOTE SELECTOR SWITCH AT BCU IS IN LOCAL MODE.
** INTERLOCKS REQUIRED FOR CLOSING/OPENING OF ISOLATORS ARE VERIFIED IN THE RESPECTIVE BAY CONTROL UNIT AND A OUTPUT IS GENERATED FROM THE BCU WHEN THE INTERLOCKS ARE SATISIFIED. THE GENERATED OUTPUT IS HARDWIRED IN THE CONTROL CIRCUIT OF THE ISOLATOR. OPEN/CLOSE COMMANDS TO THE ISOLATOR ARE NOT EXECUTED UNLESS THE INTERLOCKS ARE SATISFIED.
OPERATION OF THE ISOLATORS EITHER FROM LOCAL/REMOTE WILL BE SUCCESFUL ONLY IF THE INTERLOCKS ARE THROUGH. INTERLOCKS CAN BE BYPASSED UNDER EMERGENCY CONDITIONS, BY AUTHORISED PERSONNEL ONLY. *** FOR DETAILED INTERLOCKS REFER THE INTERLOCKS FOR THE RESPECTIVE DETAILED INTERLOCKS.
CLIENT : Fi le : PG 725000-003. x ls T h is d ra w in g a n d d e s ig n i s t h e p ro p e rt y o f AR EVA T & D a n d m u s t n o t b e c o p ie d o r l e n t w it h o u t p ri o r p e rm is s io n i n w ri ti n g OPEN/CLOSE PUSH BUTTON CONTROL
FROM BCU
OPEN BAY LOCAL/REMOTE
PUSH BUTTON ON BCU
TO CLOSING CIRCUIT EQP LOCAL/REMOTE
SELECTOR SWITCH AT EQP MARSHALLING BOX
CLOSE
TO OPEN CIRCUIT INTLK PERMISSIVE FROM
RESPECTIVE BCU **
LOCAL = EQP M.BOX REMOTE = BCU/HMI/SCADA
LOCAL = BCU REMOTE = HMI / SCADA
005 004
AREVA T&D India Limited
INTLK PERMISSIVE FROM RESPECTIVE BCU **
ADANI POWER LTD.
CONTROL LOGIC FOR REMOTE OPERATION OF
400kV ISOLATORS FROM BCU
REV.
EMI-7604PG754-4-028
AAREVA
SHEET NEXT SH.PROJECT : 400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT
MUNDRA SEZ
&
DF003
CONTROL LOGIC FOR REMOTE OPERATION OF ISOLATORS FROM HMI*
NOTE :
* IN THIS MODE, CONTROL FROM HIGHER SCADA LEVEL ARE DEFEATED AS LONG AS THE LOCAL/REMOTE SELECTION AT HMI IS IN LOCAL MODE.
** INTERLOCKS REQUIRED FOR CLOSING/OPENING OF ISOLATORS ARE VERIFIED IN THE RESPECTIVE BAY CONTROL UNIT AND A OUTPUT IS GENERATED FROM THE BCU WHEN THE INTERLOCKS ARE SATISIFIED. THE GENERATED OUTPUT IS HARDWIRED IN THE CONTROL CIRCUIT OF THE ISOLATOR. OPEN/CLOSE COMMANDS TO THE ISOLATOR ARE NOT EXECUTED UNLESS THE INTERLOCKS ARE SATISFIED.
OPERATION OF THE ISOLATORS EITHER FROM LOCAL/REMOTE WILL BE SUCCESFUL ONLY IF THE INTERLOCKS ARE THROUGH. INTERLOCKS CAN BE BYPASSED UNDER EMERGENCY CONDITIONS, BY AUTHORISED PERSONNEL ONLY. *** FOR DETAILED INTERLOCKS REFER THE INTERLOCKS FOR THE RESPECTIVE DETAILED INTERLOCKS.
CLIENT :
PROJECT : 400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT
MUNDRA SEZ
006 005
AREVA T&D India Limited
SHEET NEXT SH.
CONTROL LOGIC FOR REMOTE OPERATION OF
400kV ISOLATORS FROM HMI
REV.
EMI-7604PG754-4-028
AAREVA
LOCAL = EQP M.BOX REMOTE = BCU/HMI/SCADA
BAY LOCAL/REMOTE PUSH BUTTON ON BAY CONTROL UNIT
LOCAL = BCU REMOTE = HMI / SCADA
TO OPEN CIRCUIT INTLK PERMISSIVE FROM
RESPECTIVE BCU **
INTLK PERMISSIVE FROM RESPECTIVE BCU ** ADANI POWER LTD. TO CLOSING CIRCUIT OPEN CLOSE EQP LOCAL/REMOTE
SELECTOR SWITCH AT EQP MARSHALLING BOX REMOTE = SCADA Fi le : PG 725000-003. x ls T h is d ra w in g a n d d e s ig n i s t h e p ro p e rt y o f AR EVA T & D a n d m u s t n o t b e c o p ie d o r l e n t w it h o u t p ri o r p e rm is s io n i n w ri ti n g SUBTATION LOCAL/REMOTE SELECTION FROM HMI LOCAL = HMI OPEN/CLOSE CONTROL FROM HMI
&
&
DF003
CONTROL LOGIC FOR REMOTE OPERATION OF ISOLATORS FROM SCADA(LDC)
** INTERLOCKS REQUIRED FOR CLOSING/OPENING OF ISOLATORS ARE VERIFIED IN THE RESPECTIVE BAY CONTROL UNIT AND A OUTPUT IS GENERATED FROM THE BCU WHEN THE INTERLOCKS ARE SATISIFIED. THE GENERATED OUTPUT IS HARDWIRED IN THE CONTROL CIRCUIT OF THE ISOLATOR. OPEN/CLOSE COMMANDS TO THE ISOLATOR ARE NOT EXECUTED UNLESS THE INTERLOCKS ARE SATISFIED.
OPERATION OF THE ISOLATORS EITHER FROM LOCAL/REMOTE WILL BE SUCCESFUL ONLY IF THE INTERLOCKS ARE THROUGH. INTERLOCKS CAN BE BYPASSED UNDER EMERGENCY CONDITIONS, BY AUTHORISED PERSONNEL ONLY. *** FOR DETAILED INTERLOCKS REFER THE INTERLOCKS FOR THE RESPECTIVE DETAILED INTERLOCKS.
CLIENT :
OPEN/CLOSE CONTROL FROM HMI EQP LOCAL/REMOTE SELECTOR SWITCH AT EQP
MARSHALLING BOX
REMOTE = SCADA REMOTE = HMI / SCADA
Fi le : PG 725000-003. x ls T h is d ra w in g a n d d e s ig n i s t h e p ro p e rt y o f AR EVA T & D a n d m u s t n o t b e c o p ie d o r l e n t w it h o u t p ri o r p e rm is s io n i n w ri ti n g SUBTATION LOCAL/REMOTE SELECTION FROM HMI LOCAL = HMI BAY LOCAL/REMOTE PUSH BUTTON ON BAY CONTROL UNIT
LOCAL = BCU
PROJECT : 400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT
MUNDRA SEZ TO CLOSING CIRCUIT OPEN CLOSE TO OPEN CIRCUIT
AREVA
SHEETLOCAL = EQP M.BOX
REMOTE = BCU/HMI/SCADA INTLK PERMISSIVE FROM
RESPECTIVE BCU **
INTLK PERMISSIVE FROM RESPECTIVE BCU **
ADANI POWER LTD.
CONTROL LOGIC FOR REMOTE OPERATION OF
400kV ISOLATORS FROM SCADA
REV. NEXT SH.
007 006
AREVA T&D India Limited
EMI-7604PG754-4-028
A&
DF003
CONTROL LOGIC FOR LOCAL OPERATION OF CIRCUIT BREAKERS FROM EQUIPMENT MARSHALLING BOX*
NOTE :
* IN THIS MODE, CONTROL FROM HIGHER LEVELS NAMELY BCU / HMI/ SCADA ARE DEFEATED AS LONG AS THE LOCAL/REMOTE SELECTOR SWITCH AT EQP MARSHALLING BOX IS IN LOCAL MODE. ** THESE INTERLOCKS ARE HARDWIRED AT BMK LEVEL AND OPERATION FROM EQP. MARSHALLING BOX IS POSSIBLE ONLY WHEN THESE INTERLOCKS ARE SATISFIED.
FOR DETAILS REFER THE RESPECTIVE BREAKER INTERLOCK LOGICS
CLIENT : Fi le : PG 725000-003. x ls T h is d ra w in g a n d d e s ig n i s t h e p ro p e rt y o f AR EVA T & D a n d m u s t n o t b e c o p ie d o r l e n t w it h o u t p ri o r p e rm is s io n i n w ri ti n g EQP LOCAL/REMOTE SELECTOR SWITCH AT EQP
MARSHALLING BOX
OPEN/CLOSE PUSH BUTTON CONTROLS AT EQP MARSHALLING BOX A ADANI POWER LTD. 008 007
AREVA
EMI-7604PG754-4-028
PROJECT : 400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT
MUNDRA SEZ
LOCAL = EQP M.BOX
NEXT SH.
CONTROL LOGIC FOR LOCAL OPERATION OF
400kV CIRCUIT BREAKERS
TO TRIP COIL - 1 TO CLOSING CIRCUIT SHEET OPEN CLOSEAREVA T&D India Limited
REV. TO TRIP COIL - 2 REMOTE = BCU/HMI/SCADA HARDWIRED INTERLOCKS AT BMK LEVEL **
&
&
DF003
CONTROL LOGIC FOR REMOTE OPENING OF CIRCUIT BREAKERS FROM BCU/BAY CONTROL & PROTECTION PANEL *
NOTE :
* IN THIS MODE, CONTROL FROM HIGHER LEVELS NAMELY HMI/ SCADA ARE DEFEATED AS LONG AS THE LOCAL/REMOTE SELECTOR SWITCH AT BCU IS IN LOCAL MODE. ** EMERGENCY TRIPPING CAN BE GIVEN THROUGH THE TNC SWITCH PROVIDED ON THE BAY PROTECTION & CONTROL PANEL.
CONTROLS GIVEN THROUGH TNC SWITCH ARE ROUTED INDEPENDENT OF THE BCU AND HENCE ARE INDEPENDENT OF THE LOCAL/REMOTE SELECTION AT BCU/HMI.
*** PERMISSIVE FOR MAINTENANCE CLOSING IS GENERATED FROM BCU, WHEN BOTH THE ISOLATORS ON EITHER SIDES OF THE CB ARE OPEN. THIS OUTPUT CONTACT FROM BCU IS WIRED INTO THE TNC CLOSING CIRCUIT.
CLIENT :
008A 008
AREVA
AREVA T&D India Limited
REV.
EMI-7604PG754-4-028
ASHEET NEXT SH.
OPEN/CLOSE PUSH BUTTON CONTROL
FROM BCU
CONTROL LOGIC FOR REMOTE OPENING OF
400kV LINE-TIE- ICT CIRCUIT BREAKERS FROM
BCU
ADANI POWER LTD.
LOCAL = EQP M.BOX REMOTE = BCU/HMI/SCADA
TO TRIP COIL - 1
TO TRIP COIL - 2
OPEN CLOSE REMOTE = HMI / SCADA
PROJECT : T h is d ra w in g a n d d e s ig n i s t h e p ro p e rt y o f AR EVA T & D a n d m u s t n o t b e c o p ie d o r l e n t w it hout pri o r permi s s ion i n w ri ti n g EQP LOCAL/REMOTE SELECTOR SWITCH AT EQP
MARSHALLING BOX
BAY LOCAL/REMOTE PUSH BUTTON ON BAY CONTROL UNIT
LOCAL = BCU
400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT MUNDRA SEZ
CNTL SWTCH FROM C&R PANEL FOR EMERGENCY
CONTROL ** OPEN CLOSE
OR
&
&
&
DF003
PROTECTION TRIP LOGIC FOR LINE PROTECTIONS(TYPICAL)
CLIENT : 009 008A
AREVA
B REV. T h is d ra w in g a n d d e s ig n i s t h e p ro p e rt y o f AR EVA T & D a n d m u s t n o t b e c o p ie d o r l e n t w it hout pri o r permi s s ion i n w ri ti n gPROTECTION TRIP LOGIC FOR
LINE PROTECTION
EMI-7604PG754-4-028
400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT MUNDRA SEZ
ADANI POWER LTD. PROJECT :
SHEET NEXT SH.
DF003
PROTECTION TRIP LOGIC FOR TIE PROTECTIONS(TYPICAL)
CLIENT : T h is d ra w in g a n d d e s ig n i s t h e p ro p e rt y o f AR EVA T & D a n d m u s t n o t b e c o p ie d o r l e n t w it hout pri o r permi s s ion i n w ri ti n g
PROTECTION TRIP LOGIC FOR
TIE PROTECTION
EMI-7604PG754-4-028
400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT MUNDRA SEZ
ADANI POWER LTD. PROJECT :
SHEET NEXT SH.
AREVA T&D India Limited
008C 008B
AREVA
B REV.
DF003
PROTECTION TRIP LOGIC FOR GT PROTECTIONS(TYPICAL)
NOTE :
* ONLY HV O/C & E/F PROTECTION, LBB & BUSBAR PROTECTION ARE LOCATED IN THE SWITCHYARD RELAY PANEL. ALL THE OTHER PROTECTIONS ARE NOT IN PRESENT SCOPE.
CLIENT : 008D 008C
AREVA
B REV. T h is d ra w in g a n d d e s ig n i s t h e p ro p e rt y o f AR EVA T & D a n d m u s t n o t b e c o p ie d o r l e n t w it hout pri o r permi s s ion i n w ri ti n gPROTECTION TRIP LOGIC FOR
GT PROTECTION
EMI-7604PG754-4-028
400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT MUNDRA SEZ
ADANI POWER LTD. PROJECT :
SHEET NEXT SH.
DF003
PROTECTION TRIP LOGIC FOR ICT PROTECTIONS(TYPICAL)
NOTE :
* 220kV PROTECTIONS ARE NOT IN PRESENT SCOPE.
CLIENT : T h is d ra w in g a n d d e s ig n i s t h e p ro p e rt y o f AR EVA T & D a n d m u s t n o t b e c o p ie d o r l e n t w it hout pri o r permi s s ion i n w ri ti n g
PROTECTION TRIP LOGIC FOR
ICT PROTECTION
EMI-7604PG754-4-028
400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT MUNDRA SEZ
ADANI POWER LTD. PROJECT :
SHEET NEXT SH.
AREVA T&D India Limited
009 008D
AREVA
B REV.
CONTROL LOGIC FOR REMOTE CLOSING OF CIRCUIT BREAKERS FROM BCU/ BAY CONTROL & PROTECTION PANEL *
## PERMISSIVE FOR TNC MAINTENANCE CLOSING FROM BCU
(APPLIES TO ALL BAYS EXCEPT GT & GT TIE BAYS)
##
NOTE :
* IN THIS MODE, CONTROL FROM HIGHER LEVELS NAMELY HMI/ SCADA ARE DEFEATED AS LONG AS THE LOCAL/REMOTE SELECTOR SWITCH AT BCU IS IN LOCAL MODE.
** CHECK SYNCHRONISATION CONDITIONS ARE VALIDATED IN THE RESPECTIVE BAY CONTROL UNIT, BASED UPON THE SELECTED INCOMING & RUNNING VOLTAGES.
*** FOR DETAILED INTERLOCKING LOGICS REFER THE INTERLOCKS OF THE RESPECTIVE CIRCUIT BREAKER.
## PERMISSIVE FOR MAINTENANCE CLOSING IS GENERATED FROM BCU, WHEN BOTH THE ISOLATORS ON EITHER SIDES OF THE CB ARE OPEN. THIS OUTPUT CONTACT FROM BCU IS WIRED INTO THE TNC CLOSING CIRCUIT.
1 CLOSE COMMAND GIVEN BY THE OPERATOR FROM BCU WILL BE EXECUTED ONLY IF THE CHECK-SYNC CONDITIONS ARE SATISFIED.
2 CLOSE COMMAND FROM TNC SWITCH IS MEANT FOR CLOSING WITHOUT ANY SYNCHRONISATION & HENCE TO BE USED FOR MAINTENANCE/TESTING CONDITIONS.
3 INCOMING & RUNNING VOLTS ARE SELECTED BASED UPON THE ISOLATOR & CB POSITIONS IN THE RESPECTIVE DIA. CLIENT :
4 FOR GT-3 & GT-4 (BAYS-3, 12) REMOTE OPERATION IS NOT PROVIDED FROM SWITCHYARD.
5 FOR TIE-1 & TIE-4 (BAYS-2, 11) REMOTE OPERATION IS POSSIBLE FROM BCU/HMI/SCADA ONLY AS LONG AS THE TIE/GT SELECTOR SWITCH IS IN TIE MODE.
PERMISSIVE
Thi
s
dr
aw
ing and des
ign i s t he pr oper ty of AR EVA T&D and m u s t not be c opi ed or l ent w it hout pr io r per m is s ion i n w ri ti n g EQP LOCAL/REMOTE SELECTOR SWITCH AT EQP
MARSHALLING BOX
BAY LOCAL/REMOTE PUSH BUTTON ON BAY CONTROL UNIT
ADANI POWER LTD.
LOCAL = EQP M.BOX
PROJECT : 400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT
MUNDRA SEZ
INTLKS IMPLEMENTED THROUGH SOFT LOGIC IN RESPECTIVE BCU ***
TO CLOSING CIRCUIT
REMOTE = BCU/HMI/SCADA
OPEN/CLOSE PUSH BUTTON CONTROL
FROM BCU
OPEN
CLOSE
INTLKS IMPLEMENTED THROUGH HARDWIRING IN BAY CNTL & PROT PANEL***
LOCAL = BCU
CONTROL LOGIC FOR REMOTE CLOSING OF
400kV LINE-TIE-ICT CIRCUIT BREAKERS
FROM BCU
REMOTE = HMI / SCADASELECTED INCOMING VOLTS
SELECTED RUNNING VOLTS
PERMISSIVE FOR MAINTENANCE CLOSING CNTL SWTCH FROM C&R
PANEL FOR EMERGENCY CONTROL
OPEN CLOSE
ISO 89-B OPEN ISO 89-A OPEN
010 009
AREVA
AREVA T&D India Limited
REV.
EMI-7604PG754-4-028
B SHEET NEXT SH.VALIDATION OF
CHECK-SYNC
CONDITIONS
IN BCU**
OR
&
&
&
&
DF003
CONTROL LOGIC FOR REMOTE OPENING OF CIRCUIT BREAKERS FROM HMI *
NOTE :
* IN THIS MODE, CONTROL FROM HIGHER LEVELS NAMELY HMI/ SCADA ARE DEFEATED AS LONG AS THE LOCAL/REMOTE SELECTOR SWITCH AT BCU IS IN LOCAL MODE. ** EMERGENCY TRIPPING CAN BE GIVEN THROUGH THE TNC SWITCH PROVIDED ON THE BAY PROTECTION & CONTROL PANEL.
CONTROLS GIVEN THROUGH TNC SWITCH ARE ROUTED INDEPENDENT OF THE BCU.
CLIENT : OPEN/CLOSE CONTROL FROM HMI OPEN CLOSE SUBTATION LOCAL/REMOTE SELECTION FROM HMI LOCAL = HMI T h is d ra w in g a n d d e s ig n i s t h e p ro p e rt y o f AR EVA T & D a n d m u s t n o t b e c o p ie d o r l e n t w it hout pri o r permi s s ion i n w ri ti n g EQP LOCAL/REMOTE SELECTOR SWITCH AT EQP
MARSHALLING BOX
CNTL SWTCH FROM C&R PANEL FOR EMERGENCY
CONTROL **
OPEN
BAY LOCAL/REMOTE PUSH BUTTON ON BAY CONTROL UNIT
LOCAL = BCU
NEXT SH.
CONTROL LOGIC FOR REMOTE OPENING OF
400kV LINE-TIE- ICT CIRCUIT BREAKERS FROM
HMI
ADANI POWER LTD.
CLOSE
TO TRIP COIL - 1
TRIP COIL - 2
PROJECT : 400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT
MUNDRA SEZ
LOCAL = EQP M.BOX REMOTE = BCU/HMI/SCADA
REMOTE = SCADA REMOTE = HMI / SCADA
011 010
AREVA
AREVA T&D India Limited
REV.
EMI-7604PG754-4-028
A SHEETOR
&
&
&
CONTROL LOGIC FOR REMOTE CLOSING OF CIRCUIT BREAKERS FROM HMI *
## PERMISSIVE FOR TNC MAINTENANCE CLOSING FROM BCU
(APPLIES TO ALL BAYS EXCEPT GT & GT TIE BAYS)
##
NOTE :
* IN THIS MODE, CONTROL FROM SCADA ARE DEFEATED AS LONG AS THE SUBSTATION LOCAL/REMOTE SELECTION IS IN LOCAL MODE.
** CHECK SYNCHRONISATION CONDITIONS ARE VALIDATED IN THE RESPECTIVE BAY CONTROL UNIT, BASED UPON THE SELECTED INCOMING & RUNNING VOLTAGES.
*** FOR DETAILED INTERLOCKING LOGICS REFER THE INTERLOCKS OF THE RESPECTIVE CIRCUIT BREAKER.
## PERMISSIVE FOR MAINTENANCE CLOSING IS GENERATED FROM BCU, WHEN BOTH THE ISOLATORS ON EITHER SIDES OF THE CB ARE OPEN. THIS OUTPUT CONTACT FROM BCU IS WIRED INTO THE TNC CLOSING CIRCUIT.
1 CLOSE COMMAND GIVEN BY THE OPERATOR FROM HMI WILL BE EXECUTED ONLY IF THE CHECK-SYNC CONDITIONS ARE SATISFIED.
2 CLOSE COMMAND FROM TNC SWITCH IS MEANT FOR CLOSING WITHOUT ANY SYNCHRONISATION & HENCE TO BE USED FOR MAINTENANCE/TESTING CONDITIONS.
CLIENT : 3 INCOMING & RUNNING VOLTS ARE SELECTED BASED UPON THE ISOLATOR & CB POSITIONS IN THE RESPECTIVE DIA.
ISO 89-B OPEN
012 011
AREVA
AREVA T&D India Limited
REV.
EMI-7604PG754-4-028
BNEXT SH. SHEET 400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT MUNDRA SEZ
CNTL SWTCH FROM C&R PANEL FOR EMERGENCY
CONTROL
OPEN CLOSE
ADANI POWER LTD.
LOCAL = EQP M.BOX
INTLKS IMPLEMENTED THROUGH HARDWIRING IN BAY CNTL & PROT PANEL***
TO CLOSING CIRCUIT
REMOTE = BCU/HMI/SCADA
OPEN/CLOSE CONTROL FROM HMI
OPEN CLOSE
EQP LOCAL/REMOTE SELECTOR SWITCH AT EQP
MARSHALLING BOX
BAY LOCAL/REMOTE PUSH BUTTON ON BAY CONTROL UNIT
LOCAL = BCU
PERMISSIVE FOR MAINTENANCE CLOSING
PERMISSIVE
REMOTE = HMI / SCADA
SUBTATION LOCAL/REMOTE SELECTION FROM HMI LOCAL = HMI REMOTE = SCADA Thi s dr aw
ing and des
ign i s t he pr oper ty of AR EVA T&D and m u s t not be c opi ed or l ent w it hout pr io r per m is s ion i n w ri ti n g PROJECT : SELECTED INCOMING VOLTS SELECTED RUNNING VOLTS
CONTROL LOGIC FOR REMOTE CLOSING OF
400kV LINE-TIE- ICT CIRCUIT BREAKERS
FROM HMI
ISO 89-A OPEN
INTLKS IMPLEMENTED THROUGH SOFT LOGIC IN RESPECTIVE BCU ***
VALIDATION OF
CHECK-SYNC
CONDITIONS
IN BCU**
OR
&
&
&
&
DF003
CONTROL LOGIC FOR REMOTE OPENING OF CIRCUIT BREAKERS FROM SCADA (LDC) *
NOTE :
** EMERGENCY TRIPPING CAN BE GIVEN THROUGH THE TNC SWITCH PROVIDED ON THE BAY PROTECTION & CONTROL PANEL. CONTROLS GIVEN THROUGH TNC SWITCH ARE ROUTED INDEPENDENT OF THE BCU.
CLIENT :
TRIP COIL - 2 TO TRIP COIL - 1
PROJECT : 400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT
MUNDRA SEZ
013 012
AREVA
AREVA T&D India Limited
REV.
EMI-7604PG754-4-028
A SHEETLOCAL = EQP M.BOX REMOTE = BCU/HMI/SCADA
REMOTE = SCADA REMOTE = HMI / SCADA
BAY LOCAL/REMOTE PUSH BUTTON ON BAY CONTROL UNIT
LOCAL = BCU
NEXT SH.
CONTROL LOGIC FOR REMOTE OPENING OF
400kV LINE-TIE- ICT CIRCUIT BREAKERS FROM
SCADA
ADANI POWER LTD. SUBTATION LOCAL/REMOTE SELECTION FROM HMI LOCAL = HMI T h is d ra w in g a n d d e s ig n i s t h e p ro p e rt y o f AR EVA T & D a n d m u s t n o t b e c o p ie d o r l e n t w it hout pri o r permi s s ion i n w ri ti n g EQP LOCAL/REMOTE SELECTOR SWITCH AT EQPMARSHALLING BOX OPEN/CLOSE CONTROL FROM SCADA OPEN CLOSE CNTL SWTCH FROM C&R PANEL FOR EMERGENCY
CONTROL ** OPEN CLOSE
OR
&
&
&
CONTROL LOGIC FOR REMOTE CLOSING OF CIRCUIT BREAKERS FROM SCADA (LDC) *
## PERMISSIVE FOR TNC MAINTENANCE CLOSING FROM BCU
(APPLIES TO ALL BAYS EXCEPT GT & GT TIE BAYS)
##
NOTE :
** CHECK SYNCHRONISATION CONDITIONS ARE VALIDATED IN THE RESPECTIVE BAY CONTROL UNIT, BASED UPON THE SELECTED INCOMING & RUNNING VOLTAGES.
*** FOR DETAILS INTERLOCKING LOGICS REFER THE INTERLOCKS OF THE RESPECTIVE CIRCUIT BREAKER.
## PERMISSIVE FOR MAINTENANCE CLOSING IS GENERATED FROM BCU, WHEN BOTH THE ISOLATORS ON EITHER SIDES OF THE CB ARE OPEN. THIS OUTPUT CONTACT FROM BCU IS WIRED INTO THE TNC CLOSING CIRCUIT.
1 CLOSE COMMAND GIVEN BY THE OPERATOR FROM SCADA WILL BE EXECUTED ONLY IF THE CHECK-SYNC CONDITIONS ARE SATISFIED.
2 CLOSE COMMAND FROM TNC SWITCH IS MEANT FOR CLOSING WITHOUT ANY SYNCHRONISATION & HENCE TO BE USED FOR MAINTENANCE/TESTING CONDITIONS.
CLIENT : 3 INCOMING & RUNNING VOLTS ARE SELECTED BASED UPON THE ISOLATOR & CB POSITIONS IN THE RESPECTIVE DIA.
ISO 89-B OPEN
PERMISSIVE FOR MAINTENANCE CLOSING
CLOSE
INTLKS IMPLEMENTED THROUGH SOFT LOGIC IN RESPECTIVE BCU ***
ISO 89-A OPEN
OPEN/CLOSE CONTROL FROM HMI
OPEN
PERMISSIVE EQP LOCAL/REMOTE
SELECTOR SWITCH AT EQP MARSHALLING BOX
BAY LOCAL/REMOTE PUSH BUTTON ON BAY CONTROL UNIT
LOCAL = BCU TO CLOSING CIRCUIT REMOTE = BCU/HMI/SCADA Thi s dr aw
ing and des
ign i s t he pr oper ty of AR EVA T&D and m u s t not be c opi ed or l ent w it hout pr io r per m is s ion i n w ri ti n g SHEET
REMOTE = HMI / SCADA
SELECTED INCOMING VOLTS
SELECTED RUNNING VOLTS
ADANI POWER LTD.
LOCAL = EQP M.BOX
INTLKS IMPLEMENTED THROUGH HARDWIRING IN BAY CNTL & PROT PANEL***
CONTROL LOGIC FOR REMOTE CLOSING OF
400kV LINE-TIE- ICT CIRCUIT BREAKERS
FROM SCADA
SUBTATION LOCAL/REMOTE SELECTION FROM HMI LOCAL = HMI REMOTE = SCADA CNTL SWTCH FROM C&R PANEL FOR EMERGENCYCONTROL
OPEN CLOSE
PROJECT : 400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT
MUNDRA SEZ
NEXT SH. 013
AREVA
AREVA T&D India Limited
REV.
EMI-7604PG754-4-028
A 014VALIDATION OF
CHECK-SYNC
CONDITIONS
IN BCU**
OR
&
&
&
&
INTERLOCK LOGIC FOR OPERATION OF ISOLATORS IN O/G LINE-1
A) ISOLATOR 1-89A
B) ISOLATOR 1-89B
NOTE:
* AS INDICATED IN SHEETS: 003, 004, 005, 006 FOR CONTROL LOGIC OF ISOLATORS, THE INTERLOCK PERMISSIVE WILL BE WIRED IN THE CONTROL CIRCUIT OF ISOLATORS TO ENSURE THAT COMMAND WILL BE EXECUTED ONLY WHEN THE INTERLOCKS ARE SATISFIED.
** CLOSING & OPENING REQUEST OF ISOLATORS CAN BE GIVEN FROM ANY CONTROL LEVELS DEFINED IN SHEETS 003-006, PROVIDED THE ABOVE INTERLOCKS ARE SATISFIED. *** OPEN POSITION FOR CB IS CONFIRMED ONLY IF ALL THE THREE POLES ARE OPEN CLIENT :
PROJECT : 400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT MUNDRA SEZ
015 014
AREVA T&D India Limited
SHEET NEXT SH.
INTERLOCK LOGIC FOR OPERATION OF 400kV
ISOLATORS IN O/G LINE-1
REV.
EMI-7604PG754-4-028
BAREVA
ADANI POWER LTD. ISO 1-89B INTLK PERMISSIVE*ISO 1-89B OPEN REQUEST**
ISO 1-89B CLOSE ORDER
ISO 1-89B OPEN ORDER
ISO 1-89B CLOSE REQUEST** 1-52CB OPEN*** ISO 1-89A CLOSE
REQUEST**
ISO 1-89A OPEN REQUEST**
ISO 1-89A INTLK PERMISSIVE*
ISO 1-89A CLOSE ORDER
ISO 1-89A OPEN ORDER
F ile: P G 725000-003. x ls Thi s dr aw
ing and des
ign i s t he pr oper ty of AR EVA T&D and m u s t not be c opi ed or l ent w it hout pr io r per m is s ion i n w ri ti n g
BUS-2 CVT ISO CLOSED
BUS-2 CVT ES OPEN 1-89AE OPEN 1-52CB OPEN*** 1-89BE OPEN
&
&
&
&
&
&
INTERLOCK LOGIC FOR OPERATION OF ISOLATORS IN O/G LINE-1 (CONTD)
C) ISOLATOR 1-89C
NOTE:
* AS INDICATED IN SHEETS: 003, 004, 005, 006 FOR CONTROL LOGIC OF ISOLATORS, THE INTERLOCK PERMISSIVE WILL BE WIRED IN THE CONTROL CIRCUIT OF ISOLATORS TO ENSURE THAT COMMAND WILL BE EXECUTED ONLY WHEN THE INTERLOCKS ARE SATISFIED.
** CLOSING & OPENING REQUEST OF ISOLATORS CAN BE GIVEN FROM ANY CONTROL LEVELS DEFINED IN SHEETS 003-006, PROVIDED THE ABOVE INTERLOCKS ARE SATISFIED. *** OPEN POSITION FOR CB IS CONFIRMED ONLY IF ALL THE THREE POLES ARE OPEN
CLIENT :
ISO 1-89L OPEN ORDER
ISO 1-89L OPEN REQUEST ** 2-52CB OPEN***
Thi
s
dr
aw
ing and des
ign i s t he pr oper ty of AR EVA T&D and m u s t not be c opi ed or l ent w it h
INTERLOCK LOGIC FOR OPERATION OF
400kV ISOLATORS IN O/G LINE-1 (CONTD)
016 015 REV.
EMI-7604PG754-4-028
BAREVA T&D India Limited
AREVA
SHEET NEXT SH.PROJECT : 400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT
MUNDRA SEZ 1-89LE OPEN 1-52CB OPEN*** ADANI POWER LTD. ISO 1-89L INTLK PERMISSIVE *
ISO 1-89L CLOSE ORDER
ISO 1-89L CLOSE REQUEST **
&
&
DF003
CONTROL & INTERLOCK LOGIC FOR OPERATION OF EARTH SWITCHES IN O/G LINE-1
A) EARTH SWITCH 1-89AE*
B) EARTH SWITCH 1-89BE*
C) EARTH SWITCH 1-89LE*
NOTE:
* FOR EARTH SWITCHES THERE IS NO REMOTE CONTROL FROM BCU/HMI/SCADA. CONTROL IS POSSIBLE ONLY FROM EQUIPMENT MARSHALLING BOX. ALL THE INTERLOCKS FOR EARTH SWITCH OPERATION ARE VERIFIED IN BCU & AN OUTPUT IS GENERATED FROM BCU WHEN THE INTERLOCKS ARE SATISFIED. ** THIS INTERLOCK PERMISSIVE IS GENERATED BY THE BCU AND IS HARD WIRED IN THE CONTROL CIRCUIT OF THE EARTH SWITCH.
COMMANDS GIVEN FROM THE EQUIPMENT MARSHALLING BOX ARE EXECUTED ONLY WHEN THE INTERLOCKS ARE SATISFIED. *** LINE U/V PERMISSIVE IS TAKEN THROUGH SOFT FROM LINE DISTANCE PROTECTION RELAY.
CLIENT : T h is d ra w in g a n d d e s ig n i s t h e p ro p e rt y o f AR EVA T & D a n d m u s t n o t b e c o p ie d o r l e n t w it h o u t p ri o r p e rm is s io n i n w ri ti n g
ISO 1-89A OPEN
ISO 1-89B OPEN
ISO 1-89L OPEN
DEAD LINE O/G LINE-1 (UNDER VOLTAGE
OPERATED) *** ISO 1-89A OPEN
ISO 1-89B OPEN
OPEN/CLOSE PUSH BUTTON CONTROLS AT EQP MARSHALLING BOX
ES 1-89BE INTLK PERMISSIVE **
CONTROL & INTERLOCK LOGIC FOR OPERATION
OF 400kV EARTH SWITCHES IN O/G LINE-1
ADANI POWER LTD.
OPEN/CLOSE PUSH BUTTON CONTROLS AT EQP MARSHALLING BOX
017 016
AREVA T&D India Limited
SHEET NEXT SH. REV.
EMI-7604PG754-4-028
BAREVA
OPEN CLOSE ES 1-89AE INTLK PERMISSIVE ** TO OPEN CIRCUIT TO CLOSING CIRCUIT OPEN CLOSE TO OPEN CIRCUIT TO CLOSING CIRCUITPROJECT : 400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT
MUNDRA SEZ
ES 1-89LE INTLK PERMISSIVE **
OPEN/CLOSE PUSH BUTTON CONTROLS AT EQP MARSHALLING BOX
OPEN CLOSE TO OPEN CIRCUIT TO CLOSING CIRCUIT
&
&
&
&
&
&
&
&
&
DF003
CVT SELECTION LOGIC FOR CHECK SYNC OF CIRCUIT BREAKER IN O/G LINE-1
A) RUNNING VOLTS *
B) INCOMING VOLTS **
CASE - I
CASE - 2
NOTE:
* FOR LINE FEEDERS, BUS-2 CVT WILL BE SELECTED AS RUNNING VOLTS AND EXTENDED TO BCU TERMINALS FOR CHECK-SYNC.
** AT ANY TIME ONLY ONE OF THE CASES WILL BE SUCCESFUL FOR INCOMING VOLTS. BASED ON THE ISOLATOR & CB POSITIONS, THE LOGICS ARE VALIDATED AND OUTPUTS ARE GENERATED FROM THE BCU WHICH ARE WIRED INTO THE PT SELECTION CIRCUIT FOR EXTENSION OF THE APPROPRIATE INCOMING VOLTS TO BCU.
THE SYNCHRONISATION OF LINE WITH GT IS NOT CONSIDERED IN THE CVT SELECTION & THE CB CLOSING SCHEME.
CLIENT :
RUNNING VOLTS
CB 3-52 CLOSE
SHEET
CVT SELECTION LOGIC FOR
CHECK-SYNC OF CB
IN O/G LINE-1 (BAY-1)
ADANI POWER LTD.
AREVA T&D India Limited
PROJECT :
017
BUS-1 CVT SELECTED
ISO 3-89G OPEN
400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT MUNDRA SEZ
ISO 1-89L CLOSE LINE - 1 CVT (1 - CVTB)
SELECTED CB 1-89L OPEN T h is d ra w in g a n d d e s ig n i s t h e p ro p e rt y o f AR EVA T & D a n d m u s t n o t b e c o p ie d o r l e n t w it h o u t p ri o r p e rm is s io n i n w ri ti n g BUS - 2 CVT NEXT SH. REV.
EMI-7604PG754-4-028
BAREVA
018 CB 2-52 CLOSE&
INTERLOCK LOGIC FOR CLOSING OF CIRCUIT BREAKER IN O/G LINE-1
A) INTERLOCKS IMPLEMENTED AS HARDWIRED AT BMK LEVEL *
B) INTERLOCKS IMPLEMENTED AS HARDWIRED AT BAY CONTROL & PROTECTION PANEL **
C) INTERLOCKS IMPLEMENTED IN SOFT LOGIC IN BCU ***
NOTE:
* THESE INTERLOCKS APPLY TO CLOSE OPERATION OF CIRCUIT BREAKER FROM THE EQUIPMENT MARSHALLING BOX.
CLIENT :
** THESE HARDWIRED INTERLOCKS APPLY TO THE CONTROL USING TNC SWITCH ON THE BAY CONTROL & PROTECTION PANEL.
IN CASE OF CLOSING FROM BCU/HMI/SCADA, THESE HARDWIRED INTERLOCKS MUST BE SATISFIED IN ADDITION TO THE SOFT LOGICS BUILT IN THE BCU. *** THESE LOGICS APPLY FOR THE CLOSE OPERATION FROM BCU/HMI/SCADA. THESE LOGICS APPLY FOR AUTO RECLOS
CLOSE COMMAND ISSUED BY THE BCU. A/R CLOSING WILL SUCCESFUL ONLY IF THE INTERLOCKS ARE THROUGH.
CB 1-52 LOCAL CLOSING CIRCUIT *
86-A TRIP RELAY RESET
86-B TRIP RELAY RESET A/R LK-OUT TRIP RELAY
(86-LO) RESET 86-A TRIP RELAY RESET
86-B TRIP RELAY RESET A/R LK-OUT TRIP RELAY
(86-LO) RESET BBP RELAY RESET F ile: P G 725000-003. x ls Thi s dr aw
ing and des
ign i s t he pr oper ty of AR EVA T&D and m u s t not be c opi ed or l ent w it hout pr io r per m is s ion i n w ri ti n g ES 1-89 AE CLOSE ES 1-89 BE CLOSE
TRIP CIRCUIT - 1 & 2 HEALTHY CLOSE REQUEST FROM
BCU/SCADA/HMI BBP RELAY
RESET ISO 1-89A CLOSE
ISO 1-89B CLOSE L/R SS AT CB 1-52 M.BOX IN
REMOTE MODE
ADANI POWER LTD.
INTERLOCK LOGIC FOR CLOSING OF 400kV
CIRCUIT BREAKER IN O/G LINE-1
REV.
EMI-7604PG754-4-028
BAREVA
CB 1-52 CLOSING CIRCUIT ** 019 018AREVA T&D India Limited
SHEET NEXT SH.
PROJECT : 400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT MUNDRA SEZ
RUNNING (BUS-2 CVT) VOLTS CB 1-52 CLOSE ORDER SELECTED INCOMING VOLTS (REFER SH: 017)
&
&
&
VALIDATION OF
CHECK-SYNC
CONDITIONS
IN BCU**
INTERLOCK LOGIC FOR OPENING OF CIRCUIT BREAKER IN O/G LINE-1
A) INTERLOCKS FOR OPENING FROM BMK LEVEL *
B) INTERLOCKS FOR OPENING FROM REMOTE **
NOTE:
* THESE INTERLOCKS ARE APPLICABLE FOR OPERATION FROM EQP. MARSHALLING BOX.
** THESE INTERLOCKS ARE APPLICABLE FOR OPERATION FROM BCU/HMI/SCADA. THESE LOGICS ARE BUILT IN THE BCU.
CLIENT :
*** CB CLOSE POSITION IS CONFIRMED ONLY WHEN ALL THE THREE POLES ARE CLOSED.
INTERLOCK LOGIC FOR OPENING OF 400kV
CIRCUIT BREAKER IN O/G LINE-1
REV.
EMI-7604PG754-4-028
BAREVA
020 019
AREVA T&D India Limited
SHEET NEXT SH. F ile: P G 725000-003. x ls Thi s dr aw
ing and des
ign i s t he pr oper ty of AR EVA T&D and m u s t not be c opi ed or l ent w it hout pr io r per m is s ion i n w ri ti n g CB CLOSE *** CB CLOSE *** EQP LOCAL/REMOTE SELECTOR SWITCH AT EQP
MARSHALLING BOX EQP LOCAL/REMOTE SELECTOR SWITCH AT EQP
MARSHALLING BOX
CB OPEN REQUEST *
LOCAL = EQP M.BOX
REMOTE = BCU/HMI/SCADA TO TRIP COIL - 1
TO TRIP COIL - 1
PROJECT : 400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT MUNDRA SEZ
TO TRIP COIL - 2 OPEN/CLOSE PUSH BUTTON
CONTROLS AT EQP MARSHALLING BOX
OPEN CLOSE
TO TRIP COIL - 2
LOCAL = EQP M.BOX REMOTE = BCU/HMI/SCADA
ADANI POWER LTD.
&
INTERLOCK LOGIC FOR OPERATION OF 400kV ISOLATORS IN TIE-1
A) ISOLATOR 2-89A
A) ISOLATOR 2-89B
NOTE:
* AS INDICATED IN SHEETS: 003, 004, 005, 006 FOR CONTROL LOGIC OF ISOLATORS, THE INTERLOCK PERMISSIVE WILL BE WIRED IN THE CONTROL CIRCUIT OF ISOLATORS TO ENSURE THAT COMMAND WILL BE EXECUTED ONLY WHEN THE INTERLOCKS ARE SATISFIED.
** CLOSING & OPENING REQUEST OF ISOLATORS CAN BE GIVEN FROM ANY CONTROL LEVELS DEFINED IN SHEETS 003-006, PROVIDED THE ABOVE INTERLOCKS ARE SATISFIED. *** OPEN POSITION FOR CB IS CONFIRMED ONLY IF ALL THE THREE POLES ARE OPEN CLIENT :
F ile: P G 725000-003. x ls 2-89BE OPEN 2-52CB OPEN*** ISO 2-89B CLOSE REQUEST**
ISO 2-89B OPEN REQUEST** 2-89AE OPEN
INTERLOCK LOGIC FOR OPERATION OF 400kV
ISOLATORS FOR TIE-1
REV.
ISO 2-89A OPEN ORDER
ISO 2-89B INTLK PERMISSIVE *
ISO 2-89B CLOSE ORDER
EMI-7604PG754-4-028
BAREVA
PROJECT : 400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT
MUNDRA SEZ ADANI POWER LTD.
ISO 2-89A INTLK PERMISSIVE *
ISO 2-89A OPEN REQUEST**
ISO 2-89A CLOSE ORDER
ISO 2-89B OPEN ORDER
2-52CB OPEN***
ISO 2-89A CLOSE REQUEST**
021 020
AREVA T&D India Limited
SHEET NEXT SH.
&
&
&
&
&
&
CONTROL & INTERLOCK LOGIC FOR OPERATION OF EARTH SWITCHES IN TIE-1
A) EARTH SWITCH 2-89AE*
B) EARTH SWITCH 2-89BE*
NOTE:
* FOR EARTH SWITCHES THERE IS NO REMOTE CONTROL FROM BCU/HMI/SCADA. CONTROL IS POSSIBLE ONLY FROM EQUIPMENT MARSHALLING BOX. ALL THE INTERLOCKS FOR EARTH SWITCH OPERATION ARE VERIFIED IN BCU & AN OUTPUT IS GENERATED FROM BCU WHEN THE INTERLOCKS ARE SATISFIED. ** THIS INTERLOCK PERMISSIVE IS GENERATED BY THE BCU AND IS HARD WIRED IN THE CONTROL CIRCUIT OF THE EARTH SWITCH.
COMMANDS GIVEN FROM THE EQUIPMENT MARSHALLING BOX ARE EXECUTED ONLY WHEN THE INTERLOCKS ARE SATISFIED.
CLIENT :
CONTROL & INTERLOCK LOGIC FOR
OPERATION OF 400kV EARTH SWITCHES IN
TIE-1 (BAY-2)
REV.EMI-7604PG754-4-028
BAREVA
022 021 ADANI POWER LTD.AREVA T&D India Limited
SHEET NEXT SH.
PROJECT : 400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT MUNDRA SEZ
F ile: P G 725000-003. x ls ISO 2-89B OPEN ISO 2-89A OPEN
ISO 2-89A OPEN
ES 2-89AE INTLK PERMISSIVE **
ISO 2-89B OPEN
TO OPEN CIRCUIT OPEN/CLOSE PUSH BUTTON
CONTROLS AT EQP MARSHALLING BOX OPEN CLOSE TO CLOSING CIRCUIT ES 2-89BE INTLK PERMISSIVE ** TO OPEN CIRCUIT OPEN/CLOSE PUSH BUTTON
CONTROLS AT EQP MARSHALLING BOX OPEN CLOSE TO CLOSING CIRCUIT
&
&
&
&
&
&
DF003
CVT SELECTION LOGIC FOR CHECK SYNC OF CIRCUIT BREAKER IN TIE-1
A) RUNNING VOLTS *
CASE-1 (TIE/GT SELECTOR SWITCH IN TIE MODE. SYNCHRONISATION IS DONE FROM SWITCHYARD BCU)
CASE-2 (TIE/GT SELECTOR SWITCH IN GT MODE. SYNCHRONISATION IS DONE FROM GCP)
B) INCOMING VOLTS *
CASE - I (APPLICABLE TO BOTH TIE & GCP MODE.)
CASE - 2 (APPLICABLE TO BOTH TIE & GCP MODE.)
CASE - 3 (APPLICABLE FOR GT SYNCHRONISATION ONLY .TIE/GT SELECTOR SWITCH IN GT MODE. SYNCHRONISATION IS DONE FROM GCP)
##
NOTE:
* SINCE THE SYNCHRONISATION OF GT IS DONE FROM GCP, GT CVT IS NOT CONSIDERED IN THE CVT SELECTION LOGIC FOR BCU. FOR BCU IN THE SWITCHYARD RUNNING VOLTS BY DEFAULT IS TAKEN AS BUS-1 VOLTS
** AT ANY TIME ONLY ONE OF THE CASES WILL BE SUCCESFUL FOR INCOMING VOLTS. BASED ON THE ISOLATOR & CB POSITIONS, THE LOGICS ARE VALIDATED AND OUTPUTS ARE GENERATED FROM THE BCU WHICH ARE WIRED INTO THE PT SELECTION CIRCUIT FOR EXTENSION OF THE APPROPRIATE INCOMING VOLTS TO BCU. ## GT-3 CVT WILL BE SELECTED ONLY FOR SYNCHRONISATION OF GT THROUGH THE TIE.
CLIENT :
TIE/GCP SELECTOR SWITCH AT SWYD BAY CONTROL & PROT PANEL
TIE = FEEDER GCP = GT
BUS-2 CVT SELECTED **
CB 1-89L OPEN
TIE/GCP SELECTOR SWITCH AT SWYD BAY CONTROL & PROT PANEL
TIE = FEEDER GCP = GT
CB 3-52 OPEN
TIE/GCP SELECTOR SWITCH AT SWYD BAY CONTROL & PROT PANEL
TIE = FEEDER GCP = GT
CB 1-52 CLOSE
BUS - 1 CVT RUNNING VOLTS TO BCU
T h is d ra w in g a n d d e s ig n i s t h e p ro p e rt y o f AR EVA T & D and mus t not be c o pi ed or l ent w it hout pri o r permi s s ion i n w ri ti n g GT - 3 CVT RUNNING VOLTS ISO 1-89L CLOSE GT-3 CVT SELECTED ** CB 3-89G CLOSED LINE - 1 CVT (1 - CVTB) SELECTED **
CVT SELECTION LOGIC FOR
CHECK-SYNC OF CB
IN TIE-1 (BAY-2)
ADANI POWER LTD.
EMI-7604PG754-4-028
B 022 023PROJECT : 400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT
MUNDRA SEZ
AREVA T&D India Limited
NEXT SH. REV.
AREVA
SHEET&
&
OR
OR
&
INTERLOCK LOGIC FOR CLOSING OF CIRCUIT BREAKER IN TIE-1
(REMOTE CLOSING POSSIBLE FROM SWITCHYARD ONLY AS LONG AS ISOLATOR 3-89G IS OPEN) A) INTERLOCKS IMPLEMENTED AS HARDWIRED AT BMK LEVEL *
B) INTERLOCKS IMPLEMENTED AS HARDWIRED AT BAY CONTROL & PROTECTION PANEL **
NOTE:
* THESE INTERLOCKS APPLY TO CLOSE OPERATION OF CIRCUIT BREAKER FROM THE EQUIPMENT MARSHALLING BOX. ** THESE HARDWIRED INTERLOCKS APPLY TO THE CONTROL USING TNC SWITCH ON THE BAY CONTROL & PROTECTION PANEL.
IN CASE OF CLOSING FROM BCU/HMI/SCADA, THESE HARDWIRED INTERLOCKS MUST BE SATISFIED IN ADDITION TO THE SOFT LOGICS BUILT IN THE BCU. CLIENT :
*** THESE LOGICS APPLY FOR THE CLOSE OPERATION FROM BCU/HMI/SCADA. THESE LOGICS APPLY FOR AUTO RECLOSE CLOSE COMMAND ISSUED BY THE BCU. A/R CLOSING WILL SUCCESFUL ONLY IF THE INTERLOCKS ARE THROUGH.
GT3
INTLKS FROM GCP
PROJECT : 400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT MUNDRA SEZ
023A 023
AREVA T&D India Limited
SHEET NEXT SH.
INTERLOCK LOGIC FOR CLOSING OF 400kV
CIRCUIT BREAKER IN TIE-1
REV.
EMI-7604PG754-4-028
BAREVA
CB 2-52 LOCAL CLOSING CIRCUIT * ADANI POWER LTD. F ile: P G 725000-003. x ls Thi s dr awing and des
ign i s t he pr oper ty of AR EVA T&D and m u s t not be c opi ed or l ent w it hout pr io r per m is s ion i n w ri ti n g ES 2-89 AE CLOSE ES 2-89 BE CLOSE GT-3
86 TRIP RELAY RESET A/R LK-OUT TRIP RELAY
(86-LO) RESET
O/G LINE-1
86-A TRIP RELAY RESET 86-B TRIP RELAY RESET
TIE/GCP SELECTOR SWITCH AT SWYD BAY CONTROL &
PROT PANEL CB 2-52 CLOSING CIRCUIT** TIE = FEEDER GCP = GT
&
&
OR
INTERLOCK LOGIC FOR CLOSING OF CIRCUIT BREAKER IN TIE-1 (CONTD.)
(REMOTE CLOSING POSSIBLE FROM SWITCHYARD ONLY AS LONG AS TIE/GCP SELECTOR SWITCH IS IN TIE MODE)
C) INTERLOCKS IMPLEMENTED IN SOFT LOGIC IN BCU ***
NOTE:
* THESE INTERLOCKS APPLY TO CLOSE OPERATION OF CIRCUIT BREAKER FROM THE EQUIPMENT MARSHALLING BOX. ** THESE HARDWIRED INTERLOCKS APPLY TO THE CONTROL USING TNC SWITCH ON THE BAY CONTROL & PROTECTION PANEL.
IN CASE OF CLOSING FROM BCU/HMI/SCADA, THESE HARDWIRED INTERLOCKS MUST BE SATISFIED IN ADDITION TO THE SOFT LOGICS BUILT IN THE BCU. CLIENT :
*** THESE LOGICS APPLY FOR THE CLOSE OPERATION FROM BCU/HMI/SCADA. THESE LOGICS APPLY FOR AUTO RECLOSE CLOSE COMMAND ISSUED BY THE BCU. A/R CLOSING WILL SUCCESFUL ONLY IF THE INTERLOCKS ARE THROUGH.
F ile: P G 725000-003. x ls Thi s dr aw
ing and des
ign i s t he pr oper ty of AR EVA T&D and m u s t not be c opi ed or l ent w it hout pr io r per m is s ion i n w ri ti n g ISO 2-89B CLOSE L/R SS AT CB 2-52 M.BOX IN REMOTE MODE ISO 3-89G OPEN O/G LINE-1
86-A TRIP RELAY RESET 86-B TRIP RELAY RESET TIE-1 A/R LK-OUT TRIP RELAY
(86-LO) RESET
TIE/GCP SELECTOR SWITCH AT SWYD BAY CONTROL &
PROT PANEL TIE = FEEDER GCP = GT ADANI POWER LTD. RUNNING (BUS-1 CVT) VOLTS CB 2-52 CLOSE ORDER
TRIP CIRCUIT - 1 & 2 HEALTHY
CLOSE REQUEST FROM BCU/SCADA/HMI
SELECTED INCOMING VOLTS (REFER SH: 022)
ISO 2-89A CLOSE
GT-3
86 TRIP RELAY RESET
INTERLOCK LOGIC FOR CLOSING OF 400kV
CIRCUIT BREAKER IN TIE-1(CONTD.)
REV.
EMI-7604PG754-4-028
BAREVA
PROJECT : 400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT MUNDRA SEZ
024 023A
AREVA T&D India Limited
SHEET NEXT SH.
&
VALIDATION OF
CHECK-SYNC
CONDITIONS
IN BCU**
INTERLOCK LOGIC FOR OPENING OF CIRCUIT BREAKER IN TIE-1
(REMOTE OPENING POSSIBLE FROM SWITCHYARD ONLY IF TIE/GCP SELECTOR SWITCH IS IN TIE MODE) A) INTERLOCKS FOR OPENING FROM BMK LEVEL *
B) INTERLOCKS FOR REMOTE OPENING **
NOTE:
* THESE INTERLOCKS ARE APPLICABLE FOR OPERATION FROM EQP. MARSHALLING BOX.
** THESE INTERLOCKS ARE APPLICABLE FOR OPERATION FROM BCU/HMI/SCADA. THESE LOGICS ARE BUILT IN THE BCU. *** CB CLOSE POSITION IS CONFIRMED ONLY WHEN ALL THE THREE POLES ARE CLOSED.
CLIENT :
TIE = FEEDER GCP = GT
TO TRIP COIL - 2 OPEN/CLOSE PUSH BUTTON
CONTROLS AT EQP MARSHALLING BOX
OPEN CLOSE
TO TRIP COIL - 2
LOCAL = EQP M.BOX REMOTE = BCU/HMI/SCADA
LOCAL = EQP M.BOX
REMOTE = BCU/HMI/SCADA TO TRIP COIL - 1
TO TRIP COIL - 1
Thi
s
dr
aw
ing and des
ign i s t he pr oper ty of AR EVA T&D and m u s t not be c opi ed or l ent w it hout pr io r per m is s ion i n w ri ti n g CB CLOSE *** CB CLOSE *** EQP LOCAL/REMOTE SELECTOR SWITCH AT EQP
MARSHALLING BOX EQP LOCAL/REMOTE SELECTOR SWITCH AT EQP
MARSHALLING BOX
CB OPEN REQUEST
3-89G OPEN
TIE/GCP SELECTOR SWITCH AT SWYD BAY CONTROL &
PROT PANEL F ile: P G 725000-003. x ls ADANI POWER LTD.
INTERLOCK LOGIC FOR OPENING OF 400kV
CIRCUIT BREAKER IN TIE-1
REV.
EMI-7604PG754-4-028
BPROJECT : 400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT MUNDRA SEZ
AREVA
025 024
AREVA T&D India Limited
SHEET NEXT SH.
&
INTERLOCK LOGIC FOR OPERATION OF ISOLATORS IN GT-3
A) ISOLATOR 3-89B
B) ISOLATOR 3-89A
NOTE:
* AS INDICATED IN SHEETS: 003, 004, 005, 006 FOR CONTROL LOGIC OF ISOLATORS, THE INTERLOCK PERMISSIVE WILL BE WIRED IN THE CONTROL CIRCUIT OF ISOLATORS TO ENSURE THAT COMMAND WILL BE EXECUTED ONLY WHEN THE INTERLOCKS ARE SATISFIED.
** CLOSING & OPENING REQUEST OF ISOLATORS CAN BE GIVEN FROM ANY CONTROL LEVELS DEFINED IN SHEETS 003-006, PROVIDED THE ABOVE INTERLOCKS ARE SATISFIEDCLIENT :
*** OPEN POSITION FOR CB IS CONFIRMED ONLY IF ALL THE THREE POLES ARE OPEN
ISO 3-89B INTLK PERMISSIVE *
ISO 3-89B CLOSE ORDER
ISO 3-89B OPEN ORDER
F ile: P G 725000-003. x ls Thi s dr aw
ing and des
ign i s t he pr oper ty of AR EVA T&D and m u s t not be c opi ed or l ent w it hout pr io r per m is s ion i n w ri ti n g
BUS-1 CVT ISO CLOSED
BUS-1 CVT ES OPEN 3-89BE OPEN 3-52CB OPEN*** 3-89AE OPEN ISO 3-89B CLOSE REQUEST**
ISO 3-89B OPEN REQUEST**
ISO 3-89A INTLK PERMISSIVE *
ISO 3-89A OPEN REQUEST**
ISO 3-89A CLOSE ORDER
ISO 3-89A OPEN ORDER
3-52CB OPEN***
ISO 3-89A CLOSE REQUEST**
026 025
AREVA T&D India Limited
ADANI POWER LTD.
SHEET NEXT SH.
PROJECT : 400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT
MUNDRA SEZ
INTERLOCK LOGIC FOR OPERATION OF 400kV
ISOLATORS IN GT-3 (BAY-3)
REV.EMI-7604PG754-4-028
BAREVA
&
&
&
&
&
&
INTERLOCK LOGIC FOR OPERATION OF ISOLATORS IN GT-3 (CONTD.)
C) ISOLATOR 3-89G
NOTE:
* AS INDICATED IN SHEETS: 003, 004, 005, 006 FOR CONTROL LOGIC OF ISOLATORS, THE INTERLOCK PERMISSIVE WILL BE WIRED IN THE CONTROL CIRCUIT OF ISOLATORS TO ENSURE THAT COMMAND WILL BE EXECUTED ONLY WHEN THE INTERLOCKS ARE SATISFIED.
** CLOSING & OPENING REQUEST OF ISOLATORS CAN BE GIVEN FROM ANY CONTROL LEVELS DEFINED IN SHEETS 003-006, PROVIDED THE ABOVE INTERLOCKS ARE SATISFIED. *** OPEN POSITION FOR CB IS CONFIRMED ONLY IF ALL THE THREE POLES ARE OPEN
CLIENT :
AREVA
SHEET NEXT SH.PROJECT : 400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT
MUNDRA SEZ 3-89GE OPEN 3-52CB OPEN*** ADANI POWER LTD. Thi s dr aw
ing and des
ign i s t he pr oper ty of AR EVA T&D and m u s t not be c opi ed or l ent w it h
INTERLOCK LOGIC FOR OPERATION OF
400kV ISOLATORS IN GT-3 (BAY-3)
027 026 REV.
EMI-7604PG754-4-028
BAREVA T&D India Limited
ISO 3-89G INTLK PERMISSIVE*
ISO 3-89G CLOSE ORDER
ISO 3-89G CLOSE REQUEST **
ISO 3-89G OPEN ORDER
ISO 3-89G OPEN REQUEST ** 2-52CB OPEN***
&
&
DF003
CONTROL & INTERLOCK LOGIC FOR OPERATION OF EARTH SWITCHES IN GT-3
A) EARTH SWITCH 3-89AE*
B) EARTH SWITCH 3-89BE*
C) EARTH SWITCH 3-89GE*
NOTE:
* FOR EARTH SWITCHES THERE IS NO REMOTE CONTROL FROM BCU/HMI/SCADA. CONTROL IS POSSIBLE ONLY FROM EQUIPMENT MARSHALLING BOX. ALL THE INTERLOCKS FOR EARTH SWITCH OPERATION ARE VERIFIED IN BCU & AN OUTPUT IS GENERATED FROM BCU WHEN THE INTERLOCKS ARE SATISFIED. ** THIS INTERLOCK PERMISSIVE IS GENERATED BY THE BCU AND IS HARD WIRED IN THE CONTROL CIRCUIT OF THE EARTH SWITCH.
COMMANDS GIVEN FROM THE EQUIPMENT MARSHALLING BOX ARE EXECUTED ONLY WHEN THE INTERLOCKS ARE SATISFIED.
CLIENT : TO CLOSING CIRCUIT OPEN TO OPEN CIRCUIT OPEN/CLOSE PUSH BUTTON CONTROLS AT EQP MARSHALLING BOX
OPEN CLOSE TO OPEN CIRCUIT TO CLOSING CIRCUIT GENERATOR EXCITATION OFF
EMI-7604PG754-4-028
BAREVA
OPEN CLOSE CLOSE TO CLOSING CIRCUIT ES 3-89GE INTLK PERMISSIVE **AREVA T&D India Limited
PROJECT :
REV.
ISO 3-89A OPEN
ISO 3-89B OPEN
ISO 3-89G OPEN ISO 3-89A OPEN
ISO 3-89B OPEN
OPEN/CLOSE PUSH BUTTON CONTROLS AT EQP MARSHALLING BOX
OPEN/CLOSE PUSH BUTTON CONTROLS AT EQP MARSHALLING BOX
ES 3-89AE INTLK PERMISSIVE **
TO OPEN CIRCUIT
400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT MUNDRA SEZ T h is d ra w in g a n d d e s ig n i s t h e p ro p e rt y o f AR EVA T & D a n d m u s t n o t b e c o p ie d o r l e n t w it h o u t p ri o r p e rm is s io n i n w ri ti n g ES 3-89BE INTLK PERMISSIVE **
CONTROL & INTERLOCK LOGIC FOR OPERATION
OF 400kV EARTH SWITCHES IN GT-3
ADANI POWER LTD. 028 027 SHEET NEXT SH.&
&
&
&
&
&
&
&
&
DF003
CONTROL & INTERLOCK LOGIC FOR OPENING & CLOSING OF CIRCUIT BREAKER IN GT-3
A) INTERLOCKS IMPLEMENTED AS HARDWIRED AT BMK LEVEL FOR CLOSE OPERATION*
B) INTERLOCKS FOR CLOSING FROM REMOTE (GCP)
C) INTERLOCKS FOR OPENING FROM BMK LEVEL *
D) INTERLOCKS FOR OPENING FROM REMOTE (GCP)
NOTE:
CLIENT :
* THESE INTERLOCKS APPLY TO OPERATION OF CIRCUIT BREAKER FROM THE EQUIPMENT MARSHALLING BOX.
OPERATION OF THE CIRCUIT BREAKERS IN GT BAYS IS NOT ALLOWED FROM THE BAY CONTROL & PROTECTION PANEL, BCU/HMI/SCADA. ** CLOSE POSITION OF THE CIRCUIT BREAKER IS CONFIRMED ONLY IF ALL THE THREE POLES ARE OPEN.
CLOSE REMOTE = GCP GT3 INTLKS FROM GCP CB 3-52 REMOTE CLOSING CIRCUIT *
AREVA T&D India Limited
TO TRIP COIL - 1
OPEN/CLOSE PUSH BUTTON CONTROLS AT GCP
OPEN CLOSE
EQP LOCAL/REMOTE SELECTOR SWITCH AT EQP
MARSHALLING BOX
LOCAL = EQP M.BOX
OPEN/CLOSE PUSH BUTTON CONTROLS AT EQP MARSHALLING BOX
OPEN
SHEET NEXT SH.
REMOTE = BCU/HMI/SCADA TO TRIP COIL - 1
TO TRIP COIL - 2 OPEN CLOSE TO TRIP COIL - 2 REMOTE = GCP ADANI POWER LTD.
CONTROL & INTERLOCK LOGIC FOR 400kV
CIRCUIT BREAKER IN GT-3 (BAY-3)
REV.
EMI-7604PG754-4-028
BAREVA
029 028 Fi le : PG 725000-003. x ls T h is d ra w in g a n d d e s ig n i s t h e p ro p e rt y o f AR EVA T & D a n d m u s t n o t b e c o p ie d o r l e n t w it h o u t p ri o r p e rm is s io n i n w ri ti n g ES 3-89 AE CLOSE ES 3-89 BE CLOSE EQP LOCAL/REMOTE SELECTOR SWITCH AT EQPMARSHALLING BOX
OPEN/CLOSE PUSH BUTTON CONTROLS AT GCP EQP LOCAL/REMOTE SELECTOR SWITCH AT EQP
MARSHALLING BOX
OPEN/CLOSE PUSH BUTTON CONTROLS AT EQP MARSHALLING BOX
EQP LOCAL/REMOTE SELECTOR SWITCH AT EQP
MARSHALLING BOX GT3 INTLKS FROM GCP CB 3-52 LOCAL CLOSING CIRCUIT * CB CLOSE **
PROJECT : 400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT
MUNDRA SEZ
LOCAL = EQP M.BOX REMOTE = GCP
OPEN CLOSE
LOCAL = EQP M.BOX LOCAL = EQP M.BOX
&
&
&
INTERLOCK LOGIC FOR OPERATION OF 400kV ISOLATORS IN O/G LINE-2
A) ISOLATOR 4-89A
B) ISOLATOR 4-89B
NOTE:
* AS INDICATED IN SHEETS: 003, 004, 005, 006 FOR CONTROL LOGIC OF ISOLATORS, THE INTERLOCK PERMISSIVE WILL BE WIRED IN THE CONTROL CIRCUIT OF ISOLATORS TO ENSURE THAT COMMAND WILL BE EXECUTED ONLY WHEN THE INTERLOCKS ARE SATISFIED.
** CLOSING & OPENING REQUEST OF ISOLATORS CAN BE GIVEN FROM ANY CONTROL LEVELS DEFINED IN SHEETS 003-006, PROVIDED THE ABOVE INTERLOCKS ARE SATISFIED. *** OPEN POSITION FOR CB IS CONFIRMED ONLY IF ALL THE THREE POLES ARE OPEN CLIENT :
ISO 4-89A INTLK PERMISSIVE *
ISO 4-89A CLOSE ORDER
ISO 4-89A OPEN ORDER
F ile: P G 725000-003. x ls Thi s dr aw
ing and des
ign i s t he pr oper ty of AR EVA T&D and m u s t not be c opi ed or l ent w it hout pr io r per m is s ion i n w ri ti n g
BUS-2 CVT ISO CLOSED
BUS-2 CVT ES OPEN
4-89AE OPEN
4-52CB OPEN***
4-89BE OPEN
4-52CB OPEN*** ISO 4-89A CLOSE
REQUEST**
ISO 4-89A OPEN REQUEST**
ISO 4-89B INTLK PERMISSIVE *
ISO 4-89B OPEN REQUEST**
ISO 4-89B CLOSE ORDER
ISO 4-89B OPEN ORDER
ISO 4-89B CLOSE REQUEST**
030 029
AREVA T&D India Limited
ADANI POWER LTD.
SHEET NEXT SH.
PROJECT : 400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT MUNDRA SEZ
INTERLOCK LOGIC FOR OPERATION OF 400kV
ISOLATORS IN O/G LINE-2
REV.
EMI-7604PG754-4-028
BAREVA
&
&
&
&
&
&
DF003
INTERLOCK LOGIC FOR OPERATION OF ISOLATORS IN O/G LINE-2 (CONTD.)
C) ISOLATOR 4-89L
NOTE:
* AS INDICATED IN SHEETS: 003, 004, 005, 006 FOR CONTROL LOGIC OF ISOLATORS, THE INTERLOCK PERMISSIVE WILL BE WIRED IN THE CONTROL CIRCUIT OF ISOLATORS TO ENSURE THAT COMMAND WILL BE EXECUTED ONLY WHEN THE INTERLOCKS ARE SATISFIED.
** CLOSING & OPENING REQUEST OF ISOLATORS CAN BE GIVEN FROM ANY CONTROL LEVELS DEFINED IN SHEETS 003-006, PROVIDED THE ABOVE INTERLOCKS ARE SATISFIED. *** OPEN POSITION FOR CB IS CONFIRMED ONLY IF ALL THE THREE POLES ARE OPEN
CLIENT :
AREVA
SHEET NEXT SH.PROJECT : 400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT
MUNDRA SEZ 4-89LE OPEN 4-52CB OPEN*** ADANI POWER LTD. T h is d ra w in g a n d d e s ig n i s t h e p ro p e rt y o f AR EVA T & D a n d m u s t n o t b e c o p ie d o r l e n t w it h o
INTERLOCK LOGIC FOR OPERATION OF
400kV ISOLATORS IN O/G LINE-2(CONTD.)
031 030 REV.
EMI-7604PG754-4-028
BAREVA T&D India Limited
ISO 4-89L INTLK PERMISSIVE *
ISO 4-89L CLOSE ORDER
ISO 4-89L CLOSE REQUEST **
ISO 4-89L OPEN ORDER
ISO 4-89L OPEN REQUEST ** 5-52CB OPEN***
&
&
DF003
CONTROL & INTERLOCK LOGIC FOR OPERATION OF EARTH SWITCHES IN O/G LINE-2
A) EARTH SWITCH 4-89AE*
B) EARTH SWITCH 4-89BE*
C) EARTH SWITCH 4-89LE*
NOTE:
* FOR EARTH SWITCHES THERE IS NO REMOTE CONTROL FROM BCU/HMI/SCADA. CONTROL IS POSSIBLE ONLY FROM EQUIPMENT MARSHALLING BOX. ALL THE INTERLOCKS FOR EARTH SWITCH OPERATION ARE VERIFIED IN BCU & AN OUTPUT IS GENERATED FROM BCU WHEN THE INTERLOCKS ARE SATISFIED. ** THIS INTERLOCK PERMISSIVE IS GENERATED BY THE BCU AND IS HARD WIRED IN THE CONTROL CIRCUIT OF THE EARTH SWITCH.
COMMANDS GIVEN FROM THE EQUIPMENT MARSHALLING BOX ARE EXECUTED ONLY WHEN THE INTERLOCKS ARE SATISFIED. *** LINE U/V PERMISSIVE IS TAKEN THROUGH SOFT FROM LINE DISTANCE PROTECTION RELAY.
CLIENT : ES 4-89AE INTLK PERMISSIVE ** TO OPEN CIRCUIT TO CLOSING CIRCUIT OPEN TO OPEN CIRCUIT B
AREVA
OPEN CLOSE CLOSE TO CLOSING CIRCUIT ES 4-89LE INTLK PERMISSIVE **AREVA T&D India Limited
OPENCLOSE ISO 4-89A OPEN
ISO 4-89B OPEN
ISO 4-89L OPEN
DEAD LINE O/G LINE-2 (UNDER VOLTAGE
OPERATED) *** ISO 4-89A OPEN
ISO 4-89B OPEN
OPEN/CLOSE PUSH BUTTON CONTROLS AT EQP MARSHALLING BOX
T h is d ra w in g a n d d e s ig n i s t h e p ro p e rt y o f AR EVA T & D a n d m u s t n o t b e c o p ie d o r l e n t w it h o u t p ri o r p e rm is s io n i n w ri ti n g ES 4-89BE INTLK PERMISSIVE **
CONTROL & INTERLOCK LOGIC FOR OPERATION
OF 400kV EARTH SWITCHES IN O/G LINE-2
OPEN/CLOSE PUSH BUTTON CONTROLS AT EQP MARSHALLING BOX
TO OPEN CIRCUIT
TO CLOSING CIRCUIT
031
OPEN/CLOSE PUSH BUTTON CONTROLS AT EQP MARSHALLING BOX
PROJECT : 400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT
MUNDRA SEZ ADANI POWER LTD. 032 SHEET NEXT SH. REV.
EMI-7604PG754-4-028
&
&
&
&
&
&
&
&
&
DF003
CVT SELECTION LOGIC FOR CHECK SYNC OF CIRCUIT BREAKER IN O/G LINE-2
A) RUNNING VOLTS * B) INCOMING VOLTS ** CASE - I CASE - 2 CASE - 3 NOTE:
* FOR LINE FEEDERS, BUS-2 CVT WILL BE SELECTED AS RUNNING VOLTS AND EXTENDED TO BCU TERMINALS FOR CHECK-SYNC.
** AT ANY TIME ONLY ONE OF THE CASES WILL BE SUCCESFUL FOR INCOMING VOLTS. BASED ON THE ISOLATOR & CB POSITIONS, THE LOGICS ARE VALIDATED AND OUTPUTS ARE GENERATED FROM THE BCU WHICH ARE WIRED INTO THE PT SELECTION CIRCUIT FOR EXTENSION OF THE APPROPRIATE INCOMING VOLTS TO BCU.
CLIENT : T h is d ra w in g a n d d e s ig n i s t h e p ro p e rt y o f AR EVA T & D a n d m u s t n o t b e c o p ie d o r l e n t w it h o u t p ri o r p e rm is s io n i n w ri ti n g BUS - 2 CVT ISO 4-89L CLOSE ISO 4-89L OPEN 033 032 SHEET ISO 4-89L OPEN
CVT SELECTION LOGIC FOR
CHECK-SYNC OF CB
IN O/G LINE-2 (BAY-4)
ADANI POWER LTD.
AREVA T&D India Limited
PROJECT : 400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT
MUNDRA SEZ NEXT SH. LINE - 2 CVT (4 - CVTB) SELECTED RUNNING VOLTS ISO 6-89G CLOSE CB 5-52 CLOSE CB 6-52 CLOSE BUS-1 CVT SELECTED ISO 6-89G OPEN CB 5-52 CLOSE ICT-1 CVT (6-CVT) SELECTED REV.
EMI-7604PG754-4-028
BAREVA
&
&
INTERLOCK LOGIC FOR CLOSING OF CIRCUIT BREAKER IN O/G LINE-2
A) INTERLOCKS IMPLEMENTED AS HARDWIRED AT BMK LEVEL *
B) INTERLOCKS IMPLEMENTED AS HARDWIRED AT BAY CONTROL & PROTECTION PANEL **
C) INTERLOCKS IMPLEMENTED IN SOFT LOGIC IN BCU ***
NOTE:
* THESE INTERLOCKS APPLY TO CLOSE OPERATION OF CIRCUIT BREAKER FROM THE EQUIPMENT MARSHALLING BOX. ** THESE HARDWIRED INTERLOCKS APPLY TO THE CONTROL USING TNC SWITCH ON THE BAY CONTROL & PROTECTION PANEL.
IN CASE OF CLOSING FROM BCU/HMI/SCADA, THESE HARDWIRED INTERLOCKS MUST BE SATISFIED IN ADDITION TO THE SOFT LOGICS BUILT IN THE BCU.
CLIENT :
*** THESE LOGICS APPLY FOR THE CLOSE OPERATION FROM BCU/HMI/SCADA. THESE LOGICS APPLY FOR AUTO RECLOSE CLOSE COMMAND ISSUED BY THE BCU. A/R CLOSING WILL SUCCESFUL ONLY IF THE INTERLOCKS ARE THROUGH.
AREVA T&D India Limited
SHEET NEXT SH. RUNNING (BUS-2 CVT) VOLTS CB 4-52 CLOSE ORDER SELECTED INCOMING VOLTS (REFER SH: 032)
PROJECT : 400kV SWITCHYARD FOR 2x330MW THERMAL POWER PLANT MUNDRA SEZ
ADANI POWER LTD.
INTERLOCK LOGIC FOR CLOSING OF 400kV
CIRCUIT BREAKER IN O/G LINE-2
REV.
EMI-7604PG754-4-028
BAREVA
034 033 CB 4-52 LOCAL CLOSING CIRCUIT *86-A TRIP RELAY RESET
86-B TRIP RELAY RESET A/R LK-OUT TRIP RELAY
(86-LO) RESET 86-A TRIP RELAY RESET
86-B TRIP RELAY RESET A/R LK-OUT TRIP RELAY
(86-LO) RESET BBP RELAY RESET CB 4-52 CLOSING CIRCUIT ** F ile: P G 725000-003. x ls Thi s dr aw
ing and des
ign i s t he pr oper ty of AR EVA T&D and m u s t not be c opi ed or l ent w it hout pr io r per m is s ion i n w ri ti n g ES 4-89 AE CLOSE ES 4-89 BE CLOSE
TRIP CIRCUIT - 1 & 2 HEALTHY CLOSE REQUEST FROM
BCU/SCADA/HMI BBP RELAY
RESET ISO 4-89A CLOSE
ISO 4-89B CLOSE L/R SS AT CB 4-52 M.BOX IN REMOTE MODE