• No results found

Curriculum Professional (CV)

N/A
N/A
Protected

Academic year: 2021

Share "Curriculum Professional (CV)"

Copied!
8
0
0

Loading.... (view fulltext now)

Full text

(1)

Curriculum Professional

(CV)

Sérgio Miguel Roque Antunes

(2)

Sérgio Miguel Roque Antunes

 

Biographical

 

and

 

Personal

 

Data:

 

 

Name:  Sérgio Miguel Roque Antunes 

Date of Birth:  21/12/1970 

Place of Birth:  Castelo Branco ‐ Portugal 

Parents: Urbano dos Santos Antunes  and  Cecília Roque da Cruz Antunes 

Civil State:  Married with April Ann Amarillo Punay Antunes 

Portuguese Citizen Card Number:   09930101 

Expiry Date:  04/02/2015 

Member of the Engineers Order with the Professional Number:  n.º 44104 

 Official verification link:  

http://www.ordemengenheiros.pt/pt/a‐ordem/pesquisa‐de‐

membros/?nome=S%E9rgio+Miguel+Roque+Antunes&colegio=3&regiao=8 

Portuguese Passport Number: L971979 

Expiry Date:  28/12/2016 

Portuguese Driver Licence nº:  C‐428229  since  27/10/89 

Saudi Arabian Driver Licence nº:  2244343758       

French Address:       36 Avenue des Vignes        91420 Morangis / France 

Portuguese Address:   Rua Carlos Seixas n.º 9, 6.º C         3030–177 Coimbra / Portugal 

E‐mail:     [email protected] 

Saudi Mobile Phone Number:         +966 – (0)505984012 

(3)

Academic

 

Curriculum:

 

 

 Graduated in Civil Engineering by the Faculty of Sciences and Technology of the 

University of Coimbra since 16th of October of 2000 with final grade of twelve 

values; 

  (2003/05) Frequency of the second year of the course of Economy Sciences in the 

Faculty of Economics of the University of Coimbra; 

 (2005/06)  Post‐Graduation by ISLA ‐ Institute of Languages and Administration of 

Leiria, in Health and Safety at Work (552 hours), with final classification of Very 

Good (grade of sixteen values); 

 

Complementary

 

formations:

   

 

 Certificate of Competence for General Officer of Health, Hygiene and Safety at 

Work under the N° 04371108EC5 (European standard – Level V), valid until the 

16th of August 2016. 

 Professional Formative Authorization title since 29th of March of 2007 under the 

N° EDF 440500/2007 DC. 

 

Professional

 

Experience:

  

 

SAUDI

 

OGER

 

LTD.

 

_______________________________________

 

Since

 

Aug/2007

 

 

Working in Saudi Oger LTD. as per company requests, developing tasks and activities of 

site coordination and direct manpower management, work program and planning, work 

progress, technical support, inspections and management. 

 

SAUDI

 

OGER

 

LTD.

 

/

 

Riyadh

  

____________________________

 

since

 

Sept/2011

 

Construction Manager for Site 6 at the Project: KAP2 Institute – Personnel’s in King Fahd 

Faculty of Security – Riyadh Area. 

‐  Consultant: ... SAUDCONSULT 

 

SAUDI

 

OGER

 

LTD.

 

/

 

Riyadh

 

______________________

 

Jan/2011

 

to

 

May/2011

 

Senior Civil Works Supervisor and Service Coordination for the buildings area PN03‐3.1.0 

in the Project: (PNU) Princess Nora Bint Abdulrahman University in Riyadh. 

‐  Consultant: ... DAR AL‐HANDASAH CONSULTANTS 

 

SAUDI

 

OGER

 

LTD.

 

/

 

Abu

 

Dhabi

 

_____________________

 

May/10

 

to

 

Nov/2010

 

Mission for OGER Abu Dhabi LTD., Senior Civil Works Manager and Service Coordination 

for the Project: ADFC – Abu Dhabi Financial Center in Abu Dhabi (High‐rise buildings).  ‐  Consultant: ... FLUOR 

(4)

SAUDI

 

OGER

 

LTD.

 

/

 

Jeddah

 

______________________

 

May/2009

 

to

 

Apr/2010

 

Senior Civil & Structural Works Supervisor for the Project: King Abdullah International 

Conference Center in Jeddah (Area B – Reception Area). 

‐  Consultant: ... RASHID ENGINEERING 

 

SAUDI

 

OGER

 

LTD.

 

/

 

Jeddah

 

_______________________

 

Aug/2008

 

to

 

Apr/2009

 

Civil Works Supervisor and Service Coordination for the Project: BETA 6 – Royal Offices in Jeddah.  ‐  Consultant: ... RASHID ENGINEERING 

 

GMB

 ‐ 

SAUDI

 

OGER

 

LTD.

 

/

 

Riyadh

 

_________________

 

Aug/2007

 

to

 

May/2008

 

Working for “GMB ‐ Grupo Metalúrgico do Botão”, subcontracted by SAUDI OGER LTD.  

Service Coordination (Pilotage) and Civil Works Supervisor for the Project: "Prince Faisal 

Bin Abdallah Residence ‐ Riyadh" – FBA. 

‐  Consultant: ... RASHID ENGINEERING   

 

COIMBRA

 

CITY

 

HALL

 

_____________________________

 

May/2002

 

to

 

Jul/2007

  

On the 20/05/2002, began his functions on Coimbra City Hall as Consultant for Public 

Projects. Was promoted to Superior Engineer Technician, Class 2, on the 11/09/2003. 

Superior Engineer Technician, Class 1 since 15/12/2005.  

His major functions for the municipality was: Consultant for public construction projects, 

management and works inspection related to all processes (compliance of legislation, 

quantities  survey  reports,  negotiation  processes  in  cost  plus  projects,  stop  and 

suspension processes, deadline control, prices revision, general budget control, technical 

reports, calculation for final indemnities to main contractors, inspections for temporary 

and  definitive  reception  of  sites,  safety  coordination,  member  of  commissions  of 

analyses  in the  assignment of  public markets,  technical  project analysis,  technical 

advising, “technical inspections”.  

   

Details

 

of

 

work

 

done

 

for

 

the

 

City

 

Hall:

 

 

Consultant (For construction coordination and inspection):   

 (2002 to 2003) ‐ “Creation and requalification of public space of Inquisition Yard, West 

side of the old School of Arts S.º Bernardo fence garden.”  

/Contractor: TEIXEIRA DUARTE – Engenharia e Construções, S.A. 

 (2003 to 2004)  ‐ “Construction of a Theater located east of Cerca de S.ºBernardo.” 

/Contractor: TEIXEIRA DUARTE – Engenharia e Construções, S.A. 

 (2004 to 2005) ‐ “Construction of the House for Invited Actors”  

/Contractor: Carlos Caldeira Marques e Filhos, Lda. 

 (2004 to 2006)  ‐ “Construction of the Multifunctional Pavilion of Almedina School.” 

/Contractor:  Simões Pereira ‐ Construções e Obras Publicas Lda. 

(5)

 (2005)  ‐ “Recovering of the Historical Monument “Small Arch of Almedina – City 

Entrance of Barbacã” 

/Contractor: MONUMENTA, Conservação e Restauro do Património Arquitectónico, Lda. 

 (2005 a 2006)  ‐ “Recovering and Re‐construction of Building – Rua Velha 7‐

9/Travessa da Rua Velha 11‐19 – Centro de Noite “Telha Amiga” – 1ª Fase” – 

Metallic structure for support of external walls and internal deconstruction. 

/Contractor: Ferreira de Sousa, Construções Civis e Obras Públicas, Lda. 

 (2006 a 2007) – “Recovering of the Building located at Rua Joaquim António de 

Aguiar, 26 a 28”  

/Contractor: Rosete, Construções Lda. 

 (2006 a 2007) – “Structural rehabilitation and recovering of the City Fortress Wall 

at Couraça de Lisboa, Cerca de Coimbra ‐ Porta de Belcouce”  

/Contractor: MONUMENTA, Conservação e Restauro do Património Arquitectónico, Lda. 

  (2007) – Deco and finishing work’s inside the “Boutique at the House of Invited Actors."   

/Contractor: Carlos Caldeira Marques e Filhos, Lda. 

  (2007) –Recovering of the concrete structure of the water mirror lake at "Jardim 

da Cerca de S. Bernardo" after structural collapse.    

/Contractor: TEIXEIRA DUARTE – Engenharia e Construções, S.A. 

 Coordination of maintenance site works by consequence of the guarantees; 

 Analyse, discussion and negotiation of overcharge generated by problems out of 

the contractor responsibility in the project for construction of the " Theater located 

east of Cerca de S.º Bernardo", in order to calculate the due indemnity value; 

 Collaboration  with  the  Technical  University  of  Aveiro  for  the  execution  of 

structural analyses of old masonries at downtown buildings in the city of Coimbra in 

order to define calibrated resistance seismic model.   

Safety Coordination:    

 (2004 a 2005) ‐ “Recovering of the Building located at Rua Fernandes Tomás n.ºs  

69, 71 and 73” 

/Contractor:  Rosete, Construções Lda. 

 (2004 a 2005) ‐ “Construction of House of the Invited Actors”  

/Contractor:  Carlos Caldeira Marques e Filhos, Lda. 

 (2005) ‐ “Recovering of the Building located at Rua Fernandes Tomás n.ºs 31 to 33”  

/Contractor:  Cimave – Construtora e Imobiliária de Aveiro, Lda. 

 (2004 a 2005) – “Reconstruction of the Building located at Rua Fernandes Tomás, 

83 to 85/Rua Joaquim António de Aguiar, 9 a 13 – 2ª fase”  

/Contractor:  Canas, Electro‐Montagens, S.A. 

 (2006 a 2007) – “Structural rehabilitation and recovering of the Castle City Wall at 

Couraça de Lisboa, Cerca de Coimbra ‐ Porta de Belcouce” 

(6)

  (2007) – Finishing work’s inside the “Boutique placed at the House of Invited Actor."   

/Contractor: Carlos Caldeira Marques e Filhos, Lda. 

  (2007) – Recovering of the concrete structure of the water mirror lake at "Jardim 

da Cerca de S. Bernardo" after structural collapse.    

/Contractor: TEIXEIRA DUARTE – Engenharia e Construções, S.A.   

Analysis committee of public markets: 

 

 “ Construction of the Multifunctional Pavilion and Spa of Almedina School”; 

 “ Recovering of the Building located at Rua Joaquim António de Aguiar n.º  27 to 35 ”; 

 “ Recovering of the Building located at Quebra Costas n.º  1 to 3 ”; 

 “ Recovering of the Building located at Beco das Cruzes, n.º  2 to 4 ”; 

 “ Recovering of the Building located at Beco das Cruzes n.º  10 to 12 ”; 

 “ Reconstruction of the Building located at Rua Fernandes Tomás n.º 83 to 85/ 

Joaquim António de Aguiar n.º 9 a 13 – 1st Fase ”; 

 “ Recovering of the Building located at Rua Fernandes Tomas n.º  31 to 33 ”; 

 “ Recovering and Construction of Building – Rua Velha 7‐9 / Travessa da Rua Velha 11‐

19 – Centro de Noite “Telha Amiga” – 1st Fase ”; 

 “ Recovering of the Building located at Rua das Esteirinhas n.º 1 to 5 e Beco de São 

Cristóvão n.º  8 to 12”; 

 “ Recovering of the Building located at Rua Joaquim António de Aguiar n.º  48 to 52 ”; 

 “ Cobertura provisória for o Building located at Rua Fernandes Tomás, n.º  58 to 66”; 

 “ Recovering of the Building located at Rua Joaquim António de Aguiar  n.º  26 to 28”;  

 “ Structural rehabilitation and recovering of the Castle City Wall at Couraça de 

Lisboa, Cerca de Coimbra ‐ Porta de Belcouce”; 

 “ Recovering of the Building located at Rua Fernandes Tomás, n.º  17 to 21 and 23 to 29”. 

 “ Recovering of the Building located at R. Quebra costas, n.ºs 35 a 39 et  R. Sobre‐Ripas, 

n.º 5”;  

 “ Recovering of the Building located at Travessa da Trindade, n.º s 1 a 3 ; 

 “ Recovering of the Building located at Rue Fernandes Tomás, 83 a 85/Rua Joaquim 

António de Aguiar, 9 a 13 – 2ª fase”; 

 “ Recovering of the Building located at Couraça dos Apóstolos, n.º 6”; 

 “ Recovering of the Building located at Rue Rua Joaquim António de Aguiar, n.º s  66 a 

70”; 

 “ Recovering of the Building located at Couraça de Lisboa, n.º s 1 a 5 e Beco da Amoreira, 

n.º 1”. 

 

Inspection committee member: 

 

(7)

CONDOP,

 

Construções

 

e

 

Obras

 

Públicas

 

S.A./

 

Coimbra

 

_________

 

Jan/01

 

to

 

Oct/01

 

Assistant Site Project Manager simultaneously for the following Projects: 

 Construction of a building dedicate to offices and apartments on the down town 

of Coimbra  city,  with five floor’s levels and three  basement  levels (Special 

foundation with curtain moulded walls, 2 anchor levels, 34 piles and raft); 

 Construction of the “Secondary School of  Gois city”; 

 Construction of Public Building for the “Social and Educational Center of Gafanha 

da Encarnação city”; 

 Recover and renewal of the “Administration Building of Gafanha da Encarnação city”. 

 

Sítios

 

&

 

Formas/

 

Coimbra

 

________________________

 

Oct/2000

 

to

 

Jan/2001

 

Collaboration in studies, development and measurements of architectural and structural 

projects, civil engineering specialties, as well as site quantities survey. 

 

A3

 

 

Arquitectos/

 

Coimbra

 

_______________________

 

Feb/1999

 

to

 

Aug/1999

 

Collaboration in studies, development and measurements of architectural and structural 

projects, civil engineering specialties, as well as site quantities survey. 

   

Complementary

 

Education:

 

 

 (2000) Training in “Project 98”, by the Foundation for Development of Information 

Technology of Coimbra – 24 hours; 

 (2002) Training in “Public Construction Law, DL 59/99 of March 2nd”,  by the Center of 

Studies and Formation, Foundation Bissaya Barreto – 21 hours; 

 (2002) Training in “Safety and health at work place”, CEFA (Center of Studies and 

Formation for the City Hall) at Coimbra – 21 hours; 

 (2002) Training on “Information Systems and Company Communication”, promoted 

by Significado  ‐ Consulting, Formation and Software, Lda obtaining the grade Very 

Good – 200 hours; 

 (2002/03) Training to apply to the National Career of Superior Technical Engineer 

at  CEFA,  with  the  modules:  Public  Administration;  Staff  Management;  City 

Development; Structures and Processes of Decisions; Urban Management and 

Environment; Finances and Activity Planning; Institution and Community Policies 

– With final classification of Very Good (grade of seventeen values)– 109 hours; 

 (2003)  Participant  on  Discussion  Cycle  under  the  subject:  “Systems  and 

Instruments for Cities Territory and Development Plans”, “City and Territory”, 

“Soil Politicises” and “Cultural City Planning” – 12 hours; 

 (2003) Training on “Criteria for Main Contractor Compensation, due to suspension of 

works under others entities responsibility”, promoted by the “Sfn  ‐  Society of 

Consulting and Training, Lda” in Lisboa  –  12 hours; 

 (2004) Training on “Safety at work: Identification, Analysis and Assessment  of 

(8)

 (2005) English Language Course at “International House”, level A2‐Waystage of the 

European Reference Board for Languages – 90 Hours 

 (2005)  Participation  and collaboration in the  organization  for  the  International 

Conference about “The Image of Historical Centers”, promoted and organized by The 

Cabinet for Historical Center of Coimbra City Hall; 

 (2005) Training in “AutoCAD‐2D” promoted by CEFA – 35 hours; 

 (2006)  Participation  on  International  Conference  about  “Portuguese  World 

Heritage”, in Coimbra;  

 (2006) Training on “Order and Planning of Territory, promoted by Center of Studies and 

Formation of Foundation Bissaya Barreto – 21 hours; 

 (2002) Training in “Public Construction Law, DL 59/99 of March 2nd”, by the Legal 

Department of Coimbra City Hall – 35 hours; 

 (2006) Training on Environmental and Building Acoustics promoted by the Studies 

Department of Coimbra City Hall – 35 hours; 

 (2006)  Educational  Formation  Course  to  provide  official  teaching  capacity 

formative  promoted  by  the  Portuguese  Superior  Institute  of Education  and 

Professional Formation Training – 96 hours; 

 (2007) Training on Law DL 163/2006, of August 8 – Technical Norms to improve 

buildings access of persons with reduce mobility ‐ 8 hours; 

 (2007) Training on “General System of Public Works” promoted by AIRC – 14 hours; 

 (2007) Training on “Traditional mortars” promoted by “Prodeco‐Ensino Profissional 

Lda.” – 30 hours; 

   

Information

 

Systems

 

Knowledge:

 

 Operational Systems: Windows and Mac OS 

 Microsoft‐Office: Word, Excel, PowerPoint, Outlook‐Express, Access, Ms‐Project  

 Internet: using and browsing 

 

Languages:

 

 Portuguese, French and Spanish: fluent 

 English: average 

 Notions of Russian and Italian 

   

Riyadh, July 2012 

 ________________________

References

Related documents

Additionally, the World Bank and the International Monetary Fund – independent, specialized agencies of the United Nations – also play a role in humanitarian assistance by

OSU to assemble SBIG, filter wheel, filters, lens+extender, fiber block, several test fibers, LEDs. • Measure best focus for fiber block with

Taking into account your institute’s rules and regulations, check the number that accurately reflects the importance accorded to ALL the underlisted factors in the evaluation

It may be assumed that the muscle weakness due to anterior horn cell degeneration is clinically more impressive in milder A-T patients, as compared to classical patients in whom

By using maize stocks differing in their heterochromatin content we have established that the sequence is a major constit- uent of one class of heterochromatin, knob

Second, blur kernels are generally low-pass and consequently the frequency inversion in the prefiltering tends to amplify the higher frequencies creating expanded dynamic

In the New Page Report dialog, clear the text in the Report Title text box, select Horizontal Banded from the layout box, then click OK.. Be sure that JinfonetGourmetJava.cat

Resumen: Estudio de la transformación que sufre don Juan del Prado y Ramos, protagonista de la novela lírica Don Juan (1922) de Azorín, des- de sus coordenadas tradicionales