Change

Change

Control

Control

Wolfgang Schumacher

Roche Pharmaceuticals, Basel

Training Course

Computerized System Validation in the Pharmaceutical Industry Istanbul, 16-17 January 2003

(2)

Agenda

Agenda

Change Control Definitions Guidelines Configuration management Responsibilities Planned/unplanned changes Classification Sources of changes Example/Annex:

(3)

System Development Life Cycle

System Development Life Cycle

(Generic Approach)

(Generic Approach)

Detailed specs.

Specification Design Config./Implem. Qualification Operation

User Requirements, Functional Spec. IQ, OQ, PQ Maintenance, Requalification Change Control, Periodic Review Validation Planning FAT SAT

(4)

Change

Change

Management

Management

Attributes

Attributes

 Responsibility of system owner together with the

end-user

 No universal procedure

 More than one procedure may be appropriate

– Organization – Infrastructure

– Component being changed – Position in life cycle

(5)

Reasons for Planned System Changes

Reasons for Planned System Changes

 Hardware  Software – Release update – Bug fixes  IT Infrastructure – Network – Server – PCs  Personnel  Supplier

(6)

Change

Change

Management

Management

Regulations

Regulations

/

/

Guidelines

Guidelines

"...change control measures can apply to equipment, standard operating procedures,

manufacturing instructions, environmental conditions, or any other aspects of the process system that has an effect on ist state of control, and therefore on the state of validation."

Proposed Rules, 21 CFR parts 210 and 211, May 3, 1996

(7)

Configuration

Configuration

Management

Management

Definition ANSI/IEEE

Definition ANSI/IEEE

"A formal engineering discipline that provides methods and tools to identify and control software, hardware

and related documentation throughout its development and use."

Standards

IEEE 828: Software configuration management plans IEEE 1042: Software configuration management

(8)

Change

Change

Management

Management

Regulations

Regulations

/

/

Guidelines

Guidelines

 USA

CFR GMP sections 210 and 211 PDA Technical Report No. 18

 Europe

EU GMP Guide, Annex 11 GAMP Guide

(9)

Requirements of the

Requirements of the

FDA

FDA

Most recent statement of the FDA (CDRH) in:

General Principles of Software Validation

 Published in the Federal Register on 11 January 2002

(Docket No. 97D-0282)

 “Provides guidance to medical device manufacturers and

FDA staff”

 Only applicable for Medical Devices, but considerable

influence on other sections

(10)

General Requirement

General Requirement

 All configuration items shall be clearly defined every time  All configuration items are subject to change control after

their release for use

(11)

PIC/S Guidance PI 011

PIC/S Guidance PI 011--1 “Good Practices for 1 “Good Practices for Computerized Systems in Regulated GxP

Computerized Systems in Regulated GxP

Environments”,

Environments”, Draft JanuaryDraft January 20022002



Changes are mentioned in chapters

– 17. Change Management

– 18. Change Control and Error Report System

(12)

GAMP 4

GAMP 4

Changes are mentioned in



Configuration Management

– Guideline “Project Change Control”, Annex M8 

Change Control during system operation

– Guideline “Operational Change Control”, Annex O4 

Periodic Review

– Guideline “Periodic Review”, Annex O1

(13)

The

The

Change Control

Change Control

Phases

Phases

 Change request (User)

 Evaluation, decision (System Owner)

 Evaluation of realization (IT/Service Provider)

 Definition of validation activities, priorization, risk

assessment (System Owner, IT, QA)  Implementation (IT/Service Provider)  Change review (QA)

(14)

Changes

Changes

-

-

Roles & Responsibilities

Roles & Responsibilities

System Owner

 Approval and release for realization  Release of system after completion QA

 Review/Approval of CC request  Risk evaluation

 Review of entire documentation

 Review/Release of systems after completion Business

 CC request

 Preparation of risk assessment  Testing

(15)

Classification of

Classification of

Changes

Changes

Example:

 Major Change

– A change to a validated computerized system that, in the opinion of change-control reviewers,

necessitates substantial efforts to implement the change and return the system to a validated status.

 Minor Change

– A change to a validated computerized system that, in the opinion of change-control reviewers, requires a relatively small effort to implement the change and return the process to a validated status.

(16)

Change

Change

Management

Management

Sources of Change

Sources of Change

 Software

– Software failures: bugs/defects – Enhancements

– New version(s) of operating system – New version(s) of layered software – New version(s) of application(s) – Program temporary fixes: patches

(17)

Change

Change

Management

Management

Sources of Change

Sources of Change

 Hardware

– Computer

Failures: disk, memory, power supply, etc.

Controlled processes: sensors, etc.

Firmware

– Updated Hardware

New components, boards

– Additional Hardware

New periphericals

(18)

Change

Change

Management

Management

Sources of Change

Sources of Change

 Network

– Hardware, software, security – Other uses

 People

– New people, new procedures, errors

 Vendors

(19)

Unplanned System Changes

Unplanned System Changes

Characteristics

 Short or no advance warning period  Require

– immediate evaluation

– immediate solution for the problem – temporary quarantaine of the system

 Problem: Documentation must be generated

(20)

Change

Change

Management

Management

Repetitive Change

Repetitive Change

 Time-driven but periodic

 Part of preventative maintenance

– Replacement of parts – Re-calibration

(21)

Traceability of Changes

Traceability of Changes

Ensure traceability by

 assigning clear attributes, e.g. – system name, version No.

– requester

– reason for change (benefit of change) – running number of change request – optional: cost

– status of realization

– approval of change and release of system with signatures  documentation on CC form

 if CC form is an electronic document, then 21CFR Part 11

(22)

Traceability

Traceability

Traceability of requirements must be ensured by e.g.

 Traceability Matrix  Database

 Tools (e.g. Telelogic “DOORS”)

 Implementation and documentation in the software (code)

(23)

On

On

-

-

going evaluation

going evaluation

Once a process is validated, it must be maintained in the validated state by a number of procedures that

assure that the process remains in the state-of-control. There should be written procedures for:

 Security of data generated (including back-up)  Access control (including password change)  Emergency recovery

 Change Control  Personnel Training

(24)

Change

Change

Management

Management

 Change Control/Change Management implies the

control of change and not the computer-related system

 Configuration Management

– Automatic capture and storage of component relationship for computer-related system

(25)

Change

Change

Management

Management

Attributes

Attributes

 Change management – CharacteristicsImplementationRecording of change

(26)

Change

Change

Management

Management

Documentation

Documentation

 Document

– How? Who? Review? Approvals? – Possible documents affected:

SOPs

Problem report/incident log

Change request including course of action

Qualification activities

(27)

Changes in

Changes in

Complex Systems

Complex Systems

(Example:

(Example:

SAP)

SAP)

Change Frequency Effort

 Release change rare very high

 Bug fixes, support packs frequent medium - high  New functionalities frequent low - medium  New authorizations frequent very low

 New core data very frequent very low

 New hardware rare low - medium

All changes have to be tested on the integration system which is operated in parallel (synonym: validation- or QA-system).

(28)

Changes

Changes

during

during

System Development

System Development

Prior to operation

 often in the IQ/OQ Phase

What has to be done?

 new system specification necessary  update of documentation

(29)

Freezing of System

Freezing of System

Design

Design

When does the Change Control Process start during system development?

Design Freeze

Agreement among all involved parties that no further changes to a design document, system, or system software will be made without the use of change

control procedures. The purpose of a design freeze is to prevent coding, testing, or qualification of an evolving system or its software and to ensure that the

qualification program is directly tied to the as-build-system.

(30)

System

System

Log

Log

Books

Books

 Capture execution of day to day activities

concerning operation of the system

 Act as a historical reference of changes

considered "minor" and not requiring comprehensive change control

documentation

 Can capture small "glitches" not

(31)

Baseline

Baseline

Definition

Definition

of the

of the

FDA (1995)

FDA (1995)

"A specification or product that has been formally

reviewed and agreed upon, that serves as the basis for further development, and that can be changed only

(32)

The

The

Baseline

Baseline

Concept

Concept

 The Baseline is freezing the current status of the

system

 All Configuration elements are working together  Baselines should be generated

– with new releases

– at important milestones/Changes

 The Change Management starts with the (new)

(33)

Change

Change

Management

Management

Cost

Cost

of Change

of Change

Should be part of the Change Control SOP and request formate and include evaluation of

 Indirect costs

 Savings of the change

 Return on investment

References

Related documents

The effective method to manage the relationship proactively (thereby improving risk associated with failed contracts) is to implement the right process, followed by the right

• We proposed a new model for estimating the mean cumulative war- ranty cost in the actual time case, by using the same piece-wise linear approach in modeling mileage accumulation. •

Quantitative techniques such as SSNIP test and critical loss analysis used in market definition are also affected as a result of the demand interactions and the responses of the

four internal half-height drives (such as LTO-3Ultrium 920 SAS, LTO-4 Ultrium 1760, LTO-5 Ultrium 3000 and LTO-6 Ultrium 6250) or two full-height drives (such as the LTO- 4 Ultrium

The act of running the Program is not restricted, and the output from the Program is covered only if its contents constitute a work based on the Program (independent of having

Such forward-looking statements involve known and unknown risks, uncertainties and other important factors beyond the Group‟s control that could cause the actual results,

These include an: (1) automated search for coral colonies in a video recorded using a mobile imaging platform, (2) automated behavior identification of Upogebia

Located in addition inglis by whirlpool dryer takes too long to help you for a damp cloth to our replacement parts along with a huge replacement parts and the door.. Rear pegs