Afghanistan Agricultural Inputs Project (AAIP) (P120397)

SOUTH ASIA | Afghanistan | Agriculture Global Practice |

Recipient Executed Activities | Specific Investment Loan | FY 2014 | Seq No: 6 | ARCHIVED on 21-Dec-2015 | ISR21980 | Implementing Agencies:

Key Dates

Key Project Dates

Bank Approval Date:17-Jun-2013 Effectiveness Date:30-Jun-2013 Planned Mid Term Review Date:08-May-2016 Actual Mid-Term Review Date: --Original Closing Date:30-Jun-2013 Revised Closing Date:30-Jun-2018

Project Development Objectives

Project Development Objective (from Project Appraisal Document)

Attain strengthened institutional capacity for safety and reliability of agricultural inputs and sustainable production of certified wheat seed. The development objective would be achieved through: (i) strengthening capacity in the value chain for producing certified wheat seed; (ii) preventing marketing of banned, hazardous, sub-standard, and unreliable pesticides and fertilizers; (iii) lowering the riskof introduction and spread of plant quarantine pests into the country; and (iv) improving farmers’ access to agricultural inputs ofreliable quality.

Has the Project Development Objective been changed since Board Approval of the Project Objective?

No

PHRPDODEL

Name Previous Rating Current Rating

Progress towards achievement of PDO

Moderately Unsatisfactory

Moderately Satisfactory

Overall Implementation Progress (IP)

Moderately Unsatisfactory

Moderately Satisfactory

Components

Name

A. Improved Wheat Seed Production:(Cost $26.40 M)

B. Plant Quarantine Networks and Quality Control of Agro-chemicals:(Cost $29.90 M) C. Input Delivery Systems:(Cost $2.50 M)

D. Project Management and Monitoring:(Cost $15.90 M)

(2)

12/21/2015 Page 2 of 10

Overall Risk Rating

Substantial

Substantial

Implementation Status and Key Decisions

The project has progressed well over the last few months and its activities have made important progress supporting the project’s development objectives. Some important technical positions have been filled and a series of important procurement processes have been initiated and are making good progress. The financial and technical support along with capacity development and training programs for the technical staff of Agricultural Research Institute of Afghanistan (ARIA), Improved Seeds Enterprise (ISE) and Afghanistan National Seed Organization (ANSOR) are ongoing.. A number of major civil works contracts for the establishment of laboratories, constituting the major activities of the project has been awarded. The contract for a Nationwide Pest & Disease Survey has been finalized and an MoU on establishment of Pesticides Poisoning Management Centre has been signed between MoPH and MAIL while contracts for four border quarantine stations have also been awarded.

Furthermore, a number of Laws including Pesticides Law, Plant Protection and Quarantine Law have been approved and endorsed either by the parliament or through a presidential decree. The Fertilizer Law along with a number of bylaws have been drafted and sent to Ministry of Justice for their review.

The current progress and projections demonstrates that the project will produce significant results toward achieving its development goal over the calendar year 2016.

(3)

Risks

Systematic Operations Risk-rating Tool

Risk Category Rating at Approval Previous Rating Current Rating

Political and Governance

--

Substantial

Substantial

Macroeconomic

--

High

High

Sector Strategies and Policies

--

Substantial

Substantial

Technical Design of Project or Program

--

Substantial

Substantial

Institutional Capacity for Implementation and

Sustainability

--

High

High

Fiduciary

--

High

High

Environment and Social

--

Moderate

Moderate

Stakeholders

--

Moderate

Moderate

Other

--

--

--Overall

--

Substantial

Substantial

Results

Project Development Objective Indicators

PHINDPDOTBL

(4)

12/21/2015 Page 4 of 10

Value 14.8 15.8 20.4 26

Date 01-Jul-2013 15-Jun-2015 10-Dec-2015 30-Jun-2018

PHINDPDOTBL

Wheat Seed multiplication factors (Text, Custom Supplement)

Baseline Actual (Previous) Actual (Current) End Target

Value 9.6 n/a n/a 23

PHINDPDOTBL

Production of certified wheat seed (Metric ton, Custom)

Baseline Actual (Previous) Actual (Current) End Target

Value 24000.00 9354.00 10000.00 30000.00

Date 01-Jul-2013 06-May-2015 10-Dec-2015 30-Jun-2018

PHINDPDOTBL

Listing of plant quarantine pests and diseases (Text, Custom)

Baseline Actual (Previous) Actual (Current) End Target

Value 0 0 0 1

Date 01-Jul-2013 15-Jun-2015 10-Dec-2015 30-Jun-2018

PHINDPDOTBL

Product samples tested for pesticides residues (Number, Custom)

Baseline Actual (Previous) Actual (Current) End Target

Value 0.00 0.00 0.00 100.00

(5)

PHINDPDOTBL

Bad pesticide samples intercepted (Number, Custom)

Baseline Actual (Previous) Actual (Current) End Target

Value 0.00 0.00 0.00 75.00

Date 01-Jul-2013 15-Jun-2015 10-Dec-2015 30-Jun-2018

Overall Comments

The Ministry has decided to remove production of registered seeds from the seed production chain.

Intermediate Results Indicators

PHINDIRITBL

New wheat varieties submitted for release

(

Number, Custom)

Baseline Actual (Previous) Actual (Current) End Target

Value 3.00 0.00 0.00 5.00

Date 01-Jul-2013 15-Jun-2015 10-Dec-2015 30-Jun-2018

PHINDIRITBL

Developed farm land area in ARIA

(

Hectare(Ha), Custom)

Baseline Actual (Previous) Actual (Current) End Target

Value 60.00 0.00 0.00 447.00

Date 01-Jul-2013 15-Jun-2015 10-Dec-2015 30-Jun-2018

PHINDIRITBL

Staff trained in ARIA

(

Number, Custom)

Baseline Actual (Previous) Actual (Current) End Target

Value 0.00 140.00 227.00 284.00

(6)

12/21/2015 Page 6 of 10 PHINDIRITBL

Developed farm land area in ISE

(

Hectare(Ha), Custom)

Baseline Actual (Previous) Actual (Current) End Target

Value 80.00 0.00 0.00 904.00

Date 01-Jul-2013 15-Jun-2015 10-Dec-2015 30-Jun-2018

PHINDIRITBL

Staff trained in ISE

(

Number, Custom)

Baseline Actual (Previous) Actual (Current) End Target

Value 0.00 44.00 47.00 57.00

Date 01-Jul-2013 15-Jun-2015 10-Dec-2015 30-Jun-2018

PHINDIRITBL

Foundation seed area rejected

(

Percentage, Custom)

Baseline Actual (Previous) Actual (Current) End Target

Value 12.00 1.00 6.00 5.00

Date 01-Jul-2013 15-Jun-2015 10-Dec-2015 30-Jun-2018

PHINDIRITBL

Registered seed area rejected

(

Percentage, Custom)

Baseline Actual (Previous) Actual (Current) End Target

Value 29.00 0.00 0.00 8.00

(7)

PHINDIRITBL

Percentage of certified seed production purchased by farmers (instead of donors and/or government)

(

Percentage, Custom)

Baseline Actual (Previous) Actual (Current) End Target

Value 0.00 0.00 10.00 5.00

Date 01-Jul-2013 15-Jun-2015 10-Dec-2015 30-Jun-2018

PHINDIRITBL

Pesticide samples chemically analyzed for registration

(

Number, Custom)

Baseline Actual (Previous) Actual (Current) End Target

Value 0.00 0.00 0.00 25.00

Date 01-Jul-2013 15-Jun-2015 10-Dec-2015 30-Jun-2018

PHINDIRITBL

Pesticide samples subjected to-bio-efficacy trials

(

Number, Custom)

Baseline Actual (Previous) Actual (Current) End Target

Value 0.00 0.00 0.00 20.00

Date 01-Jul-2013 15-Jun-2015 10-Dec-2015 30-Jun-2018

PHINDIRITBL

Phytosanitary certificates issued

(

Number, Custom)

Baseline Actual (Previous) Actual (Current) End Target

Value 0.00 0.00 0.00 1100.00

(8)

12/21/2015 Page 8 of 10 PHINDIRITBL

Quarantine inspections carried out

(

Number, Custom)

Baseline Actual (Previous) Actual (Current) End Target

Value 0.00 0.00 0.00 1000.00

Date 01-Jul-2013 15-Jun-2015 10-Dec-2015 30-Jun-2018

PHINDIRITBL

Fertilizer samples tested for chemical purity

(

Number, Custom)

Baseline Actual (Previous) Actual (Current) End Target

Value 0.00 0.00 0.00 150.00

Date 01-Jul-2013 15-Jun-2015 10-Dec-2015 30-Jun-2018

PHINDIRITBL

Fertilizer lots inspected

(

Number, Custom)

Baseline Actual (Previous) Actual (Current) End Target

Value 0.00 0.00 0.00 1500.00

Date 01-Jul-2013 15-Jun-2015 10-Dec-2015 30-Jun-2018

PHINDIRITBL

Staff trained in PPQD & FQCAID

(

Number, Custom)

Baseline Actual (Previous) Actual (Current) End Target

Value 0.00 22.00 22.00 119.00

(9)

PHINDIRITBL

Field surveys completed

(

Text, Custom)

Baseline Actual (Previous) Actual (Current) End Target

Value 0 1 1 1

Date 01-Jul-2013 15-Jun-2015 10-Dec-2015 29-Jun-2013

PHINDIRITBL

Action plan for investment in input distribution system developed

(

Number, Custom)

Baseline Actual (Previous) Actual (Current) End Target

Value 0.00 0.00 0.00 1.00

Date 01-Jul-2013 15-Jun-2015 10-Dec-2015 30-Jun-2018

PHINDIRITBL

ICT applications piloted

(

Number, Custom)

Baseline Actual (Previous) Actual (Current) End Target

Value 0.00 0.00 0.00 1.00

Date 01-Jul-2013 15-Jun-2015 10-Dec-2015 30-Jun-2018

Overall Comments

To achieve many of the indicators listed on this page, infrastructures such as quarantine stations, laboratories and related facilities are needed. The contracts for establishment of these facilities are currently either awarded or are at the final procurement stages. After the establishment of these facilities progress towards these indictors will be made and it is expected that during the next reporting period some achievements will be reported.

Data on Financial Performance

Disbursements (by loan)

Project Loan/Credit/TF Status Currency Original Revised Cancelled Disbursed Undisbursed Disbursed

(10)

12/21/2015 Page 10 of 10

Key Dates (by loan)

Project Loan/Credit/TF Status Approval Date Signing Date Effectiveness Date Orig. Closing Date Rev. Closing Date

P120397 TF-15003 Effective 30-Jun-2013 30-Jun-2013 30-Jun-2013 30-Jun-2013 30-Jun-2018

Cumulative Disbursements

Restructuring History

Level Approved on

Related Project(s)

References

Related documents

These products and services can make it possible for claims administrators to successfully transmit claims data via EDI and avoid the technical details of EDI.. Another alternative

• In the Alarm and Event list configuration, if the column name is renamed, the particular column is missing in the Alarm and Event List aspect in the client node if the locale is

These include the development of processes (fabrication of necessary stamps, printing), appropriate materials, one-step fabrication of passive polymer optical devices,

Serving a global client base, the Group provides Consulting & Systems Integration services, Managed Services & BPO, Cloud operations, Big Data & Cyber- security

Transformer energization transient: (a) instantaneous differential power components; (b) moving averages of the power differential components; (c) power ratio q d(DC) /p d(DC) ;

Since private firms lack incentives to litigate each other when patents are weak, we derive a paradoxical result that paten pools should be allowed when patents have suspect value in

Disposition Date: 03/13/2014 Effective Date (New): 12/08/2013 Effective Date (Renewal): 12/08/2013 Status: Rates and/or Rules Accepted (10) Comment: Company Name: Overall %

Niz nedavnih istraživanja povezao je povišenu plazmatsku koncentraciju homocisteina (hiperhomocisteinemiju) s patogenezom niza bolesti kao što su kardiovaskularne,