Project name

Project Handover

Action statement

Date Name Position Action required

(Review/Endorse/Approve) Due date

Prepared by Name

Title Job title

Branch/District Branch/District Division/Region Division/Region Location Floor, street, city Version no. 1.0

Version date 17 March 2006

Status Draft/Final review/Sign off (delete 2 of) DMS ref. no. DMS reference number

(2)

Document control sheet

Contact for enquiries and proposed changes

If you have any questions regarding this document or if you have a suggestion for improvements, please contact:

Project Manager Insert Project Manager's name here Phone Insert phone number here

Version history

Version no. Date Changed by Nature of amendment 09/07/2002 Initial draft.

Project Handover approval

The following officers have approved this document. Customer Name Position Signatur e Date Sponsor Name Position Signatur e Date

The following officer has endorsed this document.

Name Position Signatur

(3)

Contents

Executive summary ...5

1 Introduction ...6

2 Purpose of this document ...6

2.1 References ...6

2.2 Definitions...6

3 Project Customer, Sponsor and Project Manager...6

3.1 Project Customer ...6

3.2 Project Sponsor...7

3.3 Project Manager...7

4 Stakeholders...7

5 Background...7

6 Purpose/objectives of the project ...8

6.1 Purpose/objectives ...8

6.2 Links with the department’s strategic objectives ...8

7 Scope of project...8 7.1 In scope ...8 7.2 Out of scope ...8 7.3 Related projects ...8 7.4 Constraints...9 7.5 Urgency...9 7.6 Assumptions ...9

8 Outstanding project issues...9

9 Project performance ...10

10 Project benefits realisation ...10

11 Operational handover...10

11.1 Overview of impacts...10

11.2 Funding issues ...10

11.3 Risks...10

11.4 Handover...11

(4)
(5)

Executive summary

The Executive Summary is mandatory.

Provide a summary of the Handover Report. Focus on the status of the implementation (are the outcomes operational) and how outstanding issues will be managed.

To delete this guidance text box, double click mouse in the left margin then press delete.

(6)

1

Introduction

Text in this document which has been copied forward from the previous document has been shown bold and italics “words copied from previous documents”.

2

Purpose of this document

The purpose of this document is to:

• obtain formal acceptance of the project’s deliverables from operational areas • identify outstanding project issues and who is responsible for resolving them

(operational area or project team).

2.1 References

This item lists any documents to which this document refers and could include reports on any previous investigations carried out. Include all previous documents prepared as part of this project.

To delete this guidance text box, double click mouse in the left margin then press delete.

Type here

2.2 Definitions

In the table below define any term which this document’s audience may not understand, including specific terms, abbreviations and acronyms.

To delete this guidance text box, double click mouse in the left margin then press delete.

Terms, abbreviations and acronyms Meaning

3

Project Customer, Sponsor and Project Manager

3.1 Project Customer

Enter the name of the Project Customer.

To delete this guidance text box, double click mouse in the left margin then press delete.

(7)

3.2 Project Sponsor

Enter the name of the Project Sponsor.

To delete this guidance text box, double click mouse in the left margin then press delete.

Insert name was the Project Sponsor.

3.3 Project Manager

Enter the name of the Project Manager.

To delete this guidance text box, double click mouse in the left margin then press delete.

Insert name was the Project Manager.

4

Stakeholders

This section should illustrate the engagement undertaken with stakeholders and the key outcomes of that process as outlined in the completed community engagement planner for the project. List all stakeholders with an interest in this document including internal stakeholders (from regions/districts/divisions/branches with the department) and external stakeholders. Stakeholders may be listed in tabular form (as below). Include project customer and politicians as appropriate. Stakeholders may be categorised (internal, external and so on) where appropriate.

To delete this guidance text box, double click mouse in the left margin then press delete.

Stakeholder

area Stakeholder representative Responsibility Interest/context

5

Background

Provide here sufficient information to bring the reader up to speed on the subject matter of the project, including a brief history.

This section should describe the history of the project. It should include details of: - Who initiated the project and how it was initiated

- Include a clear statement of the real underlying problem to be addressed. - Include a brief history of past community engagement, issues and outcomes. - Identify the impact of problems/issues over time

(8)

To delete this guidance text box, double click mouse in the left margin then press delete.

Type here

6

Purpose/objectives of the project

6.1 Purpose/objectives

A statement of what the project was expected to achieve including potential benefits.

To delete this guidance text box, double click mouse in the left margin then press delete.

Type here

6.2 Links with the department’s strategic objectives

A statement of how the project links to the department’s Strategic Plan and objectives.

To delete this guidance text box, double click mouse in the left margin then press delete.

Type here

7

Scope of project

7.1 In scope

This defines the project boundaries. The scope outlined in any previous document should be confirmed here. List all items that were included in the scope of this project and note performance of the project against scope items.

To delete this guidance text box, double click mouse in the left margin then press delete.

Type here

7.2 Out of scope

List identified items that were not delivered as part of this project.

To delete this guidance text box, double click mouse in the left margin then press delete.

Type here

7.3 Related projects

List any related projects or proposals that may have affected this project and how their relationships to this project were managed.

To delete this guidance text box, double click mouse in the left margin then press delete.

(9)

7.4 Constraints

Describe anything that might have impacted on the successful development and/or implementation of the project and how they were managed.

To delete this guidance text box, double click mouse in the left margin then press delete.

Type here

7.5 Urgency

Identify the urgency of the project and describe how this affected the management of the project.

To delete this guidance text box, double click mouse in the left margin then press delete.

Type here

7.6 Assumptions

List all assumptions made during the course of the project and discuss their validity.

To delete this guidance text box, double click mouse in the left margin then press delete.

Type here

8

Outstanding project issues

Identify here the unresolved/outstanding issues that continue to exist at the date of operationalisation, what action is envisaged to resolve the issue, who is responsible for the issue and when it is planned to be finalised. The outstanding issues may best be presented in a table as outlined below.

To delete this guidance text box, double click mouse in the left margin then press delete.

Issue Action to complete Responsible Date

Maintenance arrangements Creation of assets

(10)

9

Project performance

Detail how the project performed against the project success criteria in the Plan.

To delete this guidance text box, double click mouse in the left margin then press delete.

Type here

10

Project benefits realisation

Detail how the product produced by the project is expected to perform against the business success criteria in the Project Plan.

To delete this guidance text box, double click mouse in the left margin then press delete.

Type here

11

Operational handover

11.1 Overview of impacts

Outline the major impacts the project has had on the business and the potential future impacts that may eventuate under certain conditions (for example, an increase or decrease in customer demand and so on).

To delete this guidance text box, double click mouse in the left margin then press delete.

Type here

11.2 Funding issues

Summarise the key financial impacts on the operational areas of the business and how they were or are to be funded.

To delete this guidance text box, double click mouse in the left margin then press delete.

Type here

11.3 Risks

List the major ongoing risks as identified by the project and suggested mitigation where applicable.

To delete this guidance text box, double click mouse in the left margin then press delete.

(11)

11.4 Handover

Detail here any issues relevant to the operational areas and suggested follow-up actions/instructions for dealing with the project’s deliverables on an ongoing basis. To delete this guidance text box, double click mouse in the left margin then press delete.

Type here

11.5 Maintenance and support

Detail any arrangement for ongoing maintenance or support of project outputs. To delete this guidance text box, double click mouse in the left margin then press delete.

Type here

When all information has been put into this document and the guidance text boxes have been deleted, it will be necessary to reformat the document taking out any blank lines. Once this is done, right click mouse in the table of content, click Update Fields, Update entire table, then click OK. This will update the table of contents to show the new page numbers.

To delete this guidance text box, double click mouse in the left margin then press delete.

(12)

Appendix A – as required

References

Related documents

If want to delete a recorded file in DataFile, click the file wanted to delete, press mouse right key or choose Clear real Time of Edit of menu, will appear talk window inquire

In both cases to make a change it is necessary to run the context menu command of the window "Terminal — Trade — Modify or Delete Order" or to double-click by the left

Click into the Note box and type a note to display when others access your contact card in their Skype For Business application window.. To delete, click into the field and delete

• To Delete a call record, high light it on the left panel , press [Delete] Icon, [Confirm] window show and click [Yes] for continue to delete record. • Select delete record will

As a people who represent the continuing struggle for American freedom, the case of the Black Indians of the Five Civilized Tribes demonstrates how hegemony introduced the

Click results for this enrolment to delete outcomes and hours for student Click the drop down box and select the blank space (first option). Delete

In both cases to change the order it is necessary to run the context menu command of the window "Terminal — Trade — Modify or Delete Order" or to double-click the left

To delete a document, select the radial button to the left of the document icon from the library window and click the Delete option from the Quick Command Bar, or by clicking on