March 2010
English
Materials Management
(104)
SAP AG Dietmar-Hopp-Allee 16 69190 Walldorf GermanyCopyright
© 2010 SAP AG. All rights reserved.
No part of this publication may be reproduced or transmitted in any form or for any purpose without the express permission of SAP AG. The information contained herein may be changed without prior notice. Some software products marketed by SAP AG and its distributors contain proprietary software
components of other software vendors.
Microsoft, Windows, Excel, Outlook,and PowerPointare registered trademarks of Microsoft Corporation. IBM, DB2, DB2 Universal Database, System i, System i5, System p, System p5, System x, System z, System z10, System z9, z10, z9, iSeries, pSeries, xSeries, zSeries, eServer, z/VM, z/OS, i5/OS, S/390, OS/390, OS/400, AS/400, S/390 Parallel Enterprise Server, PowerVM, Power Architecture, POWER6+, POWER6, POWER5+, POWER5, POWER, OpenPower, PowerPC, BatchPipes, BladeCenter, System Storage, GPFS, HACMP, RETAIN, DB2 Connect, RACF, Redbooks, OS/2, Parallel Sysplex, MVS/ESA, AIX, Intelligent Miner, WebSphere, Netfinity, Tivoli and Informix are trademarks or registered trademarks of IBM Corporation.
Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.
Adobe, the Adobe logo, Acrobat, PostScript, and Reader are either trademarks or registered trademarks of Adobe Systems Incorporated in the United States and/or other countries.
Oracle is a registered trademark of Oracle Corporation.
UNIX, X/Open, OSF/1, and Motif are registered trademarks of the Open Group.
Citrix, ICA, Program Neighborhood, MetaFrame, WinFrame, VideoFrame, and MultiWinare trademarks or registered trademarks of Citrix Systems, Inc.
HTML, XML, XHTML and W3C are trademarks or registered trademarks of W3C®, World Wide Web
Consortium, Massachusetts Institute of Technology. Java is a registered trademark of Sun Microsystems, Inc.
JavaScript is a registered trademark of Sun Microsystems, Inc., used under license for technology invented and implemented by Netscape.
SAP, R/3, SAP NetWeaver, Duet, PartnerEdge, ByDesign, Clear Enterprise, SAP BusinessObjects Explorer, and other SAP products and services mentioned herein as well as their respective logos are trademarks or registered trademarks of SAP AG in Germany and other countries.
Business Objects and the Business Objects logo, BusinessObjects, Crystal Reports, Crystal Decisions, Web Intelligence, Xcelsius, and other Business Objects products and services mentioned herein as well as their respective logos are trademarks or registered trademarks of SAP France in the United States and in other countries.
All other product and service names mentioned are the trademarks of their respective companies. Data contained in this document serves informational purposes only. National product specifications may vary.
These materials are subject to change without notice. These materials are provided by SAP AG and its affiliated companies ("SAP Group") for informational purposes only, without representation or warranty of any kind, and SAP Group shall not be liable for errors or omissions with respect to the materials. The only warranties for SAP Group products and services are those that are set forth in the express warranty statements accompanying such products and services, if any. Nothing herein should be construed as constituting an additional warranty.
Icons
Icon Meaning Caution Example Note Recommendation Syntax External ProcessBusiness Process Alternative/Decision Choice
Typographic Conventions
Type Style Description
Example text Words or characters that appear on the screen. These include Field names, screen titles, pushbuttons as well as menu names, paths and options.
Cross-references to other documentation.
Example text Emphasized words or phrases in body text, titles of graphics and tables. EXAMPLE TEXT Names of elements in the system. These include report names,
program names, transaction codes, table names, and individual key words of a programming language, when surrounded by body text, for example, SELECT and INCLUCN.
Example text Screen output. This includes file and directory names and their paths, messages, source code, names of variables and parameters as well as names of installation, upgrade and database tools.
EXAMPLE TEXT Keys on the keyboard, for example, function keys (such as F2) or the ENTER key.
Example text Exact user entry. These are words or characters that you enter in the system exactly as they appear in the documentation.
<Example text> Variable user entry. Pointed brackets indicate that you replace these words and characters with appropriate entries.
Contents
Materials Management ... 7
1 Purpose ... 7
2 Preparation ... 7
2.1 Prerequisites ... 7
3 Configuration of Logistics General ... 7
3.1 Logistics General: Material Master ... 7
3.1.1 Setting up Posting Period for Company Code ... 7
3.1.2 Defining Attributes for Material Types ... 8
3.1.3 Defining Material Groups ... 10
3.1.4 Defining Units of Measure Groups ... 11
3.1.5 Defining Product Hierarchies ... 11
3.2 Engineering Change Management ... 12
3.2.1 Setting Control Data – Engineering Change Management Control Data ... 12
3.3 Checking Consistency ... 13
3.3.1 Checking Consistency of Unit of Measurement Tables ... 13
4 Configuration of Materials Management ... 13
4.1 Consumption Based Planning ... 13
4.1.1 Overall Maintenance of Plant Parameters - General Settings ... 13
4.1.2 Overall Maintenance of Plant Parameters - MRP Controllers ... 21
4.1.3 Overall Maintenance of Plant Parameters - Special Procurement ... 22
4.1.4 Overall Maintenance of Plant Parameters - Start in Past ... 24
4.1.5 Defining Storage Location MRP per Plant ... 25
4.1.6 Defining Floats (Scheduling Margin Key) ... 25
4.1.7 Activating Materials Requirements Planning ... 26
4.1.8 Defining Scope of Planning for Total Planning ... 27
4.2 Purchasing ... 27
4.2.1 Activating Batch-Specific Unit of Measures ... 27
4.2.2 Creating Release Procedure Characteristics ... 28
4.2.3 Creating Release Procedure Class ... 31
4.2.4 Defining Release Procedure for Purchase Orders ... 32
4.2.5 Defining Release Procedure for Purchase Orders - Set Criterias ... 33
4.2.6 Defining Calculation Schema ... 34
4.2.7 Maintaining Rounding Profiles ... 37
4.2.8 Unit of Measure Rounding Rules ... 38
4.2.9 Maintaining Account Assignment Categories ... 39
4.2.10 Maintaining Account Assignment Categories - Translation ... 56
4.2.12 Defining Permissible Partner Roles per Account Group ... 57
4.2.13 Defining Condition Type ... 58
4.2.14 Taxes in Procurement ... 58
4.2.15 Checking Incoterms ... 61
4.2.16 Returns to Vendor ... 61
4.2.17 Vendor Evaluation ... 62
4.3 Foreign Trade ... 68
4.3.1 Defining Business Transaction Types And Default Value ... 68
4.3.2 Defining Business Transaction Types and Default Value ... 69
4.3.3 Defining Customs Offices ... 69
4.3.4 Defining Modes of Transport ... 70
4.3.5 Default Values for Foreign Trade Header Data ... 70
4.4 Inventory Management and Physical Inventory ... 71
4.4.1 Grouping Together Valuation Areas ... 71
4.4.2 Defining Screen Layout ... 72
4.4.3 Printer Determination by Plant/Storage Location ... 74
4.4.4 Printer Determination by Plant/Storage Location/User Group ... 75
4.4.5 Copying and Changing Movement Types ... 76
4.5 Valuation and Account Assignment ... 79
4.5.1 Defining Valuation Classes ... 79
4.6 Logistics Invoice Verification ... 80
4.6.1 Maintaining Default Values for Tax Codes ... 80
4.6.2 Setting Tolerance Limit ... 80
4.6.3 Editing PO Supplement Text in Invoice Verification ... 84
4.6.4 PO Supplement Text: Parameters, Invoice Verification ... 84
4.6.5 Configuring Vendor-Specific Tolerances ... 85
4.6.6 Activating Direct Posting to G/L Accounts and Material Accounts ... 86
4.6.7 Setting Check for Duplicate Invoices ... 86
4.6.8 MaintainingNumber Assignments for Accounting Documents ... 86
5 Configuration of Sales and Distribution ... 88
5.1 Basic Functions ... 88
5.1.1 Setting up Partner Determination. - Account Groups - Function Assignment ... 88
6 Configuration of Logistics Execution ... 88
6.1 Shipping ... 88
6.1.1 Setting up Partner Determination for Deliveries ... 88
7 Master Data ... 89
7.1 Purchasing Output Conditions ... 89
7.1.1 Output Condition Records: Purchasing RFQ ... 89
7.1.2 Output Condition Records: Purchase Order ... 90
7.1.4 Output Condition Records: Schedule Agreement ... 92
7.1.5 Output Condition Records: Service Entry Sheet ... 93
7.1.6 Output Condition Records: Inventory Management ... 94
7.1.7 Output Condition Record: Invoice Verification ... 103
7.2 Foreign Trade ... 107
7.2.1 Creating Tax Conditions Records ... 107
8 Individual BC Sets/ Manual Steps ... 108
Materials Management
1 Purpose
This configuration guide provides the information you need to set up the configuration of this building block manually.
If you prefer an automated installation process using the SAP Best Practices Installation Assistant and other tools, refer to the SAP Best Practices Quick Guide.
2 Preparation
2.1 Prerequisites
Before you start installing this building block, you must install prerequisite building blocks. For more information, see the building block prerequisite matrix
(Prerequisites_Matrix_[xx]_EN_CN.xls; the placeholder [xx] depends on the SAP Best Practices version you use, for example, BL refers to the SAP Best Practices Baseline Package: Prerequisites_Matrix_BL_EN_CN.xls). This document can be found on the SAP Best Practices documentation DVD in the folder \BL_CN\Documentation\.
3 Configuration of Logistics General
3.1 Logistics General: Material Master
3.1.1
Setting up Posting Period for Company Code
Use
The purpose of this activity is to set up the first posting period for materials management. In Customizing, the period/year for which the last postings were performed is set and
displayed. To be able to perform postings in the current period you have to close every single period up to the current year and period.
This step is necessary to set up posting periods correctly. The last period of the previous year has to be included.
Please note that the corresponding financial posting period should be open for postings as well.
3.1.1.1
Maintaining Company Codes for Materials
Management
Procedure
1. Access the activity using one of the following navigation options:
Transaction code OMSY
IMG menu Logistics - General → Material Master → Basic Settings →
Maintain Company Codes for Materials Management 2. On the Change View “Materials Management View on Company Codes”: Overview
screen, make the following entries:
Field name User action and values Note
Company Code 1000 Select line
Year <Previous Year> Previous year
Period XX(for example:12) Last period of previous year ABp - Allow Posting to
Pre-vious Period (Backposting)
select 3. Choose Save.
3.1.2
Defining Attributes for Material Types
Procedure
1. Access the activity using one of the following navigation options:
Transaction code SPRO
IMG menu Logistics - General → Material Master → Basic Settings →
Material Types → Define Attributes of Material Types 2. On the Change View “Material Types”: Overview screen, select material type ABF (see
table in step 4).
3. Double-click Quantity/value updating in the Dialog Structure.
4. On the Change View “Quantity/value updating”: Overview screen, make the following entries:
Val. Area Material
Type Quantity updating Value Updating Pipeline mandatory Pipeline allowed
Plant_1 (1000) ABF Plant_2 (1100) ABF 5. Choose Back (F3).
6. Repeat steps 2. to 5. for the following material types:
Val. Area Material
Type Quantity updating Value Updating Pipeline mandatory Pipeline allowed
Plant_1 (1000) ABF (done) Plant_2 (1100) ABF (done) Plant_1 (1000) CONT
Val. Area Material
Type Quantity updating Value Updating Pipeline mandatory Pipeline allowed
Plant_2 (1100) CONT Plant_1 (1000) COUP Plant_2 (1100) COUP Plant_1 (1000) DIEN Plant_2 (1100) DIEN Plant_1 (1000) ERSA X X Plant_2 (1100) ERSA X X Plant_1 (1000) FERT X X Plant_2 (1100) FERT X X Plant_1 (1000) FGTR X X Plant_2 (1100) FGTR X X Plant_1 (1000) FHMI X X Plant_2 (1100) FHMI X X Plant_1 (1000) FOOD X X Plant_2 (1100) FOOD X X Plant_1 (1000) FRIP X X Plant_2 (1100) FRIP X X Plant_1 (1000) HALB X X Plant_2 (1100) HALB X X Plant_1 (1000) HAWA X X Plant_2 (1100) HAWA X X Plant_1 (1000) HERS X X Plant_2 (1100) HERS X X Plant_1 (1000) HIBE X X Plant_2 (1100) HIBE X X Plant_1 (1000) IBAU Plant_2 (1100) IBAU Plant_1 (1000) INTR X X Plant_2 (1100) INTR X X Plant_1 (1000) KMAT Plant_2 (1100) KMAT Plant_1 (1000) LEER X X Plant_2 (1100) LEER X X Plant_1 (1000) LEIH X Plant_2 (1100) LEIH X Plant_1 (1000) LGUT X X
Val. Area Material
Type Quantity updating Value Updating Pipeline mandatory Pipeline allowed
Plant_2 (1100) LGUT X X Plant_1 (1000) NLAG Plant_2 (1100) NLAG Plant_1 (1000) NOF1 X X Plant_2 (1100) NOF1 X X Plant_1 (1000) PIPE X Plant_2 (1100) PIPE X X Plant_1 (1000) PLAN Plant_2 (1100) PLAN Plant_1 (1000) PROC Plant_2 (1100) PROC Plant_1 (1000) PROD Plant_2 (1100) PROD Plant_1 (1000) ROH X X Plant_2 (1100) ROH X X Plant_1 (1000) UNBW X Plant_2 (1100) UNBW X Plant_1 (1000) VERP X X Plant_2 (1100) VERP X X Plant_1 (1000) VKHM X X Plant_2 (1100) VKHM X X Plant_1 (1000) VOLL X X Plant_2 (1100) VOLL X X Plant_1 (1000) WERB X X Plant_2 (1100) WERB X X Plant_1 (1000) WERT X Plant_2 (1100) WERT X Plant_1 (1000) WETT Plant_2 (1100) WETT 7. Save your settings.
3.1.3
Defining Material Groups
Procedure
1. Access the activity using one of the following navigation options:
Transaction code OMSF
→ Define Material Groups
2. On the Change View “Material Groups”: Overview screen, choose New Entries. 3. Make the following sets of entries:
Material Group
Mat.grp.description Description 2
YBD01 Product Group D01 Product Group Services YBF01 Product Group F01 Product Group Discrete Man. YBF02 Product Group F02 Product Group Process Man. YBR01 Product Group R01 Product group Plastic YBR02 Product Group R02 Product group Metal YBR03 Product Group R03 Product Group Stationary YBR04 Product Group R04 Product Group Spares YBR05 Product Group R05 Product Group Misc YBS01 Product Group S01 Product Group Subcon. YBS02 Product Group S02 Product Group Phantom YBT01 Product Group T01 Product Group Trade
YBZ01 Product Group Z01 Product Group Consumables YBZ02 Product Group Z02 Product Group Supplies YBZ03 Product Group Z03 Product Group Computers 4. Save your settings.
3.1.4
Defining Units of Measure Groups
Procedure
1. Access the activity using one of the following navigation options:
Transaction code SPRO
IMG menu Logistics - General → Material Master → Settings for Key Fields
→ Define Units of Measure Groups
2. On the Change View “Define Units of Measure Groups”: Overview screen, choose New Entries.
3. Make the following sets of entries.
Field name
Unit Group Alternative Unite Measurement Unit Text Counter Denominator for conversion Entry 1 10 DZ Dozen 12 1
Entry 2 10 GRO Gross 144 1
4. Save your settings.
3.1.5
Defining Product Hierarchies
1. Access the activity using one of the following navigation options:
Transaction code OVSV
IMG menu Logistics - General → Material Master → Settings for Key Fields
→ Data Relevant to Sales and Distribution → Define Product Hierarchies
2. On the Customizing Product Hierarchy screen, choose Maintenance: Product Hierarchy and choose Choose (F2).
3. On the Change View “Materials: Product Hierarchies”: Overview screen, choose New Entries.
4. Make the following entries. Start with all Level-1 entries and save them, then continue with all Level-2 entries, and so on:
Product Hierarchy Level
No. Description
#00001 1 Best Practices Prod. Hier. Top Level #00001B0001 2 Prod. Hier. Second Level – Products A #00001B000100000001 3 Prod. Hier. Third Level – Product A.01 #00001B000100000002 3 Prod. Hier. Third Level – Product A.02 #00001B000100000003 3 Prod. Hier. Third Level – Parts A.03 #00001B0002 2 Prod. Hier. Second Level – Products B #00001B000200000001 3 Prod. Hier. Third Level – Product B.01 #00001B000200000002 3 Prod. Hier. Third Level – Product B.02 5. Save your settings.
3.2 Engineering Change Management
3.2.1
Setting Control Data – Engineering Change
Management Control Data
Procedure
1. Access the activity using one of the following navigation options:
Transaction code OS54
IMG menu Logistics - General → Engineering Change Management → Set Control Data
2. On the Change View “Engineering Change Management Control Data”: Details screen, check the following entries:
Field name Description User action and values Note
Parameter Effectivity Rev.Level Act. X NR Check for Alpha X 3. Choose Save.
3.3 Checking Consistency
3.3.1
Checking Consistency of Unit of Measurement Tables
After you have installed BB - Materials Management, check the Units of Measurement. We highly recommend that you run the report RBZMECHK to avoid any inconsistencies. 1. Access the activity using one of the following navigation options:
SAP ECC menu Tools → ABAP Workbench → Development → User Interface →
ABAP Editor
Transaction code SE38
2. Enter the program RBZMECHK and choose Execute (F8).
This report establishes the consistency of the tables T006, T006A, T006B and T006C. It ensures, in particular, that each unit of measurement has an indicator in every language. However, since the report cannot know the correct translation of a unit of measurement, it only numbers missing indicators. This procedure is therefore only recommended if you have to restore the consistency of the database tables very quickly. Of course, the generated numeric indicators can be adjusted subsequently with transaction CUNI.
4 Configuration of Materials Management
4.1 Consumption Based Planning
Access the Customizing activities as outlined in the BC Set output documentation below and change the settings according to the respective table values listed.
4.1.1
Overall Maintenance of Plant Parameters - General
Settings
4.1.1.1
Overall Maintenance of Plant Parameters - Number
Ranges
Use
The purpose of this step is to maintain the number ranges per plant.
Procedure
1. Access the activity using one of the following navigation options:
Transaction code OMI8
IMG menu Materials Management → Consumption-Based Planning → Plant Parameters → Carry Out Overall Maintenance of Plant
Parameters
2. On the Plant Parameters for Material Requirements Planning screen, choose Create. 3. In the Create Plant Parameters dialog box, make the following entries:
Create the plant parameters for plant 1000 first, then create the parameters for additional plants.
Plant
1000 1100
4. Choose Create.
5. On the Maintain Plant Parameters screen, choose Number Ranges.
6. On the Assign Number Ranges screen, choose Planned Orders, and make the following entries:
Plant NRge pl. orders Simulative planned order
1000 01 01
1100 01 01
7. On the Assign Number ranges screen, choose the Reservations/Dependent Requirements button, and make the following entries:
Plant NR: StkTrns Res.
1000 01
1100 01
8. On the Assign Number Ranges screen, choose Purchase Requisitions, and make the following entries:
Plant NR – PReq.
1000 01
1100 01
9. On the Assign Number Ranges screen, choose MRP Lists, and make the following entries:
Plant No. Range - MRP
1000 01
1100 01
10. On the Assign Number Ranges screen, choose Simulative Dep Req, and make the following entries: Plant NR. SimDepRs 1000 01 1100 01 11. Choose Save. 12. Choose Back.
4.1.1.2
Overall Maintenance of Plant Parameters -
Conversion Planned Order to PReq.
Use
The purpose of this step is to maintain the number of planned orders converted to purchase requisitions per plant.
Procedure
1. Access the activity using one of the following navigation options:
Transaction code OMI8
IMG menu Materials Management → Consumption-Based Planning → Plant Parameters → Carry Out Overall Maintenance of Plant
Parameters
2. On the Plant Parameters for Material Requirements Planning screen, choose Maintain. 3. In the Maintain Plant Parameters dialog box, make the following entries:
Maintain the plant parameters for plant 1000 first, then create the parameters for additional plants.
Plant
1000 1100
4. Choose Maintain.
5. On the Maintain Plant Parameters screen, choose Conversion PlOrd->Preq.
6. On the Change View “Number Of Planned Orders”: Overview screen, make the following entries:
Plnt Number of planned orders
1000 500
1100 500
7. Choose Save. 8. Choose Back.
4.1.1.3
Overall Maintenance of Plant Parameters -
Dep.reqmt Availability
Use
The purpose of this step is to define the availability check of dependent requirements.
Procedure
1. Access the activity using one of the following navigation options:
Transaction code OMI8
IMG menu Materials Management → Consumption-Based Planning → Plant Parameters → Carry Out Overall Maintenance of Plant
Parameters
2. On the Plant Parameters for Material Requirements Planning screen, choose Maintain. 3. In the Maintain Plant Parameters dialog box, make the following entries:
Maintain the plant parameters for plant 1000 first, then create the parameters for additional plants.
Plant
1000 1100
4. Choose Maintain.
5. On the Maintain Plant Parameters screen, choose Availability Dep. Req.
6. On the Change View “Availability Check”: Overview screen, make the following entries:
Plnt Avail. Check Rule
1000 PP
1100 PP
7. Choose Save. 8. Choose Back.
4.1.1.4
Overall Maintenance of Plant Par. - External
Procurement
Use
The purpose of this step is to define external procurement.
Procedure
1. Access the activity using one of the following navigation options:
Transaction code OMI8
IMG menu Materials Management → Consumption-Based Planning → Plant Parameters → Carry Out Overall Maintenance of Plant
Parameters
2. On the Plant Parameters for Material Requirements Planning screen, choose Maintain. 3. In the Maintain Plant Parameters dialog box, make the following entries:
Maintain the plant parameters for plant 1000 first, then create the parameters for additional plants.
Plant
1000 1100
4. Choose Maintain.
5. On the Maintain Plant Parameters screen, choose External Procurement
6. On the Change View “Default Values Purchasing/MRP”: Overview screen, make the following entries: Plnt Purchasing process. time Sub. Purch. Group Description Scheduling: Info Record /Agreem. Schedule lines Unkown Acct Assignmentwm 1000 3 X U 1100 3 X U 7. Choose Save. 8. Choose Back.
4.1.1.5
Overall Maintenance of Plant Parameters -
Rescheduling
Use
The purpose of this step is to define a rescheduling check.
Procedure
1. Access the activity using one of the following navigation options:
Transaction code OMI8
IMG menu Materials Management → Consumption-Based Planning → Plant Parameters → Carry Out Overall Maintenance of Plant
Parameters
2. On the Plant Parameters for Material Requirements Planning screen, choose Maintain. 3. In the Maintain Plant Parameters dialog box, make the following entries:
Maintain the plant parameters for plant 1000 first, then create the parameters for additional plants.
Plant
1000 1100
4. Choose Maintain.
5. On the Maintain Plant Parameters screen, choose Reschduling.
6. On the Change View “Plant rescheduling”:Details screen, make the following entries:
Plant 1000 1100
Rescheduling horizon 100 100
Firmed Planned Orders X X
Production order X X
Fixed Purchase Requisitions X X
QM inspection lot X X
Shipping notificat. X X
Tolerance value forward 02 02
Tolerance value for displacement 02 02 7. Choose Save.
8. Choose Back.
4.1.1.6
Overall Maintenance of Plant Parameters - Planning
Horizon
Use
The purpose of this step is to define a planning horizon for a plant.
Procedure
1. Access the activity using one of the following navigation options:
Transaction code OMI8
IMG menu Materials Management → Consumption-Based Planning → Plant Parameters → Carry Out Overall Maintenance of Plant
Parameters
2. On the Plant Parameters for Material Requirements Planning screen, choose Maintain. 3. In the Maintain Plant Parameters dialog box, make the following entries:
Maintain the plant parameters for plant 1000 first, then create the parameters for additional plants.
Plant
1000 1100
4. Choose Maintain.
5. On the Maintain Plant Parameters screen, choose Planning Horizon.
6. On the Change View “Planning Horizon for Plant”: Overview screen, choose New Entries.
Plnt Planning horizon
1000 100
1100 100
7. Choose Save. 8. Choose Back.
4.1.1.7
Overall Maintenance of Plant Parameters -
Available Stocks
Use
The purpose of this step is to define availability of stock.
Procedure
1. Access the activity using one of the following navigation options:
Transaction code OMI8
IMG menu Materials Management → Consumption-Based Planning → Plant Parameters → Carry Out Overall Maintenance of Plant
Parameters
2. On the Plant Parameters for Material Requirements Planning screen, choose Maintain. 3. In the Maintain Plant Parameters dialog box, make the following entries:
Maintain the plant parameters for plant 1000 first, then create the parameters for additional plants.
Plant
1000 1100
4. Choose Maintain.
5. On the Maintain Plant Parameters screen, choose Available Stocks.
6. On the Change View “Available Stocks”: Overview screen, make the following entries:
Plnt Stock in transfer Blocked stock Restricted-use stock
1000 X
1100 X
7. Choose Save. 8. Choose Back.
4.1.1.8
Overall Maintenance of Plant Parameters - Error
Handling
Use
In this step, you determine how the system is to react if errors occur in the planning run.
Procedure
1. Access the activity using one of the following navigation options:
Transaction code OMI8
IMG menu Materials Management → Consumption-Based Planning → Plant Parameters → Carry Out Overall Maintenance of Plant
2. On the Plant Parameters for Material Requirements Planning screen, choose Maintain. 3. In the Maintain Plant Parameters dialog box, make the following entries:
Maintain the plant parameters for plant 1000 first, then create the parameters for additional plants.
Plant
1000 1100
4. Choose Maintain.
5. On the Maintain Plant Parameters screen, choose Error Handling.
6. On the Change View “Error Handling in the Planning Run”: Overview screen, make the following entries: Plnt Max.Proposals Subs. 1000 050 101 1100 050 111 7. Choose Save. 8. Choose Back.
4.1.1.9
Overall Maintenance of Plant Parameters - Line
Item Numbers
Use
The purpose of this step is to define a line item number.
Procedure
1. Access the activity using one of the following navigation options:
Transaction code OMI8
IMG menu Materials Management → Consumption-Based Planning → Plant Parameters → Carry Out Overall Maintenance of Plant
Parameters
2. On the Plant Parameters for Material Requirements Planning screen, choose Maintain. 3. In the Maintain Plant Parameters dialog box, make the following entries:
Maintain the plant parameters for plant 1000 first, then create the parameters for additional plants.
Plant
1000 1100
4. Choose Maintain.
5. On the Maintain Plant Parameters screen, choose Item Numbers.
6. On the Change View: “Item Numbers”: Overview screen, make the following entries:
Plant Item PR Item No. Stock Trans. Res.
1000 10 100
1100 10 100
7. Choose Save. 8. Choose Back.
4.1.2
Overall Maintenance of Plant Parameters - MRP
Controllers
Use
The purpose of this step is to maintain the MRP controller per plant.
Procedure
1. Access the activity using one of the following navigation options:
Transaction code OMI8
IMG menu Materials Management → Consumption-Based Planning → Plant Parameters → Carry Out Overall Maintenance of Plant
Parameters
2. On the Plant Parameters for Material Requirements Planning screen, choose Maintain. 3. In the Maintain Plant Parameters dialog box, make the following entries:
Maintain the plant parameters for plant 1000 first, then create the parameters for additional plants.
Plant
1000 1100
4. Choose Maintain.
5. On the Maintain Plant Parameters screen, choose MRP controllers.
6. On the Change View “MRP Controllers”: Overview screen, make the following entries:
Plant Name MRP Cont. MRP Controller Name Telephone 1000 工厂1 100 佟小玉 8400 9421 1000 工厂1 101 白叶凡 8400 9422 1000 工厂1 102 周末 8400 9423 1000 工厂1 103 郭芙蓉 8400 9424 1100 工厂2 110 李强 8490 4256 1100 工厂2 111 莫小贝 8490 4257
Plant Name MRP
Cont. MRP Controller Name Telephone
1100 工厂2 112 刑可佳 8490 4258
1100 工厂2 113 燕青 8490 4259
7. Choose Save. 8. Choose Back.
4.1.3
Overall Maintenance of Plant Parameters - Special
Procurement
Use
In this step, you define the special procurement keys which as well as the procurement type control the procurement and storage of a material. The special procurement type always refers to a procurement type.
Procedure
1. Access the activity using one of the following navigation options:
Transaction code OMI8
IMG menu Materials Management → Consumption-Based Planning → Plant Parameters → Carry Out Overall Maintenance of Plant
Parameters
2. On the Plant Parameters for Material Requirements Planning screen, choose Maintain. 3. In the Maintain Plant Parameters dialog box, make the following entries:
Maintain the plant parameters for plant 1000 first, then create the parameters for additional plants.
Plant
1000 1100
4. Choose Maintain.
5. On the Maintain Plant Parameters screen, choose Special Procurement. 6. Choose New Entries.
7. Make the following entries:
Plan t S P
T
Long Text Proc ure ment type
Sp. proc. Plant Phant om item Direct produ ction Withdr. altern.p lant Issuin g plant 1000 10 Consignm ent F K 1000 20 External procureme nt F 1000 30 Subcontra F L
cting 1000 40 Stock transfer (proc.from alter.plant) F U 1100 1000 45 Stock transfer from plant to MRP area F U 1100 1000 50 Phantom assembly E E X 1000 52 Direct production / collective order E E X 1000 60 Phantom in planning E E 1000 70 Withdrawa l from alternative plant E R X 1100 1000 80 Production in alternative plant E P 1100 1100 10 Consignm ent F K 1100 20 External procureme nt F 1100 30 Subcontra cting F L 1100 40 Stock transfer (proc.from alter.plant) F U 1000 1100 45 Stock transfer from plant to MRP area F U 1000 1100 50 Phantom assembly E E X 1100 52 Direct production / collective order E E X 1100 60 Phantom in planning E E
1100 70 Withdrawa l from alternative plant E E X 1000 1100 80 Production in alternative plant E P 1000 8. Choose Save. 9. Choose Back.
4.1.4
Overall Maintenance of Plant Parameters - Start in
Past
Use
The purpose of this step is to define that the MRP calculation may start in the past.
It is strongly recommended not to set the flag, otherwise the MRP run will create MRP elements which start and end in the past.
This step is optional. Its purpose is to check that the flag Start in Past has not been selected.
Procedure
1. Access the activity using one of the following navigation options:
Transaction code OMI8
IMG menu Materials Management → Consumption-Based Planning → Plant Parameters → Carry Out Overall Maintenance of Plant
Parameters
2. On the Plant Parameters for Material Requirements Planning screen, choose Maintain. 3. In the Maintain Plant Parameters dialog box, make the following entries:
Maintain the plant parameters for plant 1000 first, then create the parameters for additional plants.
Plant
1000 1100
4. Choose Maintain.
5. On the Maintain Plant Parameters screen, choose Start in the Past.
6. On the Change View: “Order Proposals in the Past”: Overview screen, make the following entries:
Plant Start in Past
1100 Leave empty 7. Choose Save.
8. Choose Back.
4.1.5
Defining Storage Location MRP per Plant
Procedure
1. Access the activity using on of the following navigation options:
Transaction code SPRO
IMG menu Materials Management → Consumption-Based Planning →
Planning → Define Storage Location MRP per Plant 2. In the Determine Work Area: Entry dialog box, make the following entries:
Create the plant parameters for plant 1000 first, then create the parameters for additional plants.
Plant
1000 1100
3. Choose Enter.
4. On the Change View “Storage Location MRP": Overview, make the following entries:
Plnt SLoc MRP Ind. 1000 1020 1100 1030 1000 1040 1000 1050 1000 1060 1 1100 1130 1100 1140 1100 1160 1 5. Choose Save.
4.1.6
Defining Floats (Scheduling Margin Key)
Use
Procedure
1. Access the activity using one of the following navigation options:
Transaction code SPRO
IMG menu Materials Management → Consumption-Based Planning →
Planning → Define Floats (Scheduling Margin Key) 2. On the Change View “Floats for Scheduling”: Overview screen, choose New Entries. 3. Make the following entries:
Plant Scheduling MarginKey : Float
Name 1 Opening
Period Float After Production Float Before Production Release Period
1000 000 工厂1 000 000 000 000
1000 001 工厂1 010 001 002 005
1100 000 工厂2 000 000 000 000
1100 001 工厂2 010 001 002 005
4. Choose Save.
4.1.7 Activating Materials Requirements Planning
Use
The purpose of this activity is to activate MRP.
Procedure
1. Access the activity using one of the following navigation options:
Transaction code OMDU
IMG menu Materials Management → Consumption-Based Planning →
Planning → Activate Materials Requirements Planning 2. On the Activation screen, choose Material Requirements Planning.
3. On the Change View “Activate Requirements Planning”: Overview screen, make the following entries:
Plant Activate requirements planning Note
0001 This plant is never included!
1000 X 1100 X 4. Choose Save. 5. Choose Back.
4.1.8 Defining Scope of Planning for Total Planning
Use
The purpose of this activity is to define the scope of planning for Total Planning. This means that the planning includes the selected plants and tells the system in which order the plants have to be planned, for example distribution center before production plant.
Procedure
1. Access the activity using one of the following navigation options:
Transaction code OM0E
IMG menu Materials Management → Consumption-Based Planning →
Planning → Define Scope of Planning for Total Planning 2. On the Change View “Description: scope of planning for total plng run”: Overview
screen,choose New Entries. 3. Make the following entries:
Planning Scope Activate requirements planning
YB01 All Plants
4. Mark the created entry and double-click in the left menu Sequence of plants/MRP areas. 5. On the Change View “Sequence of plants/MRP areas”: Overview screen, choose New
Entries.
6. Make the following entries:
Cntr. Plant Comment
200 1100 Distribution center first
210 1000 Production plant second
7. Choose Save. 8. Choose Back.
4.2 Purchasing
Preparation
Access the Customizing activities as outlined in the BC Set output documentation below, and make the settings according to the respective table values listed.
4.2.1
Activating Batch-Specific Unit of Measures
Use
The purpose of this activity is to activate the batch-specific unit of measures.
Procedure
Transaction code OMWS
IMG menu Logistics - General Batch Management Batch-Specific Material Unit of Measure Activate Batch-Specific Material Unit of Measure
2. On the Activate Batch-Specific Material Unit of Measure screen, choose Batch-specific units of measure active and save your entry.
Result
The batch-specific unit of measure was activated.
4.2.2
Creating Release Procedure Characteristics
Procedure
1. Access the activity using one of the following navigation options:
SAP ECC menu Cross Application Components → Classification System →
Master Data → Characteristics
Transaction code CT04
2. On the Characteristics screen, make the following entries:
Field name User action and values
Characteristic R2R_PURCH_GRP
3. Choose Create.
4. On the Create Characteristics screen, make the following entries: 5. Choose the Basic data tab page:
Field name User action and values
Description Purchasing Group
Status 1
Data Type CHAR
Number of Characters 3
Multiple Values select
6. Choose the Descriptions tab page:
Field name User action and values
Language ZH
Description 采购组
Language EN
Description Purchasing Group
Field name User action and values Char. Value 100 Description Group 100 Char. Value 101 Description Group 101 Char. Value 102 Description Group 102 Char. Value 103 Description Group 103 Char. Value 110 Description Group 110 Char. Value 111 Description Group 111 Char. Value 112 Description Group 112 Char. Value 113 Description Group 113
8. Choose the Addnl data tab page:
Field name User action and values
Table Name CEKKO
Field name EKGRP
Not Ready for Input select
9. Choose Save and go back to the Characteristics screen. 10. On the Characteristics screen, make the following entries:
Field name User action and values
Characteristic R2R_PURCH_ORD_TYPE
11. Choose Create.
12. On the Create Characteristics screen, make the following entries: 13. Choose the Basic data tab page:
Field name User action and values
Description Order Type (Purchasing)
Field name User action and values
Data Type CHAR
Number of Characters 4
Multiple Values select
14. Choose the Description tab page:
Field name User action and values
Language ZH
Description 订单类型(采购)
Language EN
Description Order Type (Purchasing)
15. Choose the Values tab page:
Field name User action and values
Char. Value FO
Description Framework Order
Char. Value NB
Description Standard PO
Char. Value UB
Description Stock Tranfer Order
16. Choose the Addnl data tab page:
Field name User action and values
Table Name CEKKO
Field name BSART
Not Ready for Input select
17. Choose Save and go back to the Characteristics screen. 18. On the Characteristics screen, make the following entries:
Field name User action and values
Characteristic R2R_PURCH_ORD_VALUE
19. Choose Create.
20. On the Create Characteristics screen, make the following entries: 21. Choose the Basic data tab page:
Field name User action and values
Description Total net order value
Field name User action and values
Data Type CURR
Number of Characters 15
Decimal Places 2
Currency CNY
Template _____________,__
Multiple Values select
22. Choose the Description tab page:
Field name User action and values
Language ZH
Description 总的净订单值
Language EN
Description Total net order value
23. Choose the Values tab page:
Field name User action and values
Char. Value > 500,00 CNY
24. Choose the Addnl data tab page:
Field name User action and values
Table Name CEKKO
Field name GNETW
Not Ready for Input select
25. Choose Save.
4.2.3
Creating Release Procedure Class
Procedure
1. Access the activity using one of the following navigation options:
SAP ECC menu Cross-Application Components → Classification System →
Master Data → Classes
Transaction code CL02
2. On the Class screen, make the following entries:
Field name User action and values
Class R2R_CL_REL_CEKKO
3. Choose Create.
4. On the Create Class screen, make the following entries: 5. Choose the Basic data tab page:
Field name User action and values
Description PO Release at Header Level
Status Released
6. Choose the Char. Tab page:
Field name User action and values
Char. R2R_PURCH_ORD_TYPE
Char. R2R_PURCH_GRP
Char. R2R_PURCH_ORD_VALUE
7. Choose Save.
4.2.4
Defining Release Procedure for Purchase Orders
Use
The purpose of this step is to define the release procedure for purchase orders containing steps Release Groups, Release Codes, Release Indicator, Release Strategies .
Procedure
1. Access the activity using one of the following navigation options:
Transaction code SPRO
IMG Menu Materials Management → Purchasing → Purchase Order →
Release Procedure for Purchase Orders → Define Release Procedure for Purchase Orders
2. Double-click Release Groups. 3. Choose New Entries.
4. Make the following entries:
Grp Obj Class Description
PH 2 R2R_CL_REL_CEKKO PO Release (Overall)
5. Choose Save. 6. Choose Back.
7. Double-click Release Codes. 8. Choose New Entries.
9. Make the following entries:
Grp Code Description
10. Choose Save. 11. Choose Back.
12. Double-click Release Indicator. 13. Choose New Entries.
14. Make the following entries:
Rel R Chg VChTo Description
1 X 6 0.0 Changeable, but new release
15. Choose Save. 16. Choose Back.
17. Double-click Release Strategies. 18. Choose New Entries.
19. Make the following entries:
Grp Strat Code Description
PH 10 01 Overall Release
20. Choose Save. 21. Choose Back.
4.2.5
Defining Release Procedure for Purchase Orders - Set
Criterias
Use
In this activity you will define a release procedure for purchase orders.
Procedure
1. Access the activity using one of the following navigation options:
Transaction code SPRO
SAP ECC menu Materials Management → Purchasing → Purchase Order →
Release Procedure for Purchase Orders → Define Release Procedure for Purchase Orders
2. Double-click Release Strategies.
3. Choose Release Prerequisites and choose Continue. 4. Choose Release Statuses and choose Continue. 5. Choose Classification.
6. On the Change View “Release Strategies”: Classification screen, make the following entries:
Field name User action and values
Order type (Purchasing) Framework order Standard PO Stock Tranfer Order
Field name User action and values Group 101 Group 102 Group 103 Group 110 Group 111 Group 112 Group 113 Total net order value > 500.00 CNY 7. Choose Back.
8. Choose Release simulation. 9. Choose Simulate release.
10. Choose Set/reset release. The release is simulated 11. Choose Cancel.
12. Choose Continue.
13. Choose Save, and then Exit.
Result
The release procedure for purchase orders is defined.
4.2.6
Defining Calculation Schema
Procedure
1. Access the activity using one of the following navigation options:
Transaction code SPRO
IMG menu Materials Management → Purchasing → Conditions → Define Price Determination Process → Define Calculation Schema 2. On the Change View “Schemas”: Overview screen, choose Procedure RM0000
(Purchasing Document (Big)).
3. In the Dialog Structure, double-click Control data. 4. Enter the values shown below.
St
ep Counter Cond. Type Fro m To Cond. Det. manu ally St at Print ID Cond . subt otal Re q Cal. Ty pe Ba se Ty pe Acc nt Key Accru als 1 1 PB0 0 9 1 2 PBX X 9 5 2 0 VA0 0
St
ep Counter Cond. Type Fro m To Cond. Det. manu ally St at Print ID Cond . subt otal Re q Cal. Ty pe Ba se Ty pe Acc nt Key Accru als 3 0 VA0 1 4 0 GAU 1 X 31 5 0 GAU 2 31 32 32 10 1 RB0 0 X X 10 2 RC0 0 X X 10 3 RA0 0 X X 10 4 RA0 1 1 X 10 5 HB0 0 X X 10 6 ZB00 X X 10 7 ZC0 0 X X 10 8 ZA00 X X 10 9 ZA01 1 X X 10 10 HB0 1 X X 10 11 RL01 1 X 10 15 MM0 0 X X 10 16 MM0 1 1 X X 10 17 RES T X 17 0 EDI1 X 53 19 0 EDI2 53 40 20 0 S 7 21 1 NAV S X 60 21 2 NAV M X 29 22 0 20 2 1 24 0 21 2 1 S
St
ep Counter Cond. Type Fro m To Cond. Det. manu ally St at Print ID Cond . subt otal Re q Cal. Ty pe Ba se Ty pe Acc nt Key Accru als 25 0 22 2 3 31 1 FRA 1 20 X X FRE FR1 31 2 FRB 1 20 X X FRE FR1 31 3 FRC 1 20 X X FRE FR1 31 4 RUE 1 20 X X FRE RUE 31 5 RUB 1 20 X X FRE RUE 31 6 RUC 1 20 X X FRE RUE 31 7 ZOA 1 20 X X FRE FR3 31 8 ZOB 1 20 X X FRE FR3 31 9 ZOC 1 20 X X FRE FR3 31 10 FRA 2 20 X X FRE FR2 31 11 FRB 2 20 X X FRE FR2 31 12 FRC 2 20 X X FRE FR2 32 1 MAR 1 20 X 12 FRE RUE 35 1 SKT O 20 X 17
37 0 A001 20 X 26 EIN BO1
38 0 A002 20 X 26 EIN BO1
39 0 30 3 2 S 40 0 25 3 8 S 41 0 25 3 2 S 60 0 WOT B X 3 70 0 GR WR 20 X 8
St
ep Counter Cond. Type Fro m To Cond. Det. manu ally St at Print ID Cond . subt otal Re q Cal. Ty pe Ba se Ty pe Acc nt Key Accru als 75 0 GWL B X 54 60 79 0 70 7 8 X C 8
5. Save your settings.
6. Choose Back (F3) two times.
4.2.7
Maintaining Rounding Profiles
Procedure
1. Access the activity using one of the following navigation options:
Transaction code OWD1
IMG menu Materials Management → Purchasing → Order Optimizing →
Quantity Optimizing and Allowed Logistics Units of Measure →
Maintain Rounding Profile
2. On the Create Quantity Addition/Subtraction screen, enter rounding profile YG00 in the Rounding profile field of the dialog box Maintain Rounding Profile: Initial Screen. 3. Enter the plant Plant_1 (1000) in the Plant field of the dialog box Maintain Rounding
Profile: Initial Screen.
4. Choose Create Dynamic (F5).
5. On the Create Dynamic Rounding Profile screen, enter the values shown below.
Field name User action and values
Rounding Profile YG00
Description Rounding to cartons, layers and pallets
Plant Plant_1 (1000)
Rounding off method 3
Rounding rule Y1
6. Save your settings. 7. Choose Back (F3).
8. Repeat steps 2. - 6. for the same rounding profile and for the plant Plant_2 (1100) as shown below:
Field name User action and values
Rounding Profile YG00
Description Rounding to cartons, layers and pallets
Plant Plant_2 (1100)
Rounding off method 3
9. To maintain the description of the rounding profile YG00 in German, logon in language ZH.
10. To access the customizing transaction, use IMG Path:
物料管理
物料管理
定单最优化
质量优化和允许的后勤计量单位
维护舍入参数文件
11. Enter the rounding profile YG00 in the 舍入参数文件 field of the dialog box Rundungsprofil pflegen: Einstieg.
12. Enter the plant Plant_1 (1000) in the 工厂field. 13. Choose Change (F7).
14. On the 显示动态取整初始文件 screen, make the following entries.
Field name User action and values
舍入参数文件 YG00
描述 舍入到纸板箱,层,货盘
工厂 1000
舍入方法 3
舍入规则 Y1
15. Save your settings.
16. Repeat steps 10. - 14. for the same rounding profile YG00 and for the plant Plant_2 (1100) as shown below:
Field name User action and values
舍入参数文件 YG00
描述 舍入到纸板箱,层,货盘
工厂 Plant_2 (1100)
舍入方法 3
舍入规则 Y1
17. Save your settings. 18. Choose Back (F3).
4.2.8
Unit of Measure Rounding Rules
Procedure
1. Access the activity using one of the following navigation options:
Transaction code SPRO
IMG menu Materials Management → Purchasing → Order Optimizing →
Quantity Optimizing and Allowed Logistics Units of Measure →
2. On the Change View “Unit of Measure Rounding Rule”: Overview screen, choose New Entries.
3. On the New Entries: Overview of Added Entries screen, make the following entries:
Rounding Rule Alternative Unit of measure % rounding up % rounding down
Y1 CAR 80,0 0,1
Y1 PAL 80,0 0,1
4. Save your settings. 5. Choose Back (F3).
4.2.9
Maintaining Account Assignment Categories
Procedure
1. Access the activity using one of the following navigation options:
Transaction code SPRO
IMG menu Materials Management → Purchasing → Account Assignment →
Maintain Account Assignment Categories
2. On the Change View “Account Assignment Categories”: Overview screen, choose Acct assignment cat. A (Asset).
3. Choose Details (Ctrl+Shift+F2).
4. On the Change View “Account Assignment Categories”: Details screen, make the following entries:
Field name User action and values
Consumption posting A
Description Asset
Distribution 1
AA Changeable at IR X
Partial invoice 2
ID.Account Assignment Screen 2
Goods Receipt X
GR Non-Valuated X
Invoice Receipt X
Field name Mandatory
Entry Optional Entry Dislay Hidden
Asset X Asset Subnumber X Business Area X Business process X CO/PP Order X Commitment Item X
Field name Mandatory
Entry Optional Entry Dislay Hidden
Cost Center X
Cost Object X
Cost Type X
Deletion indicator X
Details account assgt. block X
Functional Area X
Funds X
Funds Center X
Funds reservation X
General Ledger Account X
Goods recipient/ship-to party X
Grant X
Joint Venture Partner X
Network X
Profit Center X
Profitability Segment X
Project X
Qty./percent. mat. acct.
assgt X
Real Estate Management X
Sales Order X
Sales document schedule X
Service/activity type X
Unloading point X
5. Save your settings.
6. Repeat steps 1. to 5. for the account assignment categories B, …, X using the values shown below.
Acct. assignmt. cat. B
Field name User action and values
Consumption posting E
Description MTS prod./sales ord.
Distribution
AA Changeable at IR
Account modification VKA
Partial Invoice
ID.Account Assignment Screen Goods receipt
Field name User action and values
GR non-valuated
Invoice receipt X
Acct. assignmt. cat. C
Field name User action and values
Consumption posting V
Description Sales order
Distribution 1
AA Changeable at IR X
Account modification
Partial Invoice 2
ID.Account Assignment Screen 1
Goods receipt X
GR non-valuated
Invoice receipt X
Field name Mandatory
Entry Optional Entry Dislay Hidden
Asset X Asset Subnumber X Business Area X Business process X CO/PP Order X Commitment Item X Cost Center X Cost Object X Cost Type X Deletion indicator X
Details account assgt. block X
Functional Area X
Funds X
Funds Center X
Funds reservation X
General Ledger Account X Goods recipient/ship-to
party X
Grant X
Joint Venture Partner X
Field name Mandatory
Entry Optional Entry Dislay Hidden
Profit Center X
Profitability Segment X
Project X
Qty./percent. mat. acct.
assgt X
Real Estate Management X
Sales Order X
Sales document schedule X
Service/activity type X
Unloading point X
Acct. assignmt. cat. D
Field name User action and values
Consumption posting P
Description Indiv.cust./project
Distribution
AA Changeable at IR
Account modification VKA
Partial Invoice
ID.Account Assignment Screen 1
Special Stock E
Goods receipt X
GR non-valuated
Invoice receipt X
GR Ind. Firm X
Field name Mandatory
Entry Optional Entry Dislay Hidden
Asset X Asset Subnumber X Business Area X Business process X CO/PP Order X Commitment Item X Cost Center X Cost Object X Cost Type X Deletion indicator X
Field name Mandatory
Entry Optional Entry Dislay Hidden
Details account assgt. block X
Functional Area X
Funds X
Funds Center X
Funds reservation X
General Ledger Account X Goods recipient/ship-to
party
X
Grant X
Joint Venture Partner X
Network X
Profit Center X
Profitability Segment X
Project X
Qty./percent. mat. acct.
assgt X
Real Estate Management X
Sales Order X
Sales document schedule X
Service/activity type X
Unloading point X
Acct. assignmt. cat. E
Field name User action and values
Consumption posting E
Description Ind. cust. w. KD-CO
Distribution
AA Changeable at IR
Account modification VKA
Partial Invoice
ID.Account Assignment Screen 1
Special Stock E
Goods receipt X
GR non-valuated
Invoice receipt X
Field name Mandatory
Entry Optional Entry Dislay Hidden
Asset X Asset Subnumber X Business Area X Business process X CO/PP Order X Commitment Item X Cost Center X Cost Object X Cost Type X Deletion indicator X
Details account assgt. block X
Functional Area X
Funds X
Funds Center X
Funds reservation X
General Ledger Account X Goods recipient/ship-to
party X
Grant X
Joint Venture Partner X
Network X
Profit Center X
Profitability Segment X
Project X
Qty./percent. mat. acct.
assgt X
Real Estate Management X
Sales Order X
Sales document schedule X
Service/activity type X
Unloading point X
Acct. assignmt. cat. F
Field name User action and values
Consumption posting V
Description Order
Distribution 1
Field name User action and values
Account modification VBR
Partial Invoice 2
ID.Account Assignment Screen 1 Special Stock
Goods receipt X
GR non-valuated
Invoice receipt X
GR Ind. Firm
Field name Mandatory
Entry Optional Entry Dislay Hidden
Asset X Asset Subnumber X Business Area X Business process X CO/PP Order X Commitment Item X Cost Center X Cost Object X Cost Type X Deletion indicator X
Details account assgt. block X
Functional Area X
Funds X
Funds Center X
Funds reservation X
General Ledger Account X Goods recipient/ship-to
party X
Grant X
Joint Venture Partner X
Network X
Profit Center X
Profitability Segment X
Project X
Qty./percent. mat. acct.
assgt X
Field name Mandatory
Entry Optional Entry Dislay Hidden
Sales Order X
Sales document schedule X
Service/activity type X
Unloading point X
Acct. assignmt. cat. G
Field name User action and values
Consumption posting P
Description MTS prod./project
Distribution
AA Changeable at IR
Account modification VKA
Partial Invoice
ID.Account Assignment Screen Special Stock
Goods receipt GR non-valuated
Invoice receipt X
GR Ind. Firm
Acct. assignmt. cat. K
Field name User action and values
Consumption posting V
Description Cost center
Distribution 1
AA Changeable at IR X
Account modification VBR
Partial Invoice 2
ID.Account Assignment Screen 1 Special Stock
Goods receipt X
GR non-valuated
Invoice receipt X
GR Ind. Firm
Field name Mandatory
Entry Optional Entry Dislay Hidden
Field name Mandatory
Entry Optional Entry Dislay Hidden
Asset Subnumber X Business Area X Business process X CO/PP Order X Commitment Item X Cost Center X Cost Object X Cost Type X Deletion indicator X
Details account assgt. block X
Functional Area X
Funds X
Funds Center X
Funds reservation X
General Ledger Account X Goods recipient/ship-to
party
X
Grant X
Joint Venture Partner X
Network X
Profit Center X
Profitability Segment X
Project X
Qty./percent. mat. acct.
assgt X
Real Estate Management X
Sales Order X
Sales document schedule X
Service/activity type X
Unloading point X
Acct. assignmt. cat. M
Field name User action and values
Consumption posting
Description Ind. cust. w/o KD-CO
Distribution
AA Changeable at IR
Field name User action and values
Partial Invoice
ID.Account Assignment Screen 1
Special Stock E
Goods receipt X
GR non-valuated
Invoice receipt X
GR Ind. Firm X
Field name Mandatory
Entry Optional Entry Dislay Hidden
Asset X Asset Subnumber X Business Area X Business process X CO/PP Order X Commitment Item X Cost Center X Cost Object X Cost Type X Deletion indicator X
Details account assgt. block X
Functional Area X
Funds X
Funds Center X
Funds reservation X
General Ledger Account X Goods recipient/ship-to
party X
Grant X
Joint Venture Partner X
Network X
Profit Center X
Profitability Segment X
Project X
Qty./percent. mat. acct.
assgt X
Real Estate Management X
Field name Mandatory
Entry Optional Entry Dislay Hidden
Sales document schedule X
Service/activity type X
Unloading point X
Acct. assignmt. cat. N
Field name User action and values
Consumption posting V Description Network Distribution 1 AA Changeable at IR X Account modification VBR Partial Invoice 2
ID.Account Assignment Screen 1 Special Stock
Goods receipt X
GR non-valuated
Invoice receipt X
GR Ind. Firm
Field name Mandatory
Entry Optional Entry Dislay Hidden
Asset X Asset Subnumber X Business Area X Business process X CO/PP Order X Commitment Item X Cost Center X Cost Object X Cost Type X Deletion indicator X
Details account assgt. block X
Functional Area X
Funds X
Funds Center X
Funds reservation X
General Ledger Account X
Field name Mandatory
Entry Optional Entry Dislay Hidden
party
Grant X
Joint Venture Partner X
Network X
Profit Center X
Profitability Segment X
Project X
Qty./percent. mat. acct. assgt
X
Real Estate Management X
Sales Order X
Sales document schedule X
Service/activity type X
Unloading point X
Acct. assignmt. cat. P
Field name User action and values
Consumption posting V Description Project Distribution 1 AA Changeable at IR X Account modification VBR Partial Invoice 2
ID.Account Assignment Screen 1 Special Stock
Goods receipt X
GR non-valuated
Invoice receipt X
GR Ind. Firm
Field name Mandatory
Entry Optional Entry Dislay Hidden
Asset X Asset Subnumber X Business Area X Business process X CO/PP Order X Commitment Item X