• No results found

Case Study Case Study

N/A
N/A
Protected

Academic year: 2022

Share "Case Study Case Study"

Copied!
13
0
0

Loading.... (view fulltext now)

Full text

(1)

Case Study Case Study

“Implementation of Smart Metering

“Implementation of Smart Metering Technology”

Technology”

Zhejiang

Zhejiang Province, China Province, China

Presented to: OEB

(2)

Presentation Outline Presentation Outline

ƒ ƒ Introduction to Holley Group, China’s Introduction to Holley Group, China’s largest meter manufacturer

largest meter manufacturer

ƒ ƒ Overview of China’s electricity industry Overview of China’s electricity industry

ƒ ƒ Case study of Case study of Zhejiang Zhejiang province multi province multi - - rate meter project, 2003

rate meter project, 2003

(3)

HOLLEY GROUP

HOLLEY GROUP - - history history

ƒ ƒ Producing meters for 34 years Producing meters for 34 years

ƒ ƒ Largest meter supplier in China – Largest meter supplier in China –

Ranked #1 for 10 consecutive years for Ranked #1 for 10 consecutive years for production, sales, income, profit, exports production, sales, income, profit, exports and quality

and quality

ƒ ƒ Low cost supplier, high tech Low cost supplier, high tech

ƒ ƒ Invests heavily in R&D Invests heavily in R&D

ƒ ƒ Strategic goal - Strategic goal - world’s leading world’s leading supplier of meters and related supplier of meters and related services by 2010

services by 2010

Head Office, Hangzhou

(4)

HOLLEY

HOLLEY product line product line

Complete line of meter products:

Complete line of meter products:

ƒ ƒ Single phase, 3 phase Single phase, 3 phase

ƒ ƒ Mechanical meters Mechanical meters

ƒ ƒ Pay- Pay -as as- -you go you go

ƒ ƒ Multi rate meters Multi rate meters

(TOU)(TOU)

ƒ ƒ Multifunction meters Multifunction meters

(“net” meters, (“net” meters, remote disconnect, etc.)

remote disconnect, etc.)

ƒ ƒ Meter reading systems Meter reading systems

I meter (multi-rate, multi-function)

(5)

HOLLEY

HOLLEY - - production facilities production facilities

ƒ ƒ 10 Manufacturing facilities in China 10 Manufacturing facilities in China

ƒ ƒ R&D labs in China, Israel, Canada R&D labs in China, Israel, Canada

ƒ ƒ 2003 production - 2003 production - 15 Million units 15 Million units

ƒ ƒ 2005 - 2005 - “Holley technology zone” “Holley technology zone”

opens

opens - - largest meter manufacturing largest meter manufacturing facility in the world

facility in the world

Production line

Workshop

(6)

23 Provinces

5 Autonomous Regions 4 Municipalities

2 Spec. Admin. Regions

China’s Electricity Industry China’s Electricity Industry

ƒƒ China GDP growing at ~ 10%/yrChina GDP growing at ~ 10%/yr

ƒƒ Requires ~ 80,000 MW additional Requires ~ 80,000 MW additional 2004 (~17% increase, including 2004 (~17% increase, including 10,000 MW deficit from 2003) 10,000 MW deficit from 2003)

ƒƒ Huge economic growth in coastal Huge economic growth in coastal areas, and major shortage of areas, and major shortage of electricity:

electricity:

ƒƒ Jiangsu* (pop.= 70 Million)Jiangsu* (pop.= 70 Million)

ƒ

ƒ ShanghaiShanghai* (14.7 Million)* (14.7 Million)

ƒƒ ZhejiangZhejiang* (43 Million)* (43 Million)

ƒƒ Guangdong (67 Million)Guangdong (67 Million)

ƒƒ FujianFujian (32 Million)(32 Million)

ƒƒ Shandong (87 Million)Shandong (87 Million)

* ~90%+ conversion to digital meters

* ~90%+ conversion to digital meters

(7)

Zhejiang

Zhejiang Province Case Study Province Case Study

-4,500 MW Net

8,900 MW Added generation

1.1% - 1.3%*

33%

pct increase

45,950 MW Demand

2004

5,500 MW*

-2,000 MW Net

25,000 MW*

34,550 MW Demand

30,500 MW*

32,550 MW Generating Capacity

90 88

LDCs

$500 B

$150 B GDP

12 Million 43 Million

Population

2003

Ontario Zhejiang

* ECSTF report pg. 1

(8)

Zhejiang

Zhejiang “Smart Meters” Business Case “Smart Meters” Business Case

Shanghai, pop = 14.7 million, approx. 4 million households.

Complete conversion to digital TOU meter starting in 2002. Success in transferring load, reducing peak demand

ƒƒ Existing system of mech./pay-Existing system of mech./pay-asas--youyou--go (was installed to eliminate bad go (was installed to eliminate bad debt, reduce billing and collecting costs)

debt, reduce billing and collecting costs)

ƒƒ Wholesale conversion to digital TOU meters –Wholesale conversion to digital TOU meters – better monitoring/controlbetter monitoring/control

ƒƒ Restructure rates -Restructure rates - encourage consumers to switch load to non-encourage consumers to switch load to non-peak peak times

times

ƒƒ Use knowledge gained in other provinces/cities in China (such asUse knowledge gained in other provinces/cities in China (such as Shanghai) through government, industry, meter suppliers.

Shanghai) through government, industry, meter suppliers.

(9)

Zhejiang Province (11 Districts)

Hangzhou (13 LDCs)

Huzhou (3 LDCs)

Jiaxing (7 LDCs)

Zhoushan (4 LDCs)

Ningbo (11 LDCs)

Shaoxing (6 LDCs)

Chuzhou (6 LDCs)

Jinhua (9 LDCs)

Taizhou (9 LDCs)

Wenzhou (11 LDCs)

Lishui (9 LDCs)

Zhejiang

Zhejiang Project Implementation Project Implementation

R & D

Testing

ƒ Provincial body establishes standards for all 88 LDCs

ƒ Technical req’nts and qualified vendors

ƒ Holley and other suppliers actively worked with Provincial body

ƒ Competitive bidding

ƒ Digital meters mature industry in China – (common IC, compete less on price, more on hi-tech, high value added) Holley ranked in top of meter companies.

ƒ Close co-operation

ƒ Holley works with provincial body to receive acceptance of meter design and production Q&A

ƒ Hands on involvement in production facility

(10)

Zhejiang

Zhejiang Project Project - - Installing meters Installing meters

ƒ Holley awarded 160,000 out of 500,000 units –

limited to three districts – Hangzhou, Huzhou, Jiaxing

ƒ ƒ Holley provides technical training to installers and Holley provides technical training to installers and support personnel

support personnel

ƒ ƒ Installation spread over 7 month period Installation spread over 7 month period

focus on high focus on high density areas first, lower demand periods

density areas first, lower demand periods

ƒ ƒ Maintained strong support throughout whole Maintained strong support throughout whole process with all players

process with all players

Hangzhou

Huzhou

Jiaxing

(11)

Zhejiang

Zhejiang Project Project - - Key Success Factors Key Success Factors

ƒ ƒ Communication, co- Communication, co -ordination, co ordination, co- -operation operation

ƒ ƒ Standardize Standardize – – to achieve economies to achieve economies - - of of - - scale and lower scale and lower costs

costs

ƒ ƒ Schedule- Schedule - allow competitive market allow competitive market

ƒ ƒ Continuous improvement Continuous improvement

(12)

Remember, the Great Wall of China Remember, the Great Wall of China

wasn wasn t built in a day ! t built in a day !

Holley employees proudly complete an earlier project

(13)

Need more information on Need more information on

“smart metering”, business in China?

“smart metering”, business in China?

D.A. Hope and Associates Inc.

D.A. Hope and Associates Inc.

[email protected] [email protected]

Contact us:

References

Related documents

In order to encourage students to take the initiative in eradicating of inequality and gender violence, we suggest ending with an eighth workshop where we encourage young people

Besides being integrated with BASE, an open-source data- base for DNA array analysis, PMmA nor- malizes the data, generates information about variations in expression, identifies up-

However, the main focus of this study was to determine whether therapist empathy could increase over the course of therapy and whether relationships between therapist empathy,

2 Parent’s agreement for child under 18 years old. 3 The original Measurement Certificate of the boat. 4 The authorization of the relevant National Authority to display

Blind and Visually Impaired in Kirklees is a website designed by visually impaired people to help local visually impaired people access information, support and advice in

The system is developed completely, at present is formed embedded platform using advanced components - FPGA RT MCU and it is simultaneously integrated and supporting subsystems,

white strap like deeply lobed foliage rather than for its sulfur yellow single flowers that are sent up on stalks above the plant

Zhang, “Some Newton-type iterative methods with and without memory for solving nonlinear equations, ” International Journal of Computational Methods, vol.. Lee, “A new