Case Study

(2)

Case Study:

SharePoint Implementation and Support

Situation:

jjbjlvljvkhcvk

Meritor IGroup/SharePoint Migration

VisionIT was selected to support the Web Services and

infrastructure setup for the Meritor SharePoint implementation. The SharePoint implementation involved configuring and building the environment as well as converting the existing internal and external web sites and document repository for all departments over to SharePoint. As the initial implementation of SharePoint for Meritor extensive mapping of data, business rules and

documentation validation will be performed on approximately 400 GB data. The pilot site for the implementation includes

approximately 4500 users and requires migrating approximately 200 GB of data that VisionIT mapped and transformed into the new SharePoint internal instance. The migration for the entire internal and external site is scheduled to complete 1st quarter 2013. When complete, over 4500 users will be supported on Meritor’s

SharePoint application.

1. Client (For Internal Purposes)

Meritor

2. Managed Service or SOW Consulting Project (Internal)

Managed Service

3. Provide a General Summary/Background of the Project or Managed Service and the client (industry, size, location(s) etc..no names)

Customer is a commercial vehicle parts supplier with ties to

military/government. Meritor has a global presence & approximately 5000 employees.

VisionIT’s Managed Service supports its Customer in Web Infrastructure andwith the Microsoft SharePoint

application.

This team supports approximately 40 Microsoft Windows 2003/2008(R2) servers running various IIS Applications and

(3)

SharePoint.

The Managed Service team handles the following  Incident & Change Management

 Continuous improvement

o cleanup of old infrastructure & outdated content

o automating processes to manage daily operations more efficiently

 Supporting end users with problems faced in legacy applications

 Interact with other departments for: o Improving processes

o Problem resolution

4. Describe the Issue / Driving purpose for the project

Customer’s Web Infrastructure Team began to shrink due to

personnel changes, advancements, and attrition. Customer

was in need of a team to backfill these positions, as well as take the lead role for the rollout of a new collaborationand document management tool (SharePoint)

Customer was at a point where their current technology was beginning to fall behind, and with the push forward, it was apparent several collaboration and

document management tools were in need of upgrading. VisionIT was brought on to spearhead this initiative within the organization. Providing expert resources, the VisionIT group is designing and deploying these new technologies within the customer’s specifications.

 

5. In detail, what solution did VisionIT provide? (Technology, Resources, Methodology etc..)

This team was asked to join the ranks of the IS department and provide help defining, methods and policies, and also giving insight into the current state of Web Infrastructure

(4)

VisionIT has:

 Taken ownership of the Web Infrastructure management

 Hardware Architecture and deployment of the new SharePoint environment

 Develop Information Architecture and User Interface design of new solution to handle new web based collaboration on SharePoint Platform to replace legacy application

 Assisting in developing programs within the following spaces surrounding new platform

o Governance o Training o Security

o Backup & Disaster Recovery o Compliance

6. Did VisionIT have any outstanding Accomplishments? If so describe in detail

We are just in the infancy of this endeavor, not enough to gauge yet.

VisionIt resources will be architecting, designing and

deploying a SharePoint platform based on criteria defined by

Customer, & migrating users from legacy collaboration tools into a new, more robust solution. Many subsequent projects on the horizon to be rolled into the new SharePoint platform and VisionIt will be leading the way.

The client faced several challenges….

Solution:

jgggkhbgjvchcgl

VisionIT was contracted to define, design, develop and implement new web based systems.

The client chose to implement the new solution…

(5)

Results:

kuffffcfchchcxxjgfc.

Vision IT successfully replaced many MUMPS applications and completed projects such as Single Point of Entry, Tracking

Quotes if you have them!

The VisionIT Difference:

VisionIT expertise solves business problems and reduces operating costs. We strive to remain unique in today’s marketplace; we

deliver world-class service to our customers at a cost they can afford.

OR

VisionIT maintains a position of leadership and innovation through

consistent education and monitoring of industry best practices, trends, and by utilizing latest technologies and solutions. We strive to deliver quality service and continuous improvement.

OR

VisionIT maintains a position of leadership and innovation

employing industry best practices for software development and architecture design. We strive to utilize the latest technologies and solutions.

OR

VisionIT consultants have managed hundreds of business system and development projects, and can provide your engagements with

perspectives that only experience brings. We strive… OR

VisionIT program managers can provide your organization with integrated management of larger project efforts. We strive…

OR

(6)

areas and can use their experiences to structure a unique solution.

We strive… OR

Our VisionIT FAST philosophy and mission statement – applied

best practices and experiences from our knowledgeable staff, with flexibility and agility to tailor solutions consistent with your IT vision.

References

Related documents

expanding host range of DMV, testified by the present report and by numerous cases of DMV infection reported in the last 5 years in the Mediterranean Sea ( Mazzariol et al., 2013,

A MANOVA of the driving variables that proved to be the most sensitive to dual-task interference – mean reaction time, mean following distance, and speed control in the city – failed

Pilot Study 3 demonstrated significant reductions in BPD symptoms and global severity of psychiatric symptoms from pre- to posttreatment; however no statistically significant

– Interleukin 8 (IL- 8) is elevated in both plasma and synovial fluid in chronic inflammatory joint disorders. Defence/

different expenditure classes (e.g. televisions), this two tiered approach corrects much of the substitution bias. The Japanese CPI, by contrast, is much closer to a pure

For this operating area, ensemble model Design A was able to produce forecasts that were more accurate than the Dynamic Post Processor, but when a T-test was performed on the

Pathways to Nursing (Undergraduate) From High school Community college 4 year university or college Bachelors of Science in Nursing Associates of Nursing Registered