ENGINEERING THE FUTURE

UNIVERSITY OF KARACHI

POST QUALIFICATION OF CONSTRUCTION OF BIO-TECHNOLOGY

VALID PEC REGISTRATION CERTIFICATE IN CATEGORY C-3 & ABOVE (10 Marks)

SR. NO. NAME OF CONTRACTOR CATEGORY REMARKS

1 M/s. Nasim Co. (Pvt.) Ltd. C - 1 Dec-10 10

2 M/s. Housing Enterprises C - 1 Dec-10 10

3 M/s. Precise Constructors. C - 1 Dec-10 10

4 M/s. Tahir Enterprises C - 3 Dec-08 8 Receipt for renewal for 2009 is attached

5 M/s. Al Hamza Enterprises. C - 3 Dec-08 8

6 M/s. Muhandaseen (Pvt.) No Documents Provided REGISTRATION VALID

UNTIL YEAR

MARKS OBTAINED

(2)

POST QUALIFICATION OF CONSTRUCTION OF BIO-TECHNOLOGY BUILDING

ENGINEERING THE FUTURE

PRINCIPAL PERSONNEL & THEIR QUALIFICATIONS & EXPERIENCE (02 MARKS)

NAME OF CONTRACTOR NAME OF PERSON DESIGNATION QUALIFICATION EXPERIENCE

1 Associate Director B.E (Civil) 39 Years 2

Associate Director B.E (Civil) 38 Year

2 M/s. Housing Enterprises Business Manager (G.M) - - 1

Managing Partner B.E (Civil) 6 Years 3 M/s. Precise Constructors.

Chief Executive B.E (Civil) 24 Years

2 B.E (Civil) 24 Years

4 Executive Projects - - 1 Owner - 30 Years 5 0 6 No Documents Provided 0 S R . N O MARKS OBTAINED

M/s. Nasim Co. (Pvt.) Ltd. Mr. Iqbal Hussain Sultan Mr. Mansoor Hussain Muhammad Manzoor

Mr. Kamran Javed Mr. Syed Ghazanfar Ali

Mr. Imtiaz Ahmed Principal Engineer (Planning) M/s. Al Hamza Enterprises. Mr. Saleem Akhtar

Mr. Abdur Rahman

M/s. Tahir Enterprises No relevent Data was provided

(3)

UNIVERSITY OF KARACHI

ENGINEERING THE FUTURE

POST QUALIFICATION OF CONSTRUCTION OF BIO-TECHNOLOGY BUILDING

MACHINERY & EQUIPMENT OWNED (05 MARKS)

S R. NO EQUIPMENT 1 Theodolite 2 0 0 1 1 No Do cu m en ts P ro vi de d 2 2 0 0 0 1

3 Concrete Batching Plant 0 1 0 0 0

4 Concrete Mixer machine 4 9 2 3 5

5 Generators 2 6 1 2 3 6 Welding Plants 1 2 4 0 0 7 Mechanical Compactors 0 0 0 2 3 8 Concrete Hoist 0 2 2 2 3 9 Air Compressor 1 4 2 0 0 10 Excavator 2 4 0 0 0 11 Crane 0 1 0 0 0 MARKS OBTAINED 3 5 2 2 3 0 M/s. Nasim Co. (Pvt.) Ltd. M/s. Housing Enterprises M/s. Precise Constructors. M/s. Al Hamza Enterprises. M/s. Tahir Enterprises M/s. Muhandaseen (Pvt.) Ltd. Levelling Instrument

(4)

POST QUALIFICATION OF CONSTRUCTION OF BIO-TECHNOLOGY BUILDING

ENGINEERING THE FUTURE

TECHNICAL STAFF & THEIR QUALIFICATIONS & EXPERIENCE (03 MARKS)

NAME OF CONTRACTOR NAME OF PERSON DESIGNATION QUALIFICATION EXPERIENCE

1

Sr. Project Manager B.E. Civil 27 Years

2 Manager Project B.E. Civil 18 Years

- - - -

2 M/s. Housing Enterprises

Sr. Electrical Engineer B.E. (Electrical) -

2.5 Asst. Project Manager B.E. Civil 6 Years

Project Manager B.E. Civil 20 Years 3 M/s. Precise Constructors.

Project Engineer B. E (Civil) 17 Years

3 Planning Engineer B. E (Civil) 16 Years

Highway Engineer B. E (Civil) 18 Years 4 B. E (Civil) - 2 B.E (Electrical) - B.E (Mechanical) - 5

Project Manager D.A.E, B.CS -

2 Chief Engineer B.E. Civil -

Senior Engineer B.E. Civil -

6 No Documents Provided 0 S R . N O MARKS OBTAINED M/s. Nasim Co. (Pvt.) Ltd.

Mr. S. Afsar Jamil Zaidi Mr. Faisal Aziz Khan

Mr. Muhammad Ibrahim Usman Mr. Zeeshan Naeem

Mr. Sarwar Malik Mr. Saleem Hasan Mr. S. Mohiuddin Hassan Mr. Inamul Haq Shaikh M/s. Al Hamza Enterprises.

Engr. Ayaz Ahmed Civil Engr. Engr. Niaz Ahmed Electrical Engr. Mr. Akhtar Hussain Mechanical Engr M/s. Tahir Enterprises

Mr. M. Azhar Akram

Mr. Mian Mohammad Akram Mrs. Aamna Tuba

(5)

UNIVERSITY OF KARACHI

POST QUALIFICATION OF CONSTRUCTION OF BIO-TECHNOLOGY BUILDING

ENGINEERING THE FUTURE

WORKS OF SIMILAR NATURE COMPLETED DURING LAST 5 YEARS (30 MARKS)

S

R

.

N

O

NAME OF CONTRACTOR NAME OF PROJECTS COMPLETED MARKS

1

2003 10.00

32.00 30 2003 12.00

2003 10.00

2 M/s. Housing Enterprises No Data was provided - 0

3 M/s. Precise Constructors.

Expansion of 50 Bed Hospital at S.O.M.H. - 22.00

48.00 30 Construction of Pakistan Cotton Standard Institute - 22.00

Construction of Additional Floor on Production Hall. - 4.00 4 2005 16.30 16.30 20 - - - - - - 5 - 12.00 60.35 30 Construction of Department of Applied Physics - 18.00

Extension of Library Building - 30.35

6 No Documents Provided - 0

NOTE: 01 to 10 mill = 10 mks; 11 to 20 = 20 mks; 21 to 30 = 25 mks; and above 30 = 30 mks.

COMPL. DATE VALUE PKR (Million) TOTAL PKR (Million) M/s. Nasim Co. (Pvt.) Ltd.

Remodelling of M/s. Jamil F/S, Karimabad, Hyderabad Remodelling of M/s. Dewan S/S at Sujawal

Remodelling of M/s. Bhittai Trucking Station, Karachi

M/s. Al Hamza Enterprises.

Construction, Modification & Renovation of Karachi Institute of Heart Diseases, Karachi

M/s. Tahir Enterprises

Construction of Bunglow 2000 Sq. Yds.

(6)

POST QUALIFICATION OF CONSTRUCTION OF BIO-TECHNOLOGY BUILDING

ENGINEERING THE FUTURE

WORKS OF SIMILAR NATURE IN HAND (30 MARKS)

S

R

.

N

O

NAME OF CONTRACTOR NAME OF PROJECTS IN HAND MARKS

1

NDC Head Quarter Building Islamabad 152.00

224.95 26

59.12 13.83

2 M/s. Housing Enterprises

Construction of Jails at District Area 130.00

452.00 30

122.00

Construction of Officers Department G+14 Stories 200

3 M/s. Precise Constructors.

Rehabilitation of Existing Building and Officers Club at PMA Campus, Hawk's Bay 27.17

130.38 20

Rehabilitation of Existing STW Building# 2 at PMA Campus, Hawk's Bay 19.91

Construction and Development of Agriculture Farm. 12.00

4

14.10

39.39 15

Construction of Park for City District Govt. Karachi 19.80

Providing & Laying Sewerage Lines CDGK 5.49

5

Faculty of Islamic Learning 34.20

228.84 23

Faculty of Education (Remaining Portion) 45.75

Administration Building 50.43 6 No Documents Provided - 0 VALUE PKR (Million) TOTAL PKR (Million)

M/s. Nasim Co. (Pvt.) Ltd. Co-Located Bases for Dowel Schlumberger (Western) S.A. Islamabad

Institute of Sustainable Halophyte Utilization at University of Karachi

Construction of Intercity bus terminal at Port Qasim

M/s. Al Hamza Enterprises.

Construction of Automotive Laboratory Building for NED University of Engineering & Technology

M/s. Tahir Enterprises

(7)

ENGINEERING THE FUTURE

UNIVERSITY OF KARACHI

POST QUALIFICATION OF CONSTRUCTION OF BIO-TECHNOLOGY BUILDING

BANKERS CERTIFICATE SHOWING CREDIT WORTHINESS (05 MARKS)

S

R

. N

O

NAME OF CONTRACTOR NAME OF BANK MARKS

1 ABN - AMRO April. 2008 3.00 5

Prime Bank May. 2005 30.00

2 M/s. Housing Enterprises UBL Oct. 2007 80.00 4

Bank Al- Habib Limited - 70.00

3 M/s. Precise Constructors. The Bank of Punjab May. 2008 3.818 1

- -

-4 Details Not provided 0

5 Habib Bank Limited July. 2008 - 2

Allied Bank Sept. 2007

-6 No Documents Provided 0 CERTIFICATE ISSUED FOR YEAR BALANCE PKR (Million) M/s. Nasim Co. (Pvt.) Ltd. M/s. Al Hamza Enterprises. M/s. Tahir Enterprises M/s. Muhandaseen (Pvt.) Ltd.

(8)

UNIVERSITY OF KARACHI

POST QUALIFICATION OF CONSTRUCTION OF BIO-TECHNOLOGY BUILDING

AFFIDAVIT STATING NON-BLACK LISTING OF FIRM (05 MARKS)

NAME OF CONTRACTOR AFFIDAVIT SUBMITTED MARKS

1 Submitted 4

2 M/s. Housing Enterprises Not Submitted 0

3 M/s. Precise Constructors. Submitted 4

4 Not Submitted 0 5 Submitted 5 6 No Documents Provided 0 SR. NO. M/s. Nasim Co. (Pvt.) Ltd. M/s. Al Hamza Enterprises. M/s. Tahir Enterprises M/s. Muhandaseen (Pvt.) Ltd.

(9)

ENGINEERING THE FUTURE

UNIVERSITY OF KARACHI

POST QUALIFICATION OF CONSTRUCTION OF BIO-TECHNOLOGY BUILDING

INCOME TAX RETURNS FOR LAST 3 YEARS (05 MARKS)

NAME OF CONTRACTOR YEAR RETURNS SUBMITTED MARKS

1 2008 Submitted 2007 Submitted 4 2006 Not Submitted 2 M/s. Housing Enterprises 2007 Submitted 1.5 - -- -3 M/s. Precise Constructors. 2007 Submitted - - 1.5 - -4 2008 Submitted - - 2 - -5 2007 Submitted - - 1.5 - -6 No Documents Provided 0 S R . N O M/s. Nasim Co. (Pvt.) Ltd. M/s. Al Hamza Enterprises. M/s. Tahir Enterprises M/s. Muhandaseen (Pvt.) Ltd.

(10)

UNIVERSITY OF KARACHI

POST QUALIFICATION OF CONSTRUCTION OF BIO-TECHNOLOGY BUILDING

DETAILS OF LITIGATION, IF ANY (5 Marks)

SR. NO NAME OF CONTRACTOR INVOLVED IN ANY LITIGATION MARKS

1 Submitted 4

2 M/s. Housing Enterprises Not Submitted 0

3 M/s. Precise Constructors. Submitted 4

4 M/s. Al Hamza Enterprises. Not Submitted 0

5 M/s. Tahir Enterprises Submitted 5

6 M/s. Muhandaseen (Pvt.) Ltd. No Documents Provided 0 M/s. Nasim Co. (Pvt.) Ltd.

(11)

UNIVERSITY OF KARACHI

POST QUALIFICATION OF CONSTRUCTION OF BIO-TECHNOLOGY BUILDING

ENGINEERING THE FUTURE POST-QUALIFICATION OF CONTRACTORS FOR CONSTRUCTION OF BIO-TECHNOLOGY BUILDING

Name of Contractor W or k s i n ha nd D e ta il s of Li ti ga ti ons M a rk s O bt a ine d Remarks Marks 10 2 3 5 30 30 5 5 5 5 100 1 10 2 2 3 30 26 5 4 4 4 90 1st in order of merit 2 8 0 2 3 30 23 2 5 1.5 5 79.5 2nd in order of merit

3 M/s. Precise Constructors. 10 2 3 2 30 20 1 4 1.5 4 77.5 3rd in order of merit 4 M/s. Housing Enterprises 10 1 2.5 5 0 30 4 0 1.5 0 54 4th in order of merit

5 8 1 2 2 20 15 0 0 2 0 50 5th in order of merit

6 0 0 0 0 0 0 0 0 0 0 0 Not Qualified

Note:

Passing Marks = 60 marks

S.No. V a li d P E C R e gi s tr a ti ons C -3 & a bov e C a te gor y P ri nc ipa l P e rs o nna l & th ei r Q u al if ic at ion & E x pe ri e nc e Te c hni c a l S ta ff & t he ir Q ua li fi c a ti ons & E x pe ri e n c e M a c hi ne ry & E qui pm e nt O w ne d W or k s C om pl e te d dur ing la s t 5 y e a rs B a n k e r' s C e rt if ic at e s ho w ing c re d it w or th in e s s o f the f ir m A ff ida vi t for N on B la c k Li s ti ng of f ir m Inc om e Ta x R e tur n fo r the l a s t 3 y e a rs M/s. Nasim Co. (Pvt.) Ltd. M/s. Tahir Enterprises M/s. Al Hamza Enterprises. M/s. Muhandaseen (Pvt.) Ltd.

References

Related documents

l\s a consequence, Region 3's Water Protection Division has issued the enclosed document entitled "Findings of Violation and Order for Compliance and Information

ATT is defined as home working and remote working, flexi working and staggered hours, and communication technologies, such as teleconferencing, videoconferencing and web

Oxidant and antioxidant parameters; lipid peroxidation (LPO) and reduced glutathione (GSH) levels, superoxide dismutase (SOD), glutathione-S-transferase (GST), catalase (CAT),

Although it is possible for mixed-type inhibitors to bind in the active site, this type of inhibition generally results from an allosteric effect where the inhibitor binds to

The effect of different sample structures of an iron-tungsten model system (as a surrogate for reduced activation ferritic martensitic steels like EUROFER) on the development of

Title Visualization of solute diffusion into cell walls in solution- impregnated wood under varying relative humidity using time- of-flight secondary ion mass spectrometry..

Android applications don’t have to be working to receive messages, because the applications can be triggered by Internet broadcasts when the messages arrive with correct permissions

In conclusion, the professionals who know social media operations and business development, and who has experience in advertising industry are sought after in the