Shaping Future Schools

Future Proofing Prefabricated Learning Environments Future Proofing Prefabricated Learning Environments

An

Australian Research Council Linkage Project 2010-2012 - Future Proofing Schools Clare Newton

Associate Professor in Learning Environments Associate Professor in Learning Environments

Deputy Director, LEaRN [Learning Environments Applied Research Network]

(2)

beginning

An accidental… .

(3)
(4)
(5)
(6)

We are reaching some

tipping points

Green imperatives

We are reaching some tipping points

- Green imperatives

- Visualisation tools

C dC

f

t

- CadCam manufacture

- Mass customisation

- Construction labour

shortage

Systems thinking

- Systems thinking

- Bespoke possibilities

- 21st century spaces

- Place-specific design

- Outdoor learning

(7)
(8)

that look good

How about prefabricated learning environments…

… that look good

enough to be at the

g

(9)

1

2

3

Smart Green       

Future Proofing      

Template

Schools

Schools

Schools

ARC Linkage Project 2007‐2010 ARC Linkage Project 2010‐2013 UniMelb Interdisciplinary  2010

Cash funding  ‐ $400,000approx Cash funding  $660,000approx Seed Funding  $60,000approx

(10)

1

2

3

1

2

3

Smart

 

Green

       

Future Proofing      

Template

Schools

Schools

Schools

Schools

Schools

Schools

(11)

1

2

3

1

2

3

Smart Green       

Future Proofing      

Template

Schools

Schools

Schools

Schools

Schools

Schools

(12)

LEaRN:

Learning Environments LEaRN Partners

Applied Research Network

f S

Future Proofing Schools

is one of five funded research projects undertaken on

L i E i t d i

Learning Environment design at the University of Melbourne

(13)

2010 2011 2012

6

1

12

6

researchers

1

PhD student &

12

Industry Partners

(14)

12

12

Industry PartnersCEFPI (Australasia)

tropical

Education departments in:

Western Australia

sub-tropical

Northern TerritoryQueenslandNSW Vi t i

arid

grasslands

Victoria

Catholic Education (Melb)

Vic Government Architect

temperate

Vic. Government Architect

Hayball Architects

Mary Featherston Design

Mary Featherston Design

TeeCH Project

(15)

Future

Proofing

Schools

Future

Proofing

Schools

embedded a

design ideas competition

as a way to leverage research

y

g

2010 2011 2012

(16)

Future

Proofing

Schools

Future

Proofing

Schools

(17)

Our scope

off-site construction

permanent modular

portable classrooms

new technologies and opportunities

design led, adaptable

future proofed schools

(18)

Monitoring by PhD student Pippa Howard

8 prefabricated classrooms around Australia

Temperature

(ambient & surface) Air movement Natural & Artificial Light

(19)

Monitoring by PhD student Pippa Howard

8 prefabricated classrooms around Australia

Sound Power usage Indoor Air Quality

(20)

Th Id C titi l t d l t

The Ideas Competition was completed last year With sponsorship from MSD and Civica.

(21)

design & occupation

We have come a long way in the …

design & occupation

(22)

Creative Commons Licensed Flickr: Christy Tvarok Green 2009!!

(23)

New Zealand

Remarkables Primary School, Frankton, 2010 New Zealand by Babbage Consultants

(24)

St Mary's Catholic Primary School new Hall and Library, Reggio Emelia Early Learning Centre and Courtyard, 2011 Troppo Architects NT http://architectureau.com

(25)

Queensland

Lilley Centre Brisbane Grammar, QLD

Design by Wilson Architects

(26)

Vi t

i

Victoria

(27)

permanent prefabs?

We are also starting to see interesting ideas in permanent prefabs…

(28)

Remote WA

Wiluna Remote Community School, WA

(29)
(30)

Kids consider

which school they

like best

like best

(31)

new school

Canterbury Girls’ Secondary College, Victoria

new school

(32)
(33)

what about the

We are starting to see interesting ideas in the permanent prefabs…

….what about the

temporary prefabs?

temporary prefabs?

(34)
(35)
(36)
(37)
(38)
(39)
(40)

they are temporary?

… Do they need to be anything more than adequate when….

(41)
(42)

Permanent

We need ….

Permanent

Quality/Temporary

y

p

y

(43)

this is a relocatable school

(44)

yes, a relocatable school

y

,

it will be relocated after 5 years

(45)

a collaborative process involving

p

g

the school community

the architect

the architect

the manufacturer

the city of amsterdam

the city of amsterdam

(46)

an unknown future location

the prefabricated modules can be

re-configured in a variety of ways

configured in a variety of ways

building costs: Euro 1,125 per sqm

(47)

Australia has an unprecedented

opportunity to benefit from

opportunity to benefit from

tipping points

tipping points

which could revolutionise the design

g

and manufacture of these utilitarian

(48)
(49)

prefabrication

p

(50)

Future

Proofing

Schools

Future

Proofing

Schools

knows that

potential for relocation

p

is

no excuse for a building of temporary

(51)

the future

Possibilities for…..

(52)
(53)
(54)
(55)

Professional Competition: Sustainability: Chris Moller Architecture + Urbanism with Studio E l b k Bl P il d E C b d B ildi W k h N Z l d

(56)
(57)
(58)
(59)
(60)
(61)

so what

s holding us back?

…so what s holding us back?

(62)

The process

today

The process

today

INFRASTRUCTURE  CLIENT Departments of Education RELOCATABLES PREFABRICATION MANUFACTURERS Generic Product Departments of Education Utilitarian

(63)

could be more

inclusive

… could be more

inclusive

INFRASTRUCTURE CLIENT DESIGNERS Product Design Detail Delight Departments of Education RELOCATABLES PREFABRICATION MANUFACTURERS Generic Product Utilitarian EXPERT EDUCATOR CLIENT

Departments of Education ENDEducators USERS

Students Local Community

(64)

for a

21

st

century future

PERMANENT 

PREFABRICATED

…for a

21 century future

.

PREFABRICATED  LEARNING SPACES DESIGNERS Product Design Detail Delight INFRASTRUCTURE CLIENT PREFABRICATION  MANUFACTURERS Customisable Product Departments of Education MEDIUM TERM PREFABRICATED  LEARNING SPACES EXPERT EDUCATOR CLIENT Departments of Education Design Led END USERS Educators LEARNING SPACES Students

Local Community SHORT TERM

PREFABRICATED 

(65)

Let’s get educators, developers, infrastructure

experts, designers, students together to forecast

p

,

g

,

g

what education might be in 15 years.

From there we can

‘backcast’

the stepping stones.

pp g

Image from

http://www.urbeingrecorded.com/news/2010/08/ /back-casting-from-2043/

(66)

References

Related documents

Formative assessment and TESSOL experience would be beneficial.. School visits are

This is simply a fancy way of saying that you can pass control back to the event loop when you are performing I/O, like reading a file, and specify the code you want to run when

St Mary Catholic Church, West Point Guardian Angels Central Catholic School..

The scale has two factors, each of which is assessed by 6 items: “positive metacogni- tions about online gaming” (P-MOG) referring to the usefulness of online gaming

• Digital communications with students / pupils (email / Virtual Learning Environment (VLE) / voice) should be on a professional level and only carried out using official

This illustrates the general need to address the relationship between organismal responses and the temporal dynamics of global change fac- tors: abrupt treatments may

In addition, by establishing a model of simple digital liquid level control system, this paper explains each aspects of reliability analysis software platform,

Pavesic did not treat food cost percentage and gross profit as mutually exclusive components and used weighted gross profit/contribution margin to replace the individual menu