Site Planning

Boundary • Topographic • Right-of-Way • Easements • School Sites • • Offi ce Complexes Municipal Facilities • Wetlands •

(2)

mwyusa.com

SURVEY AND MAPPING SERVICES

Key staff members of McGoodwin Williams & Yates have conducted and managed, a wide variety of both

engineering and land surveying projects over the life of the firm, including engineering field surveys, site surveys, GPS, existing facility surveys and all aspects necessary to complete the project.

Rights-Of-Way and Easements - MWY has extensive experience in determining project right-of-way requirements and preparing legal descriptions for all types of municipal improvements. We have managed right-of-way acquisition on numerous major projects in Northwest Arkansas and throughout the state.

Equipment – MWY utilizes both Global Positioning and conventional “total station” electronic surveying equipment complete with field data recorders. Data collected in the field can be entered directly into computer software within minutes so analysis, design, and generation of CAD drawings can begin immediately without manual processing of field data.

Our surveyors are trained in the use of the State Plane Coordinate System and are equipped with "Astro-Rhomb" software for quick, accurate determination of azimuth from solar observations. They are skilled in the use of global positioning equipment for topographic, route and control surveys for mapping projects. They are equipped with Trimble R8GNSS units, Trimble Pro XRS Mapping Grade GPS Unit, a trimble S6 RRobotic Total Station, a Sokkia Set 3 total station, Sokkia Optical Level, laptop computers for field use and an Olympus Camedia D580 digital camera.

Digital Base Mapping - MWY maintains digital based zoning maps for several municipalities. These maps are easily updated or rescaled using computer aided drafting software and ArcView G.I.S. Software.

EXAMPLES:

City of Batesville, Existing Sewer Manhole Mapping - In 2009 our survey team mapped all existing sewer manholes in the city of Batesville using our Trimble Pro XRS Mapping Grade GPS unit. The total number of manholes was approximately 2700.

City of Batesville, GPS Control Network - In 2001, our survey team established a GPS Control Network that covers the entire city of Batesville, Arkansas. NGS monuments were utilized in establishing the control network. Since 2001 all surveying for projects in Batesville have been on one coordinate system, which enables all projects to be referenced to each other in real-world positions. This control network covers approximately 40 square miles; and has been used for various types of projects including new water and sewer lines, water and sewer treatment plant improvements, and utility relocation projects.

REFERENCE:

Mr. Damon Johnson, P.E., City Engineer City of Batesville, Arkansas

500 Main Street Batesville, AR 72501 (870) 793-7242

(3)

302 E. Millsap Fayetteville, AR 72703 479-443-3404 mwyusa.com

SITE DEVELOPMENT, SPRINGDALE SCHOOLS

MWY HAS PROVIDED SITE DEVELOPMENT FOR OVER 15 SCHOOLS MWY has performed site development services and survey for most new construction and renovations for the Springdale School District in recent years. In addition, MWY has performed design for adjacent infrastructure improvements to support the schools including streets, signalization, utilities relocation, drainage, wastewater improvements and other amenities.

Projects included the following schools: Springdale School of Innovation -- 2015

Springdale High School Bull Dog Stadium – 2014 Har-Ber High Athletic Park – 2013

Hylton Junior High School – 2013 Sonora Middle School – 2011 Sonora Elementary School – 2010 Central Junior High –2009

Parson Hills Elementary – 2009 Westwood Elementary – 2009 Springdale High School – 2007 Central Junior High School – 2006

Elmdale Elementary School – 2006 Springdale Pre-K – 2006 Monitor Road Elementary School – 2006

Shaw Elementary School – 2005 Turnbow Elementary School – 2004 Jones Elementary Improvements – 2003 Hunt Elementary School – 2003

Har-Ber High School and Hellstern Middle School – 2003 Bayyari Elementary School – 2002

George Junior High School – 2002 CLIENT:

Springdale School District Springdale, Arkansas COMPLETED: As needed CONTACT:

Gary Compton, ED.D Assistant Superintendent for Special Services

804 West Johnson Ave. Springdale, AR 72764 (479) 750-8745

(4)

mwyusa.com

HYLTON ROAD JUNIOR HIGH SCHOOL

SITE DEVELOPMENT MWY performed site development design services for the Hylton Road Junior High School.

The scope of the projects included utility relocation/extensions, parking, widening of Hylton Road, and extensive drainage improvements including a large detention pond.

The project required a significant amount of coordination with city officials, as well as nearby landowners.

In addition, a separate project brought off-site utilities, including water and sewer, to the school site.

CLIENT:

Springdale School District Springdale, Arkansas COMPLETED: 2013 CONTACT:

Gary Compton, ED.D Assistant Superintendent

for Special Services 804 West Johnson Ave. Springdale, AR 72764 (479) 750-8745

(5)

302 E. Millsap Fayetteville, AR 72703 479-443-3404 mwyusa.com

HAR-BER HIGH & HELLSTERN MIDDLE SCHOOLS

PHASED CONSTRUCTION

Athletic Facility Parking and Access Drive (2012)

MWY recently completed design services for an access roadway and a parking lot to serve the Har-Ber High Athletic Facilities. The parking lot will accommodate 125 vehicles, including athletic team buses. Special attention was given to large bus turning radii in the parking lot and drive.

Site Improvements for Har-Ber High and Hellstern Middle (2003)

MWY performed site development design services for the Har-Ber High School and Adjacent Hellstern Middle School. The scope of the projects included utility relocation/extensions, parking, widening of Hylton Road, and extensive drainage improvements including a large detention pond. The project required a significant amount of coordination with city officials, as well as nearby landowners.

In Addition, the site was master-planned to make sure that the utilities and infrastructure constructed in the first phase would accommodate and serve future expansions.

CLIENT:

Springdale School District Springdale, Arkansas

CONTACT:

Gary Compton, ED.D Assistant Superintendent for Special Services

804 West Johnson Ave. Springdale, AR 72764 (479) 750-8745

(6)

mwyusa.com

SONORA ELEMENTARY and MIDDLE SCHOOLS

SITE DEVELOPMENT MWY performed site development services for Sonora Elementary School and the Sonora Middle School.

The scope of work included utility relocation/extensions, parking, widening and signalization of Sonora Road and Highway 412, and extensive drainage improvements including a large detention pond.

The project required a significant amount of coordination with city, county, and Arkansas State Highway and Transportation Department (AHTD) officials, as well as nearby landowners.

Among the highlights of this design is the capability of on-site wastewater handling facilities designed by MWY engineers. CLIENT:

Springdale School District Springdale, Arkansas COMPLETED: 2011, 2012 CONTACT:

Gary Compton, ED.D Assistant Superintendent

for Special Services 804 West Johnson Ave. Springdale, AR 72764 (479) 750-8745

(7)

302 E. Millsap Fayetteville, AR 72703 479-443-3404 mwyusa.com

SPRINGDALE HIGH SCHOOL

SITE DEVELOPMENT MWY performed site development services for the renovations and additions to the Springdale High School.

The school originally was separated into a north campus and south campus by Emma Street. This project required the closing of Emma Street to allow for an addition that connected the two campuses.

The street closure included numerous utility relocations in close proximity of the existing structures on the site. The utility relocations included but were not limited to water, sanitary sewer and storm drainage.

The storm drainage relocation required special consideration due to the unique challenges that were present with the existing topography and the locations of the new addition. CLIENT:

Springdale School District Springdale, Arkansas COMPLETED: 2010 CONTACT:

Gary Compton, ED.D Assistant Superintendent

for Special Services 804 West Johnson Ave. Springdale, AR 72764 (479) 750-8745

(8)

mwyusa.com

Pi Kappa Alpha Fraternity House

CIVIL SITE DESIGN, CONTRACT PREPARATION AND CONSTRUCTION SERVICES

MWY provided the Civil and Site design for the new Pi Kappa Alpha Fraternity house on the University of Arkansas campus. In coordination with Cyntergy AEC of Tulsa, OK, the Architect of Record for this project, MWY provided the site and civil design services.

These services included preparation and submission of planning documents for the city of Fayetteville planning and permitting requirements, grading and drainage design, utility relocation and coordination, pavement design, and retaining wall and additional structural design outside of the building envelope.

In addition, MWY provided assistance to Cyntergy AEC in contract document preparation and review with the University Planning and Facilities Management staff.

During the on-going construction phase, MWY has provided construction services for the U of A, including site surveys and construction staking, submittal review, change order preparation, and local coordination with utility providers and municipal infrastructure connections.

CLIENT: University of Arkansas COST: $6.5 Million

COMPLETED: Under Construction CONTACT: Bob Beeler,

Director of Design & Construction Services

479-575-6192 [email protected]

(9)

302 E. Millsap Fayetteville, AR 72703 479-443-3404 mwyusa.com

STORMWATER MANAGEMENT

“GREEN” SITE RESULTS IN SUPERB DRAINAGE - COST SAVINGS

Stormwater management for the new 10-acre Beaver Water District site focused on the recycling and conservation of water and landscape. As such, MWY incorporated both innovative and time-tested techniques to create a showcase for stormwater management and sustainable design. The overall approach/goal was to slow water down as it drained and reduce concentrated flows to a minimum. Infiltration/Bioretention basins are the key component of this design. Five basins were constructed into which heavy volumes of stormwater runoff is directed and can be stored for up to three days before being discharged into the receiving stream.

The infiltration basin is typically formed by digging a large hole and constructing a small perforated discharge pipe that will allow for drainage. These pipes are generally six inches in diameter. The use of small diameter piping represents significant savings over the use of large diameter concrete stormwater piping. Above and below the perforated pipe, crushed stone is placed to allow for water to both enter the discharge piping and infiltrate as much water as possible into the soils.

By maximizing the infiltration, every chance possible is provided to replenish groundwater supplies and maintain soil moisture. An additional benefit occurs in the layer of gravel as the water is filtered. Pervious concrete parking and walkways also allows for water to enter the system and eliminates direct runoff during rain events. CLIENT:

Beaver Water District

COST:(Site development $1.65 million) Cost of total project including the 14,000 sq. ft. administration building.

Opinion of Probable Cost: $4,500,000 Construction Bid: $4,562,000

Final Construction Cost: $4,471,818 COMPLETED: June 2009

CONTACT:

Alan Fortenberry, P.E. Chief Executive Officer 301 N. Primrose Road Lowell, AR 72745 479-756-3651 AWARDS:

ACEC/A 2010 Grand Conceptor Award Winner – Part of overall 10 acre site design and 14,000 square foot administration center.

LEED GOLD certified site & structure &

(10)

mwyusa.com

WOOLSEY WET PRAIRIE MITIGATION

SETS PRECEDENT FOR WETLAND MITIGATION

As an extension of the design of the Fayetteville, Arkansas Westside Wastewater Treatment Plant completed by McGoodwin, Williams, and Yates, MWY also provided site planning and design services for the 28-acre Woolsey Wetland Sanctuary mitigation project. Environmental aspects of this project were completed by Environmental Consulting Operations, Inc. of Benton, Arkansas.

MWY completed land surveys to develop drawings with six-inch contour lines; mitigation site layout and hydrological engineering design features, including the installation of water level control structures; and development of a hydrobudget model.

Hydrological modifications were made by construction of earthen berms using spoils generated from construction of the wastewater plant to create a mix of habitats such as wet meadow wetlands, marsh and open water habitat, and forested wetlands.

The wetlands area has since been expanded to encompass 46 acres and has since been recognized by the National Wildlife Federation as a certified national wildlife habitat.

CLIENT:

City of Fayetteville, Arkansas COMPLETED: 2009

CONTACT:

Water & Sewer Division 113 W. Mountain Street 479-575-8318

AWARDS:

• 2009 ENVY Award finalist • 2009 Governors Corporate Conservationist of the Year via the Arkansas Wildlife Federation • Certified Wildlife Habitat

(11)

302 E. Millsap

Fayetteville, AR 72703

479-443-3404

mwyusa.com

H

AR-BER MEADOWS COMMUNITY SITE DEVELOPMENT

MWY PROVIDES MULTIPLE SERVICES FOR 450-ACRE SITE

Har-Ber Meadows encompasses approximately 450 acres west of Springdale, Arkansas. The goal was to create a "village type" community, including residential units and also commercial establishments as well as neighborhood parks, bike paths, and small lakes.

Parcels for other types of community uses such as a church, an elementary school, a daycare center and a community center were also reserved.

MWY was responsible for professional engineering advice and overall coordination of the project; design of water, sewer, street and drainage facilities; platting of the phases of the development; coordination of photogrammetry and geotechnical engineering services; boundary and topographic surveys, and other assistance as requested by the owner.

(12)

mwyusa.com

JONES CENTER FOR FAMILIES

SITE DESIGN FOR 34-ACREA MULTI-USE FACILITY

MWY provided site planning for the Jones Center Complex in Springdale, situated on a 34-acrea campus-like setting. (MWY did not design the building in this instance.)

The project required the planning and design of the typical infrastructure improvements of access drives, parking areas, water and wastewater facilities, storm drainage, area lighting and sidewalks all integrated into a non-typical intensely landscaped setting.

Site planning involved creating a pleasant outside environment among access and parking facilities for over 750 vehicles. All design elements were arranged in spaces with sufficient allocation to allow for heavy landscaping to minimize the impact of both parked and moving vehicles on the site. A stormwater drainage system was designed to improve the safety and comfort of pedestrians during periods of rainfall.

References

Related documents

To determine whether SNS is needed in professional education, in this case Engineering Management graduate program, a survey will be done on current Engineering Management

NFR is responsible for the coordination and utilisation by Swedish scientists of national and international synchrotron radiation facilities, with (a) a committee for funding

CSM(eHR) is responsible for providing professional advice and steer to the overall development and maintenance of the eHR sharing infrastructure, architecture and

B.S. in construction related field or equivalent experience. Certified Project Management Professional. Provided overall coordination and management of staff of Schedulers and

The CASA Project Manager is responsible for managing the overall assessment process and the coordination of the project team members and ensuring that sufficient resources

This component would finance the costs of a Project Implementation Unit (PIU) responsible for the overall coordination of the activities under the project,

Project Address Street Map of County Facilities: Review the State & County Roads and Parks map (which also includes county channel lines) to.. identify proximity to