EVN

Hydropower Development

in Albania

The River Devoll Project

Dr. Michael Laengle, CFO

(2)

Agenda

> EVN – Overview and strategy

> Albania – Electricity market in SEE

> The River Devoll project

(3)

Company profile – fact sheet 2007/08

EVN

EVN is a leading integrated energy and environmental service group serving customer in Lower Austria and Central and Eastern Europe

Business areas Electricity, gas, heating, water, waste incineration

Countries

Austria, Albania, Bulgaria, Croatia, Cyprus, Denmark, Estonia, Germany, Hungary, Latvia, Lithuania,

Macedonia, Montenegro, Poland, Russia, Slovakia, Slovenia, Turkey

Employees 9,342 (–2.0%) thereof ~ 75% in abroad

Revenue 2,397.0 EUR m (+7.3%)

EBITDA 362.3 EUR m (+3.3%)

EBIT 166.6 EUR m (–15.6%)

Net results 186.9 EUR m (–17.7%)

Credit Rating

Moody’s: A1, stable

Standard & Poor’s: A, negative

(4)

EVN currently active in 18 CEE countries

Highlights Energy supply

> About 1 m electricity, gas, heat and water customers in Lower Austria

> 1.6 m electricity, 40,000 heating customers in Bulgaria

> 720,000 electricity customers in Macedonia Electricity generation

> 1,829 MW generation capacity (gas, coal, hydro, wind and biomass)

> Construction of a coal-fired power plant of 790 MW in Duisburg-Walsum, Germany

Networks

> 127,294 km electricity networks, 10,650 km gas pipelines and 540 km heating networks

Environmental services

> Waste incineration plants of 300,000 tons p.a.

in Lower Austria, 360,000 tons p.a. in Moscow

> More than 80 drinking and waste water plants for more than 10 m people

EVN presence Energy supply

Drinking and wastewater project Waste incineration

Power station under construction/project Group headquarters

Regional location

(5)

EVN’s strategy - Focus on Energy and Environmental Services

>Benefit from strategic advantages:

>Common customer basis („one-stop shop“)

>Know-how-transfer primarily in generation and networks

>Regional synergies in operation and supply (currently mainly in Austria)

>Benefit from administrative functions of head office for non-domestic activities

>Optimisation of financial resources

Traditional EVN core activities …

>

Energy

> Generation

> Networks

> Supply

> Waste incineration

> Drinking water

> Waste water

… complemented by related

infrastructure and environmental services

>

Environment

(6)

EVN – important energy market player in SEE

> EVN assets:

- Network operator / supplier - District heating plant in

Bulgaria

- Hydro power plants in Macedonia

> Bulgaria: Fully liberalised

electricity market starting on July 2007 Æ fully negotiable prices versus long-term electricity supply agreements and limited

generation capacities

> Macedonia: Single-buyer model, some eligible customers,

electricity prices amount to only one-third of the level in WE

> Electricity prices amount to only 30-50% of the Western European level

EVN’s strategy:

> Vertical integration Æ increase of production capacities

> Modernisation of grid networks

> Active electricity trading

Black Sea Western

Bulgaria

North Eastern Bulgaria

South Eastern Bulgaria Sofia

Plovdiv

Greece

Turkey Romania

Serbia

Bulgaria

Macedonia

Albania

Skopje

(7)

Electricity sales and generation

> Strong growth and high exposure in electricity supply

> Coverage ratio of the Group: ~20%

> Coverage ratio excl. Bulgaria and Macedonia: 60-70%

> Mid-term target:

- Increase of coverage ratio to min. 40%

- Vertical integration in SEE 18,043

19,372 15,641

4,022 4,556

3,451

0 5,000 10,000 15,000 20,000

2005/06 2006/07 2007/08 Electricity sales

Electricity generation

(8)

Agenda

> EVN – Overview and strategy

> Albania – Electricity market in SEE

> The River Devoll project

(9)

Albania: Transition economy

> Strong GDP growth:

- 2003–2008: ~ 6.0%

> Best GDP forecast among transition economies in Europe

- 2009–2011e: 3.0 – 6.0%

> Strong expected economic development Æ significant increase in electricity demand

> Bottlenecks in the whole electricity sector:

production, interconnection and transformers

> Population: 3.2m

> GPD/capita (2008): 6,400 EUR - 25% of EU-27

- 44% of EU-12

> Huge potential for basic infrastructure investment

Black Sea Sofia

Plovdiv

Greece

Turkey Romania

Serbia

Bulgaria

Macedonia

Albania

Skopje Tirana

(10)

Challenging electricity situation in Albania

>

Electricity demand: 6,700 GWh

- Domestic production: 4,100 GWh

- Import: 2,400 GWh

>

High dependency from electricity import

>

Current energy production

represents only one-third of total hydro power potential

>

Hydro power potential:

- River Drin: two HPP - River Vjosa: seven HPP - River Devoll: three HPP

>

Bottleneck in interconnections

(11)

Electricity demand scenarios for Albania

5,000 10,000 15,000 20,000 25,000

1980 1990 2000 2010 2020 2030

historic demand high forecast

medium forecast low forecast GWh/a

>

Electricity demand will triple until 2030 from 7GWh to ~ 20 GWh

>

Expected growth rate:

5% p.a. with high volatility:

- Winter period: 4%

- Summer period: 7%

>

Peak hour is at 9:00 p.m.

and a strong increase

again in the morning

(12)

Electricity market reform

> Attract strategic investors in the sector through implementation of privatisation

> Establish a competitive electricity market consistent with EU requirements:

- 2006: Ratification of The Energy Community Treaty - 2007- 2008: new market model

• Restructuring of the national electricity company

• Unbundling of transmission and distribution system operators

• Separate wholesale and retail supply function

(13)

Energy sector Albania - Current situation

> A free energy market (wholesale, balancing,…) is not established Æ market liberalisation expected in mid-term

> Agreements between market participants are subject for approval and enforcement by the Energy Regulatory Commission

> Future development could be assumed similar to other more developed markets in the region or in the EU

> Energy shortage and therefore energy outages are common

> The whole region is not supplied adequately with energy

> Further demand due to high growth of economy and population in Albania expected

> Interconnection with the high-voltage electricity network enable

export possibilities

(14)

Grid connection

> Good integration into the

Albanian network

(15)

Agenda

> EVN – Overview and strategy

> Albania – Electricity market in SEE

> The River Devoll project

1. Project description

2. Concession Agreement

3. Business and financing model

4. Risks and challenges

(16)

> Concession for three large hydro power plants on the River Devoll in

Albania

> Capacity: 320 MW

> Electricity production:

1,000 GWh p.a.

> Investment: EUR 950m

> 50:50% joint venture with Statkraft (Norway)

> Excellent opportunities for peak energy due to flow conditions

1. The River Devoll Project

(17)

1. Planned powerhouse locations

(18)

2. Conclusion of Concession Agreement

> December 19, 2008

- Signing Concession Agreement with the Ministry of Economy, Trade and Energetics

- Signing Transmission Network Agreement with the

Transmission System Operator

> January 21, 2009

- Ratification of the Concession Agreement by Albanian Council of Ministers

> February 23, 2009

- Ratification by Albanian Parliament

> April 1, 2009

- Effective date

(19)

2. Main elements of the Concession Agreement

> BOOT concession

> Joint venture with Statkraft (Norway)

> Flexibility and optimisation of applied technology

> Stepwise realisation of the three plants

> Free marketability of electricity generated

> Strong commitment from authorities and governmental institutions

(20)

3. Business model

Supply

Statkraft EVN AG

Joint venture project company

Hydro power plants River Devoll

50% 50%

Power purchase agreements

(21)

3. Financing model

> Raising of the funding after pre-construction phase

> Project financing structure envisaged on a „limited recourse“-basis with a respective share of equity

> Project-specific securities including:

• Completion guarantee for completion risks which are not transferable to the EPC-contractor during construction phase

• Appropriate sponsors support to mitigate economic risk during operation phase

> Involvement of multilateral financial institutions and export credit

agencies (ECAs) to cover political risks (e.g. EBRD, IFC, EIB, MIGA,

OeKB)

(22)

4. Project challenges and opportunities

> Challenges

- Sophisticated technology (long diversion tunnels, high dams, existing dam structure)

- Geological challenges - Environmental challenges - Social challenges

- Approval procedure

> Opportunities

- Long-term investment

- Growth market (shortage of electricity in SEE) - Renewable energy

- Peak electricity

- Free marketability on the whole region

- Strong commitment from authorities / political institutions in Albania

(23)

4. Benefits for Albania

> Increase of the domestic electricity production by ~ 20%Æ state-of- the-art hydro power storage system, highly flexible peak-load

> Financial income for the budget at estimated cumulative EUR 1,000m through increased government's revenues

> Increase of GDP growth rate by 2%, stimulation of the economy

- Construction phase

• Directly: ~ 5,000 people for 6 years (= 30,000 men year)

• Indirectly: >2,500 people for 6 years (= 15,000 men year)

• Salaries directly: EUR 120m

• Salaries indirectly: EUR 60m

• Decreasing of the unemployment rate (currently: 13%) - Operating phase

• 300 permanent new jobs for joint venture company and suppliers

• Salaries (estimated on real terms): EUR 50m

(24)

Disclaimer

Certain statements made in this presentation may constitute „Forward-Looking Statements”

within the meaning of the U.S. federal securities law. Forward-looking information is subject to various known and unknown risks and uncertainties. These include statements concerning our expectations and other statements that are not historical facts.

The Company believes any such statements are based on reasonable assumptions and reflect the judgement of EVN’s management based on factors currently known by it.

No assurance can be given that these forward-looking statements will prove accurate and correct, or that anticipated, projected future results will be achieved.

For additional information regarding risks, investors are referred to EVN’s latest annual report.

References

Related documents

Gradual reduction in water temperature prior to or during transportation will however contribute to reduced risk for welfare problems by decreasing the metabolism and stress

Ovim eksperimentom dobiven je tlak zasićenja koji iznosi 137.2·10 5 Pa, sastav isparenog plina, termička ekspanzija zasićene nafte (tablica 7-2) pomoću koje je

Finally, small multifamily firms (defined as 101-500 units under management) saw a 4% gain in their online payment offerings, with 30% of firms this size confirming the existence

A great fraction of the new links between pairs of users in social networks like Twitter, LinkedIn or Facebook are created through personalized contact

My name is Kirsten Schlein and I am a graduate student in the Department of Nutrition at the University of Massachusetts, Amherst. I am conducting a research study to determine

The complete system consists of a microphone receiver MW1-RX-Fx, a wireless handheld microphone MW1- HTX-Fx or a wireless belt-pack transmitter with clip-on lavalier

 Receive information about Daman’s health insurance plans and services including but not limited to health insurance plan benefits, exclusions, policy terms

then show that the Sym-Polhmeyer curves associated with appropriately re- stricted curvature functions can be naturally considered as corresponding to all curves in the Euclidean