• No results found

Dilip Sadh Solman Training Material

N/A
N/A
Protected

Academic year: 2021

Share "Dilip Sadh Solman Training Material"

Copied!
28
0
0

Loading.... (view fulltext now)

Full text

(1)

Solution Manager Training

By Dilip Sadh

(2)

1

– Solution Manager – Overview & Capabilities – Solution Manager Roles & Responsibilities – Realization Management

Realization – Configuration Realization – BPP

Agenda

By Dilip Sadh

Think Tree Technologies, Inc

Consulting ,Training, Outsourcing

(3)

SAP Solution Manager By Dilip Sadh

Pre-2000: ASAP

2000: Kick-off SAP Solution Manager 2002: Releases 2.1 & 2.2

2003: Release 3.1

2004: Release 3.2 SAP Solution Manager

From ASAP to SAP Solution Manager

(4)

3

SAP Solution Manager By Dilip Sadh

SAP Solution Manager is the central platform for efficient implementation and operation of SAP solutions:

― Can service all SAP Technologies. ― Integrates with SAP/Non-SAP

Products.

Provide Centralized….

1. Documentation

2. Configuration and Customization 3. Landscape Definition

4. Testing 5. Monitoring

6. Service Delivery & Execution 7. Note Handling

Think Tree Technologies, Inc

Consulting ,Training, Outsourcing

(5)

SAP Solution Manager Use In Implementation By Dilip Sadh SAP Solution Manager in Implementation

Configuration Project definition Define Business Blueprint Customizing synchronization Authorization Data transfer End user Training and documentation Testing Project phase Roadmaps Project Administration Cross functions Project activities

Issue Tracking / Status Monitoring / Reporting Developments

Define

system landscape

Focus of tool support

Project Preparation Business Blueprint Realization Go Live & Support Final preparation

(6)

5

SAP Solution Manager – Use in Operations By Dilip Sadh SAP Solution Manager in Operations

System Monitoring Define/Import System Landscape SAP EarlyWatch Alert Service Level Reporting Service Delivery Enabling Business Process Monitoring

SAP Service Marketplace Issue Tracking Microsoft NetMeeting Central System Administration Best Practices Documents Upgrade

Support desk/ SAP Note Assistant

Define/Import Business Processes Recom-mended functions sequence Cross functions

Think Tree Technologies, Inc

Consulting ,Training, Outsourcing

(7)

Development Quality Assurance Production SCM XI BW Legacy SRM ECC GTS SCM XI BW Legacy SRM ECC GTS SCM XI BW Legacy SRM ECC GTS SAP Solution Manager Sandbox SCM XI BW Legacy SRM ECC GTS Select your Processes Do your customizing

Do your Testing Final Transport to Production

The Fundament of all functions of the Solution Manager is the Definition of the System Landscape.

Define the System Landscape, Products, Systems and related RFC destinations in System Landscape Maintenance transaction (SMSY)

System Landscape By Dilip Sadh

(8)

7

Solution Manager System Landscape By Dilip Sadh

Think Tree Technologies, Inc

Consulting ,Training, Outsourcing

(9)

Scenario Purchase to Pay – Direct Procurement (End-to-End-Process) Process Step Transaction Process Purchase Order Processing Create Purchase Order ME21N

• Process steps are selected from the Business process repository • Process steps can also be selected manually.

• Transactions are populated automatically based on the process step selected

from the business process repository.

Solman till now.. By Dilip Sadh

(10)

9

Roles & Responsibilities (contd..) By Dilip Sadh

Task - Adding/Changing blueprint documents to blueprint structure – SOLAR01

Go to General documentation tab at the

Process level

Think Tree Technologies, Inc

Consulting ,Training, Outsourcing

(11)

Roles & Responsibilities (contd..) By Dilip Sadh

Task - Adding/Deleting BPML transactions to the Blueprint Structure – SOLAR01

Add/delete transactions BPML transactions at the Process step level

(12)

11

Roles & Responsibilities (contd..) By Dilip Sadh

Task – Changing the scope of the blueprint structure at the Process level – SOLAR01

Change Structure at the Process level

Go to Structure tab at the Process level

Think Tree Technologies, Inc

Consulting ,Training, Outsourcing

(13)

Roles & Responsibilities (contd..)

By Dilip Sadh

Task – Executing detailed configuration of the CI Templates documents– SOLAR02 (contd..)

Critical requirements are captured in the BPML at each process step level in Solution Manager. (e.g.) Process step level – Create/process Purchase orders.

(14)

13

When all the requirements are captured in the BPML, all configuration objects associated with this process step are captured at the same process step level in SOLAR02 -Configuration.

(e.g.) All config objects associated with this Process step – “Create/process Purchase orders” are pulled from the business process repository and are listed in the Configuration tab

Roles & Responsibilities (contd..) By Dilip Sadh

Think Tree Technologies, Inc

Consulting ,Training, Outsourcing

(15)

Customizing data Customizing Distribution Predefined list of synchronizing objects ECC DEV ECC QAS ECC PRD SRM DEV SRM QAS SRM PRD SCM DEV SCM QAS SCM PRD Central system

• Ensures that customizing in In-Sync across systems

• Reuses customizing in other systems

Transport Transport

Transport Transport

Transport Transport

Customizing Synchronization & Distribution By Dilip Sadh

(16)

15

SAP Solution Manager

By Dilip Sadh

Configuration SOLAR02

In Configuration transaction, you have to assign the configuration structure that is needed for your implementation scenario.

The entry screen of the Realization phase looks similar to the Business Blueprint transaction. The Business Scenario structure you selected in the scope is taken over from the previous transaction

From here you can select individual parts of the maintained configuration structure content that are required to configure your scenarios.

In the business process repository, select the configuration structure for SAP component and confirm it.

The Configuration content is divided into different sections. You should at least select the basic settings for mySAP component to configure the overall solution.

In the second step choose basic settings for your key capability.

Think Tree Technologies, Inc

Consulting ,Training, Outsourcing

(17)

Steps for Building Configuration Structure (SOLAR02) By Dilip Sadh

– Create Configuration Structure

Manually create configuration structure

Created automatically when you select specific processes from the business process repository

– Assign objects to the configuration elements (e.g. IMG objects and

documents)

(18)

17

Steps for Building Configuration Structure By Dilip Sadh

Click the drop down selection and select “IMG Object” selections

Think Tree Technologies, Inc

Consulting ,Training, Outsourcing

(19)

Steps for Building Configuration Structure (contd..) By Dilip Sadh

The Logical Component will default in based on the component selected for

the Business Process Step

Select the drop down selection in the “Object” field to navigate to the IMG of the applicable system.

(20)

19

IMG for the ECC Development system

Select the IMG Objects to be configured for the process step.

Click the “Copy Selected Nodes (Enter)” button

Steps for Building Configuration Structure (contd..) By Dilip Sadh

Think Tree Technologies, Inc

Consulting ,Training, Outsourcing

(21)

Selected IMG Objects nodes are copied into the Configuration Structure

Steps for Building Configuration Structure (contd..) By Dilip Sadh

(22)

21

Creating Configuration Guide Document By Dilip Sadh

Execute transaction SOLAR02

Follow the menu path Configuration > Generate Configuration Guide

Select the structure items to be included in the Configuration Guide

Execute the “macro” within the generated word document.

Steps for Creating Configuration Guide

Think Tree Technologies, Inc

Consulting ,Training, Outsourcing

(23)

Go to Configuration tab at the Process step level Select the configuration object and click on the configure icon. This will directly go to the configuration node of the desired target system box. Configuring IMG Objects By Dilip Sadh

(24)

23

Configuring IMG objects (contd..) By Dilip Sadh

You are now right at the config node of the config object. This is where the necessary

configuration settings are done.

Think Tree Technologies, Inc

Consulting ,Training, Outsourcing

(25)

Documenting the Configuration By Dilip Sadh

Documentation should be inserted

directly below the configured node. Document name should mirror that of the IMG node configured.

(26)

25

Administration Activities By Dilip Sadh

Processing Status for the Document and IMG Object should be added as

well as the person responsible for completing the configuration should

be added

Think Tree Technologies, Inc

Consulting ,Training, Outsourcing

(27)

Adding BPPs to Solution Manager By Dilip Sadh

One BPP will be added under the “Training Materials” tab per t-code listed

under the “Transactions” tab

All completed BPP’s will be added under the “Training Materials” tab at the process step level

(28)

27

Questions By Dilip Sadh

Think Tree Technologies, Inc

Consulting ,Training, Outsourcing

References

Related documents

Common Terminology Business process Business process analysis Business process redesign Requirements definition Information systems Entity Transaction Business process

Drug product level Independent requirements Kit level Independent requirements Create Independent DP Demand 1 – 3 years Process orders 6 – 18 months Process orders 3 months

In one embodiment of the present invention, the Step (c) of continuously computing the horizontal protection level (HPL) associated with the effective configuration of

Performance Objective: Given the business process narrative document, identify types of Flow Objects in the business process.. Learners should correctly classify the three

• Must speak Protocol fluently (Telegram, Comm Objects, group, ..) • Must know integration rules (Distance, timers, transactions, ..)  Need a graphic software for configuration.

Next, we describe the Process Logic Design (Level III) step, using detailed BPMN process models of the business design.. Finally, we show the IT Process Support (Level IV)

If the "Octane Barrel" requirements can't be met by reforming heavy naphtha (90 - 160 °C), then it may be necessary to increase the amount of feed processed

Monitoring activities should be set up for every monitoring object within a business process step. All monitoring objects defined within a business process step are listed there.