Report run on: March 20, 2012 11:17 AM

Crossfield Elementary School B9359A

Crossfield

Rocky View Sch Div #41

(2)

B9359A Building Id:

Crossfield Elementary Schoo Building Name:

Crossfield Location:

P. O. Box 369 Address:

2,870.13 Gross Area (sq. m):

$6,529,000 Replacement Cost:

1953 Construction Year:

Evaluation Date: November 22 2011 Stantec Consulting Ltd.

Evaluation Company:

Pat Quinn Evaluator Name:

The original 1,220.55 square metre school is understood to have been built in 1953, with permanent additions in 1959, 1962, 1971, and 1996.

In 1989, a link and 4 portables were added to the east elevation.

In 1993, a link and 2 portables were added to the west elevation.

In 1999, 2 portables were added to the south elevation of the 1993 link.

A separate structure, understood to have been the original school, is situated on the southwest side of the site. The building is currently occupied by a daycare. The building was not assessed at the time of the site visit.

The current gross building area is approximately 2,872 square metres, with a maximum capacity of 400 students.

General Summary:

Structural Summary:

Building foundations are understood to be concrete walls on concrete strip footings, concrete slab on grade floors, with above grade structures a combination of concrete masonry unit and wood framed walls. Roof structures are wood framed.

Overall, the building structure is in acceptable condition.

Envelope Summary:

Exterior walls are finished with cement stucco. Window are fixed and operable insulating glazing units set in painted wood frames. Entrance doors are painted metal hinged doors with upper wired glazing, set in painted metal frames.

Exterior emergency doors are painted hollow metal hinged units set in painted metal frames.

The roof is covered with an SBS roofing system, including prefinished metal flashings and parapet top caps.

Overall the building envelope is in acceptable condition.

Interior Summary:

Interior walls are generally painted gypsum board and concrete masonry units. The majority of ceilings in classrooms and corridors are suspended T-bar grid with lay-in acoustical tile. Ceilings in foyers and washrooms are painted gypsum board. The gymnasium ceiling is clad with prefinished metal panels. Flooring is comprised of quarry tile in the main entrance foyers and washrooms, and sheet tile or vinyl composite tile in classrooms and corridors. Carpet is installed in administration areas, the library, and portions of a number of classrooms.

Overall the interior finishes are in acceptable condition.

Mechanical Summary:

The plumbing systems that service the building consist of domestic water distribution, natural gas, storm and sanitary water piping and plumbing fixtures. Domestic hot water is produced by a commercial tank type ,gas-fired, hot water heater. Plumbing fixtures in the washroom consist of floor mounted urinals, floor mounted tank-type water closets complete with manual flush valves and floor mounted vitreous china lavatories. The four fiberglass shower cubicles are equipped with wall mounted shower heads and manual turn type flow valves. Janitor sinks are located in selective caretaker rooms. Miscellaneous sinks area located in staff and the cafeteria kitchen.

11.32%

5 year Facility Condition Index (FCI):

Facility Details Evaluation Details

Total Maintenance Events Next 5 years: $739,400

(3)

Typical ABC fire extinguishers are installed throughout the building.

Based on the age and condition of the mechanical systems the following are recommended in the next five years:

- Replace one waist height custodial sink with a floor level or lower model.

- Replace/repair inadequate air handling unit installed in the 1971 addition.

- Paint exterior roof mounted gas lines.

.

Overall the mechanical systems in the building are in acceptable condition.

Electrical Summary:

Electricity is routed to the building from a pad mounted utility supplied transformer installed on the south side of the school. The main electrical switchboard is rated at 600 A, 120/208 V, 3 phase, 4 wires. Electricity is fed to distribution panels and terminals with copper wiring and conduit located throughout the school.

Interior lighting is mainly provided by T8 fluorescent technology installed throughout the building, metal halide fixtures were provided in the gym. Exterior lighting is provided by high pressure sodium installed at entrances and locations along the walls.

The majority of the emergency lighting in the building is powered by a battery operated wall packs. Exit signs consist of illuminated LED fixtures.

The building is protected by a zoned fire alarm control panel which controls fire alarm bells and strobes throughout the building. Initiation is activated by manual pull stations, heat detectors, and smoke detectors.

The building has an externally monitored security system.

Communication & data installed in the building consist of; twisted pair telephone system, custom public address system, Fiber optics line, hardwired and wireless Local Area Network.

There following are recommended electrical system actions for the next five years:

- Replace the obsolete fire system and detection systems.

Overall the electrical systems in the building are in acceptable condition.

Condition Rating Performance

1 - Critical Unsafe, high risk of injury or critical system failure.

2 - Poor Does not meet requirements, has significant deficiencies. May have high operating/maintenance costs.

3 - Marginal Meets minimum requirements, has significant deficiencies. May have above average operating maintenance costs.

4 - Acceptable Meets present requirements, minor deficiencies. Average operating/maintenance costs.

Rating Guide

5 - Good Meets all present requirements. No deficiencies.

6 - Excellent As new/state of the art, meets present and foreseeable requirements.

(4)

A1010 Standard Foundations*

A1030 Slab on Grade*

B1010.01 Floor Structural Frame (Building Frame)*

B1010.02 Structural Interior Walls Supporting Floors (or Roof)*

B1010.07 Exterior Stairs*

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

2 - Poor Rating

Rating

Rating

Rating

Rating

0

0

0

0

1953 Installed

Installed

Installed

Installed

Installed

0

0

0

0

0 Design Life

Design Life

Design Life

Design Life

Design Life

MAR-12

MAR-12

MAR-12

MAR-12

MAR-12 Updated

Updated

Updated

Updated

Updated

12 IMR Roof Ladders.

Repair 2012 $9,000 Medium

No roof ladder.

Concern:

Add roof ladder.

Recommendation:

S1 STRUCTURAL

Event:

Type Year Cost Priority

The building foundations are understood to be concrete foundation walls on concrete strip footings.

Concrete slab on grade floors are installed in the building, consistent with the construction dates of the additions.

The floor structural frame is understood to be comprised of wood framed assemblies, wood beams and trusses.

Interior walls are comprised of load bearing wood framed or concrete masonry units with wood beams and trusses supporting the roof.

No roof ladders.

(5)

B1020.01 Roof Structural Frame*

B1020.03 Roof Decks, Slabs, and Sheathing*

4 - Acceptable

4 - Acceptable Rating

Rating

0

0 Installed

Installed

0

0 Design Life

Design Life

MAR-12

MAR-12 Updated

Updated

Roof structural frames include a wood framed roof deck on load bearing concrete masonry unit and wood framed walls, timber beams, trusses and columns.

The majority of the building roof structure is understood to be wood decking.

(6)

B2010.01.06.03 Metal Siding**

B2010.01.08 Cement Plaster (Stucco): Ext. Wall*

B2010.01.09 Expansion Control: Ext. Wall*

B2010.01.11 Joint Sealers (caulking): Ext. Wall**

B2010.02.05 Wood Framing: Ext. Wall Const.*

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable Rating

Rating

Rating

Rating

Rating

1996

1953

1953

1995

0 Installed

Installed

Installed

Installed

Installed

40

0

0

20

0 Design Life

Design Life

Design Life

Design Life

Design Life

MAR-12

MAR-12

MAR-12

MAR-12

MAR-12 Updated

Updated

Updated

Updated

Updated Replace metal siding (200m2)

Replace caulking (100 lineal metres) Lifecycle Replacement

Lifecycle Replacement

2036

2015

$25,000

$3,000

Unassigned

Unassigned

S2 ENVELOPE

Event:

Event:

Type

Type

Year

Year Cost

Cost

Priority

Priority Updated:

Updated:

MAR-12

MAR-12

Upper exterior building walls are clad with prefinished metal siding.

The lower wall sections of the building have a cement stucco exterior finish.

Control joints in the stucco and metal exterior wall coverings are provided at regularly spaced intervals.

Exterior joints, door and window perimeters, and overlaps in building materials are sealed with caulking compound.

The building is understood to have wood framed stud assembly exterior walls.

(7)

B2010.06 Exterior Louvers, Grilles, and Screens*

B2010.09 Exterior Soffits*

B2020.01.01.05 Wood Windows (Glass & Frame)**

B2030.01.02 Steel-Framed Storefronts: Doors**

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable Rating

Rating

Rating

Rating

0

0

2000

2000 Installed

Installed

Installed

Installed

0

0

35

30 Design Life

Design Life

Design Life

Design Life

MAR-12

MAR-12

MAR-12

MAR-12 Updated

Updated

Updated

Updated Replace wood framed windows (120m2)

Replace 2 steel exterior doors.

Lifecycle Replacement

Lifecycle Replacement

2035

2030

$120,000

$8,000

Unassigned

Unassigned Event:

Event:

Type

Type

Year

Year Cost

Cost

Priority

Priority Updated:

Updated:

MAR-12

MAR-12

Various sized painted metal ventilation louvres are installed on the building exterior walls.

Prefinished vented metal soffits are installed on roof overhangs on the building.

The windows on the front elevation of the original school building are insulating glazing units set in painted wood frames.

The front entrance doors of the school are painted metal with upper glazings, set in painted metal frames.

(8)

B2030.02 Exterior Utility Doors**

B3010.04.04 Modified Bituminous Membrane Roofing (SBS)**

B3010.08.02 Metal Gutters and Downspouts**

B3020.02 Other Roofing Openings (Hatch, Vent, etc)*

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable Rating

Rating

Rating

Rating

1971

2007

2005

1971 Installed

Installed

Installed

Installed

40

25

30

0 Design Life

Design Life

Design Life

Design Life

MAR-12

MAR-12

MAR-12

MAR-12 Updated

Updated

Updated

Updated Replace exit doors (2)

Replace roofing (2,000m2)

Replace gutters and downspouts (100 lineal metres)

Lifecycle Replacement

Lifecycle Replacement

Lifecycle Replacement

2021

2032

2015

$5,000

$350,000

$2,000

Unassigned

Unassigned

Unassigned Event:

Event:

Event:

Type

Type

Type

Year

Year

Year Cost

Cost

Cost

Priority

Priority

Priority Updated:

Updated:

Updated:

MAR-12

MAR-12

MAR-12

Utility doors are painted metal hinged units set within painted metal frames. The age of the doors is generally consistent with the age of the construction.

A modified bituminous membrane assembly, (SBS), is provided on the roof of the building.

Prefinished metal gutters and downspouts are provided on a number of roof areas.

Roof access is via a metal roof hatch with a fixed steel ladder, located in the east mechanical room of the building.

(9)

C1010.01 Interior Fixed Partitions*

C1010.03 Interior Operable Folding Panel Partitions**

C1010.05 Interior Windows*

C1010.07 Interior Partition Firestopping*

C1020.01 Interior Swinging Doors (& Hardware)*

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable Rating

Rating

Rating

Rating

Rating

0

1962

1971

1984

1984 Installed

Installed

Installed

Installed

Installed

0

30

0

0

0 Design Life

Design Life

Design Life

Design Life

Design Life

MAR-12

MAR-12

MAR-12

MAR-12

MAR-12 Updated

Updated

Updated

Updated

Updated Replace stage folding panel partition (25m2)

Lifecycle Replacement 2015 $32,500 Unassigned

S3 INTERIOR

Event:

Type Year Cost Priority

Updated: MAR-12

Interior building partitions are comprised of painted concrete masonry units or wood framed partitions with painted gypsum board on either side.

An operable folding panel partition wall is installed at the stage opening in the gymnasium.

Single glazed windows in painted, pressed steel frames are installed between the computer room and library in the building.

Penetrations or gaps in firewalls are sealed with caulking.

Interior doors consist of painted hollow metal doors or clear finish solid core wood doors set in painted metal or clear finish wood frames.

(10)

C1030.01 Visual Display Boards**

C1030.02 Fabricated Compartments (Toilets/Showers)**

C1030.05 Wall and Corner Guards*

4 - Acceptable

4 - Acceptable

4 - Acceptable Rating

Rating

Rating

1992

2004

2000 Installed

Installed

Installed

20

30

0 Design Life

Design Life

Design Life

MAR-12

MAR-12

MAR-12 Updated

Updated

Updated Replace visual display boards (40 boards)

Replace fabricated compartments (12 units) Lifecycle Replacement

Lifecycle Replacement

2015

2034

$26,000

$15,000

Unassigned

Unassigned Event:

Event:

Type

Type

Year

Year Cost

Cost

Priority

Priority Updated:

Updated:

MAR-12

MAR-12

Visual display boards consist of chalk boards, white boards, and tack boards in classrooms, administration areas, and corridors in the building.

Prefinished metal toilet compartments are installed in the building washrooms. Acrylic shower stalls are installed in the gym change/wash rooms.

Metal corner guards are generally installed in corridors in the building.

(11)

C1030.06 Handrails*

C1030.08 Interior Identifying Devices*

C1030.12 Storage Shelving*

C1030.14 Toilet, Bath, and Laundry Accessories*

C1030.17 Other Fittings*

3 - Marginal

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable Rating

Rating

Rating

Rating

Rating

1989

0

0

0

0 Installed

Installed

Installed

Installed

Installed

0

0

0

0

0 Design Life

Design Life

Design Life

Design Life

Design Life

MAR-12

MAR-12

MAR-12

MAR-12

MAR-12 Updated

Updated

Updated

Updated

Updated Add code compliant handrail to corridor ramp (lump sum)

Code Upgrade 2013 $1,000 Medium

The corridor ramp to the 1989 portables does not have a handrail.

Concern:

Add code compliant handrail.

Recommendation:

Event:

Type Year Cost Priority

Updated: MAR-12

A partial wall with a wood cap is installed at the ramp and stair in the 1989 portable connecting link.

Plastic or metal room number plates are generally installed on walls and doors in the building.

A variety of prefinished metal, painted wood, and clear finished wood storage shelving is installed in storage rooms in the building.

Wall mounted mirrors, soap, toilet tissue, and paper towel dispensers are provided in washrooms and a number of classrooms. Napkin dispenser/disposal units are installed in the women's staff washroom.

Various clear finished wood, wall mounted coat racks, and prefinished metal boot racks are installed in entrance vestibules and corridors in the building.

Consequences of Deferral:

Barrier free interior circulation requirement is not met.

(12)

C2010 Stair Construction*

C2020.05 Resilient Stair Finishes**

C2020.08 Stair Railings and Balustrades*

C3010.02 Wall Paneling**

C3010.04 Gypsum Board Wall Finishes (Unpainted)*

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable Rating

Rating

Rating

Rating

Rating

1962

2000

1962

2000

1953 Installed

Installed

Installed

Installed

Installed

0

20

0

30

0 Design Life

Design Life

Design Life

Design Life

Design Life

MAR-12

MAR-12

MAR-12

MAR-12

MAR-12 Updated

Updated

Updated

Updated

Updated Replace vinyl stair covering (25m2)

Replace MDF wall panelling in gym (100m2) Lifecycle Replacement

Lifecycle Replacement

2020

2030

$2,000

$6,000

Unassigned

Unassigned Event:

Event:

Type

Type

Year

Year Cost

Cost

Priority

Priority Updated:

Updated:

MAR-12

MAR-12

A wood framed stair is installed in the gymnasium to access the stage, as well as adjacent to the corridor ramp in the 1989 portable connecting corridor.

Resilient vinyl stair treads and rubber nosings are installed on the gymnasium and corridor stairs.

A painted steel handrail is provided at the gymnasium stairs to the stage.

Painted MDF, (medium density fibreboard), paneling is installed to 2.5m height in the gymnasium.

Gypsum board walls are installed throughout the school.

(13)

C3010.06 Tile Wall Finishes**

C3010.09 Acoustical Wall Treatment**

C3010.11 Interior Wall Painting*

4 - Acceptable

4 - Acceptable

4 - Acceptable Rating

Rating

Rating

1953

2000

2004 Installed

Installed

Installed

40

20

0 Design Life

Design Life

Design Life

MAR-12

MAR-12

MAR-12 Updated

Updated

Updated Replace ceramic tile walls (100m2)

Replace acoustical wall panels (10m2) Lifecycle Replacement

Lifecycle Replacement

2015

2020

$25,500

$2,000

Unassigned

Unassigned Event:

Event:

Type

Type

Year

Year Cost

Cost

Priority

Priority Updated:

Updated:

MAR-12

MAR-12

Glazed ceramic tile is installed in the building washrooms to full height, with partial height ceramic tile walls in the janitor rooms above the sinks.

Fabric covered acoustical wall panels are installed on upper wall portions in the library.

Interior partitions and walls are generally painted in the building.

(14)

C3020.01.02 Painted Concrete Floor Finishes*

C3020.02 Tile Floor Finishes**

C3020.04 Wood Flooring**

4 - Acceptable

4 - Acceptable

4 - Acceptable Rating

Rating

Rating

1980

1953

1990 Installed

Installed

Installed

0

50

30 Design Life

Design Life

Design Life

MAR-12

MAR-12

MAR-12 Updated

Updated

Updated Repaint mechanical room floor (lump sum)

Replace quarry tile flooring (80m2)

Replace gym floor (300m2) Failure Replacement

Lifecycle Replacement

Lifecycle Replacement

2012

2015

2020

$1,000

$22,000

$75,000

Low

Unassigned

Unassigned 1971section - mechanical room floor painted surface was peeling.

Concern:

Re-paint mechanical room floor.

Recommendation:

Event:

Event:

Event:

Type

Type

Type

Year

Year

Year Cost

Cost

Cost

Priority

Priority

Priority Updated:

Updated:

Updated:

MAR-12

MAR-12

MAR-12

Concrete floors in the building mechanical and janitorial rooms are generally painted.

Quarry tile flooring is installed in entrance vestibules and washrooms in the building.

The gymnasium flooring is wood strip sports flooring with painted game lines, reportedly re-finished circa 1990.

Consequences of Deferral:

Possible accelerated deterioration, loss of aesthetics.

(15)

C3020.07 Resilient Flooring**

C3020.08 Carpet Flooring**

C3030.04 Gypsum Board Ceiling Finishes (Unpainted)*

4 - Acceptable

4 - Acceptable

4 - Acceptable Rating

Rating

Rating

1999

1999

0 Installed

Installed

Installed

20

15

0 Design Life

Design Life

Design Life

MAR-12

MAR-12

MAR-12 Updated

Updated

Updated Replace damaged resilient floor tile in the copier room (40m2)

Replace resilient flooring (1,950m2)

Replace carpet flooring (490m2) Failure Replacement

Lifecycle Replacement

Lifecycle Replacement

2012

2019

2015

$2,000

$98,000

$32,000

Low

Unassigned

Unassigned Damaged and curled floor tiles were observed in the copier room.

Concern:

Replace damaged floor tiles.

Recommendation:

Event:

Event:

Event:

Type

Type

Type

Year

Year

Year Cost

Cost

Cost

Priority

Priority

Priority Updated:

Updated:

Updated:

MAR-12

MAR-12

MAR-12

Resilient vinyl flooring is comprised of sheet goods and tile installed in corridors and classrooms in the building.

Carpet flooring is installed in the library, the administration area, and in portions of some classrooms in the building.

Unpainted gypsum board ceilings were observed in the gym storage area, and in the mechanical room on the east building elevation.

Consequences of Deferral:

Possible accelerated damage, tripping hazard, and loss of aesthetics.

(16)

C3030.06 Acoustic Ceiling Treatment (Susp. T-Bar)**

C3030.07 Interior Ceiling Painting*

C3030.09 Other Ceiling Finishes*

4 - Acceptable

4 - Acceptable

4 - Acceptable Rating

Rating

Rating

1989

2004

2000 Installed

Installed

Installed

25

0

0 Design Life

Design Life

Design Life

MAR-12

MAR-12

MAR-12 Updated

Updated

Updated Replace acoustical ceiling tiles (2,000m2)

Lifecycle Replacement 2015 $88,000 Unassigned Event:

Type Year Cost Priority

Updated: MAR-12

A suspended T-Bar grid system with acoustic lay-in ceiling tiles is installed in the majority of the building, including classrooms, corridors, and the administration area.

Gypsum board ceilings in the foyers and washrooms are generally painted.

A prefinished, linear metal ceiling system is installed in the gymnasium.

(17)

D2010.04 Sinks**

D2010.04 Sinks** - Waist height cust.

4 - Acceptable

2 - Poor Rating

Rating

1984

1953 Installed

Installed

30

30 Design Life

Design Life

MAR-12

MAR-12 Updated

Updated Replace 16 SS Sinks and 1 Stone form. Mop Sink

Replace waist height mop sink Lifecycle Replacement

Program Functional Upgrade 2015

2012

$25,000

$2,300

Unassigned

Medium Waist height custodial sinks are associated with physical injuries.

Concern:

It is recommended that the sinks be replaced as they have exceeded their expected useful life.

It is recommended that the sink be replaced with a low profile custodial sink.

Recommendation:

Recommendation:

S4 MECHANICAL

Event:

Event:

Type

Type

Year

Year Cost

Cost

Priority

Priority Updated:

Updated:

MAR-12

MAR-12

There are 16 stainless steel sinks installed throughout the building. Installed in a custodial room is a single floor height, stone formed mop basin.

There is a single waist height custodial sink constructed of enameled steel installed in a custodial room.

Consequences of Deferral:

Possible injury.

(18)

D2010.05 Showers**

D2010.08 Drinking Fountains/Coolers**

3 - Marginal

3 - Marginal Rating

Rating

1984

1984 Installed

Installed

30

35 Design Life

Design Life

MAR-12

MAR-12 Updated

Updated Replace 4 Fiberglass Showers and plumbing Trim

Replace 5 Vit. Fountains Lifecycle Replacement

Lifecycle Replacement

2015

2019

$14,800

$8,500

Unassigned

Unassigned It is recommended that the showers be replaced as they have exceeded their expected useful life.

It is recommended that the fountains be replaced as they reach their expected useful life.

Recommendation:

Recommendation:

Event:

Event:

Type

Type

Year

Year Cost

Cost

Priority

Priority Updated:

Updated:

MAR-12

MAR-12

A total of four shower cubicles are installed in the building. Shower stalls are constructed of fiberglass complete with heavy duty shower head and pressure balance valves.

There are five vitreous china drinking fountains installed in the buildings main corridors. Separation of the water fountains for the walls has resulted in the splitting of the water resistant sealant. It is recommended that these be repairer, however, repairs are not expected to meet the reporting threshold.

(19)

D2010.10 Washroom Fixtures (WC, Lav, Urnl)**

D2020.01.01 Pipes and Tubes: Domestic Water*

D2020.01.02 Valves: Domestic Water**

D2020.01.08 Hose Bibbs*

4 - Acceptable

4 - Acceptable

3 - Marginal

4 - Acceptable Rating

Rating

Rating

Rating

1984

1984

1984

1984 Installed

Installed

Installed

Installed

35

0

40

0 Design Life

Design Life

Design Life

Design Life

MAR-12

MAR-12

MAR-12

MAR-12 Updated

Updated

Updated

Updated Replace 17 WC, 14 LAV, 6 Urn.

Replace 20 Water Valves Lifecycle Replacement

Failure Replacement

2019

2024

$68,000

$24,100

Unassigned

Low Minor leak stains were observed around various valves indicating leak repairs.

Concern:

It is recommended that the washroom fixtures be replaced as they reach their expected useful life.

It is recommended that the domestic water valves be replaced as they reach their expected useful life.

Recommendation:

Recommendation:

Event:

Event:

Type

Type

Year

Year Cost

Cost

Priority

Priority Updated:

Updated:

MAR-12

MAR-12

The buildings washrooms are equipped with 17 vitreous china, tank type, floor mounted water closets, 14 vitreous china wall mounted sinks and six vitreous china floor mounted urinals.

Domestic water piping is mainly copper and ranges in size from 40 mm down to 15 mm.

There are isolation valves installed on the domestic cold and hot water systems found throughout the building.

Frost-proof hose bibs are installed on the building's exterior walls.

(20)

D2020.02.02 Plumbing Pumps: Domestic Water**

D2020.02.06 Domestic Water Heaters**

D2030.01 Waste and Vent Piping* - 1953

D2030.01 Waste and Vent Piping* -1971 4 - Acceptable

4 - Acceptable

4 - Acceptable Rating

Rating

Rating

2006

2006

1953 Installed

Installed

Installed

20

20

0 Design Life

Design Life

Design Life

MAR-12

MAR-12

MAR-12 Updated

Updated

Updated Replace plumbing pumps.

Replace 151 l/h Hot Water Tank Lifecycle Replacement

Lifecycle Replacement

2026

2026

$1,000

$2,000

Unassigned

Unassigned It is recommended that the hot water tank be replaced as it reaches it's expected useful life.

Recommendation:

Event:

Event:

Type

Type

Year

Year Cost

Cost

Priority

Priority Updated:

Updated:

MAR-12

MAR-12

Domestic hot water is serviced by a re-circulation pump located beside hot water tank distribution line. As the pump is fractional in power, replacement is not expected to meet the reporting threshold.

Domestic hot water is supplied by a 115 l/h, natural gas-fired, tank type water heater located in the mechanical room, heating capacity input of 11 kW and storage capacity of 151 l.

Waste and vent piping is generally cast iron and original to the construction of the building. Floor drainage is facilitated by cast iron receptacles complete with brass covers installed throughout the building.

It has been reported that a service manhole outside is too shallow and results in overflowing. Costing for this repair has been included in the site report.

Waste and vent piping is generally cast iron and original to the construction of the 1971 addition. Floor drainage is facilitated by cast iron receptacles complete with brass covers installed throughout the addition.

(21)

D2040.01 Rain Water Drainage Piping Systems* - 1953

D2040.01 Rain Water Drainage Piping Systems* - 1971

D3010.02 Gas Supply Systems*

4 - Acceptable

4 - Acceptable

2 - Poor Rating

Rating

Rating

1953

1971

1984 Installed

Installed

Installed

0

0

0 Design Life

Design Life

Design Life

MAR-12

MAR-12

MAR-12 Updated

Updated

Updated

Paint Gas Piping on the Roof

Failure Replacement 2012 $5,000 High Roof gas lines exposed to the elements have rusted significantly and can result in pitting, more so in threaded areas.

Concern:

It is recommended that the gas piping routed on the roof receives a protective paint coat.

Recommendation:

Event:

Type Year Cost Priority

Updated: MAR-12

Rain water roof drainage is facilitated by rooftop drains complete with cast iron debris screens. Drains are routed through the building by internal cast iron rain water leaders which discharges to grade.

Rain water roof drainage is facilitated by rooftop drains complete with cast iron debris screens. Drains are routed through the building by internal cast iron rain water leaders which discharges to grade.

The natural gas piping is routed through the ceiling to the heating boilers, roof top air units and domestic hot water heater.

Consequences of Deferral:

Pitting could result in stress blow outs and may close the building till repairs are finished.

(22)

D3020.02.01 Heating Boilers and Accessories: H.W.**

D3020.02.02 Chimneys (& Comb. Air): H.W. Boiler**

D3020.02.03 Water Treatment: H. W. Boiler*

4 - Acceptable

4 - Acceptable

4 - Acceptable Rating

Rating

Rating

2002

2002

2002 Installed

Installed

Installed

35

35

0 Design Life

Design Life

Design Life

MAR-12

MAR-12

MAR-12 Updated

Updated

Updated Replace Two 305 kW Boilers and Two 351 l

Expansion Tanks

Replace 20 m of Chimney Lifecycle Replacement

Lifecycle Replacement

2037

2037

$67,000

$13,700

Unassigned

Unassigned It is recommended that the heating boilers be replaced as they reach their expected useful life.

It is recommended that the chimney be replaced as it reaches it's expected useful life.

Recommendation:

Recommendation:

Event:

Event:

Type

Type

Year

Year Cost

Cost

Priority

Priority Updated:

Updated:

MAR-12

MAR-12

The building's hydronic heating needs are supplied by two, manufactured by Weil Mclain, hot water boilers, with an input heating capacity of 305 KW each, model AAE-1800M. A 341 liter vertical, floor mounted, fixed bladder, expansion tank is installed on the return line in the building's mechanical room.

Boiler and hot water tank insulated flues extend through the roof of the mechanical room, as well as, a forced air, combustion air supply routed to boiler burners.

Pot feeders are used for boiler chemical treatment and are connected to the boiler supply piping. A water treatment program serves the heating hot water system.

(23)

D3040.01.01 Air Handling Units: Air Distribution** - 1996

2 - Poor Rating

1998 Installed

30 Design Life

MAR-12 Updated

Conduct a Study of Ventilation in the 1971 Addition

Repair/Replace 1400 l/s Air Handling Unit Study

Failure Replacement

2012

2012

$1,000

$11,000

Medium

Medium The air handling unit currently cannot meet the necessary flow to maintain the area.

The air handling unit currently cannot meet the necessary flow capacity to maintain the area.

Concern:

Concern:

It is recommended that a study of the air handling unit be conducted to determine a cost effective repair or replacement.

Based on study findings it is recommended that repair or replacement of the air handling unit, model DJ-20-0, be conducted.

Recommendation:

Recommendation:

Event:

Event:

Type

Type

Year

Year Cost

Cost

Priority

Priority Updated:

Updated:

MAR-12

MAR-12

Conditioned outside air is provided to the 971 addition by an Engineered Air, air handling unit installed on the roof, models DJ-20-0. Flow capacity was observed to be 1400 l/s. Units are equipped with combustion chamber, filter section, mixing box, supply air fan and return air fan.

The model DJ-20-0 was installed to replace a previous furnace and brought from another building. Unit was reported and observed to not possess the necessary flow needed to service it's intended area.

Consequences of Deferral:

Air quality will continue to poor in serviced area.

(24)

D3040.01.01 Air Handling Units: Air Distribution** - 1998

D3040.01.01 Air Handling Units: Air Distribution** -1984

D3040.01.04 Ducts: Air Distribution* - 1953 4 - Acceptable

4 - Acceptable Rating

Rating

Rating

1998

1984 Installed

Installed

Installed

30

30 Design Life

Design Life

Design Life

MAR-12

MAR-12 Updated

Updated

Updated Replace 2800 l/s Air Handler

Replace 3800 l/s Air Handler Lifecycle Replacement

Lifecycle Replacement

2028

2015

$13,500

$19,500

Unassigned

Unassigned It is recommended that the air handling unit be replaced as it reaches it's expected useful life.

It is recommended that the air handling units be replaced as it has exceeded it's expected useful life.

Recommendation:

Recommendation:

Event:

Event:

Type

Type

Year

Year Cost

Cost

Priority

Priority Updated:

Updated:

MAR-12

MAR-12

Conditioned outside air is provided to the gym by an Engineered Air, air handling unit installed on the roof, models IM-6- CO. Flow capacity was observed to be 2800 l/s. The unit was equipped with wet coils, filter section, mixing box, supply air fan and return air fan.

Conditioned outside air is provided to the building, excluding the gym and 1971 addition, by an Engineered Air gas-fired make up air handling unit installed on the roof, model IM-8-W. Flow capacity was observed to be 3800 l/s. Unit is equipped with a combustion chamber, filter section, mixing box, supply air fan and return air fan.

The duct distribution system consists of galvanized sheet metal uninsulated ceiling and below grade supply air ducts, ceiling return air plenums and sheet metal return air ducts. Distribution ducting was reported to be connected to the constant air volume boxes (CAV) installed throughout the building. Linear grilles and square diffusers are installed for supply and return air.

(25)

D3040.01.04 Ducts: Air Distribution* - 1971

D3040.03.01 Hot Water Distribution Systems**

D3040.04.01 Fans: Exhaust**

4 - Acceptable

4 - Acceptable

3 - Marginal Rating

Rating

Rating

1971

1971

1984 Installed

Installed

Installed

0

40

30 Design Life

Design Life

Design Life

MAR-12

MAR-12

MAR-12 Updated

Updated

Updated Replace HW distribuiton system serving 2100 m.sq. gross floor area (GFA)

Replace exhaust fans serving 2100 m.sq. GFA.

Lifecycle Replacement

Lifecycle Replacement

2015

2015

$195,300

$33,000

Unassigned

Unassigned It is recommended that the hot water distribution systems be replaced as they have exceeded their expected useful life.

It is recommended that the exhaust fans be replaced as they have exceeded their expected useful life.

Recommendation:

Recommendation:

Event:

Event:

Type

Type

Year

Year Cost

Cost

Priority

Priority Updated:

Updated:

MAR-12

MAR-12

The duct distribution system consists of galvanized sheet metal uninsulated ceiling and below grade supply air ducts, ceiling return air plenums and sheet metal return air ducts. Distribution ducting was reported to be connected to the constant air volume boxes (CAV) installed throughout the building. Linear grilles and square diffusers are installed for supply and return air.

Heated gycol is distributed by two 2.2 kW centrifugal pumps and routed to finned tube radiation, unit heaters, cabinet heaters and the air handling units. Two fractional coil circuit pumps supply preheat coils with hot water. Distribution piping is primarily steel and is complete with insulated fiberglass pipe wrap.

There are three roof mounted exhaust fans of varying sizes that supply the building with exhaust needs Additional ceiling mounted fans ventilate various rooms and washrooms..

Fan protective covers were observed to have broken mounts and stripped anchor bolts. It is recommended that these be repaired, however, repairs are not expected to meet the reporting threshold.

(26)

D3040.04.03 Ducts: Exhaust*

D3050.01.02 Packaged Rooftop Air Conditioning Units (& Heating Units)**

D3050.05.02 Fan Coil Units**

4 - Acceptable

4 - Acceptable

4 - Acceptable Rating

Rating

Rating

1984

1994

1984 Installed

Installed

Installed

0

30

30 Design Life

Design Life

Design Life

MAR-12

MAR-12

MAR-12 Updated

Updated

Updated Replace 11 kW Air Conditioner

Replace two 189 l/s fan coil units Lifecycle Replacement

Lifecycle Replacement

2024

2015

$5,700

$11,100

Unassigned

Unassigned It is recommended that the roof top air conditioner be replaced as it reaches it's expected useful life.

It is recommended that the fan coil units be replaced as they have exceeded their expected useful life.

Recommendation:

Recommendation:

Event:

Event:

Type

Type

Year

Year Cost

Cost

Priority

Priority Updated:

Updated:

MAR-12

MAR-12

Galvanized ducts installed from respective rooms to associated exhaust fan on roof. Ceiling and wall mounted metal exhaust grills were observed throughout the building.

Cooled air is supplied to the computer room 1028 by a roof top mounted air conditioner manufactured by Lennox, model ChA16-311-3P, capacity of 11 kW's of cooling.

There are two fan coil units installed at entrance vestibules to the main building.

(27)

D3050.05.03 Finned Tube Radiation**

D3050.05.06 Unit Heaters**

D3050.07 Other Terminal and Packaged Units*

4 - Acceptable

4 - Acceptable

4 - Acceptable Rating

Rating

Rating

1984

1984

1984 Installed

Installed

Installed

40

30

0 Design Life

Design Life

Design Life

MAR-12

MAR-12

MAR-12 Updated

Updated

Updated Replace 266 m.sq. Finn Tube Panels

Replace two 566 l/s Unit Heaters Lifecycle Replacement

Lifecycle Replacement

2024

2015

$12,400

$6,900

Unassigned

Unassigned It is recommended that the finned tube radiation be replaced as it reaches it's expected useful life.

It is recommended that the unit heater be replaced as it has exceeded it's expected useful life.

Recommendation:

Recommendation:

Event:

Event:

Type

Type

Year

Year Cost

Cost

Priority

Priority Updated:

Updated:

MAR-12

MAR-12

Raised finned tube radiation is installed in the gym.

The mechanical room and utility room are supplied with supplementary heat by hydronic suspended unit heaters.

Capacities could not be observed during the assessment.

It was reported that there are constant air volume (CAV) boxes installed inline with supply ducts throughout the building.

Units are complete with fans, dampers, filters, reheat coils and and return air.

(28)

D3060.02.01 Electric and Electronic Controls**

D3060.02.05 Building Systems Controls (BMCS, EMCS)**

D4030.01 Fire Extinguisher, Cabinets and Accessories*

4 - Acceptable

5 - Good

4 - Acceptable Rating

Rating

Rating

1984

2008

1953 Installed

Installed

Installed

30

20

0 Design Life

Design Life

Design Life

MAR-12

MAR-12

MAR-12 Updated

Updated

Updated Replace 4 Thermostats

Replace 2100 m.sq of DDC Lifecycle Replacement

Lifecycle Replacement

2015

2028

$1,000

$50,500

Unassigned

Unassigned It is recommended that the thermostats be replaced as they have exceeded their expected useful life.

It is recommended that the DDC system be replaced as it reaches it's expected useful life.

Recommendation:

Recommendation:

Event:

Event:

Type

Type

Year

Year Cost

Cost

Priority

Priority Updated:

Updated:

MAR-12

MAR-12

Mechanically operated thermostats are installed in vestibules equipped with fan coil units and for the suspended unit heater in the mechanical room.

Mechanical control is provided by a DDC system, manufacture by delta, installed in the mechanical room.

Typical ABC fire extinguishers are installed throughout the building, each located in a recessed or wall mounted cabinet.

They are reported to be inspected annually and replaced as needed.

(29)

D5010.03 Main Electrical Switchboards (Main Distribution)**

D5010.05 Electrical Branch Circuit Panelboards (Secondary Distribution)**

4 - Acceptable

4 - Acceptable Rating

Rating

1984

1984 Installed

Installed

40

30 Design Life

Design Life

MAR-12

MAR-12 Updated

Updated Replace 600 amp switch board

Replace 6-42 CCT, 225 A secondary panelboards Lifecycle Replacement

Lifecycle Replacement

2024

2015

$13,800

$29,800

Unassigned

Unassigned As the original panelboards have surpassed their expected useful life, replacement is recommended.

Concern:

It is recommended that the main distribution panel be replaced as it reaches its expected useful life.

Recommendation:

S5 ELECTRICAL

Event:

Event:

Type

Type

Year

Year Cost

Cost

Priority

Priority Updated:

Updated:

MAR-12

MAR-12

The main electrical distribution board is located in mechanical room near the gym. The main distribution panel was manufactured by Federal Pioneer and installed in 1982 with a capacity of; 600 amp, 3 phz, 4 w, 120/208 v and approximately 25% available space. It was observed that the main switch gear is rated at 400 amp and leaves room for future upgrades.

Secondary distribution panelboards consist of six, 42 CCT, panels that supply mechanical equipment, lighting and plug-in circuits located throughout the building. The majority of the panel boards are manufactured by Federal Pioneer and have the following capacities; 225 A, 3 phz, 4 wire, 120/208 V and approximately 25% available space.

600

225 Capacity Size

Capacity Size

amps

amps Capacity Unit

Capacity Unit

(30)

D5010.07.02 Motor Starters and Accessories**

D5020.01 Electrical Branch Wiring*

D5020.02.01 Lighting Accessories: Interior (Lighting Controls)*

D5020.02.02.02 Interior Fluorescent Fixtures**

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable Rating

Rating

Rating

Rating

1984

1984

1984

1997 Installed

Installed

Installed

Installed

30

0

0

30 Design Life

Design Life

Design Life

Design Life

MAR-12

MAR-12

MAR-12

MAR-12 Updated

Updated

Updated

Updated Replace 17 motor starters

Replace T-8 lighitng systems serving 2100 m.sq gross floor area.

Lifecycle Replacement 2015 $8,400 Unassigned As the motor starters have surpassed their expected useful life, replacement is recommended.

It is recommended that the T-8 lighting be replaced as it reaches it's expected useful life.

Recommendation:

Recommendation:

Event:

Event:

Type Year Cost Priority

Updated: MAR-12

Motor control is facilitated by 17 individual motor starters mounted in associated areas and above the mechanical rooms gutter/splitter.

Electrical branch wiring is predominately copper and routed through the building in conduit.

Inline manually operated, low voltage switches are installed throughout the building and provide the primary means of light control.

Fluorescent strip fixtures using T-8 technology are the predominant lighting type installed throughout the building.

(31)

D5020.02.02.03 Interior Metal Halide Fixtures*

D5020.02.03.02 Emergency Lighting Battery Packs**

D5020.02.03.03 Exit Signs*

D5020.03.01.04 Exterior H.P. Sodium Fixtures*

D5020.03.02 Lighting Accessories: Exterior (Lighting Controls)*

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable Rating

Rating

Rating

Rating

Rating

1984

1993

1995

1984

1984 Installed

Installed

Installed

Installed

Installed

0

20

0

0

0 Design Life

Design Life

Design Life

Design Life

Design Life

MAR-12

MAR-12

MAR-12

MAR-12

MAR-12 Updated

Updated

Updated

Updated

Updated Replace 20 Emergency Lighting Battery Packs

Lifecycle Replacement 2015 $24,200 Unassigned As the battery operated wall packs have surpassed their expected useful life, replacement is recommended.

Recommendation:

Event:

Type Year Cost Priority

Updated: MAR-12

Metal halide recessed fixtures are installed in the gym.

In the event of power failure emergency lighting is provided to egress routes by battery operated wall packs installed through out the school.

Illuminated exit signs using LED technology indicate the paths of egress throughout the building.

Exterior lighting is mainly provided to the building by eight wall mounted high pressure sodium down lights and four high pressure sodium pot light type fixtures.

Control for the outside lights is provided by photocells and a timer switch.

(32)

D5030.01 Detection and Fire Alarm** - 1984 fire panel

D5030.01 Detection and Fire Alarm** - Detection and annunciation 2 - Poor

4 - Acceptable Rating

Rating

1984

2008 Installed

Installed

25

25 Design Life

Design Life

MAR-12

MAR-12 Updated

Updated Replace obsolete fire systems panel

Replace fire detection systems serving 2100 m.sq gross floor area.

Failure Replacement

Lifecycle Replacement

2012

2033

$8,900

$61,000

Medium

Unassigned As the fire panel is obsolete and no longer supported, replacement parts may become difficult to find.

Concern:

It is recommended that the obsolete fire panel be replaced with a new addressable type fire panel.

It is recommended that the fire alarm systems be replaced as it reaches it's expected useful life.

Recommendation:

Recommendation:

Event:

Event:

Type

Type

Year

Year Cost

Cost

Priority

Priority Updated:

Updated:

MAR-12

MAR-12

The fire alarm system consists of an zoned fire alarm panel, manufactured by Edwards, complete with bell and strobe devices for annunciating. Activation is achieved by smoke detectors, heat detectors and manual pull stations. The fire alarm panel, model 2280, is obsolete and is no longer supported. Inspection and certification was last conducted in May 2011 and is reported to be inspected annually.

Consequences of Deferral:

In the even of failure without part replacement the closure of the building may occur till repairs are finished.

(33)

D5030.02.02 Intrusion Detection**

D5030.04.01 Telephone Systems*

D5030.04.05 Local Area Network Systems*

D5030.05 Public Address and Music Systems**

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable Rating

Rating

Rating

Rating

1999

1990

2000

1995 Installed

Installed

Installed

Installed

25

0

0

20 Design Life

Design Life

Design Life

Design Life

MAR-12

MAR-12

MAR-12

MAR-12 Updated

Updated

Updated

Updated Replace intrusion detection systems serving 2100 m.sq. gross floor area.

Replace Public Address and Music Systems Lifecycle Replacement

Lifecycle Replacement

2024

2015

$67,300

$5,500

Unassigned

Unassigned It is recommended that the intrusion detection systems be replaced as it reaches it's expected useful life.

It is recommended that the public address system be replaced as it has exceeded it's expected useful life.

Recommendation:

Recommendation:

Event:

Event:

Type

Type

Year

Year Cost

Cost

Priority

Priority Updated:

Updated:

MAR-12

MAR-12

There is a Magnum Alert security panel installed in the staff room with a security access pad mounted at the schools main entrance. Intrusion is detected by motion sensors installed throughout the building.

The building is serviced by a twisted pair telephone system, manufactured by Onyx.

The building is serviced by a Bell, fiber optics system which is connected to the building's category 5 cabling and wireless routers. The data system consist primarily of category 5 cabling routed throughout the building interfaced to network computers and several Cisco data controllers.

The building is equipped with a Rauland PA system tied in with phone systems and speakers for annunciation.

References

Related documents

A new design of audio port code named slimport provides much improved polar radiation performance in the new radios3. the slimport design is optimised with several goals in

Rogers (2006), a practicing digital forensics educator and investigator, defines AF as "attempts to negatively affect the existence, amount, and/or quality of evidence from

Management grades driving forward looking, innovative and ethical digital investigations must be equipped with significant levels of knowledge sufficient for the ever changing

Roof Primary: Flat construction with modified bituminous finish Fair Interiors Walls: Painted gypsum board. Floors: Carpet, VCT, ceramic tile, quarry tile Ceilings: Painted

» Demising wall, corridor wall, exterior walls will be framed and insulated and ready for drywall. » Up to $30.00/SF in Tenant Improvement Allowance (Based on

Painted hollow metal doors in pressed steel frames are installed at service rooms. Painted hollow metal doors with glazing have been installed in the corridors to access the

Code Upgrade 2004 $500 High Door to mechanical room does not have a

(1957)(1961) - Glued on 300 x 300 mm perforated (compressed fibre) acoustic tiles on the surfaces of gypsum boards in corridors of east and north wings; Entrance Vestibule, the