• No results found

Presentation Overview

N/A
N/A
Protected

Academic year: 2021

Share "Presentation Overview"

Copied!
55
0
0

Loading.... (view fulltext now)

Full text

(1)

1

Using Interactive Digital Storytelling to Engage the Public in GSI Planning for the

Lake Charlevoix Watershed

Donald D. Carpenter, PhD, PE, LEED AP Rachel Pieschek, PE

Jennifer Buchanan

Tip of the Mitt Watershed Council

1

• Charrettes & Public Visioning

• Virtual Methods of Public Engagement

• Lake Charlevoix GSI Project

• Project Overview

• ESRI StoryMap Example

• Survey123 Results

• Lessons Learned

Presentation Overview

(2)

2

3

Charrette

Assets, Weaknesses, Barriers, & Connections

Future “Visions”

Preferred Alternative

Concepts and Visioning

4

(3)

3

Visioning Board

5

Dot Voting

6

(4)

4

Actual CoVID “Charrette” Photo

7

8

Virtual Room

(5)

5

• Facebook/Social Media

• Mural

• ESRI Storymaps

• Miro

• CivicInsight

• CrowdGauge

• SessionLab

Online Engagement - Platforms

Mural

• “Sticky” notes

• Comments &

Sketches

• Photo & Video

• Support

10

Mural

(6)

6

• Users Led through Project

• Photo & Video

• Interactive Maps

• Embedded Surveys (Esri Survey123)

11

Esri StoryMaps

12

Project Background

Goal – Preserve and protect the high quality of the Lake Charlevoix Watershed with Green Stormwater Infrastructure.

Tasks – Community Engagement, Planning,

Visioning, Modeling & Conceptual Cost Estimating

(7)

7

Lake Charlevoix Watershed

13

Charlevoix 2,499 people

East Jordan 2,350 people

Boyne City 3,750 people

332 sq. miles 3rd Largest Lake in Michigan (917,200 ac)

14

Boyne City

(8)

8

• Bioretention Cells/Rain Gardens

• Vegetated Swales and Bioswales

• Planter Boxes

• Street Trees and Tree Box Filters

• Infiltration Galleries or Swales

• Permeable Pavement

Green Stormwater Infrastructure

Boyne City

16

(9)

9 Downtown (Sites 1 – 4)

1 - B i o r e te n t i o n C u r b E x te n s i o n - E x i s t i n g

(10)

10 1 - B i o r e te n t i o n C u r b E x te n s i o n -

P r o p o s e d

2 - Green Alley - Existing

(11)

11 2 - Green Alley - Proposed

3 - Roadside Swale - Existing

(12)

12 3 - Roadside Swale – Proposed A

3 - Roadside Swale – Proposed B

(13)

13 3 - Roadside Swale – Proposed C

Peninsula Beac h (Sites 5 & 6)

(14)

14 5 - Pe n i n s u l a B e a c h B i o r e te n t i o n -

E x i s t i n g

5 - Pe n i n s u l a B e a c h B i o r e te n t i o n - P r o p o s e d

(15)

15 6 - Pe n i n s u l a B e a c h C i r c l e R a i n G a r d e n -

E x i s t i n g

6 - Pe n i n s u l a B e a c h C i r c l e R a i n G a r d e n - P r o p o s e d

(16)

16 Rotar y Park (Site 7)

7 - Rotar y Park - Existing

(17)

17 7 - Rotar y Park - Proposed

Tanner y Beac h (Site 8)

(18)

18 8 - Tanner y Beac h - Existing

8 - Tanner y Beac h Swale – Proposed A

(19)

19 8 - Tanner y Beac h Swale – Proposed B

38

Charlevoix

(20)

20

Charlevoix

39

Depot Park (Sites 1 & 2)

(21)

21 1 - D e p o t Pa r k C u r b C u t R a i n G a r d e n -

E x i s t i n g

1 - D e p o t Pa r k C u r b C u t R a i n G a r d e n – P r o p o s e d A

(22)

22 1 - D e p o t Pa r k C u r b C u t R a i n G a r d e n –

P r o p o s e d B

2 - D e p o t Pa r k P i p e d R a i n G a r d e n - E x i s t i n g

(23)

23 2 - D e p o t Pa r k P i p e d R a i n G a r d e n -

P r o p o s e d

Ferr y Beac h & Boat Launc h (Sites 3-5)

(24)

24 3 - Fe r r y B e a c h B o a t L a u n c h S h o r e l i n e -

E x i s t i n g

3 - Fe r r y B e a c h B o a t L a u n c h S h o r e l i n e – P r o p o s e d A

(25)

25 3 - Fe r r y B e a c h B o a t L a u n c h S h o r e l i n e –

P r o p o s e d B

3 - Fe r r y B e a c h B o a t L a u n c h S h o r e l i n e – P r o p o s e d C

(26)

26 4 - Fe r r y B e a c h Pa r k i n g L o t B i o r e te n t i o n -

E x i s t i n g

52

4 - Fe r r y B e a c h Pa r k i n g L o t B i o r e te n t i o n - P r o p o s e d

(27)

27 5 - Ferr y Beac h Wetland - Existing

5 - Ferr y Beac h Wetland - Proposed

(28)

28 Downtown (Sites 6-8)

6 - D ow n tow n S to r mwa te r P l a n te r B oxe s - E x i s t i n g

(29)

29

57

6 - D ow n tow n S to r mwa te r P l a n te r B oxe s - P r o p o s e d

7 - Downtown Bioretention - Existing

(30)

30 7 - Downtown Bioretention - Proposed

8 - D ow n tow n S to r mwa te r Tr e e B ox - E x i s t i n g

(31)

31

61

8 - D ow n tow n S to r mwa te r Tr e e B ox - P r o p o s e d

Elm Street Tennis Cour ts (Site 9)

(32)

32 9 - Te n n i s C o u r t s R a i n G a r d e n - E x i s t i n g

9 - Te n n i s C o u r t s R a i n G a r d e n - P r o p o s e d

(33)

33

65

East Jordan

East Jordan

66

(34)

34

67

Downtown (Sites 1-3)

68

1 - D ow n tow n B i o r e te n t i o n C r o s s wa l k - E x i s t i n g

(35)

35

69

1 - D ow n tow n C r o s s wa l k B i o r e te n t i o n - P r o p o s e d

70

2 - D ow n tow n S to r mwa te r Tr e e B oxe s - E x i s t i n g

(36)

36

71

2 - D ow n tow n S to r mwa te r Tr e e B oxe s - P r o p o s e d

72

2 - D ow n tow n S to r mwa te r Tr e e B oxe s - P r o p o s e d

(37)

37

73

3 - Downtown Bioretention - Existing

74

3 - Downtown Bioretention - Proposed

(38)

38

75

Ec ho Street Park (Site 4)

76

4 - E c h o S t r e e t B i o r e te n t i o n a n d Pa r k i n g - E x i s t i n g

(39)

39

77

4 - E c h o S t r e e t B i o r e te n t i o n a n d Pa r k i n g - P r o p o s e d

78

John & Jordan Streets (Sites 5&6)

(40)

40

79

5 - J o h n & J o r d a n I n te r s e c t i o n – E x i s t i n g

80

5 - J o h n & J o r d a n I n te r s e c t i o n – P r o p o s e d

(41)

41

81

6 - John & Jordan Street - Existing

82

6 - John & Jordan Street – Proposed A

(42)

42

83

6 - J o h n & J o r d a n S t r e e t s – P r o p o s e d A

84

6 - J o h n & J o r d a n S t r e e t s – P r o p o s e d B

(43)

43

85

6 - J o h n & J o r d a n S t r e e t s – P r o p o s e d B

86

6 - John & Jordan Street – Proposed C

(44)

44

87

6 - J o h n & J o r d a n S t r e e t s – P r o p o s e d C

88

6 - J o h n & J o r d a n S t r e e t s – P r o p o s e d D

(45)

45

89

6 - J o h n & J o r d a n S t r e e t s – P r o p o s e d D

90

East Jordan Sc hools (Sites 7 & 8)

(46)

46

91

7 - E a s t J o r d a n S c h o o l s R a i n G a r d e n - E x i s t i n g

92

7 - E a s t J o r d a n S c h o o l s R a i n G a r d e n - P r o p o s e d

(47)

47

93

8 - East Jordan Sc hools - Existing

94

8 - East Jordan Sc hools – Proposed A

(48)

48

95

8 - East Jordan Sc hools – Proposed B

96

8 - East Jordan Sc hools – Proposed C

(49)

49

97

Example ESRI StoryMap East Jordan

98

ESRI Stor yMap

Link: https://arcg.is/0iWbz5

(50)

50

• Limited submissions to one per browser

• Internet cookies

• Geolocation/IP address

Participants

82%

13%

4% 1%

EAST JORDAN GSI SURVEY

Live or Work Nearby Community/Visitor Vacation Other

Drag and Drop Ranking

Single Choice Grid

Types of Questions

Drop Down List

Likrt Likert

Text Box

(51)

51

Embedded Survey

Results

(52)

52

• Weighted Average Results

• Results Need Filtering

• Difficult for Phone Users

Drag and Drop Ranking

Lessons Learned

(53)

53

How are users accessing the data?

Virtual Media Access

Computer Tablet Phone

Power of Social Media and Social Diffusion

• Population 2,350

• 71 survey participants (As of Oct 29)

• 3% Participation in online survey

• Survey active Oct 15 - Dec 1

• FB Page followers: 3,110 people

Social Media Post by City of East Jordan

(54)

54

• Trained Facilitators/Moderators

• Vocal Minority & Silent Majority

• Respect

107

Online vs In-Per son Civility

Comments in Context

“We are not as concerned with these little upgrades as we are with our road quality, sidewalk quality, removal of EJ foundry, and other much needed projects.”

“It's a beautiful idea, but right now our town needs other things. The gardens are nice, but unrealistic. This is not the year to "beautify" EJ, and the lake is fine. Too many are struggling.

This plan is insulting to all those struggling.”

(55)

55

Questions?

References

Related documents

Land capability is the inherent physical capacity of the land to sustain a range of land uses and management practices in the long term without degradation to

4) Facility local recovery (FLR) schemes [4] (Figure 1(d)): Backup LSPs are constructed as in the RLR schemes. However, a single backup LSP protects all the primary LSPs that

[18] Linux also runs on embedded systems , which are devices whose oper- ating system is typically built into the firmware and is highly tailored to the system; this includes

(2007) found that higher brand awareness results in a greater recall rate, more positive attitudes and a stronger intention to purchase the placed

Copper Sulphate 35 – 50 g/l Sulphuric Acid 170-100 g/l Chloride 30-100 g/l Brightener • adsorbs on Copper • disables Cu-deposition Carrier • desorbs Brightener • enables

STANDARD OPERATING PROCEDURES CONCIERGE P 800 Introductions P 801 History P 802 Guest Relations P 803 Telephone Techniques P 804 Complaint Handling P 805 Guest Arrival P 806

Key impacts anticipated on birds is during the operation phase and mainly related to risk of bird strikes and collisions with operating wind turbines.. However, to control

Initially offering a Nursing Science Program Study (PSIK) the University established the Faculty of Nursing in 1995 and in 2004 the Faculty expanded into six