• No results found

3G KPI Definations

N/A
N/A
Protected

Academic year: 2021

Share "3G KPI Definations"

Copied!
3806
0
0

Loading.... (view fulltext now)

Full text

(1)

Category KPI MOC

Accessibility Speech Access Success Rate (%) UtranCell

Accessibility Overall Accessibility Success Rate CS64 (%) UtranCell

Accessibility Overall Accessibility Success Rate PS Interactive (%) UtranCell

Accessibility Packet_R99 Access Success Rate (%) UtranCell

Accessibility Packet_HS Access Success Rate (%) UtranCell

Accessibility Overall Accessibility Success Rate PS Interactive EUL (%) UtranCell

Accessibility RRC Setup Success Rate (%) UtranCell

Accessibility RRC Setup Success Rate CS (%) UtranCell

Accessibility RRC Setup Success Rate PS (%) UtranCell

Accessibility RAB Establishment Success Rate Speech (%) UtranCell

Accessibility RAB Establishment Success Rate CS64 (%) UtranCell Accessibility RAB Establishment Success Rate PS Interactive (%) UtranCell Accessibility RAB Establishment Success Rate PS Interactive R99 (%) UtranCell Accessibility RAB Establishment Success Rate PS Interactive HS (%) UtranCell Accessibility RAB Establishment Success Rate PS Interactive EUL (%) UtranCell

(2)

Accessibility CS NAS Signaling Success Rate (%) UtranCell

Accessibility PS NAS Signaling Success Rate (%) UtranCell

Accessibility RAB Establishment Block Due to Lack of DL Channel Code

(%) UtranCell

Accessibility RRC Request Denied By DL Channel Code Admission

Control (%) UtranCell

Retainability Speech Drop Rate (%) UtranCell

Retainability RAB Drop Rate CS64 (%) UtranCell

Retainability RAB Drop Rate PS Interactive (%) UtranCell

Retainability Packet_R99 Drop Rate (%) UtranCell

Retainability Packet_HS Drop Rate (%) UtranCell

Retainability RAB Drop Rate PS Interactive EUL (%) UtranCell

Retainability Drop due to Soft Handover Action (%) UtranCell

Retainability Drop due to Missing Neighbor (%) UtranCell

(3)

Retainability Drop due to Congestion (%) UtranCell

Retainability Drop due to IRAT Handover Lost (%)

UtranCell, GsmRelati on

Mobility Soft HO Success Rate (%) UtranCell

Mobility Speech IRAT HO Success Rate (%) GsmRelati

on

Mobility PS IRAT (UMTS to GSM) Success Rate (%) GsmRelati on

Mobility HSDPA Cell Change SR (%) UtranCell

Mobility EUL Cell Change SR (%) UtranCell

Integrity HSDPA USER THROUGHPUT HsDschR

esources

Integrity HSPDA CELL THROUGHPUT HsDschR

(4)

Integrity EUL 2ms User Throughput EDchRes ources

Integrity EUL 10ms User Throughput EDchRes

ources

Integrity EUL 2ms Cell Throughput EDchRes

ources

Integrity EUL 10ms Cell Throughput EDchRes

ources

Integrity R99 Throughput UL UtranCell

Integrity R99 Throughput DL UtranCell

Cell Traffic Speech (Erl) UtranCell

Cell Traffic CS64 (Erl) UtranCell

(5)

Cell Traffic Volume DL Speech UtranCell

Cell Traffic Volume DL CS64 UtranCell

Cell Traffic Volume DL CS128 UtranCell

Cell Traffic Volume UL Speech UtranCell

Cell Traffic Volume UL CS64 UtranCell

Cell Traffic Volume UL CS128 UtranCell

Total Data Volume UL(MB) UtranCell

Eul Data Volume (MB) UtranCell

R99 Data Volume UL (MB) UtranCell

PS8 Data Volume UL (MB) UtranCell

PS16 Data Volume UL (MB) UtranCell

PS128 Data Volume UL (MB) UtranCell

PS384 data Volume UL (MB) UtranCell

PS64 Data Volume UL (MB) UtranCell

Total Data Volume DL(MB) UtranCell

HSDPA Data Volume (MB) UtranCell

R99 Data Volume DL (MB) UtranCell

PS8 Data Volume DL (MB) UtranCell

PS16 Data Volume DL (MB) UtranCell

PS64 Data Volume DL (MB) UtranCell

PS128 Data Volume DL (MB) UtranCell

PS384 data Volume DL (MB) UtranCell

PS Traffic CS Traffic

(6)

Utilization Average Users HS UtranCell

Utilization Average Users EUL UtranCell

Utilization RNC Capacity Utilization (%) RncCapac

ity Utilization CE Utilization UL (%) UplinkBas eBandPoo l Utilization CE Utilization DL (%) DownlinkB aseBandP ool

Utilization Used DL Codes Average Carrier

IubLink::pmTotalTimeIubLinkUnavail - the time that an Iub link is unavailable in seconds due to network Problems.

UtranCell::pmNoFailedAfterAdm -This counter can include failures for reasons that are TN-related as well as not TN-related.

RAB and RRC Establishment failures which occur after admission control can be due to timeout in the UE, RNC or RBS, logical error and invalid parameter settings, as well as for TN failure reasons. The user will perceive this as a failure to setup a call.

Includin g: IUR HOs HS cell change IRAT cell change IRAT HOs IF HOs

(7)

CN Hard Handove

rs

(8)
(9)
(10)
(11)
(12)
(13)
(14)
(15)
(16)
(17)
(18)
(19)
(20)
(21)
(22)
(23)
(24)
(25)
(26)
(27)
(28)
(29)
(30)
(31)
(32)
(33)
(34)
(35)
(36)
(37)
(38)
(39)
(40)
(41)
(42)
(43)
(44)
(45)
(46)
(47)
(48)
(49)
(50)
(51)
(52)
(53)
(54)
(55)
(56)
(57)
(58)
(59)
(60)
(61)
(62)
(63)
(64)
(65)
(66)
(67)
(68)
(69)
(70)
(71)
(72)
(73)
(74)
(75)
(76)
(77)
(78)
(79)
(80)
(81)
(82)
(83)
(84)
(85)
(86)
(87)
(88)
(89)
(90)
(91)
(92)
(93)
(94)
(95)
(96)
(97)
(98)
(99)
(100)
(101)
(102)
(103)
(104)
(105)
(106)
(107)
(108)
(109)
(110)
(111)
(112)
(113)
(114)
(115)
(116)
(117)
(118)
(119)
(120)
(121)
(122)
(123)
(124)
(125)
(126)
(127)
(128)
(129)
(130)
(131)
(132)
(133)
(134)
(135)
(136)
(137)
(138)
(139)
(140)
(141)
(142)
(143)
(144)
(145)
(146)
(147)
(148)
(149)
(150)
(151)
(152)
(153)
(154)
(155)
(156)
(157)
(158)
(159)
(160)
(161)
(162)
(163)
(164)
(165)
(166)
(167)
(168)
(169)
(170)
(171)
(172)
(173)
(174)
(175)
(176)
(177)
(178)
(179)
(180)
(181)
(182)
(183)
(184)
(185)
(186)
(187)
(188)
(189)
(190)
(191)
(192)
(193)
(194)
(195)
(196)
(197)
(198)
(199)
(200)

References

Related documents

whenever a study used a scale other than Green and Brock’s (2000) Transportation scale, the effect sizes of narrative transportation on the consequence variables were inflated.

1) A recapitulation of cash receipts, disbursements and bank deposits, representing cash on hand at the end of the accounting period. 2) A statement of personal property on

All persons, firms, or corporations who receive such information shall be deemed by the act of their receiving the same to have agreed to make no duplication, or other disclosure,

Hear about nuclear research and development activities and organisation that will underpin the programme and support implementation of a number of future nuclear technology

When an employee is able to return to work following a leave of absence (regard- less of what type of leave it is, i.e., workers’ comp, FMLA/CFRA, or an extended leave as a form

Abstract Yeast tRNA ligase (Trl1) is an essential trifunctional enzyme that catalyzes exon-exon ligation during tRNA biogenesis and the non-conventional splicing of HAC1 mRNA during

● Global Business Lines include Merchant Services & Terminals (in Belgium, France, Germany, India, Luxembourg, Spain, The Netherlands and United Kingdom), Financial Processing

10.1 All patients’ possessions will be recorded by a designated member of staff on the Patients’ Possessions Register (PPR), which will identify the patient by name and