CNOIS
CNOIS
INGENIERIA DE DETALLE
INGENIERIA DE DETALLE
CENTRO NACIONAL DE OPERACIONES DE
CENTRO NACIONAL DE OPERACIONES DE
IMÁGENES SATELITALES DEL PERÚ
IMÁGENES SATELITALES DEL PERÚ
PROYECTO GMI N° 1818
PROYECTO GMI N° 1818
1818-200-CD-IE-001
1818-200-CD-IE-001
CRITERIOS DE DISEÑO
CRITERIOS DE DISEÑO
ELECTRICIDAD
ELECTRICIDAD
Rev. A
Rev. A
APROBADO POR: APROBADO POR: JefeJefe de de Disciplina Disciplina Ing. Ing. Angel Angel AquijeAquije Jefe
Jefe de de Proyecto Proyecto Ing. Ing. Ludgar Ludgar AparicioAparicio Cliente
Cliente GyM GyM S.A. S.A. - - AIRBUSAIRBUS
Revisión
Revisión Hecho Hecho Por Por Descripción Descripción Fecha Fecha Revisado Revisado AprobadoAprobado
A
A W. W. Fabián Fabián Emitido Emitido para para Coordinación Coordinación Interna Interna 10/11/2014 10/11/2014 A. A. Aquije Aquije L. L. AparicioAparicio
COMENTARIOS: COMENTARIOS:
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime.
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime.
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime.
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime.
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime.
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime.
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime. Proy.GMI N°1818 Proy.GMI N°1818 1818-200-CD-IE-001 1818-200-CD-IE-001 Rev.A Rev.A CNOIS CNOIS INGENIERIA DE DETALLE INGENIERIA DE DETALLE
CENTRO NACIONAL DE OPERACIONES DE CENTRO NACIONAL DE OPERACIONES DE
IMÁGENES SATELITALES DEL PERÚ IMÁGENES SATELITALES DEL PERÚ
CRITERIOS DE DISENO CRITERIOS DE DISENO ELECTRICIDAD ELECTRICIDAD Fecha: 10/11/2014 Fecha: 10/11/2014 Página 2 de 27 Página 2 de 27 ÍNDICE ÍNDICE CRITERIO DE DISEÑO ... 5 CRITERIO DE DISEÑO ... 5 1.0 1.0 GENERALIDADES GENERALIDADES ... 5... 5 2.0 2.0 ALCANCE ... 5ALCANCE ... 5 3.0
3.0 CÓDIGOS FUENTE ...CÓDIGOS FUENTE ... 5... 5 4.0
4.0 CÓDIGOS, REGULACIONES Y CÓDIGOS, REGULACIONES Y ESTÁNDARES ESTÁNDARES ... 6... 6 A)
A) CÓDIGOS ... 6CÓDIGOS ... 6 B)
B) ESTÁNDARES ESTÁNDARES ... 6... 6 5.0
5.0 CONDICIONES EN EL CONDICIONES EN EL LUGAR (CÓDIGO LUGAR (CÓDIGO A) A) ... 7... 7 A)
A) UBICACIÓN ... 7UBICACIÓN ... 7 B)
B) CONDICIONES CLIMÁTICAS ... 7CONDICIONES CLIMÁTICAS ... 7 6.0
6.0 SUMINISTRO DE SUMINISTRO DE ENERGÍA ENERGÍA ... 7... 7 A)
A) FUENTE DE SUMINISTRO DE ENERGÍA ... 7FUENTE DE SUMINISTRO DE ENERGÍA ... 7 B)
B) FUENTE DE SUMINISTRO FUENTE DE SUMINISTRO DE ENERGÍA DE ENERGÍA DE RESPALDO DE RESPALDO ... 7... 7 C)
C) TENSIONES NOMINALES DE DISTRIBUCIÓN TENSIONES NOMINALES DE DISTRIBUCIÓN Y UTILIZACIÓN ... 7Y UTILIZACIÓN ... 7 6.C.1
6.C.1 DISTRIBUCIÓN EN MEDIA TENSIÓN ...DISTRIBUCIÓN EN MEDIA TENSIÓN ... 8... 8 6.C.2
6.C.2 DISTRIBUCIÓN EN DISTRIBUCIÓN EN BAJA TENSIÓN BAJA TENSIÓN ... 8... 8 6.C.3
6.C.3 UTILIZACIÓN EN BAJA TENSIÓN ...UTILIZACIÓN EN BAJA TENSIÓN ... 8... 8 6.C.4
6.C.4 SUMINISTRO ELÉCTRICO SUMINISTRO ELÉCTRICO PARA CONTROL ... 8PARA CONTROL ... 8 D)
D) NIVELES DE AISLAMIENTO ...NIVELES DE AISLAMIENTO ... 8.... 8 E)
E) DISTORSIÓN DISTORSIÓN ARMÓNICA ARMÓNICA ... 8... 8 F)
F) SISTEMA DE SISTEMA DE MEDICIÓN MEDICIÓN ... 9... 9 7.0
7.0 PROTECCIÓN (ENCLOSURES) DE PROTECCIÓN (ENCLOSURES) DE EQUIPOS ELÉCTRICOS ... EQUIPOS ELÉCTRICOS ... 99 A)
A) ENCERRAMIENTOS DE LAS CELDAS DE ENCERRAMIENTOS DE LAS CELDAS DE MEDIA TENSIÓN ... 9MEDIA TENSIÓN ... 9 B)
B) ENCERRAMIENTOS DE TRANSFORMADORES ENCERRAMIENTOS DE TRANSFORMADORES TIPO SECO ... 9TIPO SECO ... 9 C)
C) ENCERRAMIENTOS DE TABLEROS ELÉCTRICOS ...ENCERRAMIENTOS DE TABLEROS ELÉCTRICOS ... 9... 9 8.0
8.0 EQUIPOS ELÉCTRICOS ... 9EQUIPOS ELÉCTRICOS ... 9 A)
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime.
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime.
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime.
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime.
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime.
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime. Proy.GMI N°1818 Proy.GMI N°1818 1818-200-CD-IE-001 1818-200-CD-IE-001 Rev.A Rev.A CNOIS CNOIS INGENIERIA DE DETALLE INGENIERIA DE DETALLE
CENTRO NACIONAL DE OPERACIONES DE CENTRO NACIONAL DE OPERACIONES DE
IMÁGENES SATELITALES DEL PERÚ IMÁGENES SATELITALES DEL PERÚ
CRITERIOS DE DISENO CRITERIOS DE DISENO ELECTRICIDAD ELECTRICIDAD Fecha: 10/11/2014 Fecha: 10/11/2014 Página 3 de 27 Página 3 de 27 F)
F) TABLERO PARA AIRE TABLERO PARA AIRE ACONDICIONADO (TAA ACONDICIONADO (TAA Y TAAE) Y TAAE) ... 13... 13 G)
G) SISTEMA DE ENERGÍA SISTEMA DE ENERGÍA ININTERRUMPIDA (UPS) ININTERRUMPIDA (UPS) ... 13. 13 9.0
9.0 SUBESTACIÓN DE TRANSFORMACIÓN... 14SUBESTACIÓN DE TRANSFORMACIÓN... 14 A)
A) DISPOSICIÓN DISPOSICIÓN ... 14. 14 B)
B) CAPACIDAD. ... 14CAPACIDAD. ... 14 10.0
10.0 ESPACIO LIBRE EN ESPACIO LIBRE EN SALAS ELECTRICAS SALAS ELECTRICAS ... 14... 14 11.0
11.0 CABLES CABLES ... 15... 15 A)
A) DIMENSIONAMIENTODIMENSIONAMIENTO... 15... 15 B)
B) CAÍDA DE TENSIÓN ... 15CAÍDA DE TENSIÓN ... 15 C)
C) CABLES DE CABLES DE FUERZA DE FUERZA DE MEDIA TENSIÓN MEDIA TENSIÓN ... 16... 16 D)
D) CABLES DE FUERZA CABLES DE FUERZA DE BAJA DE BAJA TENSIÓN TENSIÓN ... 16... 16 E)
E) CABLES DE ALUMBRADO Y CABLES DE ALUMBRADO Y TOMACORRIENTES ... 16TOMACORRIENTES ... 16 F)
F) IDENTIFICACIÓN DE IDENTIFICACIÓN DE CABLES Y CONCABLES Y CONDUCTORES DUCTORES ... 17. 17 G)
G) TERMINACIONES PARA CABLES DE MT ...TERMINACIONES PARA CABLES DE MT ... 17... 17 H)
H) TERMINACIONES PARA CABLES TERMINACIONES PARA CABLES DE BT DE BT ... 17... 17 12.0
12.0 CANALIZACIONES CANALIZACIONES ... 18... 18 A)
A) TUBERÍAS EXPUESTAS TUBERÍAS EXPUESTAS ... 18... 18 B)
B) TUBERÍAS ENTERRADAS TUBERÍAS ENTERRADAS ... 19... 19 C)
C) TUBERÍAS DE PVC TUBERÍAS DE PVC Y ACCESORIOS Y ACCESORIOS ... 19... 19 D)
D) BANDEJAS PORTACABLES BANDEJAS PORTACABLES ... 20... 20 E)
E) TUBERÍAS FLEXIBLES ...TUBERÍAS FLEXIBLES ... 21. 21 13.0
13.0 CAJAS CAJAS ... 21... 21 A)
A) CAJAS DE CAJAS DE PASO PASO ... 21... 21 14.0
14.0 ALUMBRADO ... 21ALUMBRADO ... 21 A)
A) GENERAL GENERAL ... 21. 21 A.1
A.1 EMPLAZAMIENTO DE EMPLAZAMIENTO DE LUMINARIAS LUMINARIAS ... 22... 22 A.2
A.2 CONTROL DE ILUMINACIÓN ...CONTROL DE ILUMINACIÓN ... 22... 22 B)
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime.
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime.
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime.
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime.
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime.
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime. Proy.GMI N°1818 Proy.GMI N°1818 1818-200-CD-IE-001 1818-200-CD-IE-001 Rev.A Rev.A CNOIS CNOIS INGENIERIA DE DETALLE INGENIERIA DE DETALLE
CENTRO NACIONAL DE OPERACIONES DE CENTRO NACIONAL DE OPERACIONES DE
IMÁGENES SATELITALES DEL PERÚ IMÁGENES SATELITALES DEL PERÚ
CRITERIOS DE DISENO CRITERIOS DE DISENO ELECTRICIDAD ELECTRICIDAD Fecha: 10/11/2014 Fecha: 10/11/2014 Página 4 de 27 Página 4 de 27 16.0
16.0 TOMACORRIENTES DE USO GENERAL... 24TOMACORRIENTES DE USO GENERAL... 24 17.0
17.0 PUESTA A TIERRA ... 24PUESTA A TIERRA ... 24 A)
A) GENERAL GENERAL ... 24. 24 B)
B) DISEÑO ... 25DISEÑO ... 25 18.0
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime.
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime.
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime.
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime.
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime.
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime. Proy.GMI N°1818 Proy.GMI N°1818 1818-200-CD-IE-001 1818-200-CD-IE-001 Rev.A Rev.A CNOIS CNOIS INGENIERIA DE DETALLE INGENIERIA DE DETALLE
CENTRO NACIONAL DE OPERACIONES DE CENTRO NACIONAL DE OPERACIONES DE
IMÁGENES SATELITALES DEL PERÚ IMÁGENES SATELITALES DEL PERÚ
CRITERIOS DE DISENO CRITERIOS DE DISENO ELECTRICIDAD ELECTRICIDAD Fecha: 10/11/2014 Fecha: 10/11/2014 Página 5 de 27 Página 5 de 27 CRITERIO DE DISEÑO CRITERIO DE DISEÑO 1.0 1.0 GENERALIDADESGENERALIDADES
El presente documento define los requerimientos, condiciones y parámetros de diseño que deberán cumplir El presente documento define los requerimientos, condiciones y parámetros de diseño que deberán cumplir los equipos e instalaciones eléctricas para la Ingeniería a desarrollarse para el proyecto de "Centro Nacional los equipos e instalaciones eléctricas para la Ingeniería a desarrollarse para el proyecto de "Centro Nacional de Operaciones de Imágenes Satelitales del Perú (CNOIS)", propiedad de CONIDA (Comisión Nacional de de Operaciones de Imágenes Satelitales del Perú (CNOIS)", propiedad de CONIDA (Comisión Nacional de Investigac
Investigación y ión y Desarrollo Aeroespacial del Perú).Desarrollo Aeroespacial del Perú).
Las prácticas y recomendaciones presentadas aquí deberán aplicarse a las labores desarrolladas por Las prácticas y recomendaciones presentadas aquí deberán aplicarse a las labores desarrolladas por ingeniería, proveedo
ingeniería, proveedores de equipos y res de equipos y sistemas, y en general toda instancia que sistemas, y en general toda instancia que intervenga en el diseño.intervenga en el diseño. 2.0
2.0 ALCANCEALCANCE
El alcance del presente documento establece los estándares de ingeniería y las prácticas a seguir para la El alcance del presente documento establece los estándares de ingeniería y las prácticas a seguir para la ejecución del diseño de las instalaciones eléctricas, que comprenden la alimentación eléctrica, ruteo de ejecución del diseño de las instalaciones eléctricas, que comprenden la alimentación eléctrica, ruteo de cables y bandejas, diseño de la iluminación, dibujo de planos y documentación técnica, y tiene la intención de cables y bandejas, diseño de la iluminación, dibujo de planos y documentación técnica, y tiene la intención de servir como guía de diseño para las instalaciones eléctricas interiores y exteriores del Centro Nacional de servir como guía de diseño para las instalaciones eléctricas interiores y exteriores del Centro Nacional de Operaciones de Imágenes Satelitale
Operaciones de Imágenes Satelitales del Perú s del Perú (CNOIS).(CNOIS).
Las prácticas y recomendaciones presentadas aquí deberán aplicarse a las labores desarrolladas por Las prácticas y recomendaciones presentadas aquí deberán aplicarse a las labores desarrolladas por Ingeniería, proveedore
Ingeniería, proveedores de equipos y s de equipos y sistemas, y en general toda instancia que sistemas, y en general toda instancia que intervenga en el diseño.intervenga en el diseño. Este Criterio de Diseño gobernará sobre
Este Criterio de Diseño gobernará sobre el contenido de los siguientes documentos:el contenido de los siguientes documentos: - - Planos Planos de de arreglos arreglos generales.generales.
- - Planos Planos de de detalles.detalles. - - Memorias Memorias descriptivasdescriptivas.. - - Memorias Memorias de de cálculo.cálculo. - - EspecificaEspecificaciones ciones técnicas.técnicas. 3.0
3.0 CÓDIGOS FUENTECÓDIGOS FUENTE
Las letras de los códigos fuentes listadas para cada criterio hacen referencia al origen del valor de dicho Las letras de los códigos fuentes listadas para cada criterio hacen referencia al origen del valor de dicho criterio. En algunos casos, 2 códigos fuentes pueden ser referenciados. Los siguientes códigos de letras criterio. En algunos casos, 2 códigos fuentes pueden ser referenciados. Los siguientes códigos de letras están designados como:
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime.
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime.
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime.
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime.
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime.
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime. Proy.GMI N°1818 Proy.GMI N°1818 1818-200-CD-IE-001 1818-200-CD-IE-001 Rev.A Rev.A CNOIS CNOIS INGENIERIA DE DETALLE INGENIERIA DE DETALLE
CENTRO NACIONAL DE OPERACIONES DE CENTRO NACIONAL DE OPERACIONES DE
IMÁGENES SATELITALES DEL PERÚ IMÁGENES SATELITALES DEL PERÚ
CRITERIOS DE DISENO CRITERIOS DE DISENO ELECTRICIDAD ELECTRICIDAD Fecha: 10/11/2014 Fecha: 10/11/2014 Página 6 de 27 Página 6 de 27 Código Descripción Código Descripción A
A Criterios Criterios provistos provistos por por AIRBUS AIRBUS Defence Defence & & SpaceSpace B
B Prácticas Prácticas estándar estándar de de la la industriaindustria C
C RecomendacioneRecomendaciones s de de GMIGMI D
D Criterios Criterios originados originados por por el el proveedorproveedor E
E Datos Datos de de manuales manuales de de ingenieríaingeniería F
F Criterios Criterios de de cálculocálculo G
G Datos Datos asumidosasumidos H
H Criterios provistos por “el proveedor de la Criterios provistos por “el proveedor de la tecnología”tecnología”
4.0
4.0 CÓDIGOS, REGULACIONES Y ESTÁNDARESCÓDIGOS, REGULACIONES Y ESTÁNDARES a)
a) CódigosCódigos
El diseño eléctrico y la construcción, en general, deberán cumplir con lo establecido en los El diseño eléctrico y la construcción, en general, deberán cumplir con lo establecido en los siguientes códigos:
siguientes códigos:
RNE RNE - - 2006 2006 Reglamento Nacional Reglamento Nacional de de EdificaciEdificaciones.ones.
DGE DGE / / MEM MEM - - 2006 2006 Código Código Nacional Nacional de de ElectricidadElectricidad – – Utilización (CNE). Utilización (CNE).
DGE DGE / / MEM MEM - - 2011 2011 Código Código Nacional Nacional de de ElectricidadElectricidad – – Suministro (CNE). Suministro (CNE).
NESC NESC National National Electric Electric Safety Safety Code.Code.
NEC NEC / / NFPA70 NFPA70 National National Electric Electric Code.Code.
El Código Nacional de Electricidad (CNE)
El Código Nacional de Electricidad (CNE) – – Suministro 2011 será complementado por el National Suministro 2011 será complementado por el National
Electric Safety Code (NESC) en todo aquello que no se le oponga. De igual manera, el Código Electric Safety Code (NESC) en todo aquello que no se le oponga. De igual manera, el Código Nacional de Electricidad
Nacional de Electricidad – – Utilización 2006 será complementado por el National Electric Code Utilización 2006 será complementado por el National Electric Code
(NEC). (NEC). b)
b) EstándaresEstándares
Los equipos, materiales y componentes eléctricos, serán diseñados, construidos, clasificados, y Los equipos, materiales y componentes eléctricos, serán diseñados, construidos, clasificados, y probados de acuerdo con los requerimientos, recomendaciones de la
probados de acuerdo con los requerimientos, recomendaciones de la Comisión ElectrotécnicaComisión Electrotécnica Internacional - IEC
Internacional - IEC..
Como un complemento, pero no mandatario, se utilizará los últimos estándares eléctricos de las Como un complemento, pero no mandatario, se utilizará los últimos estándares eléctricos de las siguientes
siguientes organizacioorganizaciones:nes:
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime.
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime.
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime.
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime.
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime.
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime.
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime. Proy.GMI N°1818 Proy.GMI N°1818 1818-200-CD-IE-001 1818-200-CD-IE-001 Rev.A Rev.A CNOIS CNOIS INGENIERIA DE DETALLE INGENIERIA DE DETALLE
CENTRO NACIONAL DE OPERACIONES DE CENTRO NACIONAL DE OPERACIONES DE
IMÁGENES SATELITALES DEL PERÚ IMÁGENES SATELITALES DEL PERÚ
CRITERIOS DE DISENO CRITERIOS DE DISENO ELECTRICIDAD ELECTRICIDAD Fecha: 10/11/2014 Fecha: 10/11/2014 Página 7 de 27 Página 7 de 27
NFPA NFPA Asociación Asociación Nacional Nacional de de Protección Protección contra contra el el Fuego.Fuego.
ASTM ASTM Sociedad Sociedad Americana Americana para para Pruebas Pruebas y y Materiales.Materiales.
Adicionalmente a los códigos y estándares antes mencionados, el diseño y la construcción Adicionalmente a los códigos y estándares antes mencionados, el diseño y la construcción eléctrica serán conforme a los requerimientos de ley o regulaciones de autoridades locales eléctrica serán conforme a los requerimientos de ley o regulaciones de autoridades locales incluyendo el Código Nacional de Electricidad (CNE). En caso se presente conflicto entre incluyendo el Código Nacional de Electricidad (CNE). En caso se presente conflicto entre requerimiento
requerimientos y s y estándares, prevalecerá el CNE.estándares, prevalecerá el CNE. 5.0
5.0 CONDICIONES EN EL LUGAR (Código A)CONDICIONES EN EL LUGAR (Código A) a)
a) UbicaciónUbicación
El proyecto Centro Nacional de Operaciones de Imágenes Satelitales del Perú (CNOIS), se El proyecto Centro Nacional de Operaciones de Imágenes Satelitales del Perú (CNOIS), se encuentra ubicado al Sur de Lima, en el distrito de Pucusana, a la altura del km 50 de la encuentra ubicado al Sur de Lima, en el distrito de Pucusana, a la altura del km 50 de la Panamerican
Panamericana Sur, en el a Sur, en el terreno que pertenece a CONIDA.terreno que pertenece a CONIDA. b)
b) Condiciones ClimáticasCondiciones Climáticas
Altitud sobre el nivel del mar: Menor a 1000mAltitud sobre el nivel del mar: Menor a 1000m
Temperatura máximTemperatura máxima del aire: a del aire: 23.6 ºC23.6 ºC
Temperatura mínTemperatura mínima del aire: 16.2 ºCima del aire: 16.2 ºC
Humedad Relativa Promedio Máxima: 99%Humedad Relativa Promedio Máxima: 99%
Humedad Relativa Promedio Mínima: 80%Humedad Relativa Promedio Mínima: 80%
6.0
6.0 SUMINISTRO DE ENERGÍASUMINISTRO DE ENERGÍA a)
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime.
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime.
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime.
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime.
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime.
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime. Proy.GMI N°1818 Proy.GMI N°1818 1818-200-CD-IE-001 1818-200-CD-IE-001 Rev.A Rev.A CNOIS CNOIS INGENIERIA DE DETALLE INGENIERIA DE DETALLE
CENTRO NACIONAL DE OPERACIONES DE CENTRO NACIONAL DE OPERACIONES DE
IMÁGENES SATELITALES DEL PERÚ IMÁGENES SATELITALES DEL PERÚ
CRITERIOS DE DISENO CRITERIOS DE DISENO ELECTRICIDAD ELECTRICIDAD Fecha: 10/11/2014 Fecha: 10/11/2014 Página 8 de 27 Página 8 de 27 6.c.1
6.c.1 Distribución en Media TensiónDistribución en Media Tensión
13.2 kV, 3 fases, 3 hilos, 60 13.2 kV, 3 fases, 3 hilos, 60 Hz, neutro sólidamente aterradHz, neutro sólidamente aterrado (este o (este nivel de tensión deberánivel de tensión deberá
de ser confirmado por
de ser confirmado por la concesionaria) (Código A).la concesionaria) (Código A). 6.c.2
6.c.2 Distribución en Baja TensiónDistribución en Baja Tensión
400 V, 3 fases + 400 V, 3 fases + neutro + tierra, 5 hilos, 60 neutro + tierra, 5 hilos, 60 Hz, neutro corrido (Código A).Hz, neutro corrido (Código A).
230 V, 1 fase + neutro + tierra, 3 hilos, 60 Hz, neutro corrido (Código A).230 V, 1 fase + neutro + tierra, 3 hilos, 60 Hz, neutro corrido (Código A).
6.c.3
6.c.3 Utilización en Baja TensiónUtilización en Baja Tensión
380 V, 3 fases + neutro + tierra, 5 hilos, 60 Hz (Código A).380 V, 3 fases + neutro + tierra, 5 hilos, 60 Hz (Código A).
Para equipos eléctricos, alimentado
Para equipos eléctricos, alimentadores y res y tomacorrienttomacorrientes industriales (Códigos B y es industriales (Códigos B y C).C).
220 V, 1 fase + neutro + tierra, 3 hilos, 60 Hz (Código A).220 V, 1 fase + neutro + tierra, 3 hilos, 60 Hz (Código A).
Para distribución de circuitos de tomacorrientes y alumbrado. El suministro para los Para distribución de circuitos de tomacorrientes y alumbrado. El suministro para los tomacorrientes y artefactos de alumbrado será mediante circuitos monofásicos tomacorrientes y artefactos de alumbrado será mediante circuitos monofásicos balanceado
balanceados en los s en los tableros de distribución trifásicos (Códigos B y tableros de distribución trifásicos (Códigos B y C).C). 6.c.4
6.c.4 Suministro Eléctrico para ControlSuministro Eléctrico para Control
125 VDC, para tensión de control de 125 VDC, para tensión de control de interruptores de media tensión (Códigos B y C):interruptores de media tensión (Códigos B y C):
d)
d) Niveles de AislamientoNiveles de Aislamiento
Según norma IEC 60071-1 para las condiciones del sitio del proyecto se tiene las siguientes Según norma IEC 60071-1 para las condiciones del sitio del proyecto se tiene las siguientes tensiones de soportabilidad normalizadas (Código E):
tensiones de soportabilidad normalizadas (Código E): Tensión Tensión Nominal Nominal (kV) (kV) Clase de Clase de Aislamiento Aislamiento (kV) (kV) Tensión de Tensión de Soportabilida Soportabilidad d aa Frecuencia Frecuencia Tensión de Soportabilidad a Tensión de Soportabilidad a Impulso Atmosférico (BIL) Impulso Atmosférico (BIL)
(kV) (kV)
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime.
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime.
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime.
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime.
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime.
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime. Proy.GMI N°1818 Proy.GMI N°1818 1818-200-CD-IE-001 1818-200-CD-IE-001 Rev.A Rev.A CNOIS CNOIS INGENIERIA DE DETALLE INGENIERIA DE DETALLE
CENTRO NACIONAL DE OPERACIONES DE CENTRO NACIONAL DE OPERACIONES DE
IMÁGENES SATELITALES DEL PERÚ IMÁGENES SATELITALES DEL PERÚ
CRITERIOS DE DISENO CRITERIOS DE DISENO ELECTRICIDAD ELECTRICIDAD Fecha: 10/11/2014 Fecha: 10/11/2014 Página 9 de 27 Página 9 de 27
f)f) Sistema de MediciónSistema de Medición
La medición será realizada en las celdas principales de 13.2kV para monitorear la potencia, La medición será realizada en las celdas principales de 13.2kV para monitorear la potencia, energía consumida, tensión y corriente. Similar medición será realizada en los tableros de energía consumida, tensión y corriente. Similar medición será realizada en los tableros de distribución en 400 / 230 VAC según sea
distribución en 400 / 230 VAC según sea necesario (Código B y C).necesario (Código B y C). 7.0
7.0 ENCERRAMIENTOS DE EQUIPOS ELÉCTRICOSENCERRAMIENTOS DE EQUIPOS ELÉCTRICOS
En general los gabinetes del equipamiento eléctrico tendrán los siguientes encerramientos tipo, según el En general los gabinetes del equipamiento eléctrico tendrán los siguientes encerramientos tipo, según el estándar IEC 60529 (Código C):
estándar IEC 60529 (Código C): a)
a) Encerramientos de las Celdas de Media TensiónEncerramientos de las Celdas de Media Tensión
-- IP3X: Protegido contra los cuerpos sólidos mayores a 2.5 mm (Código C).IP3X: Protegido contra los cuerpos sólidos mayores a 2.5 mm (Código C).
Las celdas de media tensión serán instaladas en el interior de la Subestación Eléctrica (Códigos A y C). Las celdas de media tensión serán instaladas en el interior de la Subestación Eléctrica (Códigos A y C). b)
b) Encerramientos de Transformadores Tipo SecoEncerramientos de Transformadores Tipo Seco
-- IP21: Previsto para uso interior en salas eléctricas, áreas secas y limpias; tendrán encerramientosIP21: Previsto para uso interior en salas eléctricas, áreas secas y limpias; tendrán encerramientos ventilados (Código C).
ventilados (Código C).
Los transformadores tipo seco serán instaladas en el interior de la Subestación Eléctrica (Códigos A y Los transformadores tipo seco serán instaladas en el interior de la Subestación Eléctrica (Códigos A y C).
C). c)
c) Encerramientos de Tableros EléctricosEncerramientos de Tableros Eléctricos
-- IP54: Previsto para uso interior en IP54: Previsto para uso interior en salas eléctricas, hermésalas eléctricas, hermético al polvo, protección contra suciedad ytico al polvo, protección contra suciedad y goteo de líquidos no corrosivos (Código C).
goteo de líquidos no corrosivos (Código C).
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime.
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime.
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime.
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime.
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime.
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime. Proy.GMI N°1818 Proy.GMI N°1818 1818-200-CD-IE-001 1818-200-CD-IE-001 Rev.A Rev.A CNOIS CNOIS INGENIERIA DE DETALLE INGENIERIA DE DETALLE
CENTRO NACIONAL DE OPERACIONES DE CENTRO NACIONAL DE OPERACIONES DE
IMÁGENES SATELITALES DEL PERÚ IMÁGENES SATELITALES DEL PERÚ
CRITERIOS DE DISENO CRITERIOS DE DISENO ELECTRICIDAD ELECTRICIDAD Fecha: 10/11/2014 Fecha: 10/11/2014 Página 10 de 27 Página 10 de 27
-- Barra Principal (Código C).Barra Principal (Código C). -- Barra de Tierra (Código C).Barra de Tierra (Código C).
-- Interruptor de potencia (Código C).Interruptor de potencia (Código C). -- Bloqueos de seguridad (Código C).Bloqueos de seguridad (Código C).
-- Dispositivos de control auxiliar (Código C).Dispositivos de control auxiliar (Código C).
-- TransformadoTransformadores de control, medición y protección res de control, medición y protección (Código C).(Código C). -- Relés de protección (Código C).Relés de protección (Código C).
-- Sistema de Medición (Código C).Sistema de Medición (Código C). -- Protocolo de Protocolo de comunicacicomunicaciones:ones:
Medidores MF: IEC 61850 (Código C).Medidores MF: IEC 61850 (Código C).
Relés MF: IEC 61850 (Código C).Relés MF: IEC 61850 (Código C).
-- Todos los accesorios necesarios: fuente estabiliTodos los accesorios necesarios: fuente estabilizada, rectificador 125 VDC zada, rectificador 125 VDC (Código C).(Código C).
Cada celda será apropiada para ampliaciones futuras por sus extremos. Las barras serán Cada celda será apropiada para ampliaciones futuras por sus extremos. Las barras serán perforadas para futuros empalmes con platinas y las platinas removibles serán suministradas en el perforadas para futuros empalmes con platinas y las platinas removibles serán suministradas en el exterior de los cubículos para la extensión de las barras. La capacidad de cortocircuito que exterior de los cubículos para la extensión de las barras. La capacidad de cortocircuito que soportará la celda de media tensión será 16 kA (A ser
soportará la celda de media tensión será 16 kA (A ser confirmada con la factibilidad) (Código C).confirmada con la factibilidad) (Código C). Las Celdas serán diseñadas para instalarse contra la pared, en caso contrario, debe diseñarse Las Celdas serán diseñadas para instalarse contra la pared, en caso contrario, debe diseñarse según se indique en la
según se indique en la especificaespecificación técnica respectiva 1818-200-ET-IE-001 (Código C).ción técnica respectiva 1818-200-ET-IE-001 (Código C).
La Celda de llegada será mediante un interruptor fijo, tripolar, en vacío, operados eléctricamente La Celda de llegada será mediante un interruptor fijo, tripolar, en vacío, operados eléctricamente por un motor que cargue un mecanismo de resortes de almacenamiento de energía. Este debe ser por un motor que cargue un mecanismo de resortes de almacenamiento de energía. Este debe ser completo con los mecanismos de cierre y
completo con los mecanismos de cierre y disparo, contactos auxiliares, bobinas, relés, indicadoredisparo, contactos auxiliares, bobinas, relés, indicadoress de posició
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime.
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime.
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime.
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime.
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime.
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime. Proy.GMI N°1818 Proy.GMI N°1818 1818-200-CD-IE-001 1818-200-CD-IE-001 Rev.A Rev.A CNOIS CNOIS INGENIERIA DE DETALLE INGENIERIA DE DETALLE
CENTRO NACIONAL DE OPERACIONES DE CENTRO NACIONAL DE OPERACIONES DE
IMÁGENES SATELITALES DEL PERÚ IMÁGENES SATELITALES DEL PERÚ
CRITERIOS DE DISENO CRITERIOS DE DISENO ELECTRICIDAD ELECTRICIDAD Fecha: 10/11/2014 Fecha: 10/11/2014 Página 11 de 27 Página 11 de 27 b)
b) Transformadores de PotenciaTransformadores de Potencia
Los transformadores de potencia serán fabricados bajo normas IEC, serán del tipo seco, diseñados Los transformadores de potencia serán fabricados bajo normas IEC, serán del tipo seco, diseñados para uso interior y operación en forma continua, suministrarán su potencia nominal en kVA a las para uso interior y operación en forma continua, suministrarán su potencia nominal en kVA a las condiciones de temperatura ambient
condiciones de temperatura ambiente y e y para un para un aumento promedio de temperatura de 65°C en aumento promedio de temperatura de 65°C en loslos devanados,
devanados, con refrigeraciócon refrigeración natural (AN) (Códigos n natural (AN) (Códigos B y C).B y C). Estarán equipados con tomas de derivaci
Estarán equipados con tomas de derivación en vacío en el ón en vacío en el lado primario de lado primario de +/- 2 x 2,5% cada una;+/- 2 x 2,5% cada una; dos por encima y
dos por encima y dos por debajo de la tdos por debajo de la tensión nominal (Códigensión nominal (Códigos os B y C).B y C).
Los transformadores tendrán una relación de transformación de 22.9-13.2/0.40-0.23 kV y tendrán el Los transformadores tendrán una relación de transformación de 22.9-13.2/0.40-0.23 kV y tendrán el siguiente grup
siguiente grupo de conexión Dyn5 (1o de conexión Dyn5 (13.2kV) (Códigos 3.2kV) (Códigos B y C).B y C).
A menos que se indique otra cosa en las hojas de datos, los transformadores serán trifásicos, A menos que se indique otra cosa en las hojas de datos, los transformadores serán trifásicos, apropiados para mon
apropiados para montaje interior sobre una base de contaje interior sobre una base de concreto (Con ruedas) (Códigos creto (Con ruedas) (Códigos B y C).B y C). Los transformad
Los transformadores contarán con un relé de monitoores contarán con un relé de monitoreo de temperatura (Códigos reo de temperatura (Códigos B y C).B y C). c)
c) Generadores Eléctricos DiéselGeneradores Eléctricos Diésel
Criterios de dimensionamiento del grupo
Criterios de dimensionamiento del grupo electrógeno:electrógeno:
- - El dimensionamiento estará El dimensionamiento estará basado en basado en la carga la carga operacional ajustada para operacional ajustada para la que la que sea necesariosea necesario arrancar inmediatam
arrancar inmediatamente después de la falla en el ente después de la falla en el suministsuministro eléctrico (Códigos B y ro eléctrico (Códigos B y C).C).
- - La potencia La potencia actual en actual en kW rkW requerida capaz de equerida capaz de soportar la soportar la demanda eléctrica demanda eléctrica de los de los equipos conequipos con una autonom
una autonomía de 56 horas ía de 56 horas (Código (Código A).A).
- - Para el presente proyPara el presente proyecto se considecto se considerará aceptable erará aceptable el porcentaje +/- 2% para la reguel porcentaje +/- 2% para la regulación delación de voltaje y +/- 2 Hz para la regu
voltaje y +/- 2 Hz para la regulación de frecuelación de frecuencia (Código ncia (Código C).C).
- - Los tableros de transferencLos tableros de transferencia automática realizia automática realizarán la conmutación del suminiarán la conmutación del suministro de energíastro de energía eléctrica al suministro de energía eléctrica de emergencia en un tiempo promedio de 10 eléctrica al suministro de energía eléctrica de emergencia en un tiempo promedio de 10
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime.
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime.
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime.
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime.
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime.
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime.
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime. Proy.GMI N°1818 Proy.GMI N°1818 1818-200-CD-IE-001 1818-200-CD-IE-001 Rev.A Rev.A CNOIS CNOIS INGENIERIA DE DETALLE INGENIERIA DE DETALLE
CENTRO NACIONAL DE OPERACIONES DE CENTRO NACIONAL DE OPERACIONES DE
IMÁGENES SATELITALES DEL PERÚ IMÁGENES SATELITALES DEL PERÚ
CRITERIOS DE DISENO CRITERIOS DE DISENO ELECTRICIDAD ELECTRICIDAD Fecha: 10/11/2014 Fecha: 10/11/2014 Página 12 de 27 Página 12 de 27
Sistema de alumbrado de emergencia. (Modulo 3, 4, 6 y 7). Sistema de alumbrado de emergencia. (Modulo 3, 4, 6 y 7). (Código C).(Código C).
Tomacorrientes servicios generales. (Modulo 3, 4 y 7). (Código A y C).Tomacorrientes servicios generales. (Modulo 3, 4 y 7). (Código A y C).
-- El generador eléctrico diésel estará ubicado en un lugar en la cual los ruidos molestosEl generador eléctrico diésel estará ubicado en un lugar en la cual los ruidos molestos
producidos por estos no sea un problema para el personal que se encuentre trabajando en el producidos por estos no sea un problema para el personal que se encuentre trabajando en el lugar y además se tomará las precauciones adecuadas para asegurar que las vibraciones lugar y además se tomará las precauciones adecuadas para asegurar que las vibraciones mecánicas generales por el conjunto de equipos generadores eléctricos diésel sean absorbidos mecánicas generales por el conjunto de equipos generadores eléctricos diésel sean absorbidos y que los
y que los niveles de las restantes vibraciones sean limitadas (Códigos niveles de las restantes vibraciones sean limitadas (Códigos A y C).A y C).
- - Para mayor detalle sPara mayor detalle sobre el grupo electrógenobre el grupo electrógeno ver especificaco ver especificaciones técnicas 18iones técnicas 1818-200-ET-IE- 18-200-ET-IE-012 (Código C).
012 (Código C). d)
d) Tableros de Distribución de Baja TensiónTableros de Distribución de Baja Tensión Los tableros de distribución serán de
Los tableros de distribución serán de frente muerto (frente muerto (con mandil), auto soportado. Los interruptorescon mandil), auto soportado. Los interruptores y/o dispositiv
y/o dispositivos os serán completamserán completamente accesibles desde el frente. Podrán instente accesibles desde el frente. Podrán instalarse en arreglos dealarse en arreglos de una fila o espalda con espalda según se indique en los planos del
una fila o espalda con espalda según se indique en los planos del proyecto (Código C).proyecto (Código C). Los tableros de distribución serán apropiados para operar a una
Los tableros de distribución serán apropiados para operar a una tensión de servicio de 400 - tensión de servicio de 400 - 230 V,230 V, 3 fases, 60 Hz (3 barras de fases + Neutro + 1 barra de Tierra) (Código C).
3 fases, 60 Hz (3 barras de fases + Neutro + 1 barra de Tierra) (Código C).
Los tableros de distribución estarán previstos para ampliaciones futuras mediante la adición
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime.
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime.
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime.
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime.
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime.
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime. Proy.GMI N°1818 Proy.GMI N°1818 1818-200-CD-IE-001 1818-200-CD-IE-001 Rev.A Rev.A CNOIS CNOIS INGENIERIA DE DETALLE INGENIERIA DE DETALLE
CENTRO NACIONAL DE OPERACIONES DE CENTRO NACIONAL DE OPERACIONES DE
IMÁGENES SATELITALES DEL PERÚ IMÁGENES SATELITALES DEL PERÚ
CRITERIOS DE DISENO CRITERIOS DE DISENO ELECTRICIDAD ELECTRICIDAD Fecha: 10/11/2014 Fecha: 10/11/2014 Página 13 de 27 Página 13 de 27 e)
e) Tablero para Alumbrado, Tomacorrientes y Servicios Auxiliares (TN, TE, TUPS)Tablero para Alumbrado, Tomacorrientes y Servicios Auxiliares (TN, TE, TUPS)
Los tableros de alumbrado, tomacorrientes y servicios auxiliares serán metálicos, para instalación Los tableros de alumbrado, tomacorrientes y servicios auxiliares serán metálicos, para instalación interior, sin partes accesibles bajo tensión (frente muerto con mandil) y del tipo para adosar de interior, sin partes accesibles bajo tensión (frente muerto con mandil) y del tipo para adosar de acceso frontal, contará con un sistema de seguridad que permita el cierre de la potencia en caso acceso frontal, contará con un sistema de seguridad que permita el cierre de la potencia en caso de emergencia (Códigos A y C).
de emergencia (Códigos A y C).
Los tableros serán apropiados para operar a una tensión de servicio 400-230 V + Neutro, 3 fases, Los tableros serán apropiados para operar a una tensión de servicio 400-230 V + Neutro, 3 fases, 60 Hz (3 barras de fases + Neutro + 1 barra de Tierra) (Códigos A y
60 Hz (3 barras de fases + Neutro + 1 barra de Tierra) (Códigos A y C).C). Los tableros están equipados, según se indique en
Los tableros están equipados, según se indique en los diagramas unifilares (Código C).los diagramas unifilares (Código C).
El tablero será provisto completamente armado y con todos sus elementos de soporte y fijación y El tablero será provisto completamente armado y con todos sus elementos de soporte y fijación y llevará un rótulo de acrílico entornillado que indique el código del tablero (Códigos A y C).
llevará un rótulo de acrílico entornillado que indique el código del tablero (Códigos A y C). Los tableros estarán en servicio las 24 horas del día, los 365
Los tableros estarán en servicio las 24 horas del día, los 365 días del año (Código C).días del año (Código C). f)f) Tablero para Aire Acondicionado (TAA y TAAE)Tablero para Aire Acondicionado (TAA y TAAE)
El tablero HVAC tendrá un enclavamiento con el sistema contra incendio y se debe parar de modo El tablero HVAC tendrá un enclavamiento con el sistema contra incendio y se debe parar de modo automático en el
automático en el caso de caso de detecciódetección de n de dicha condición peligrosa. En dicha condición peligrosa. En caso de caso de falla del falla del aireaire acondicionado, una alarma de alta temperatura será activada con el fin de informar al personal de acondicionado, una alarma de alta temperatura será activada con el fin de informar al personal de la estación (Códigos A y C).
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime.
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime.
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime.
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime.
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime.
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime. Proy.GMI N°1818 Proy.GMI N°1818 1818-200-CD-IE-001 1818-200-CD-IE-001 Rev.A Rev.A CNOIS CNOIS INGENIERIA DE DETALLE INGENIERIA DE DETALLE
CENTRO NACIONAL DE OPERACIONES DE CENTRO NACIONAL DE OPERACIONES DE
IMÁGENES SATELITALES DEL PERÚ IMÁGENES SATELITALES DEL PERÚ
CRITERIOS DE DISENO CRITERIOS DE DISENO ELECTRICIDAD ELECTRICIDAD Fecha: 10/11/2014 Fecha: 10/11/2014 Página 14 de 27 Página 14 de 27
Los UPS deberán estar acompañados con un transformador de aislamiento y un tablero de Los UPS deberán estar acompañados con un transformador de aislamiento y un tablero de transferencia manual que permita el bypass del UPS en caso de mantenimiento de este y el transferencia manual que permita el bypass del UPS en caso de mantenimiento de este y el sistema continúe funcionan
sistema continúe funcionando solo con do solo con el transformador de aislamiento (Código C).el transformador de aislamiento (Código C).
El transformador de aislamiento debe ser seco, con arrollamiento de cobre o aluminio, deberá tener El transformador de aislamiento debe ser seco, con arrollamiento de cobre o aluminio, deberá tener factor K13 (Código C).
factor K13 (Código C).
Los UPS y transformadores de aislamiento deberán tener una capacidad de reserva de 25% para Los UPS y transformadores de aislamiento deberán tener una capacidad de reserva de 25% para un crecimiento futuro (Código C).
un crecimiento futuro (Código C).
El sistema UPS será equipado con filtros anti-armónicos situado en ambas direcciones de las El sistema UPS será equipado con filtros anti-armónicos situado en ambas direcciones de las unidades UPS con la finalidad de evitar que la carga no lineal reinyecte corrientes eléctricas unidades UPS con la finalidad de evitar que la carga no lineal reinyecte corrientes eléctricas armónicas (Código A).
armónicas (Código A).
Se contará con dos UPS que operarán a tensiones d
Se contará con dos UPS que operarán a tensiones de 400/230 voltios, e 400/230 voltios, los cuales alimenlos cuales alimentara lostara los módulos del edificio y la antena. (Código A y
módulos del edificio y la antena. (Código A y C).C). 9.0
9.0 SUBESTACIÓN DE TRANSFORMACIÓNSUBESTACIÓN DE TRANSFORMACIÓN a)
a) DisposiciónDisposición
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime.
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime.
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime.
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime.
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime.
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime. Proy.GMI N°1818 Proy.GMI N°1818 1818-200-CD-IE-001 1818-200-CD-IE-001 Rev.A Rev.A CNOIS CNOIS INGENIERIA DE DETALLE INGENIERIA DE DETALLE
CENTRO NACIONAL DE OPERACIONES DE CENTRO NACIONAL DE OPERACIONES DE
IMÁGENES SATELITALES DEL PERÚ IMÁGENES SATELITALES DEL PERÚ
CRITERIOS DE DISENO CRITERIOS DE DISENO ELECTRICIDAD ELECTRICIDAD Fecha: 10/11/2014 Fecha: 10/11/2014 Página 15 de 27 Página 15 de 27
Tabla N°1: Distancias mínimas para
Tabla N°1: Distancias mínimas para espacios libresespacios libres – – Condición 2 Condición 2
Tensión nominal Tensión nominal
(Voltios) (Voltios)
Distancia mínima para Distancia mínima para espacio libre de trabajo espacio libre de trabajo
(mm) (mm) 00 – –600 600 1,2001,200 10000 10000 - - 25000 25000 1,8001,800 11.0 11.0 CABLESCABLES a) a) DimensionamientoDimensionamiento
Todos los alimentadores en Media
Todos los alimentadores en Media y Baja y Baja Tensión serán dimensionados considerandTensión serán dimensionados considerando los o los criterioscriterios siguientes:
siguientes:
-- Nivel de aislamiento (tensión de utilización) (Código C).Nivel de aislamiento (tensión de utilización) (Código C).
-- Capacidad de conducción de corriente a las Capacidad de conducción de corriente a las condiciones de instalación (Código C).condiciones de instalación (Código C).
-- Capacidad ante solicitaciones térmicas por corrientes de cortocircuito (trascendente solo paraCapacidad ante solicitaciones térmicas por corrientes de cortocircuito (trascendente solo para cables de media tensión) (Código C).
cables de media tensión) (Código C).
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime.
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime.
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime.
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime.
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime.
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime. Proy.GMI N°1818 Proy.GMI N°1818 1818-200-CD-IE-001 1818-200-CD-IE-001 Rev.A Rev.A CNOIS CNOIS INGENIERIA DE DETALLE INGENIERIA DE DETALLE
CENTRO NACIONAL DE OPERACIONES DE CENTRO NACIONAL DE OPERACIONES DE
IMÁGENES SATELITALES DEL PERÚ IMÁGENES SATELITALES DEL PERÚ
CRITERIOS DE DISENO CRITERIOS DE DISENO ELECTRICIDAD ELECTRICIDAD Fecha: 10/11/2014 Fecha: 10/11/2014 Página 16 de 27 Página 16 de 27
La caída de tensión durante el arranque de motores, se refiere al valor que toma la caída de La caída de tensión durante el arranque de motores, se refiere al valor que toma la caída de tensión por efecto del alto valor de la corriente transitoria de arranque de
tensión por efecto del alto valor de la corriente transitoria de arranque de los motores (Código C).los motores (Código C). En todos los casos de arranque de motores, la tensión en los terminales del motor deberá ser el En todos los casos de arranque de motores, la tensión en los terminales del motor deberá ser el suficiente para asegurar el arranque y aceleración del motor, En general, la caída de tensión suficiente para asegurar el arranque y aceleración del motor, En general, la caída de tensión permisible desde el sistema de barras durante el arranque de motores no debe exceder los permisible desde el sistema de barras durante el arranque de motores no debe exceder los siguientes valores (Código C):
siguientes valores (Código C):
Aplicación
Aplicación Caída Caída Máxima Máxima (%)(%) En
En la la barra barra del del switchgear switchgear de de 22.9 22.9 - - 13.2 13.2 kV kV (distribución (distribución primaria) primaria) 5%5% En
En la la barra barra de de 400 400 V V que que alimenta alimenta directamentdirectamente e al al motor motor 15%15% c)
c) Cables de fuerza de Media TensiónCables de fuerza de Media Tensión
Conductor de cobre electrolítico recocido, cableado compactado, compuesto semiconductor Conductor de cobre electrolítico recocido, cableado compactado, compuesto semiconductor extruido sobre el conductor. Aislamiento de polietileno reticulado (XLPE), compuesto extruido sobre el conductor. Aislamiento de polietileno reticulado (XLPE), compuesto semiconductor extruido y cinta o alambres de cobre electrolítico sobre el conductor aislado. semiconductor extruido y cinta o alambres de cobre electrolítico sobre el conductor aislado. Cubierta externa de PVC. Serán fabric
Cubierta externa de PVC. Serán fabricados de acuerdo a la normas ados de acuerdo a la normas NTP IEC 60502-2. Tensión deNTP IEC 60502-2. Tensión de servicio de
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime.
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime.
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime.
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime.
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime.
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime.
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime. Proy.GMI N°1818 Proy.GMI N°1818 1818-200-CD-IE-001 1818-200-CD-IE-001 Rev.A Rev.A CNOIS CNOIS INGENIERIA DE DETALLE INGENIERIA DE DETALLE
CENTRO NACIONAL DE OPERACIONES DE CENTRO NACIONAL DE OPERACIONES DE
IMÁGENES SATELITALES DEL PERÚ IMÁGENES SATELITALES DEL PERÚ
CRITERIOS DE DISENO CRITERIOS DE DISENO ELECTRICIDAD ELECTRICIDAD Fecha: 10/11/2014 Fecha: 10/11/2014 Página 17 de 27 Página 17 de 27
Se utilizarán como mínimos el calibre # 4mm² (12 AWG) para los cables de alumbrado y Se utilizarán como mínimos el calibre # 4mm² (12 AWG) para los cables de alumbrado y tomacorrient
tomacorrientes de uso es de uso general (Código C).general (Código C). f)f) Identificación de cables y conductoresIdentificación de cables y conductores
Los conductores serán identificados y marcados en las terminaciones y principales cajas de Los conductores serán identificados y marcados en las terminaciones y principales cajas de empalme con cintas del tipo termo contraíble (Códigos B y C).
empalme con cintas del tipo termo contraíble (Códigos B y C). El código de
El código de colores para los cables colores para los cables en baja tensión (según CNE - en baja tensión (según CNE - UtilizaciónUtilización) será (Códigos B ) será (Códigos B yy C):
C):
Fase
Fase A A o o R R RojoRojo Fase
Fase B B o o S S NegroNegro Fase
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime.
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime.
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime.
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime.
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime.
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime. Proy.GMI N°1818 Proy.GMI N°1818 1818-200-CD-IE-001 1818-200-CD-IE-001 Rev.A Rev.A CNOIS CNOIS INGENIERIA DE DETALLE INGENIERIA DE DETALLE
CENTRO NACIONAL DE OPERACIONES DE CENTRO NACIONAL DE OPERACIONES DE
IMÁGENES SATELITALES DEL PERÚ IMÁGENES SATELITALES DEL PERÚ
CRITERIOS DE DISENO CRITERIOS DE DISENO ELECTRICIDAD ELECTRICIDAD Fecha: 10/11/2014 Fecha: 10/11/2014 Página 18 de 27 Página 18 de 27 12.0 12.0 CANALIZACIONESCANALIZACIONES
De acuerdo a la arquitectura, la distribución de alimentadores generales será en banco de ductos y para De acuerdo a la arquitectura, la distribución de alimentadores generales será en banco de ductos y para circuitos de
circuitos de alumbrado, alumbrado, tomacorrietomacorrientes ntes y y fuerza serán fuerza serán empotrados en empotrados en pisos, techos pisos, techos y/o y/o paredes,paredes, empleándos
empleándose cables en tuberías del tipo PVC-P e cables en tuberías del tipo PVC-P (Códigos B y C).(Códigos B y C).
De ser necesario se utilizarán bandejas metálicas de acero galvanizado en caliente de tipo perforada con o De ser necesario se utilizarán bandejas metálicas de acero galvanizado en caliente de tipo perforada con o sin tapa y de acuerdo a indicación en los planos (Códigos B y
sin tapa y de acuerdo a indicación en los planos (Códigos B y C).C).
En el caso de canalizaciones en que se requiera que los conductores sean jalados a través de ellas, no se En el caso de canalizaciones en que se requiera que los conductores sean jalados a través de ellas, no se permitirán más de cuatro curvas de 90° entre cajas o puntos de derivación, incluyéndose las curvas permitirán más de cuatro curvas de 90° entre cajas o puntos de derivación, incluyéndose las curvas necesarias en el accesorio, la salida o el tomacorriente de acuerdo a 070-942 CNE - Utilización. Las necesarias en el accesorio, la salida o el tomacorriente de acuerdo a 070-942 CNE - Utilización. Las canalizacio
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime.
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime.
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime.
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime.
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime.
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime. Proy.GMI N°1818 Proy.GMI N°1818 1818-200-CD-IE-001 1818-200-CD-IE-001 Rev.A Rev.A CNOIS CNOIS INGENIERIA DE DETALLE INGENIERIA DE DETALLE
CENTRO NACIONAL DE OPERACIONES DE CENTRO NACIONAL DE OPERACIONES DE
IMÁGENES SATELITALES DEL PERÚ IMÁGENES SATELITALES DEL PERÚ
CRITERIOS DE DISENO CRITERIOS DE DISENO ELECTRICIDAD ELECTRICIDAD Fecha: 10/11/2014 Fecha: 10/11/2014 Página 19 de 27 Página 19 de 27
- - 3.0 3.0 m m para para tuberías tuberías de de 40 40 mm mm de de diámetro diámetro nominal nominal o o mayores. mayores. (Códigos (Códigos B B y y C).C). El diámetro
El diámetro interior míinterior mínimo nimo de las tuberíde las tuberíasas expuestas será de 20 mm (3/4”) (Códigos B y expuestas será de 20 mm (3/4”) (Códigos B y C)C)..
b)
b) Tuberías EnterradasTuberías Enterradas --Banco de ductosBanco de ductos
Las tuberías que corren enterradas serán generalmente en banco de ductos, Las tuberías que corren enterradas serán generalmente en banco de ductos, conformadas por tuberías de PVC-P, embebidas en concreto con una cobertura mínima conformadas por tuberías de PVC-P, embebidas en concreto con una cobertura mínima de 75 mm. Los bancos de ductos de tuberías enterradas que corren bajo carreteras serán de 75 mm. Los bancos de ductos de tuberías enterradas que corren bajo carreteras serán reforzados con barras de refuerzo (Códigos B y C).
reforzados con barras de refuerzo (Códigos B y C).
Los bancos de ductos estarán compuestos por tubos de PVC, de 50 mm (2”) como Los bancos de ductos estarán compuestos por tubos de PVC, de 50 mm (2”) como
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime.
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime.
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime.
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime.
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime.
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime. Proy.GMI N°1818 Proy.GMI N°1818 1818-200-CD-IE-001 1818-200-CD-IE-001 Rev.A Rev.A CNOIS CNOIS INGENIERIA DE DETALLE INGENIERIA DE DETALLE
CENTRO NACIONAL DE OPERACIONES DE CENTRO NACIONAL DE OPERACIONES DE
IMÁGENES SATELITALES DEL PERÚ IMÁGENES SATELITALES DEL PERÚ
CRITERIOS DE DISENO CRITERIOS DE DISENO ELECTRICIDAD ELECTRICIDAD Fecha: 10/11/2014 Fecha: 10/11/2014 Página 20 de 27 Página 20 de 27
Las tuberías de PVC serán protegidos cuando puedan estar expuestos a daños mecánicos, tanto Las tuberías de PVC serán protegidos cuando puedan estar expuestos a daños mecánicos, tanto durante su instalación com
durante su instalación como después de ella (Códigos B y C)o después de ella (Códigos B y C)..
Se permitirá el curvado en obra de las tuberías de PVC, en la medida que se cuente con los Se permitirá el curvado en obra de las tuberías de PVC, en la medida que se cuente con los equipos de curvado específicame
equipos de curvado específicamente requeridos para este propósito (Códigos B y nte requeridos para este propósito (Códigos B y C).C).
El radio de curvatura mínimo a utilizarse debe ser por lo menos de 6 veces el diámetro interno de la El radio de curvatura mínimo a utilizarse debe ser por lo menos de 6 veces el diámetro interno de la canalizació
canalización (Códigos B y n (Códigos B y C).C). d)
d) Bandejas PortacablesBandejas Portacables
Se usarán bandejas portacables tipo perforada para el transporte de los cables en la subestación Se usarán bandejas portacables tipo perforada para el transporte de los cables en la subestación eléctrica, sala eléctrica o en áreas en la cual el transporte de cables no se pueda realizar mediante eléctrica, sala eléctrica o en áreas en la cual el transporte de cables no se pueda realizar mediante
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime.
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Start Free Trial Cancel Anytime.