PROJECT CHARTER

PROJECT CHARTER

GENERAL SUPPLIES E-COMMERCE WEBSITE GENERAL SUPPLIES E-COMMERCE WEBSITE

12/07/2015 12/07/2015 General Supplies General Supplies

41, SPRING HILL PKWY SE, 41, SPRING HILL PKWY SE,

SMYRNA, GA-30080 SMYRNA, GA-30080

(2)

Project

Project Name Name :: General Supplies E-commerce WebsiteGeneral Supplies E-commerce Website Focus

Focus Area Area :: Creation of E-commerce website for the successful operation ofCreation of E-commerce website for the successful operation of online business

online business

Prepared By Prepared By

Document

Document Owners Owners Organizational RolesOrganizational Roles Rob

Rob Wade Wade Business Business Analyst Analyst / / Project Project ManagerManager

Josephine Architect

Josephine Architect

Prashaanth Developer

Prashaanth Developer

Gayathri

Gayathri QA QA TesterTester Chuchu

Chuchu Support Support SpecialistSpecialist

Project Charter Version Control Project Charter Version Control

Version

Version Date Date Author Author Change Change DescriptionDescription A

A 12/07/2015 12/07/2015 Rob Rob Wade Wade Primary Primary Scope Scope andand Project Charter Project Charter

(3)

Table of Contents Table of Contents

1.

1. Project Charter PurposeProject Charter Purpose 2.

2. Project Executive SummaryProject Executive Summary 3.

3. Project OverviewProject Overview 4.

4. Project ScopeProject Scope

4.1 Goal and Objectives 4.1 Goal and Objectives

4.2 Statement of Work (SOW) 4.2 Statement of Work (SOW) 4.3 Project Deliverable

4.3 Project Deliverable

4.4 Project Estimated Costs & Duration 4.4 Project Estimated Costs & Duration 5.

5. Project ConditionsProject Conditions

5.1 Project Assumptions 5.1 Project Assumptions 5.2 Project Risks 5.2 Project Risks 5.3 Project Constraints 5.3 Project Constraints 6.

6. Project Structure ApproachProject Structure Approach 7.

7. Project Team Organization PlansProject Team Organization Plans 8.

(4)

1.

1. Project Charter PurposeProject Charter Purpose

The project team will determine and identify the required steps for developing an The project team will determine and identify the required steps for developing an e-commerce website that covers the combination of business models. Our website will e-commerce website that covers the combination of business models. Our website will establish the

establish the process of buying the process of buying the products of General products of General Supplies company online. Supplies company online. WeWe will examines the business model and incorporate it onto the website. The project team will examines the business model and incorporate it onto the website. The project team will discover possible solutions for the new e-commerce business. The project team will will discover possible solutions for the new e-commerce business. The project team will  become knowledgeable on how to develop

 become knowledgeable on how to develop an e-commerce websitean e-commerce website

2.

2. Project Executive SummaryProject Executive Summary

• Project Project Goal Goal : : Creation Creation of of new new e-commerce e-commerce website website for for General General SuppliesSupplies

company that will be successful and generate revenues company that will be successful and generate revenues

• Objectives Objectives : : To To create create and and maintain maintain a a high high revenue revenue e-commerce e-commerce website website toto

capture the business potential of selling General Supplies products online capture the business potential of selling General Supplies products online

• Scope Scope : : Deliver Deliver a a quality quality e-commerce e-commerce website website within within the the time, time, costcost

and project requirements set by the project team and project requirements set by the project team

• Assumptions Assumptions : There : There are lot are lot of e-commerce of e-commerce websites that websites that have beenhave been

successful in generating the revenues. The e-commerce business has also successful in generating the revenues. The e-commerce business has also witnessed growth in the last 5 years

witnessed growth in the last 5 years

• Risks Risks : : Identify Identify and and research research possible possible risks risks starting starting up up new new e-

e-commerce website commerce website

• Costs Costs : : Deliver Deliver the the website website within within the the allotted allotted money money for for the the project.project.

Costs would be considered for website specifications such as human resources, Costs would be considered for website specifications such as human resources, training and other expenses that might arise

training and other expenses that might arise

• Timeline Timeline : : Develop Develop a a reasonable reasonable timeline timeline by by researching researching other other e-

e-commerce websites and determine time taken to complete the entire project. commerce websites and determine time taken to complete the entire project.

• Approach Approach : : Project Project Manager Manager will will conduct conduct weekly weekly project project meeting meeting TheThe

 project

 project manager manager will will be be responsible responsible for for delegating delegating work work and and assign assign projectproject duties. The project manager will communicate via email, phone and duties. The project manager will communicate via email, phone and conference calls.

(5)

• Organization Organization : : Star Star Associates. Associates. The The organizational organizational structure structure of of this this project project isis

as follows as follows

Rob

Rob Wade Wade : : Business Business Analyst Analyst / / Project Project ManagerManager Josephine

Josephine : : ArchitectArchitect Prashaanth

Prashaanth : : DeveloperDeveloper Gayathri

Gayathri : : QA QA TesterTester ChuChu

ChuChu : : Support Support SpecialistSpecialist

3.Project Overview 3.Project Overview

Our Project's mission is to develop a new and successful e-commerce website for Our Project's mission is to develop a new and successful e-commerce website for General Supplies company. The site will feature the products of General Supplies

General Supplies company. The site will feature the products of General Supplies company and will enable online purchase of selected products. We will examine the company and will enable online purchase of selected products. We will examine the  possible methods to develop the e-commerce website into premiu

 possible methods to develop the e-commerce website into premium online business form online business for General Supplies company

General Supplies company

4.

4. Project ScopeProject Scope

4.1 Goals and Objectives 4.1 Goals and Objectives

Goals Objectives

Goals Objectives

• Enable General SuppliesEnable General Supplies

company to sell their company to sell their  products online.  products online.

• Gather requirements for theGather requirements for the

website website

• Develop website to increaseDevelop website to increase

the revenue through online the revenue through online sales

sales

• Develop the website withinDevelop the website within

allocated cost, time and allocated cost, time and resources

resources

• Create an e-commerce websiteCreate an e-commerce website

selling their products online selling their products online

• Research many e-commerceResearch many e-commerce

websites to develop ideas and websites to develop ideas and actions point to incorporate actions point to incorporate onto the developing website onto the developing website

• The project team will researchThe project team will research

the best model and design for the best model and design for generating revenue through generating revenue through online sales

online sales

• Complete the website withinComplete the website within

$275,000.00 before 11/30/2016 $275,000.00 before 11/30/2016 with 5 resources

(6)

4.2

4.2 Departmental Statement of Work Departmental Statement of Work  Statement

Statement of of Work Work Responsibility Responsibility Due Due DateDate Business

Business case case Business Business Analyst,Analyst, Architect Architect

01/14/16 01/14/16 Planning

Planning Business Business Analyst Analyst 02/25/1602/25/16 Design

Design Business Business Analyst,Analyst, Architect Architect

03/25/16 03/25/16 Build

Build Developer Developer 05/26/1605/26/16 Quality Assurance Quality Assurance Testing Testing QA QA Tester Tester 07/18/1607/18/16 Implementation

Implementation Business Business Analyst,Analyst, Architect Architect

07/26/16 07/26/16 Project Website Soft

Project Website Soft Launch Launch Developer, Business Developer, Business Analyst Analyst 08/17/16 08/17/16 Hard

Hard Launch Launch Developer Developer 08/18/1608/18/16 Handover

Handover Business Business Analyst,Analyst, Architect Architect

08/25/16 08/25/16 Online

Online Support Support Business Business Analyst,Analyst, Support Specialist Support Specialist 10/14/16 10/14/16 4.3 Project Deliverables 4.3 Project Deliverables Milestones Deliverables Milestones Deliverables

Sign off Project Schedules and Sign off Project Schedules and

contracts contracts

Audit E-Commerce objectives Audit E-Commerce objectives Develop project schedule

Develop project schedule Budget, Risk and Change Budget, Risk and Change control planning

control planning

Contracts and Cross functional Contracts and Cross functional requirement

requirement Sign off business case

Sign off business case High level requirementHigh level requirement Business Assessment Business Assessment Technical Specification Technical Specification

(7)

Milestones Deliverables

Milestones Deliverables

Sign off Planning

Sign off Planning Requirement GatheringRequirement Gathering Content Outline

Content Outline Website Page layout Website Page layout Sign off Design

Sign off Design Visual Element DesignVisual Element Design Create Prototype template Create Prototype template Design Review

Design Review Sign

Sign off off DevelopmentDevelopment CSS & HTML CodingCSS & HTML Coding Module Integration Module Integration Content Population Content Population Unit Testing Unit Testing Security Implementation Security Implementation Sign Off Testing

Sign Off Testing Site TestingSite Testing

Cross Device Testing Cross Device Testing Performance Testing Performance Testing User Experience Testing User Experience Testing Sign off Soft Launch

Sign off Soft Launch Configure production ServerConfigure production Server Verify Production Server Verify Production Server

Transfer files to Production Server Transfer files to Production Server Final UAT & copy proofing

Final UAT & copy proofing Project Closure

Project Closure Completion of ProjectCompletion of Project Project Estimated Cost and Duration

Project Estimated Cost and Duration Project

Project Phases Phases

Due

Due Date Date Deliverables Deliverables CostCost Business

Business Case Case 01/14/1601/14/16 •• High Level RequirementHigh Level Requirement •

• Business Case AssessmentBusiness Case Assessment •

• Technical SpecificationTechnical Specification

$64,655.00 $64,655.00

Planning 02/25/16

Planning 02/25/16 •• Requirement GatheringRequirement Gathering •

• Content OutlineContent Outline •

• Website Page LayoutWebsite Page Layout

$25,103.25 $25,103.25

(8)

Project Project Phases Phases

Due

Due Date Date Deliverables Deliverables CostCost Design 03/25/16

Design 03/25/16 •• Visual Element DesignVisual Element Design •

• Create Prototype TemplateCreate Prototype Template •

• Design ReviewDesign Review

$34,280.00 $34,280.00

Build 06/25/16

Build 06/25/16 •• CSS & HTML CodingCSS & HTML Coding •

• Module IntegrationModule Integration •

• Content PopulationContent Population •

• Unit TestingUnit Testing •

• Security ImplementationSecurity Implementation

$41,700.00 $41,700.00 Quality Quality Assurance Assurance Testing Testing 07/18/16

07/18/16 •• Site TestingSite Testing •

• Cross Device TestingCross Device Testing •

• Performance TestingPerformance Testing •

• User Experience TestingUser Experience Testing

$32,584.00 $32,584.00 Implementati Implementati on on 07/26/16

07/26/16 •• Prepare Launch SchedulePrepare Launch Schedule •

• Register with searchRegister with search

Engines Engines

• Check DNS EntriesCheck DNS Entries

$12,360.00 $12,360.00 Project Project Website Soft Website Soft Launch Launch 08/17/16

08/17/16 •• Configure production ServerConfigure production Server •

• Verify Production ServerVerify Production Server •

• Transfer files to ProductionTransfer files to Production

Server Server

• Final UATFinal UAT •

• Final copy proofingFinal copy proofing

$14,680.00 $14,680.00

Hard

Hard Launch Launch 08/18/1608/18/16 •• Hard LaunchHard Launch $800.00$800.00

Handover 08/25/16

Handover 08/25/16 •• Complete ProjectComplete Project

Documentation Documentation

• Prepare User ManualPrepare User Manual •

• Site trainingSite training

$6,940.00 $6,940.00 Online Online Support Support 10/14/16

(9)

5.

5. Project ConditionsProject Conditions 5.1

5.1 Project AssumptionsProject Assumptions

• Creation of E-commerce website for General Supplies companyCreation of E-commerce website for General Supplies company

incorporates all the General Supplies products available in their retail store incorporates all the General Supplies products available in their retail store

• Develop alternate revenue generation for General Supplies company byDevelop alternate revenue generation for General Supplies company by

selling their products online selling their products online

• E-commerce E-commerce business has has been successful business has has been successful and grown in the lasand grown in the last 5 yearst 5 years

and alternate mode of selling develops General Supplies company business and alternate mode of selling develops General Supplies company business initiatives.

initiatives.

5.2

5.2 Project RisksProject Risks Risk

Risk Areas Areas LikelihooLikelihoo d /Impact d /Impact

Risk

Risk Owner Owner Mitigation Mitigation PlanPlan Scope

Scope Creep Creep High High Project Manager Project Manager Contact project Contact project sponsor sponsor toto determine future project determine future project requirements; no more requirements; no more changes to current project. changes to current project. Custom Coding

Custom Coding Overruns

Overruns

High

High Project Project Manager Manager Strict Strict guidelines guidelines aroundaround scope creep, updates on scope creep, updates on  project documents.  project documents. 5.3

5.3 Project ConstraintsProject Constraints

• Budget : The requirement to complete the project under the estimatedBudget : The requirement to complete the project under the estimated

cost of $275,000.00 cost of $275,000.00

• Time Time : : Client Client requires requires to to launch launch the the website website before before NovemberNovember

30,2016. 30,2016.

(10)

6. Project Structure Approach 6. Project Structure Approach

Project Manager will conduct weekly project meeting. The project manager will be Project Manager will conduct weekly project meeting. The project manager will be responsible for delegating work and assign project duties. The

responsible for delegating work and assign project duties. The

 project manager will communicate via email, phone and conference calls.  project manager will communicate via email, phone and conference calls.

7. Project Team Organization Plans 7. Project Team Organization Plans

The constraints of the project are the cost and the time. Hence the team decided to The constraints of the project are the cost and the time. Hence the team decided to

include the associates from India , Prashaanth – Developer and Gayathri- QA tester and include the associates from India , Prashaanth – Developer and Gayathri- QA tester and ChuChu from Philippines for Online Support

ChuChu from Philippines for Online Support Project

Project Team Team Role Role Project Project Team Team MembersMembers Business

Business Analyst Analyst Rob Rob WadeWade

Architect Josephine

Architect Josephine

Developer Prashaanth Developer Prashaanth QA

QA Tester Tester GayathriGayathri Support

Support Specialist Specialist ChuChuChuChu

8. Approvals 8. Approvals

Approved

References

Related documents

For this, OpenFPM provides an encapsulated serialization/de-serialization sub-system that is used by each processor locally in order to serialize the local pieces of a distributed

Starting from a classical approach where data have been studied in the α-band (8– 14 Hz) and in a broad time period, as in the literature [ 4 – 6 , 8 – 10 , 20 ], we performed a

(CAREERTECH CAREER MAJORS) 9676 ACADEMY OF MANUFACTURING SCIENCE 9677 AUTOMATED MANUFACTURING TECHNOLOGY 9678 AUTOMATED SYSTEMS TECHNOLOGY 9679 CNC MACHINING 9680

Committee has set up two integration bodies, respectively called the AIG (Accord Implementation Group) and CTF (Capital Task Force). The former is a committee composed

Contradicting this explanation, however, are data that coronary blood flow is increased, not decreased, in patients with septic shock, and that elevated troponin levels in a majority

[r]

å se nærmere på hva som kjennetegner de strategiske endringene som AS Vinmonopolet har gjennomført de siste årene. Slik vi ser det er offentlige virksomheter avhengig av legitimitet