• No results found

COMPONENTS OF A PROJECT MANAGEMENT PLAN. Introductions. Workshop Topics. Project Management Evaluation & Assessment. Proposal Writing Workshop IV

N/A
N/A
Protected

Academic year: 2021

Share "COMPONENTS OF A PROJECT MANAGEMENT PLAN. Introductions. Workshop Topics. Project Management Evaluation & Assessment. Proposal Writing Workshop IV"

Copied!
12
0
0

Loading.... (view fulltext now)

Full text

(1)

Project Management

Evaluation &

Assessment

Proposal Writing

Workshop IV

Proposal Development Team 

Office of Research & Sponsored Projects (ORSP)        November 11, 2009

Introductions

Ann Gates, Associate  Vice President for 

Research

ORSP Proposal Development Team

Flo Dick, Coordinator of  Pre‐Award Services Malu Picard‐Ami,  Proposal Development  Specialist Claudine Riccillo,  Associate Director

Workshop

 

Topics

Components

 

of

 

a

 

Project

 

Management

 

Plan

Project Timeline

Project

 

Timeline

Project

 

Evaluation

 

&

 

Assessment

 

Plan

COMPONENTS

 

OF

 

(2)

ƒ

Personnel

 

&

 

organizational

 

structure

ƒ

Planned

 

collaborations

 

ƒ

Project

 

implementation

 

schedule

ƒ

Project risks and limitations

Project

 

Management

 

Components

ƒ

Project

 

risks

 

and

 

limitations

ƒ

Optional

 

subsections

ƒ Financial management & institutional resources

ƒ Subcontract management 

ƒ Acquisition and maintenance of instrumentation or 

equipment

5

ƒ Describe qualifications and experience of the Principal 

Investigator (PI) and project team

ƒ Describe how overall program will be directed and  implemented

ƒ Clearly lay out the various participants and their rolesand 

Personnel

 

&

 

Organizational

 

Structure

responsibilitiesin the project

ƒ Relate to activities in project

ƒ Describe reporting structure

ƒ May include an organizational chart to show personnel  interaction

ƒ Explain role of advisory committees if part of project 6

Activity:

Review of

Criteria:

Presents team’s qualifications and experience?

Describes roles and responsibilities? Describes reporting structure?

Review

 

of

 

Examples

Time Limit: 15 minutes 7

Describes reporting structure?

Question: 

How would you show how the project will be implemented?

ƒ Outline activities/tasks of the proposed project as they 

relate to the project goal and objectives, including 

evaluation

ƒ Set a timeline for various stages of the project

Project

 

Implementation

 

Schedule

ƒ Define the milestones associated with the project

ƒ Provide benchmarks, If applicable

ƒ Describe  how the project will be tracked, e.g., reporting 

structure

(3)

Provide

  

information

 

on:

ƒ Financial systems and safeguards used to ensure the 

reliable management of program finances

Financial

 

Management

 

&

 

Program

 

Risk

ƒ Project and Institutional resources

ƒ Program risks ‐describe alternate plans  if necessary

9

ƒ Identify subrecipients and existing relationship  ƒ Describe means and structure of communication

ƒ Describe processes used to manage subrecipients to ensure

Subrecipient

 

Management

 

&

 

Planned

Collaborations

 

ƒ Describe processes used to manage subrecipients to ensure 

program goals and requirements are met

ƒ Provide information on contractual arrangements

ƒ Identify and describe existing relationships or plans to expand 

relationships with internal or external collaborators  ƒ Describe and define collaborative  proposal partnerships

10

Answer

 

the

 

questions:

ƒ How will the acquisition be made?

ƒ Who will be in charge of overseeing it?

Acquisition

 

and

 

Maintenance

 

of

  

Instrumentation

 

or

 

Equipment

ƒ Who will have access to the equipment?

ƒ How will it be scheduled ?

ƒ What mechanisms will be put in place for training?

ƒ Where will the equipment be housed?

ƒ How will it be maintained?

ƒ How will it be sustained on a long‐term basis?

Some

 

Notes:

Handouts

 ‐

Collaborations

 

&

Instrumentation

 

Acquisitions

(4)

DEVELOPING

 

A

 

PROJECT

 

TIMELINE

13

– Include

 

the

 

evaluation

 

effort

 

early

 

in

 

the

 

timeline

– Indicate

  

initiation

 

and

 

duration

 

of

 

activities

– Identify milestones and expected dates of

Don’t

 

leave

 

it

 

up

 

to

 

the

 

reviewers

 

imagination

   

as

 

to

 

how

 

you

 

will

 

get

 

it

 

done

– Identify

 

milestones

 

and

 

expected

 

dates

 

of

 

completion

– Balance

 

the

 

amount

 

of

  

detail

 

with

 

information

 

needed

Provide

 

a

 

realistic

 

timeline

14

Types

 

of

 

Project

 

Timelines

ƒ Basictimelines

ƒ Gantt chart is a graphical representation of the 

duration of tasks againstg  the p gprogression of time      

ƒ Pert chart is a model for project management 

designed to analyze and represent the tasks involved 

in completing a given project       

15

CREATING

 

A

 

BASIC

 

TIMELINE

(5)

Project Timeline Project Activities

Year 1

January – March 2010 Plan experiment April – June 2010 Collect data July -September 2010 Conduct experiment October – December 2010 Prepare and administer survey

Basic

 

Project

 

Timeline

Year 2

January – March 2011 Complete data collection Start data analysis April – June 2011 Complete data analysis

July -September 2011 Conduct comparative analysis October – December 2011 Prepare report

17

Basic

 

Text

 

Timeline

Workplan

Year One:

‰ Conduct an ethnographic study of newsrooms to identify key aspects of the social context that news 

organizations use to build information montages

‰ Implement initial prototype ABC server for collecting and disseminating basic readership statistics ‰ Release a desktop MeedFeed prototype to a selected community of Northwestern users for initial feasibility 

testing

‰ Translate a set of search techniques (hill climbing, simulated annealing, tabu search, evolutionary algorithms) 

to operate within a Clifford algebra framework

‰ Outcomes: Representations and models for montage construction will be established; Theoretical feasibility 

of search using Clifford algebras will be determined; Demonstrate personalization effects ‰ Outputs: Initial experimental software framework will be deployed amongst a small user community

Year Four:

‰ Analyze empirical data from user community observations

‰ Extend the MeedFeed concept to another physical context: e.g. news reading within an interactive physical 

space (smart environment) or on a Tablet PC device

‰ Implement a centralized Web version of MeedFeed, to investigate the potential of sharing and amortizing 

evolutionary searches across communities

‰ Benchmark, evaluate, and potentially revise search algorithms 

‰ Benchmark, evaluate, and revise social network analyses

‰ Outcomes: Insights into community behavior from empirical studies; Rigorous evaluation of the potential 

and limitations of the two key elements of evolutionary journalism; Demonstration of amortizing the cost of 

evolutionary search across users

‰ Outputs: Empirical data for other researchers to investigate; Two new instantiations of the MeedFeed 

concept

18

Project Activities/Tasks Year 1 Year 2 Year 3

0‐6  months 6‐12  months 0‐6  months 6‐12  months 0‐6  months 6‐12  months Activity 1 Activity 2 Activity 3

Tabular

 

Timeline

 

(GANTT

 

Chart)

Activity 4

Activity 5

Activity 6 Activity 7

Project Evaluation

Prepare final report

(6)

Activity:

Timelines

Using

 

the

 

solicitation

 

you

 

brought

 

with

 

you,

 

develop

 

a

 

basic

 

timeline

 

that

 

charts

 

the

 

activities

 

Activity:

 

Time

 

Limit:

 

15

 

minutes

21

that

 

must

 

be

 

accomplished

 

to

 

meet

 

the

 

proposal

 

deadline

 

Sample Proposal Planning Timeline

o Identify, contact  and confirm  Co‐PI’s and/or collaborators* o Notify ORSP Proposal Development Team (DevT) & ORSP Research Administrator (RA) of proposal  intentions o Outline Solicitation and requirements o First draft budget and submission planning meeting with ORSP RA o First rough draft narrative sections o First draft narrative – review & send for edit by DevT  o Submit requests for collaboration, commitment, institutional support letters, etc. o Contact ORSP RA on any  budget changes Bi k t h t & di th i d f l t d 22 o Biosketches, current & pending or other required forms completed o Second draft narrative – edit, send to DevT for agency review criteria o Finalize budget, prepare  budget justification o Complete Abstract or Project Summary o Complete narrative & other sections of proposal ‐submit to DevT for review o Submit narrative for internal and external review from senior colleagues

o Incorporate review recommendations and prepare Final Draft

o Appendices – provide departmental letters, collaboration letters, institutional support letters (if required) and submit to ORSP RA o Final submission review  o Submit final documents to ORSP RA 

Discussion

Discussion

23

PROJECT

 

TIMELINE

 

TOOLS

(7)

Project

 

Timeline

 

Software

 

Tools

ExcelSpreadsheet       

Templates       

http://www.vertex42.com/ExcelArticles/create‐a‐timeline.html

Sample: Excel spreadsheet

• Microsoft Visiotemplates       

Worddocument tables

• Project management software on web • Microsoft Project

25

PROJECT

 

EVALUATION

 

PLANS

26

Evaluation

 

is

 

the

 

“systematic

 

investigation

 

of

 

the

 

worth or merit of an object ”

Project

 

Evaluation

 ‐

Definitions

worth

 

or

 

merit

 

of

 

an

 

object.”

The Joint Committee on Standards for Educational Evaluation (1994)

Project

 

Evaluation

 

– Overview

Integral

 

part

 

of

 

a

 

grant

 

proposal

Provides

 

different

 

kinds

 

of

 

information

oGauge how project is progressing

oGauge how project is progressing

oDetermine impact of project

oVerify and validate results 

(8)

Evaluations

 

should

 

be

 

conducted

 

for

 

action

related

 

reasons,

 

and

 

the

 

information

 

provided

 

should

 

facilitate

 

deciding

 

a

 

course

 

of

 

action.”

Project

 

Evaluation

 ‐

Purpose

NSF 02‐057 The 2002 User‐Friendly Handbook for Project Evaluation

29

Project

 

Evaluation

 

Plan

Helps  with the planning of a project

(understanding the project's goals, objectives, and 

strategies)

Determines whether a project is proceeding as planned

(meeting its stated goals and objectives) (meeting its stated goals and objectives)

Allows for continuous improvement

(provides immediate information on direct effects of the 

project) 

Provides insights on new or unintended project 

effects

Tells you what you have accomplished

30

Types

 

of

 

Project

 

Evaluation

Formative

•assesses initial and ongoing project activities •begins during project development •continues   through implementation

Summative

in•assesses reaching the its  qualitystated  goalsand success of the project          •provides data on the activities and outcomes •takes place after the completion of the project

31

Project

 

Evaluation

 

Plans

• Consider

 

using

 

a

 

table

 

to

 

illustrate

 

evaluation

 

plan

• Helps

 

reviewers

 

to

 

understand

 

the

 

evaluation

 

process

Goal Objectives Evaluation

h Anticipated  Technique Outcome Increased retention  of women students in STEM fields Develop courses  with  interdisciplinary focus to connect  STEM fields with  societal concern Retention data  after each  semester & for cohorts after 4 and  5 years Increased percent  of women  remaining in any  STEM major

Adapted from Engineering Education Extension Service (EEES) Proposal Writing and Project Management 

(9)

Project

 

Evaluation

Get

 

an

 

expert

 

evaluator

Use

 

an

 

external

 

evaluator

  

Get evaluator advice early in proposal process

Get

 

evaluator

 

advice

 

early

 

in

 

proposal

 

process

Provide

 

details

 

on

 

evaluation

 

design

 

and

 

tools

• Describe how and who will collect, analyze and interpret the data

33

GROUP

 

ACTIVITY

34

Exercise:

Evaluation Plan

Read the sample Evaluation Plan and list

suggestions for improving it

(Exercise take from “Proposal  Writing Strategies” presentation by 

Steve Cooper of the Division of Undergraduate Education, National 

Science Foundation, 2007)

Time Limit: 10 minutes

Sample Evaluation Plan

Assessment of the Student Response Technology (SRT) will be both quantitative and qualitative. First, students will be surveyed at the end of the semester on the content, level of difficulty, and their perceived level of mastery of the proposed algorithms. Second, faculty members p p g y teaching the course using SRT will be asked to judge its effectiveness in monitoring student achievement throughout the semester. In addition, faculty members who have been teaching the proposed course for several years will be asked to compare students' abilities after using SRT with those in previous years who have not used SRT. Finally, the final grades of students using SRT will be compared with those from previous years who have not used the technology in the classroom.

(10)

PD’s Response

Evaluation Plan (1)

Include formative assessment

„

Provides feedback during the design

and implementation phases

and implementation phases

„

Helps monitor progress toward

outcomes

PD’s Response

Evaluation Plan (2)

Get help at the beginning – in the

proposal writing phase

„

Involve an expert evaluator

„

Involve an expert evaluator

„

Consider an outside (independent)

evaluator

„

Size of budget

„

Importance of objectivity

PD’s Response

Evaluation Plan (3)

Consult other sources

NSF’s User Friendly Handbook for Project Evaluation „http://www.nsf.gov/pubs/2002/nsf02057/start.htm Existing tools

Existing tools

„Online Evaluation Resource Library (OERL)

„http://oerl.sri.com/

„Field-Tested Learning Assessment Guide (FLAG)

„http://www.wcer.wisc.edu/archive/cl1/flag/default.asp

Science education literature

„J. of Engineering Education, Jan, 2005

PD’s Response

Evaluation Plan (4)

Provide details on tools & experimental design

„Describe how

„Students will be “surveyed”,

„Faculty will be “asked”

„Faculty will be asked ,

„Grades will be “compared”

„Indicate who will do these tasks

„Indicate who will analyze and interpret the data

„Consider confounding factors

„Try to measure deeper learning

(11)

PD’s Response

Evaluation Plan (5)

Consider broadening the approach

„

Examine effects on retention and diversity

„

Involve larger populations

g

p p

„More diverse populations

„

Collaborate

„

Beta test

Report Out

Report

 

Out

 

42

• User‐Friendly Handbook for Project Evaluation ‐Science,  Mathematics, Engineering and Technology Education(more info),  1993, Floraline Stevens, Frances Lawrenz and Laure Sharp, edited by Joy Frechtling.  NSF 93‐152

• User‐Friendly Handbook for Mixed Method Evaluations, 1997,  Edited by Joy Frechtling and Laure Sharp NSF 97 153

Some

 

Evaluation

 

Resources

Edited by Joy Frechtling and Laure Sharp. NSF 97‐153

• Practical Assessment, Research and Evaluation (PARE)is an on‐ line journal. Its purpose is to provide education professionals access to refereed  articles that can have a positive impact on assessment, research, evaluation • National Institute for Science Education(NSF funded)

• North Carolina State University Internet Resources for Higher  Education Outcomes AssessmentA portal to numerous web‐accessible  resources on assessment

Resources

ORSP Development 

Team ORSPAdministrators Research 

(12)

Proposal

 

Development

 

Team

Contact

 

Information

Ann Gates [email protected] Flo Dick [email protected] Claudine Riccillo [email protected]

Malu Picard‐Ami

[email protected]

45

Reflection

What did you learn 

today that was new?

What elements of 

the workshop did 

you find the most 

relevant? What would you 

like to learn more 

about?

46

ORSP Development Team

Fall 2009

Proposal Writing Workshops

Session V ‐

December 2

nd

Budget Preparation

1:30‐3:30pm 

Location:

 

Blumberg

 

Auditorium

(UTEP

 

Library)

References

Related documents

The Project Management Fundamentals workshop helps participants learn practical skills to apply Project Management principles in the workplace and acquire

A generator (500kVA–5MVA) connected to an isolated power system that includes at least one other generator should be protected by a three- phase time-delayed voltage

constructed and tested.. Each group contai ned one un trengthened contr I specimen. The moment red i stri bution \v as reduced for both groups compared with the

direction of facilitators of thelearning and teaching processes. In this context, learners are supposed to be given opportunities to use the language naturally

In the panel regressions we include the following independent variables: %Risky, the percentage allocated to risky assets based on strategic asset allocation policy; ∆%Riskyt−1,

This logo is also approved for use on documents when use of the full color logo takes away from the artistic appeal or when the logo needs to be too small to see the letters

The player is solely responsible for verifying the accuracy of the numbers and draw date(s) printed on the ticket whether the information was entered into the central

“State Facilities Located in the ---- Hazard Area by Jurisdiction” – These tables are developed using GIS algorithms that intersect spatially referenced state facilities with