Corporate Presentation 2011 ABENER. Engineering and Construction for Sustainability

N/A
N/A
Protected

Academic year: 2021

Share "Corporate Presentation 2011 ABENER. Engineering and Construction for Sustainability"

Copied!
24
0
0

Loading.... (view fulltext now)

Full text

(1)

ABENER

Engineering and Constructionfor Sustainability

Corporate Presentation 2011

(2)

Abengoa. Innovative Solutions for

Sustainability.

(3)

2

Abengoa (MCE: ABG) is an international company that applies innovative technology

solutions for sustainability in the energy and environment sectors…

A leading and innovative company with a clear vision of the future and a global focus.

CAGR: Compound Annual Growth Rate

Abengoa. Innovative Solutions for Sustainability.

(4)

… with over 27,000 employees in 77 countries.

Spain Brazil USA Rest of Latam Rest of Europe

Asia & Oceania Africa

Sales by geographies

Abengoa. Innovative Solutions for Sustainability.

(5)

4 Abengoa. Innovative Solutions for Sustainability.

Engineering and construction

Concession-type infrastructure

 Solar, transmission, desalination and cogeneration

 Very limited market risk

 An average of 27 years of regulated revenues

 70 years of experience

 Proprietary know-how

 1st international contractor for transmission, 3rd for electricity infrastructures

Industrial production

 Biofuels, industrial waste recycling

 High growth markets

 Market leadership

1

2

3

(6)

Abeinsa, the Engineering and

Construction Business Group of

Abengoa.

(7)

6

Engineering and Construction

Abeinsa is a key player in the engineering, construction, and concession activities of

Abengoa; as well as the development of R + D + i.

1

Energy Infrastructure Services Environment Transportation

Concessions

2

Generation Water Transmission Singular Buildings

Abeinsa New Horizons

3

Hydrogen Technologies

Energy from Seas and Oceans

Biomass

GHG Emissions Management

Energy Efficiency

Highly Innovative R&D

Abeinsa. The Engineering and

(8)

Abeinsa has maintained its leadership in the market for years, positioned among the

major constructors of energy infrastructure worldwide …

Power

1. China National Machinery Industry Corp. 2. Hyundai Engineering & Construction

3. Abeinsa

4. Iberdrola Ingeniería y Construcción 5. Grupo ACS

Transmission & Distribution

1. Abeinsa

2. Bouygues

3. Iberdrola Ingeniería y Construcción 4. Larsen & Toubro Ltd. E&C División 5. Hochtief AG

Latin America / Caribbean

1. Constructora Norberto Odebrecht

2. Grupo ACS 3. Techint Group

4. Abeinsa

5. Grupo Isolux Corsan

ENR (Engineering News-Record) Ranking: Major international contractors in …

Abeinsa. The Engineering and

(9)

8

… as well as water treatment plants, desalination plants and hydraulic infrastructure …

Desalinization

1. Veolia. 2. Doosan 3. Fisia Itialimpianti

8. Abeinsa

(1)

Desalinization (membrane

technology)

1. Veolia 2. GE 3. Degrémont

6. Abeinsa

(1)

IDA (Desalination yearbook 2010-2011): Mayor EPC contractors since 2000…

(1) After acquisition of Befesa Agua EPC

Abeinsa. The Engineering and

(10)

… with over 12,500 highly qualified employees, in over 30 countries.

114 employees (0.9%) 7,191 employees (57.3%) 337 employees (2.7%) 4,676 employees (35.4%) 235 employees (1.9%)

Abeinsa. The Engineering and

(11)

10

Abener. Engineering and

(12)



Tower Technology



Parabolic Through Technology



Integrated Solar Combined Cycle Techonology

(ISCC)

Solar



Bioethanol



Biodiesel



ETBE

Biofuels



Open Cycles / Combined Cycles



Add - ons



Diesel Power Plants



Cogeneration



Biomass

Generation

Three Areas of Activity

(13)

12 Our Key Capabilities

Competitive Advantage

Abener

has an integrated business model that constitutes a crucial competitive advantage…

Engineering

Construction

Commisioning Operation &

Maintenance Risk Management

Integration

 All engineering supervision and management are executed with their own resources.

 Cooperation through stable and strategic alliances.

 Standardization of activities through clearly defined procedures for:

 Engineering and Construction.

 Commisioning, operation and maintenance.

 Integration.

 Risk management.

… by controlling the whole integrated process of our projects we are able to guarantee

the fulfillment of:

(14)

Solar Business Area Tower Technology

 The world’s largest commercial solar tower plant.

 20 MW.

 Capacity to supply 10,000 households.

 Reducing annual CO2 emissions to 12,000 t / year.

 Solúcar Platform (Seville. Spain).

 In operation since 2008.

PS20

PS10

 The world’s first commercial solar tower plant.

 11 MW.

 Capacity to supply 5,500 households.

 Reducing annual CO2 emissions to 6.700 t / year.

 Solúcar Platform (Seville. Spain).

 In operation since 2007.

Abener

is a pioneer and worldwide leader in the construction of concentrating solar

power plants.

(15)

14 Solar Business Area

Parabolic trough technology

Solana

Shams-1

Mojave

Solar Platforms in Spain

Solnova 1, 3 y 4

Solar Field in India

The world’s largest solar plant. 280 MW. Six hours of thermal storage from molten salt.

Arizona (USA).

 The largest thermosolar plant in the United Arab Emirates.

100 MW.

More than 627,000 m2solar field.

Abu Dhabi (UAE).

250 MW. Mojave Desert (USA). Écija. El Carpio. Castilla la Mancha. Extremadura. 100MW (each one). More than 588,000 m2 solar field (each

one). 150 MW . More than 882,000 m2solar field. Solúcar Platform (Seville, Spain). In operation since 2010. 3 MW.

Solar Energy Centre. Gurgaon (India).

Three CSP plants with parabolic trough technology are already in commercial operation.

Eleven more are under construction, among them the world’s largest one.

(16)

 150 MW.

 More than 183,000 m2 solar field

of parabolic trough.  Hassi R’Mel (Algeria).  In operation since 2011.  470 MW.

 The world’s first commercial ISCC power plant.

 More than 183,000 m2 solar field of

parabolic trough.

 Ain Beni Mathar (Morocco).  In operation since 2010.

Solar Business Area

Integrated Solar Combined Cycle (ISCC)

Abener has developed the two first ISCC power plants and both are already in commercial

operation.

Ain Beni Mathar

Hassi R’Mel

Agua Prieta II solar field

Recently, Abener has been awarded the construction of the solar field of Agua Prieta II, the

first ISCC plant in Mexico.

 12 MW.

 Integrated with a combined cycle of 464,4 MW.  The first ISCC plant in Mexico.

 Agua Prieta, Sonora (Mexico).  Operation expected in 2013.

(17)

16

Abener is the leading bioethanol plant constructor in Europe and is developing second

generation bioethanol projects.

Biofuels Business Area Bioetanol: Recent Projects

 480,000 m3/year.  From cereal and corn.

 Rotterdam (Holland).

 In operation since 2010.

 333,000 m3/year each one.  88 MGal/year each one.

 From corn (sorghum).

 Illinois & Indiana.

 In operation since 2009.

Rotterdam Bioethanol

Indiana & Illinois Bioethanol

Hugoton

 The first commercial 2ndGeneration

bioethanol plant.

 Kansas (USA).

(18)

Abener has extensive experience in constructing

biodiesel and ETBE plants

.

 200,000 t/year biodiesel.

 From vegetables oils.

 21,000 t/year pharmaceutical glycerine

 San Roque (Cadiz, Spain).

 In operation since 2009.

 34,028 t/year ETBE.

 Huelva (Spain).

 In operation since 2004.

ETBE Huelva

Biodiesel San Roque

Biofuels Business Area Biodiesel and ETBE

(19)

18

Abener’s conventional generation power projects represents +5 GW of installed capacity.

Generation Business Area

Add - ons

Open /Combined Cycles Diesel Power Plants

Cogeneration Biomass 870 MW 2,902 MW 284,3 MW 930 MW 194 MW 300 MW under construction

Installed Power Capacity

42,3 MW under construction

(20)

 300 MW cogeneration plant.

 Petróleos Mexicanos state company (Pemex).

 Villahermosa, Tabasco (Mexico).

 Operation expected in 2012.

 Two 70 MW biomass cogeneration plant associated with bioethanol .

 Sao Luiz y Sao Joao (Brazil).

Recent Projects:

Generation Business Area

 Internal combustion plant of 42,3 MW.

 Incorporates a system to reduce the nitrogen oxide emissions.

 Petróleos Mexicanos state company (Pemex).

 Baja California Sur (México).

 Operation expected in 2013.

Baja California Sur IV

Tabasco Cogeneration

(21)

20 Abener Today and Tomorrow Abener Today

Abener has over 1,000 employees and is present in four continents through its subsidiaries

network and project offices.

Abener’s Projects Subsidiaries Network

Energoprojekt Gliwice, S.A.

Abener Ghenova Ingeniería, S.L. Abener Engineering and Construction

Services LLC.

Abener Mexico S.A. de CV

Spain Africa

Poland

India & Middle East USA

Mexico

Human Resources Distribution by Geographies

Abener Engineering Private Limited

(22)

International Sales National Sales

We count on a diversified business in sectors and activities with great potential, and

sales of almost 1,200 M€ in 2010, with 44% of international sales.

Abener Today and Tomorrow Abener Today

(23)

22

To be a world leader in the design and construction of power and

industrial plants by applying innovative technology solutions that

contribute to sustainable.

Our strong strategic position allows us to continue our way to become a global leader in

innovative technological solutions for sustainable development.

Abener Today and Tomorrow The future is already here

(24)

Abener Engineering and Construction Services LLC.

The United States

14522 South Outer Forty Road Chesterfield, 63017 - Saint Louis, MO (USA)

Tel. +1 (314) 275 1100 Fax: +1 (314) 275 2408

Abener Engineering Private Limited

India

110, L.B.S. Marg Vikhroli (West)

400 083 - Mumbai, Maharashtra (India) Tel. 91 22 6688 9600

Fax: 91 22 6688 9655

Energoprojekt Gliwice, S.A.

Poland

Ul. Zygmunta Starego, 11 44101 - Gliwice (Poland) Tel. 48 032 7902 600 Fax: 48 032 7902 601

Abener México S.A. de CV

Mexico

Bahía Santa Bárbara, 174 11300 - México D.F. (Mexico) Tel. 52 5530 67 39 00 Fax: 52 5552 62 71 60

Abener Ghenova Ingenieria, S.L.

Spain C/Energía Solar, nº1 Palmas Altas 41014 - Seville (Spain) Tel. (+34) 954 93 70 00 Directory

Abener and its Subsidiaries

C/Energía Solar, nº1 Palmas Altas 41014 - Seville (Spain) Tel. (+34) 954 93 70 00 Fax: (+34) 954 93 60 05 Web: www.abener.es Email: [email protected]

ABENER

References

Related documents

Scrivo, Esquire McElroy, Deutsch, & Mulvaney 1300 Mount Kemble Ave.. Iacullo, Esquire Iacullo, Martino & Marzella 247

Statistical and instantaneous results of vortex shedding and wake capture for a massively separated flow generated by a bluff-body are provided with URANS and DDES methods obtained

Allen’s name comes up, but then the people always say, “But Frances and Charles taught our whole church how we can do it ourselves through the power of the Holy Spirit within us!”

Altogether, the data indicate that ferumoxytol is retained in biofilms following topical exposure, and display pH-dependent catalysis of H2O2 in situ, which can enhance killing

This figure shows that the mass flow rate is the largest factor that determines the cooling efficiency and that the ambient relative humidity has a large impact on the

Some success in reducing the number of symmetric solutions while solving

• Maintain a minimum depth of 9 inches of loose-fill materials such as wood mulch/chips, engineered wood fiber (EWF), or shredded/recycled rubber mulch for equipment up to 8 feet

This work extends the already proposed method considering surface normal information during the learning process and performing an extensive evaluation on noisy point clouds