Chapter 6

Project Time Management Project Time Management 

(PMBOK Guide)

Mohammad A. Rajabi

D t f G ti E U i it f T h

Dept. of Geomatics Eng., University of Tehran Tel: +98 21 8833 4341, Cell: +98 912 132 5823

Email: marajabi@ut ac ir Email: [email protected]

Homepage: http://www.marajabi.com

(2)

Table of Content

Table of Content

(3)

Introduction Introduction

Includes processes required to manage timelyIncludes processes required to manage timely  completion of the project

Define activities

Define activities

Sequence activities

Estimate activity resources

Estimate activity durationsy

Develop schedule

Control schedule

Control schedule

(4)
(5)

Scheduling Scheduling 

Overview

(6)

6.1 Define Activities 6.1 Define Activities

Identifying the specific activities to produceIdentifying the specific activities to produce  the project deliverables

WBS identifies the deliverables at the lowest

WBS identifies the deliverables at the lowest  level

(7)

Inputs, Tools & Techniques, 

Outputs

(8)

Data Flow Diagram

Data Flow Diagram

(9)

Inputs Inputs

Scope baselineScope baseline

Deliverables, constraints, assumptions

Enterprise environmental factors

Enterprise environmental factors

PMIS

Organizational process assets

Existing formal and informal activity planning‐

related policies, procedures, and guidelines Lessen learned

(10)

Tools and Techniques Tools and Techniques

DecompositionDecomposition

Subdividing the project work package Developing WBS, WBS dictionary and p g , y

decomposing it for development of the final  activity list

Rolling Wave Planning

Work to be accomplished in the near future is planned  in detail, future work is planned at a higher level

in detail, future work is planned at a higher level

Templates

Expert judgment p j g

(11)

Outputs Outputs

Activity list

A comprehensive list including all schedule activities A comprehensive list including all schedule activities 

required for the project Activity identifier

Scope of work description for each activity

Activity attributes

Activity ID WBS ID activity name when completed Activity ID, WBS ID, activity name, when completed 

activity codes, activity description, predecessors, 

successors, logical relationships, leads, lags, resource  requirement imposed dates constraints and

requirement, imposed dates, constraints, and 

assumptions, person responsible, geographic area,  Level of Effort (LOF)

Mil t li t

Milestone list

(12)

6.2 Sequence Activities 6.2 Sequence Activities

The process of identifying and documentingThe process of identifying and documenting  relationships among the project activities

Every activity (except the first and the last

Every activity (except the first and the last  ones) is connected to one predecessor and  one successor

one successor

Leads and lags might be necessary

PM software, manual, and/or automated

(13)

Inputs, Tools & Techniques, 

Outputs

(14)

Inputs Inputs

Activity listActivity list

Activity attributes

il li

Milestone list

Project scope statement

Checking scope description to ensure accuracy

Organizational process assetsg p

Project files from the corporate knowledge base  used for scheduling methodologyg gy

(15)

Tools and Techniques

Precedence Diagramming Method (PDM)

Also called Activity‐On‐Mode (AON)

Finish‐to‐start (FS), Finish‐to‐finish (FF), Start‐to‐start  (SS), Start‐to‐finish (SF) [rarely used!]

Dependency determinationDependency determination

Mandatory: by contract or inherent

Discretionary: preferred logic, preferential logic, or 

f l b d b

soft logic based on best practices

External: relationship between project and non‐

project activities (out of project team’s control)

p j ( p j )

Applying leads and lags

Schedule network templates (specially good for  d d li bl )

repeated deliverables)

(16)

Precedence Diagramming Method

Precedence Diagramming Method

(17)

Outputs Outputs

Project schedule network diagramsProject schedule network diagrams

Project document updates

A ti it li t Activity lists

Activity attributes Risk register

(18)

6.3 Estimate Activity Resources 6.3 Estimate Activity Resources

The process of estimating the type andThe process of estimating the type and 

quantities of material, people, equipment or  supplies

supplies

(19)

Inputs, Tools & Techniques, 

Outputs

(20)

Data Flow Diagram

Data Flow Diagram

(21)

Inputs Inputs

Activity list

Activity attributes

Activity attributes

Resource calendars

When and how long a resources is available + its g

attributes (experience/skill, geographic location, i.e.,  availability, capability) 

Enterprise environmental factors (resourceEnterprise environmental factors (resource  availability and skills)

Organizational process assets (policies, 

procedures related to staffing, rental or purchase  of equipment, historical information regarding 

types of resources types of resources 

(22)

Tools and Techniques Tools and Techniques

Expert judgmentExpert judgment

Alternative analysis (various level of resource  capability skills size or type of machines

capability, skills, size or type of machines,  different tools, make or buy decisions

P bli h d i i d

Published estimating data

Bottom‐up estimating

Project management software

(23)

Outputs Outputs

Activity resource requirements (types andActivity resource requirements (types and  quantities of resources)

Resource breakdown structure (hierarchy ofResource breakdown structure (hierarchy of  identified resources by resource category, and  type (labour, material, equipment, and supplies)) type (labour, material, equipment, and supplies))

Project documents updates

Activity listActivity list

Activity attribute Resource calendarResource calendar

(24)

6.4 Estimate Activity Duration 6.4 Estimate Activity Duration 

Estimating the number of work periodsEstimating the number of work periods 

needed to complete activities with estimated  resources

resources

Progressively elaborated considering quality  and availability of data

and availability of data 

(25)

Inputs, Tools & Techniques, 

Outputs

(26)

Data Flow Diagram

Data Flow Diagram

(27)

Inputs

Activity listActivity list

Activity attributes

Activity resource requirements

Resource calendars (type, quantity, availability, 

capability of human resources, equipment, material)

Project scope management (constraints andProject scope management (constraints and 

assumptions such as existing conditions, availability of  information , and length of reporting periods, for 

example: available skilled resources, contract terms example: available skilled resources, contract terms  and requirements)

Enterprise environmental factors (duration estimating  DB productivity metrics published commercial

DB, productivity metrics, published commercial  information)

Organizational process assets (historical duration 

i f i j l d h d li

information, project calendars, scheduling 

(28)

Tools and Techniques

Expert judgment

Analogous estimating (duration, budget, size, weight 

d l it f i i il j t)

and complexity from a previous similar project)

Less costly and time consuming but less accurate

Parametric estimating (using statistical relationship a a et c est at g (us g stat st ca e at o s p between historical data and variables (e.g.: square  footage)

Three‐point estimation (originated from Program

Three‐point estimation (originated from Program  Evaluation and Review Technique (PERT)

Most likely (Tm), optimistic (To), pessimistic (Tp), expected  (Te): Te=(To+4Tm+Tp)/6

(Te): Te=(To+4Tm+Tp)/6

Reserve Analysis: contingency reserves or time 

reserves or buffers) to account for schedule uncertainty 

(29)

Outputs Outputs

Activity duration estimates (do not include anyActivity duration estimates (do not include any  lag)

E g : 2 weeks ± 2 days 15% probability of E.g.: 2 weeks ± 2 days, 15% probability of 

exceeding 3 weeks 

Project document updates

Project document updates

Activity attributes

A ti d i d l i th ti it

Assumption made in developing the activity  duration estimate such as skill levels and 

availability availability

(30)

6.5 Develop Schedule 6.5 Develop Schedule

The process of analyzing activity sequenceThe process of analyzing activity sequence,  durations, resource requirements and 

schedule constraints to create the project schedule constraints to create the project  schedule

Often an iterative process

Often an iterative process

(31)

Inputs, Tools & Techniques, 

Outputs

(32)

Data Flow Diagram

Data Flow Diagram

(33)

Inputs Inputs

Activity list

Activity attributes

Project schedule network diagrams

Activity resource requirements

Resource calendars

Activity duration estimates

P j t t t t

Project scope statement

Enterprise environmental factors (scheduling  tool)

tool)

Organizational process asset (scheduling  methodology and project calendar)

(34)

Tools and Techniques Tools and Techniques

Schedule network analysis

Critical Path Method (CPM)

Critical Chain Method (resource‐constrained CPM +  buffers at the beginning and end of scheduled 

activities))

Resource leveling (limited resources)

What‐if scenario analysis (Monte Carlo Analysis) A l i l d d l

Applying leads and lags

Schedule compression

Crashing (approving overtime, adding resources for effortCrashing (approving overtime, adding resources for effort  driven activities)

Fast tracking (overlapping the activities)

(35)

CPM

CPM

(36)

Output

Project schedule

Milestone charts Bar charts

Project schedule network diagrams

Schedule baseline

Schedule data (milestones activities activity attributes

Schedule data (milestones, activities, activity attributes,  documented assumptions and constraints)

Resource histogram

Alternative schedules (best worst case resource leveled not Alternative schedules (best, worst case, resource‐leveled, not 

resource‐leveled, with or without imposed dates Scheduling of contingency reserves

Project document updates

Project document updates

Activity resource requirements Activity attributes

(37)

Graphic

Graphic 

Examples p

(38)

6.6 Control Schedule 6.6 Control Schedule

The process of monitoring the status of the 

product to update project progress and manage product to update project progress and manage  changes to the schedule baseline

Determining the current status of the projectDetermining the current status of the project  schedule

influencing the factors that create scheduleinfluencing the factors that create schedule  changes

Determining that the project schedule has g p j changed

Managing the actual changes as they occur

(39)

Inputs, Tools & Techniques,

Outputs

(40)

Data Flow Diagram

Data Flow Diagram

(41)

Inputs p

Project management plan

Project schedule (the most recent version withProject schedule (the most recent version with  notations to indicate updates, completed 

activities and started activities as of the indicated  data date

Work performance information (which activities 

h t t d/fi i h d th i )

have started/finished, their progress)

Organizational process asset

E i ti f l d i f l h d l t l l t d

Existing formal and informal schedule control‐related  policies, procedure and guidelines

Schedule control toolsSchedule control tools

(42)

Tools and Techniques

Performance reviews (measure, compare and analysis of  performance (start, finish, percent complete and 

remained)). In Earned Value Management (EVM), Schedule )) g ( ), Variance (SV), and Schedule Performance Index (SPI) are  used to assess the schedule variance 

Variance analysis (determining the cause and degree of y ( g g variance WRT schedule baseline)

Project management software (tracking planned dates  versus actual dates, forecast the change effects)

versus actual dates, forecast the change effects)

Resource leveling

What‐if scenario analysis (to bring the schedule into  alignment with the plan)

alignment with the plan)

Adjusting leads and lags

Schedule compression

(43)

Outputs

Work performance measurements (SV and SPI for WBS  components, work packages are documented and 

communicated to stakeholders)) communicated to stakeholders))

Organizational process assets updates

Causes of variances

C ti ti h d th

Corrective action chosen and the reasons Other types of lessons learned

Change request

Project management plan updates

Schedule baseline

Schedule management plan Cost baseline

Project document updates

Schedule dataSchedule data Project schedule

References

Related documents

The important implication for the following empirical analysis is that this model implies that workers may be able to increase their wages by changing firms because the wage

Notwithstanding the observed greater volatility of the respective local currencies, the monetary authorities of these four Asian economies tend to adopt a form

As in the case where explicit deposit costs d o not vary with risk and leverage, the impact of increased capital requirements on portfolio behavior for banks paying

Cushioned for best starter components of a frame i need to my motto is important the record player on the vinyl in the turntable produce good.. Buy a turntable, this vertere is a

• Unified result sources from both cloud and on-prem indexes • Office Graph now looks into on-prem content. • Delve can now be used with

To take into account in regional data assimilation the information about uncertainties arising from the large scale forcing model, we use additive noise with the samples from

Despite the huge benefits of cloud computing; concerns on the security and confidentiality of data stored in the cloud, privacy and regulatory compliance, vendor lock-in, location