• No results found

Configuration Management Plan

N/A
N/A
Protected

Academic year: 2021

Share "Configuration Management Plan"

Copied!
7
0
0

Loading.... (view fulltext now)

Full text

(1)

Configuration Management Plan

Project:

Version:

Prepared by:

Date:

(2)

ii

Approvals:

Submitted By:

Project Team Member Signature Date

Review Approvals By:

Signature Date

Signature Date

Signature Date

Signature Date

Document Change Log

Version Date Author Description

(3)

Table of Contents

iii

1.0 Scope 1

2.0 Configuration Management Resources 1

2.1 Organization 1

2.2 Responsibilities 1

2.3 Facilities 1

2.4 Tools 1

2.5 Training 1

3.0 Configuration Management Elements 2

3.1 Configuration Management Planning 2

3.2 Configuration Identification 2

3.2.1 Configuration Items 2

3.2.2 Software Builds 2

3.2.3 Release Management 2

3.2.4 Baseline Identification 3

3.3 Configuration and Change Control 3

3.3.1 Configuration Change Requests 3

3.3.2 Change Control Authority 3

3.3.3 Controlling Work Products 3

3.3.4 Vendor Commercial-off-the-Shelf (COTS) Software Control 3

3.4 Configuration Status 3

3.4.1 Status Records 3

3.4.2 Status Reports 4

3.4.3 Configuration Management Measurements 4

3.5 Software Baseline Audits 4

(4)

1

1.0 Scope

The scope of this project is:

Describe whether this Configuration Management Plan is a project-level plan (addressing a specific project) or a group-level plan (addressing more than one project):

Identify the system, program, or application to which this plan applies:

2.0 Configuration Management Resources

2.1 Organization

Identify the person(s) responsible for implementing CM activities on this project, and explain their relationship with the group manager and the project team:

2.2 Responsibilities

Identify roles and individual(s) by name and their CM responsibilities.

Role and Name CM Responsibility

Group Manager:

Project Manager:

CM Group:

SQA Group:

Developer(s):

Other:

2.3 Facilities

Describe the location (name and address) where all software development activities will take place and project- developed work products will be stored:

2.4 Tools

Describe the tools used to support software development and CM activities.

Tool Name Version Purpose

2.5 Training

Identify all training requirements needed by the software engineering group to implement project CM activities.

Training Topic Person in Need of Training

(5)

2

3.0 Configuration Management Elements

3.1 Configuration Management Planning

Configuration Management Plan Preparation procedure:

1. Assign responsibility for preparing the CM Plan 2. Gather data to be used and include in the CM Plan 3. Conduct a peer review of the CM Plan

4. Incorporate changes noted during the peer review

5. Present the updated version of the CM Plan to the peer review group 6. Approve CM Plan for implementation

7. Release the approved CM Plan

Identify the software development lifecycle model to be used on this project:

Lifecycle Phases, CM Activities, and Work Products:

Lifecycle Phase CM Activity Work Product

Inception Phase

Elaboration Phase

Construction Phase

Transition Phase

Production Phase

3.2 Configuration Identification

3.2.1 Configuration Items

Identify where all configuration items, including software baselines and work products, are stored in the table below.

Configuration Management Library:

Contents Responsible Person(s) Location

Library Backup Procedure:

Configuration Management Log procedure:

Describe the DEV environment:

Describe the TEST environment:

Describe the QUAL environment:

Describe the PROD environment:

3.2.2 Software Builds

Identify the code, files, compilers, development tools, and other components that are needed to create an official build:

3.2.3 Release Management

Describe the project software migration procedure:

Describe how software items are released from the Development library to the Test library:

Describe how software items are released from the Test library to the QUAL library:

(6)

3

Describe how software items are released from the QUAL library to the Production library:

3.2.4 Baseline Identification

Describe how baselines are established, managed, controlled, and stored:

Software Baseline Library:

Contents Responsible Person(s) Location

Software Baseline Identification:

Baseline Contents Requirements Baseline

Design Baseline

Product Baseline

Other:

3.3 Configuration and Change Control

3.3.1 Configuration Change Requests

Describe how problems are reported and approved using a Change Request:

Describe how change impact is assessed:

Describe how enhancements are identified, reviewed, and approved:

Describe how emergency production fixes are handled involving modules checked out:

Describe how each change or problem is peer reviewed:

3.3.2 Change Control Authority

Change Control Authority Delegated By Responsibilities

Primary:

Alternate:

Describe how unresolved issues are escalated to upper management:

3.3.3 Controlling Work Products

Describe the Checkout/Check-in procedure:

Describe how project-related software baselines and work products are controlled:

Describe how configuration items are versioned:

Describe labeling, branching, and merging procedures:

3.3.4 Vendor Commercial-off-the-Shelf (COTS) Software Control

Describe how the CM group controls all vendor-provided and supported (COTS) software, how changes are

evaluated for project impact, how the software is approved for use by the customer and project management, and the steps taken by the CM group to maintain a current record of the software:

3.4 Configuration Status

3.4.1 Status Records

Describe how the status of CM activities is created and maintained:

(7)

4 Identify each record needed to track CM activities:

3.4.2 Status Reports

CM Status Report Prepared For Due

3.4.3 Configuration Management Measurements

CM Measurement Prepared For Due

3.5 Software Baseline Audits

Describe the software baseline audit process:

Software Baseline Audit Schedule Audit Responsibility

Requirements Baseline

Design Baseline

Product Baseline

Other:

References

Related documents

Our simulation results indicate that failure of the Ktzi 201 wellbore system is highly unlikely to occur at the Ketzin pilot site, taking into account the available site-specific

Objectives: To ascertain the extent of socioeconomic and health condition inequalities in people with diagnosed and undiagnosed diabetes and impaired glucose regulation (IGR) in

Although total labor earnings increase with the unskilled unions’ bargaining power, we can say nothing when the increase in production is due to stronger skilled unions, since

[r]

However, the small-dollar loan market in Texas is undergoing an important shift in response to the recent proliferation of abusive products. This report profiles six market newcomers

For each week, we provide 95% one week ahead forecast intervals for ILINet data Intervals are provided for both the Multi-Season and Single-Season models.. To produce intervals for

For high latitude (YELL, MCM4) and low latitude (CHPI, SEY1) receivers: red pluses, residual of the ionospheric-free combination, LIF ; blue crosses, residual of L IF after

WHITEMARSH TOWNSHIP EMERGENCY SERVICES BOARD October 21, 2020..