• No results found

TANDA TERIMA DOKUMEN

N/A
N/A
Protected

Academic year: 2021

Share "TANDA TERIMA DOKUMEN"

Copied!
10
0
0

Loading.... (view fulltext now)

Full text

(1)

SITE NAME :

XL 3G Cisauk

SITE ID :

JKT_HBSD0007

LENGKAP TIDAK

1

Special Design Foundation Analysis + Drawing + Guarantee Letter

PRE IMPLEMENTASI / IMPLEMENTASI *

NO ITEM PEKERJAAN DOKUMEN REMARKS

* Coret yang tidak perlu

NOTE :

Diserahkan oleh, Diterima Oleh, Disetujui oleh,

PT. Handasa Konsultan PT Inti Bangun Sejahtera

Name : Siti Masfiah Name : Name : Hermanto

Title : Head of Engineering Division Title : Title : Engineering Manager

***

Tanda Terima Asli => Vendor Copy => IBS HO

(2)

FM-MPL-006 Rev. 02

SITE NAME :

ITC Depok

SITE ID :

BGD_01A195

LENGKAP TIDAK

1

Hammer test <(>&<)> Building Condition Survey (4 Point Column, 4 Point Beam, 2 Point Slab @ 10) + Drawing

2 Existing Building Strength Analysis Report

PRE IMPLEMENTASI / IMPLEMENTASI *

TANDA TERIMA DOKUMEN

NO ITEM PEKERJAAN DOKUMEN REMARKS

* Coret yang tidak perlu

NOTE :

Diserahkan oleh, Diterima Oleh, Disetujui oleh,

PT. Handasa Konsultan PT Inti Bangun Sejahtera

Name : Siti Masfiah Name : Name : Hermanto

Title : Head of Engineering Division Title : Title : Engineering Manager

***

Tanda Terima Asli => Vendor Copy => IBS HO

(3)

SITE NAME :

Gedung Wira Usaha

SITE ID :

JKT_05N034

LENGKAP TIDAK

1

Hammer test <(>&<)> Building Condition Survey (4 Point Column, 4 Point Beam, 2 Point Slab @ 10) + Drawing

2 Existing Building Strength Analysis Report

PRE IMPLEMENTASI / IMPLEMENTASI *

NO ITEM PEKERJAAN DOKUMEN REMARKS

* Coret yang tidak perlu

NOTE :

Diserahkan oleh, Diterima Oleh, Disetujui oleh,

PT. Handasa Konsultan PT Inti Bangun Sejahtera

Name : Siti Masfiah Name : Name : Hermanto

Title : Head of Engineering Division Title : Title : Engineering Manager

***

Tanda Terima Asli => Vendor Copy => IBS HO

(4)

FM-MPL-006 Rev. 02

SITE NAME :

Kombos

SITE ID :

MNC020

LENGKAP TIDAK

1 GF Consultan Peninggian Pagar Kombos

PRE IMPLEMENTASI / IMPLEMENTASI *

TANDA TERIMA DOKUMEN

NO ITEM PEKERJAAN DOKUMEN REMARKS

* Coret yang tidak perlu

NOTE :

Diserahkan oleh, Diterima Oleh, Disetujui oleh,

PT. Handasa Konsultan PT Inti Bangun Sejahtera

Name : Siti Masfiah Name : Name : Hermanto

Title : Head of Engineering Division Title : Title : Engineering Manager

***

Tanda Terima Asli => Vendor Copy => IBS HO

(5)

SITE NAME :

Kalidawir

SITE ID :

MLG_01N300

LENGKAP TIDAK

1 Existing Tower Strength (SST/MT/Pole) Analysis Report

2

Strengthening Tower Design + Detail Drawing + BoQ + Guarantee Letter

3 Existing Foundation Analysis Report

4

Strengthening Tower Design + Detail Drawing + BoQ + Guarantee Letter

PRE IMPLEMENTASI / IMPLEMENTASI *

NO ITEM PEKERJAAN DOKUMEN REMARKS

* Coret yang tidak perlu

NOTE :

Diserahkan oleh, Diterima Oleh, Disetujui oleh,

PT. Handasa Konsultan PT Inti Bangun Sejahtera

Name : Siti Masfiah Name : Name : Hermanto

Title : Head of Engineering Division Title : Title : Engineering Manager

***

Tanda Terima Asli => Vendor Copy => IBS HO

(6)

FM-MPL-006 Rev. 02

SITE NAME :

Baruharjo

SITE ID :

MLG_01N717

LENGKAP TIDAK

1 Existing Tower Strength (SST/MT/Pole) Analysis Report

2

Strengthening Tower Design + Detail Drawing + BoQ + Guarantee Letter

3 Existing Foundation Analysis Report

4

Strengthening Tower Design + Detail Drawing + BoQ + Guarantee Letter

PRE IMPLEMENTASI / IMPLEMENTASI *

TANDA TERIMA DOKUMEN

NO ITEM PEKERJAAN DOKUMEN REMARKS

* Coret yang tidak perlu

NOTE :

Diserahkan oleh, Diterima Oleh, Disetujui oleh,

PT. Handasa Konsultan PT Inti Bangun Sejahtera

Name : Siti Masfiah Name : Name : Hermanto

Title : Head of Engineering Division Title : Title : Engineering Manager

***

Tanda Terima Asli => Vendor Copy => IBS HO

(7)

SITE NAME :

Banjar Arum

SITE ID :

SBY_02N251

LENGKAP TIDAK

1 Existing Tower Strength (SST/MT/Pole) Analysis Report

2

Strengthening Tower Design + Detail Drawing + BoQ + Guarantee Letter

3 Existing Foundation Analysis Report

4

Strengthening Tower Design + Detail Drawing + BoQ + Guarantee Letter

PRE IMPLEMENTASI / IMPLEMENTASI *

NO ITEM PEKERJAAN DOKUMEN REMARKS

* Coret yang tidak perlu

NOTE :

Diserahkan oleh, Diterima Oleh, Disetujui oleh,

PT. Handasa Konsultan PT Inti Bangun Sejahtera

Name : Siti Masfiah Name : Name : Hermanto

Title : Head of Engineering Division Title : Title : Engineering Manager

***

Tanda Terima Asli => Vendor Copy => IBS HO

(8)

FM-MPL-006 Rev. 02

SITE NAME :

Ngoro

SITE ID :

SBY_01N202

LENGKAP TIDAK

1 Existing Tower Strength (SST/MT/Pole) Analysis Report

2

Strengthening Tower Design + Detail Drawing + BoQ + Guarantee Letter

3 Existing Foundation Analysis Report

4

Strengthening Tower Design + Detail Drawing + BoQ + Guarantee Letter

PRE IMPLEMENTASI / IMPLEMENTASI *

TANDA TERIMA DOKUMEN

NO ITEM PEKERJAAN DOKUMEN REMARKS

* Coret yang tidak perlu

NOTE :

Diserahkan oleh, Diterima Oleh, Disetujui oleh,

PT. Handasa Konsultan PT Inti Bangun Sejahtera

Name : Siti Masfiah Name : Name : Hermanto

Title : Head of Engineering Division Title : Title : Engineering Manager

***

Tanda Terima Asli => Vendor Copy => IBS HO

(9)

SITE NAME :

Kemasan

SITE ID :

SBY_01N195

LENGKAP TIDAK

1 Existing Tower Strength (SST/MT/Pole) Analysis Report

2

Strengthening Tower Design + Detail Drawing + BoQ + Guarantee Letter

3 Existing Foundation Analysis Report

4

Strengthening Tower Design + Detail Drawing + BoQ + Guarantee Letter

PRE IMPLEMENTASI / IMPLEMENTASI *

NO ITEM PEKERJAAN DOKUMEN REMARKS

* Coret yang tidak perlu

NOTE :

Diserahkan oleh, Diterima Oleh, Disetujui oleh,

PT. Handasa Konsultan PT Inti Bangun Sejahtera

Name : Siti Masfiah Name : Name : Hermanto

Title : Head of Engineering Division Title : Title : Engineering Manager

***

Tanda Terima Asli => Vendor Copy => IBS HO

(10)

FM-MPL-006 Rev. 02

SITE NAME :

Paiton 1

SITE ID :

SBY_01N727

LENGKAP TIDAK

1 Existing Tower Strength (SST/MT/Pole) Analysis Report

2

Strengthening Tower Design + Detail Drawing + BoQ + Guarantee Letter

3 Existing Foundation Analysis Report

4

Strengthening Tower Design + Detail Drawing + BoQ + Guarantee Letter

PRE IMPLEMENTASI / IMPLEMENTASI *

TANDA TERIMA DOKUMEN

NO ITEM PEKERJAAN DOKUMEN REMARKS

* Coret yang tidak perlu

NOTE :

Diserahkan oleh, Diterima Oleh, Disetujui oleh,

PT. Handasa Konsultan PT Inti Bangun Sejahtera

Name : Siti Masfiah Name : Name : Hermanto

Title : Head of Engineering Division Title : Title : Engineering Manager

***

Tanda Terima Asli => Vendor Copy => IBS HO

References

Related documents

This program allows outstanding undergraduate Chinese science and engineering students to obtain in 5 years after high school graduation both a Chinese Bachelor’s degree (BenKe) and

For instance, the impact of an exchange rate depreciation will depend on gross foreign asset and liability holdings (in addition to the net position); the currency composition of

used as corporate IT is limited and tends to emphasize employee preference but acknowledges that there may also be firm benefits (Bernoff and Schadler, 2010:

We proceed to an impulse response analysis on the conditional correlations between three stock indices returns: the Nikkei, the FTSE 100 and the S&amp;P 500.. As a first step,

Subclinically, poor peripheral nerve function is associated with lower physical performance and lower strength in older adults, independent of diabetes mellitus (Strotmeyer

(2013) found an increase in earnings instability in Denmark starting with the mid-1990s, and this appears to be the trend across most other European countries, at least until the

VMRS &lt;Rd&gt;, FPSID ; Read Floating-Point System ID Register VMRS &lt;Rd&gt;, MVFR1 ; Read Media and VFP Feature Register 1 VMSR FPSCR, &lt;Rt&gt; ; Write Floating-Point

In memory of Harold Taub, beloved husband of Paula Taub by: Karen &amp; Charles Rosen.. Honouring Maria Belenkova-Buford on her marriage by: Karen &amp;