UAP DOCUMENTS QUESTIONS:
IV. B. MULTIPLE CHIOCE
1. Certificate of Payments are issued by the:
a) architect c) contractor
b) owner d) construction manager
2. All permits for construction are paid by the:
a) architect c) contractor
b) construction manager d) owner 3. Project Construction Cost includes:
a) architect’s fee c) both a & b
b) the design engineer’s fee d) none of the foregoing
4. Fees for normal structural, electrical, mechanical and plumbing services are for the account of:
a) owner c) contractor
b) architect d) design engineer
5. Shop drawings are prepared by the:
a) architect c) project supervisor
b) contractor d) owner 6. Awards of Contract are the responsibility of the ff:
a) architect c) owner
b) construction manager d) project manager
7. Resolution of conflict on technical matters relative to drawings, specifications and other contract documents is made by the:
a) owner c) construction manager
b) architect d) contractor
8. Verification of as built drawings is done by:
a) architect c) construction supervisor
b) contractor d) owner
9. For the purpose of the Construction, a PERT CPM is prepared by the:
a) architect c) construction manager
b) contractor d) construction supervisor
10. In keeping of field records, test results are kept by the:
a) construction supervisor c) contractor
b) architect d) construction managers
11. Graphical studies which will show the owner how his needs and requirements will be met in the proposed building is called a:
a) chart c) preliminary studies
b) design development d) conceptual plans
12. Documents utilized by the Contractor and Sub-contractors in determining materials and equipment and the process of the construction of the building is known as:
a) specifications c) general conditions b) working drawings d) feasibility studies 13. A statement of probable cost is called a:
a) cost-plus-fee c) speculative guess
b) estimate d) price index
14. Periodic visits by the Architect to the project in order to determine the progress of work in accordance with plans and specification is called:
a) superintendence c) administration
b) supervision d) management
15. The offer of a bidder to perform the work described by the contract documents is a:
a) proposal c) performance bond
b) offer the bid d) advertisement
16. For alterations and additions to of existing structures belonging to group 1 to 5, compensation for services should:
a) 10% c) 50%
b) 20%
17. Payment for structural, acoustical, chemical, mechanical, soil mechanics, or other tests and reports as maybe required for the project is the responsibility of the:
a) owner c) contractor
b) architect
18. A price given by a contractor, sub-contactor, material supplier or vendor to furnish materials, labor or both is known as:
a) bid c) instruction to bidders
b) quotation
19. Written or printed descriptions of work to be done describing quantities of materials and mode of construction is known as:
a) specification c) instruction to bidders b) general conditions
20. The binding resolution of disputes by one or more neutral persons as a substitute for judicial proceeding is known as:
a) lien c) substantive law
b) arbitration
21. A specific period of time within which legal action must be brought for alleged damage or injury is:
a) time limit c) statute of limitation
b) completion time
22. The amount paid by the contractor to the owner for every day of delay in construction time is known as:
a) liquidated damages c) credit memo b) payment bond
23. One of the activities that fall under pre-design services is:
a) project financing c) schematic design b) interior design
24. One of the activities that fall under design services is:
a) space/management studies c) construction phase b) landscaping
25. One of the activities that fall under specialized allied services is:
a) architectural programming c) full time supervision b) physical planning
26. One of the activities that fall under construction services is:
a) construction management c) site selection and analysis c) comprehensive planning
27. One of the activities that fall under post construction services is:
a) promotional services c) building and equipment maintenance c) contract document phase
28. In the formulation of a master development plan, a component to be considered is:
a) socio-cultural component c) competitive component b) construction component
29. The architect as a project manager is compensated what percentage of the project cost?
a) 1% - 2% c) 3% - 6%
b) 2% - 5%
30. A percentage of his fee an architect is entitled to receive when the owner fails to implement the plans and documents for construction as prepared by the architect is:
a) 50% c) 90%
b) 85%
V. ENUMERATION (Set A)
A. The Contract consists of the following documents:
1. __________________________________________________________________
2. __________________________________________________________________
3. __________________________________________________________________
4. __________________________________________________________________
5. __________________________________________________________________
B. Two divisions of the Architect’s National Code:
1. __________________________________________________________________
2. __________________________________________________________________
C. Three architectural organization integrated into one association called the United Architects of the Philippines:
1. __________________________________________________________________
2. __________________________________________________________________
3. __________________________________________________________________
D. Have the sole power of interpreting the provisions of the Architects National Code 1. __________________________________________________________________
2. __________________________________________________________________
3. __________________________________________________________________
E. The entire range of architect’s services are divided into seven major services as follows:
1. __________________________________________________________________
2. __________________________________________________________________
3. __________________________________________________________________
4. __________________________________________________________________
5. __________________________________________________________________
6. __________________________________________________________________
7. __________________________________________________________________
F. The several activities that fall under Pre-Design Services are:
1. __________________________________________________________________
2. __________________________________________________________________
3. __________________________________________________________________
4. __________________________________________________________________
5. __________________________________________________________________
6. __________________________________________________________________
7. __________________________________________________________________
G. The Architect renders services whose sequence come in four phases:
1. __________________________________________________________________
2. __________________________________________________________________
3. __________________________________________________________________
4. __________________________________________________________________
H. Design services which fall under specialized allied services are:
1. __________________________________________________________________
2. __________________________________________________________________
3. __________________________________________________________________
4. __________________________________________________________________
5. __________________________________________________________________
I. In the formulation of the Master Development Plan, the following components are to be considered:
1. __________________________________________________________________
2. __________________________________________________________________
3. __________________________________________________________________
4. __________________________________________________________________
5. __________________________________________________________________
J. The design and building construction process is undertaken by four principal members namely:
1. __________________________________________________________________
2. __________________________________________________________________
3. __________________________________________________________________
4. __________________________________________________________________
K. Some of the services of the architect in post-construction services are:
1. __________________________________________________________________
2. __________________________________________________________________
3. __________________________________________________________________
L. Two ways to undertake design build services:
1. __________________________________________________________________
2. __________________________________________________________________
M. Three basic methods of selection available to client seeking the services of an architect:
1. __________________________________________________________________
2. __________________________________________________________________
3. __________________________________________________________________
N. Under the direct selection method, the clients selects his Architect on the basis of:
1. __________________________________________________________________
2. __________________________________________________________________
3. __________________________________________________________________
4. __________________________________________________________________
O. During the progress of work, the owner shall furnish the architect the following:
1. __________________________________________________________________
2. __________________________________________________________________
P. A complete and detailed documentation of construction or erection drawings prepared by the architect shall consists of the following:
1. __________________________________________________________________
2. __________________________________________________________________
3. __________________________________________________________________
4. __________________________________________________________________
5. __________________________________________________________________
6. __________________________________________________________________
7. __________________________________________________________________
8. __________________________________________________________________
Q. The Architect in the process of translating abstract ideas into meaningful concrete terms, produces documents in the forms of:
1. __________________________________________________________________
2. __________________________________________________________________
3. __________________________________________________________________
4. __________________________________________________________________
5. __________________________________________________________________
6. __________________________________________________________________
7. __________________________________________________________________
8. __________________________________________________________________
9. __________________________________________________________________
10. __________________________________________________________________
R. Physical planning is approached through a mechanism which integrates in time and space, the following components:
1. __________________________________________________________________
2. __________________________________________________________________
3. __________________________________________________________________
S. The 3-D wheel of a building project:
1. __________________________________________________________________
2. __________________________________________________________________
3. __________________________________________________________________
T. Functions of Construction Management
1. __________________________________________________________________
2. __________________________________________________________________
3. __________________________________________________________________
4. __________________________________________________________________
5. __________________________________________________________________
6. __________________________________________________________________
7. __________________________________________________________________
U. Post Construction Services includes:
1. __________________________________________________________________
2. __________________________________________________________________
V. Design build services can be performed by the architect in two ways:
1. __________________________________________________________________
2. __________________________________________________________________
W. The scope of comprehensive architectural services are as follows:
1. __________________________________________________________________
2. __________________________________________________________________
3. __________________________________________________________________
4. __________________________________________________________________
5. __________________________________________________________________
X. Payments to the Architects in fraction of the full fee according to the four phases of services based on the architect’s basic services:
1. __________________________________________________________________
2. __________________________________________________________________
3. __________________________________________________________________
4. __________________________________________________________________
Y. Owner-Architect agreement should at least include:
1. __________________________________________________________________
2. __________________________________________________________________
3. __________________________________________________________________
4. __________________________________________________________________
5. __________________________________________________________________
6. __________________________________________________________________
7. __________________________________________________________________
8. __________________________________________________________________
9. __________________________________________________________________
10. __________________________________________________________________
11. __________________________________________________________________
12. __________________________________________________________________
13. __________________________________________________________________
14. __________________________________________________________________
Z. The Architects Code of Ethical Conduct involves the architect’s responsibilities to:
1. __________________________________________________________________
2. __________________________________________________________________
3. __________________________________________________________________
4. __________________________________________________________________
5. __________________________________________________________________
V. ENUMERATION (Set B)
A. The Executive Committee of the UAP organization aside from President, Secretary and Treasurer is composed of:
1. __________________________________________________________________
2. __________________________________________________________________
3. __________________________________________________________________
B. The UAP Standing Committee are under the supervision of four commissions namely:
1. __________________________________________________________________
2. __________________________________________________________________
3. __________________________________________________________________
4. __________________________________________________________________
C. Shop drawings shall be numbered consecutively and represent
1. __________________________________________________________________
2. __________________________________________________________________
3. __________________________________________________________________
4. __________________________________________________________________
D. Shop drawings shall be dated and contain the following:
1. __________________________________________________________________
2. __________________________________________________________________
3. __________________________________________________________________
E. The value of extra work or change shall be determined in any one or more of the following ways:
1. __________________________________________________________________
2. __________________________________________________________________
3. __________________________________________________________________
F. Reasons for the delay in the mobilization and/or in the progress of his work for reasons attributable to the Owner are:
1. __________________________________________________________________
2. __________________________________________________________________
3. __________________________________________________________________
G. The Contractor will be allowed an extension of time based on the following conditions:
1. __________________________________________________________________
2. __________________________________________________________________
3. __________________________________________________________________
H. The UAP Charter Documents contains the following:
1. ___________________________
2. ___________________________
3. ___________________________
4. ___________________________
5. ___________________________
6. ___________________________
7. ___________________________
8. ___________________________
I. The UAP Documents on Professional Practice and Ethics contain the following:
1. __________________________________________________________________
2. __________________________________________________________________
3. __________________________________________________________________
4. __________________________________________________________________
5. __________________________________________________________________
6. __________________________________________________________________
7. __________________________________________________________________
8. __________________________________________________________________
9. __________________________________________________________________
10. __________________________________________________________________
J. The UAP Standard of Contract Documents contain the following:
1. __________________________________________________________________
2. __________________________________________________________________
3. __________________________________________________________________
4. __________________________________________________________________
5. __________________________________________________________________
6. __________________________________________________________________
7. __________________________________________________________________
K. UAP Standard Contract Documents contain the following:
1. __________________________________________________________________
2. __________________________________________________________________
3. __________________________________________________________________
4. __________________________________________________________________
5. __________________________________________________________________
6. __________________________________________________________________
L. UAP Inter-Professional Documents contain the following:
1. __________________________________________________________________
2. __________________________________________________________________
3. __________________________________________________________________
M. UAP Professional Services Manual contain the following:
1. __________________________________________________________________
2. __________________________________________________________________
3. __________________________________________________________________
4. __________________________________________________________________
5. __________________________________________________________________
6. __________________________________________________________________
7. __________________________________________________________________
N. Five methods of compensation for the architect:
1. __________________________________________________________________
2. __________________________________________________________________
3. __________________________________________________________________
4. __________________________________________________________________
5. __________________________________________________________________