• No results found

Dynamic Pricing

N/A
N/A
Protected

Academic year: 2021

Share "Dynamic Pricing"

Copied!
11
0
0

Loading.... (view fulltext now)

Full text

(1)

Dynamic Pricing

Dynamic Pricing

Restructuring & Deregulation

Restructuring & Deregulation

.. Presented By, Presented By, Kashinath Shinde Kashinath Shinde & & Madhura Tuljapurkar. Madhura Tuljapurkar. Collage Of Engineering,Pune Collage Of Engineering,Pune

(2)

Introduction

  Market restructuring has created seams between wholesale and retail markets , leading

to unusual levels of price volatility and customer dissatisfaction with retail choice. These seams can be partially or completely closed by introducing dynamic pricing.

 Dynamic pricingrefers to any tariff that recognizes the inherent uncertainty in supply

costs. It differs from traditional time-of-use pricing , in which prices vary across the day and perhaps seasonally, but where both prices and time periods are fixed and known a  priori.

 The most complete expression of dynamic pricing is real time pricing (RTP), where

 prices vary by hour on a day-ahead or hour-ahead basis, according to market

conditions. However, there are simpler forms of dynamic pricing , in which prices vary only during extreme supply conditions.

 These options may capture many of the economic benefits of RTP, and may be suitable for 

wide-scale deployment to mass-s market consumers, for whom dynamic pricing options have largely been ignored until quite recently.

 Dynamic pricinghas the potential to make significant improvements in economic

(3)

Need Of Dynamic Pricing

o The idea of moving from time-invariant electricity prices to “peak -load”

pricing, where prices are more closely tied to variations in the marginal cost of generating electricity, has been around for at least fifty years . The

marginal cost of electricity varies widely over time because

o (a) the demand for electricity varies widely;

o (b) it is uneconomical to store electricity in most applications;

o (c) the optimal mix of generating capacity to balance supply and demand at

all hours given (a) and (b) includes a combination of base load capacity with high construction costs and low marginal operating costs, intermediate

capacity with lower construction costs but higher marginal operating costs, and peaking capacity with the lowest construction costs and the highest marginal operating costs. When demand is low it is cleared with base load capacity with low marginal operating costs and as demand rises generating capacity with higher marginal operating costs are called upon to balance supply and demand. In general, marginal costs are low at night and high

(4)

Need Of Dynamic Pricing

 If end-use consumers face retail prices that do not reflect these variations

in marginal generation costs, they will consume too much during peak periods and too little during off-peak periods. Distortions in consumption lead to distorted investment in and utilization of generating capacity.

 In regions with deregulated wholesale electricity markets, power prices

reflect both differences in marginal costs as well as time-varying differences in firms abilities to push prices above marginal costs by exercising market power. In this context, moving end-use customers to time-varying prices can also reduce firms incentives and ability to exercise market power by increasing the elasticity of their residual demand.

(5)

Dynamic Pricing Comes In Many Flavors

Critical peak pricing (CPP)

 A dynamic rate that allows a short-term price increase to a

predetermined level (or levels) to reflect real-time system conditions.

In a fixed-period CPP, the time and duration of the price increase are

predetermined, but the days are not predetermined. In a

variable-period CPP, the time, duration and day of the price increase are not

predetermined.

Peak time rebates (PTR)

The Peak-Time Rebates program helps you save money if you

reduce energy use on peak-event days when electricity demand is

high. This no risk program allows you to keep the same rate you

have now but gives you the opportunity to get a rebate for each

kilowatt-hour (kWh) reduction you make at designated times

during the summer.

(6)

Dynamic Price Program

  Variable peak pricing (VPP)

Standard on-peak and off-peak time-of-day rates are in effect throughout the month. Under the VPP program, the on-peak price for each weekday becomes available the previous day (typically late afternoon) and you get billed for actual consumption during the billing cycle at these prices.

 Real time pricing (RTP)

This rate design features prices that vary hourly or sub-hourly all year long, for

some or all of a customer’s load. Customers are notified of the rates on a day  -ahead or hour--ahead basis.

• Time-of-Use Pricing (TOU).

This rate design features prices that vary by time period, being higher in peak periods and lower in off-peak period. The simplest rate involves just two

pricing periods, a peak period and an off-peak period. More complex rates also have one or more shoulder periods.

• Extreme Day Pricing (EDP).

This rate design is similar to CPP, except that the higher price is in effect for all 24 hours for a maximum number of critical days, the timing of which is

(7)

Examples Of Dynamic Pricing

 Dynamic pricing refers to any electricity tariff that recognizes the

inherent uncertainty in supply costs.

 One example is a tariff where price levels are established ahead of time but

the timing when these prices are in effect is unknown. An example is the critical peak pricing tariff currently offered by Gulf Power where a price of  $0.29/kWh can be charged during the peak-price period for up to one

percent of the total hours in a year, but neither the consumer or the utility  know when these high- priced hours will occur until 24 hours prior to their implementation.

 Another form of dynamic pricing is where both price levels and timing are

unknown, but the time block periods within a day when high prices change from one level to another are allowed are known. An example is provided by 

PPuget Sound Energy’s proposed adjustable rate tariff, where prices vary  daily within known time periods for a portion of participating customer’s’

loads.

 Still another example of dynamic pricing is real-timepricing, where price

(8)

Illustration of Residential CPP Rate 0.0 0.2 0.4 0.6 0.8 1.0 1.2 0 2 4 6 8 10 12 14 16 18 20 22 24 Hour of Day    R  a    t  e    (    $    /    k    W    h    ) Existing All-In CPP on Critical Days CPP on Non-Critical Days

(9)

Advantages Of Dynamic Pricing

 The idea of providing electric customers with dynamic pricing information as a

 way of reducing peak demand, ultimately reduces generating station capacity.

 Fixed pricing is still the industry standard for charging customers for electricity 

usage, but some industry professionals say a pricing structure that incentivizes less energy use could save the industry money in the long run.

Utility Cost Savings Breakdown Typical CPP Rate Design

Capacity Cost Savings ~ 70%

Transmission Cost Savings ~ 15%

Energy Cost Savings ~ 5%

Distribution Cost Savings ~ 10%

(10)

So Why Is There So Little

Dynamic Pricing?

It strikes many people as a radical new idea

 As Arthur C. Clarke noted, when confronted with a new

idea

The first reaction is, “It is completely impossible”

The delayed second reaction is, “It’s possible but not worth doing”

(11)

References

Related documents

As you can see the title is "Engaging Venture Capital to Strengthen Agricultural Value Chains in Morocco", and the main purpose of this short-term, one-year pilot project

(forthcoming).. decisions.26 Administrative officials willing to ask hard questions of each other may, in fact, more thoughtfully assert the state secrets privilege. The

The Advantages of User Type, Enumeration, and Format Files For network management messages, network diagnostic messages, and network variable messages that use a SNVT (if used with

Based on the analysis above, this paper first quantitatively determine the length of window and the number and position of the consensus bases by a Chi-square test, then extract

Each of the parties comprising the Insured shall for the purpose of this section be considered as a separate and distinct unit and the words "the Insured" shall be

This brings to the situation that no study has diffused itself on the issue of the modeling population dynamics by considering factors like food and predators

In the irst part of this article, the most well-known approaches for risk targeting are reviewed, with particular focus on the one implemented in recent American design codes, the

For all investigated DOC concentrations using water from lake Bolmen, adsorption of the investigated PFASs decreased as the perfluorocarbon chain length increased (Figure 19).. PFCAs