Earned Value Management

g

Program and Project Management Enablement

Program and Project Management Enablement

April 2010

Contact: jjacobi@scottmadden.com

l

@

tt

dd

(2)

What is Earned Value Management and Why Do I Need It?

g

y

Complex projects have a need for accurate and consistent status information

‹ 70% of large projects are over budget and behind schedule1

‹ 50% of all projects finish at 190% of their initial budget1

‹ And some, after huge investments of time and money, are simply never complete1

‹ EVA compares the PLANNED amount of work with what has actually been COMPLETED to determine if COST,

SCHEDULE, and WORK ACCOMPLISHED are progressing as planned

‹ Work is “earned” or credited as it is completed

‹ Earned Value Management (EVM) is needed because

— There are different measures of progress for different types of tasks

— There is a need to “roll up” progress of many tasks into an overall project status

— There is a requirement for a uniform unit of measure (dollars or work-hours)

‹ Additionally, EVM provides an early warning signal for prompt corrective action

‹ Earned Value Management is required for ARRA projects and DOE Grants, but is also a premium project management

tool in its own right

ScottMadden has built, managed, and evaluated Earned Value systems on behalf of our clients –

with projects as large as $250 million in value

Copyright © 2010 by ScottMadden. All rights reserved.

Note 1: The Standish Group

(3)

Why is Earned Value Different?

Why is Earned Value Different?

‹ Integrated project performance is determined by the three parameters displayed in the “Performance Triangle” below

‹ All three dimensions of project performance must be monitored and controlled to ensure that all project deliverables are attained

Scope

Schedule

Cost/Resources

Traditional project management often reverts to “pick any two;” EVM is a way to look at all three

simultaneously a true measure of project effectiveness

(4)

Earned Value Basics

Earned Value Basics

‹ Earned Value Management (EVM) is a systematic approach to the integration and measurement of cost, schedule, and

technical (scope) accomplishments on a project or task

The Earned Value Management system includes:

‹ In comparing Earned Value Management to Traditional Management, Traditional Management does not allow for analysis of the

physical amount of work performed. Earned Value Management allows for both schedule and cost analysis against physical amount of work performed

Project Schedule

WBS/OBS

‹ Earned Value (EV) Actual Cost (AC)

‹ Metrics and performance measurements

‹ Forecasting

‹ Integrated baseline review

The inputs required for an EVM system include:

‹ Work Breakdown Structure (WBS)

‹ Organizational Breakdown Structure (OBS)

Schedule Resource Planning

Define/Assign Schedule/Budget

Establish Baseline Performance Measurement

‹ Organizational Breakdown Structure (OBS)

‹ Project schedule

‹ Time-phased baseline budget

‹ Cost/resource control plan

‹ Change control plan

$$$

Early Warning & Detection • Informed Management Decisions • Corrective Actions • Recovering Planning Earned Value Management system

The outputs required for an EVM system include:

‹ Reporting requirements

Accounting System

Copyright © 2010 by ScottMadden. All rights reserved.

‹ Proper analysis of reports

(5)

Earned Value is a National Standard

Earned Value is a National Standard

Earned Value Management (EVM) has become an ANSI standard primarily driven by PMI (Project Management Institute) sponsorship since the 1990’s, and is prominently included in PMBOK

‹ EVM is a system that manages project cost and schedule performance measurements as integrated elements and not as

‹ EVM is a system that manages project cost and schedule performance measurements as integrated elements and not as

separate entities

— EVM is a primary element of the all government sponsored projects, but is also utilized by major construction

companies, nuclear organizations, and some fossil organizations

‹ EVM is essentially based on three basic metrics:y

— Budgeted Cost of Work Scheduled –BCWS

• How much work (in terms of both time and money) is planned for the project?

— Actual Cost of Work Performed –ACWP

• How much did that same work actually cost (labor, materials, etc.) to perform?y ( ) p

— Budgeted Cost of Work Performed (or Earned Value) – BCWP (or EV)

• What was/is the value of the work that was/is planned for a given time period in the project schedule?

‹ The BCWS can be depicted as an “S” curve with cost on the vertical axis and schedule (time) on the horizontal axis

‹ The BCWP is the % task complete multiplied by the task’s total project budget (BAC or Budget at Completion)

‹ The ACWP (actual cost incurred) will be reported from the company financial system at a total project level

Earned Value is the standard for all federal projects including all stimulus work, and is an industry

standard used by large construction EPC contract management firms

y

g

g

(6)

Earned Value Starts With the WBS and OBS

Earned Value Starts With the WBS and OBS

WBS

WBS =

OBS =

Organization Breakdown Structure

Work Breakdown Structure

‹ The Work Breakdown Structure (WBS) is

a tool that defines a project and groups the project’s discrete work elements in a the project s discrete work elements in a way that helps organize and define the total work scope of the project

‹ WBS provides the necessary framework

for detailed cost estimating and control along with providing guidance for schedule development and control.

Control Accounts (CA),

where work scope,

schedule and cost are

Additionally the WBS is a dynamic tool

and can be revised and updated as needed by the project manager

schedule and cost are

planned and managed

‹ The Organization Breakdown Structure

OBS

(OBS) indicates the organizational relationships and is used as the framework for assigning work responsibilities

‹ The OBS is structured by Responsible

Department and then by Performing Department at the lowest level The Department at the lowest level. The Performing Department level is where the responsibility and resource needed to accomplish the project will be assigned

Copyright © 2010 by ScottMadden. All rights reserved.

(7)

Calculating Earned Value Metrics

Calculating Earned Value Metrics

There are a variety of useful metrics that can be generated within the EVM system – all derived from the three basic measurements of BCWS, ACWP, and BCWP

‹ Metrics

— Basic

• BCWS = Budgeted Cost of Work Scheduled

• ACWP = Actual Cost of Work Performed

• ACWP Actual Cost of Work Performed

• BCWP (or EV) = Budgeted Cost of Work Performed or Earned Value

• BAC = Budget at Completion (total dollars budgeted for project)

— Variance

• CV (Cost Variance) = BCWP – ACWP

• CV (Cost Variance) BCWP ACWP

• CV % (Cost Variance %) = (BCWP - ACWP) / BCWP

• SV (Schedule Variance) = BCWP - BCWS

• SV % (Schedule Variance %) = (BCWP – BCWS) / BCWS

— Performance IndicesPerformance Indices

• CPI (Cost Performance Index) = BCWP / ACWP

– Is the work tracking above/below budget given the actual work completed to date?

• SPI (Schedule Performance Index) = BCWP / BCWS

– Is the work tracking above/below schedule given the actual work completed to date?Is the work tracking above/below schedule given the actual work completed to date?

Managing through a well-constructed Earned Value system will provide the ability for project

managers to identify schedule and cost issues early enough to positively react

(8)

EVM Dashboard Displays From ScottMadden Toolkit

EVM Dashboard Displays From ScottMadden Toolkit

Project-Level Summary

Basic Metrics Status Metrics

Summary (BCWP) Budgeted Cost of

Work Performed

(BCWS) Budgeted Cost of Work Scheduled

(ACWP) Actual Cost of Work

Performed (BAC) Budget at Completion

% Scheduled: (BCWSc/BAC)

% Complete: (BCWPc/BAC)

Proj X $0 $0 $0 $21,117,000 0.0% 0.0%

Variance Metrics Performance Indices

Data Updated: xx/xx/xxxx Reporting Month: xx/xxxx (CV) Cost Variance: (BCWP-ACWP) (SV) Schedule Variance: (BCWP-BCWS) (CV %) Cost Variance %: (BCWP-ACWP/BCWP) (SV %) Schedule Variance %: (BCWP-BCWS/BCWS)

(CPI) Cost Performance Index: (BCWP/ACWP) (SPI) Schedule Performance Index: (BCWP/BCWS) ( ) ( ) ( ) ( ) ( ) ( ) $0 $0 0.0% 0.0% 0.00 0.00 $17,500,000 $20,000,000 $22,500,000 $7,500,000 $10,000,000 $12,500,000 $15,000,000 $ , ,

The Blue line is the BCWS

$-$2,500,000 $5,000,000

(9)

Earned Value Management

Terminology

Earned Value Management Terminology

EVMS BASIC COMPONENTS

AC = actual cost = ACWP = actual cost of work performed

EV = earned value = BCWP = budgeted cost for work performed

PV = planned value = BCWS = budgeted cost for work scheduled

BAC = cumulative PV = cumulative BCWS = budget at completion

VARIANCES

CV =EV -AC = BCWP -ACWP = cost variance

SV = EV-PV = BCWP-BCWS = schedule variance

CV% = (EV-AC)/EV = (BCWP-ACWP)/BCWP = cost variance, percentage

SV% = (EV- PV)/PV = (BCWP- BCWS)/BCWS = schedule of variance, percentage

VAC = BAC EAC = variance at completion

VAC = BAC - EAC = variance at completion

OVERALL STATUS

% scheduled = PVcum /BAC = BCWScum/BAC

% complete = Evcum/BAC = BCWPcum/BAC

% b d t t AC /BAC ACWP /BAC

% budget spent = ACcum/BAC = ACWPcum/BAC

WR = BAC -EVcum = BAC -BCWPcum = work remaining

BR = BAC -ACcum = BAC -ACWPcum = budget remaining

PERFORMANCE INDICES

CPI = EV/AC = BCWP/ACWP = cost performance index

SPI = EV/PV = BCWP/BCWS = schedule performance index

TCPIBAC = WR/BR = to complete performance index, BAC

(10)

Integrating EVM Into Other ScottMadden Project

Management Tools

F.G.P. PROJECTS DRIVING BOARD

Status Tendency (previous)Tendency (actual) TIME COST (Euro) Open issues

Dashboard

Project

Management

Tools Overview

Management Tools

Order Project Description ManagerProject Type Impact 30 -A pr-0131-M ay-01B as eline S tart B a seline

End F o reca st

End B udget

A ctua l F o rec ast& Critical Points

CMFR0027 PRGT00PB Pow erbrain Sorrenti F M 1-Nov-00 31-Aug-01 31-Aug-0126,550 26,085 26,550 CMEV0007 PRGT1572 Impl. Verrone PlantSerafino F M 15-Jan-01 28-Sep-01 28-Sep-0182,633 0 82,633 CMSP0015 PRGT2982 HRMS new . Devel. Pukly F H 1-Jan-01 31-Dec-01 31-Dec-01 108,785 0 108,785 CMSP0015 PRGT3044Web professional Pukly F M 15-Apr-01 31-Dec-01 31-Dec-0171,975 0 71,975 CMSP0039 PRGT0017 Estesa Di Carlo O L 7-May-01 30-Jun-01 30-Jun-0123,750 0 23,750 CMSP0015 PRGT3047 I.I.S. HR FGP Pukly F L 1-Jan-0131-Jul-01 31-Jul-01 77,468 0 77,468 CMSP0028 PRGT0014 Engine Sperim. Appl. Brezigar O M 12-Apr-01 31-Dec-01 31-Dec-01 158,479 0 158,479

Total 549,640 26,085 549,640

Legend

T C l (O) I tHi h (H) St t C iti l T d Fl t

Risk Map

Low

Data Migration and Go-Live Change Management

Project Governance Interfaces

Type Compulsory (O) ImpactHigh (H) Status Critical Tendency Flat

Firm (F) Medium (M) Medium Raising

Opportunity (O) Low (L) On track Falling

CODE NAME TYPE 28733

33000 38114 34303 36545 40949 25355 29058 33375 34678 36920 38489 25000 30000 35000 40000 45000

Baseline (Core) Baseline (Contingency)

Actual Forecast

Integrated Cost and Progress (EVM)

Project Scorecard (each project and a roll-up)

Value Project Documentation Resources Project Management Technological Architecture Application Legacy Systems ORDER XXX XXX Date 05/17/2001

PROJECT PRGTnnnn Implementation CompulsoryFirmOpportunity

Description: References Architecture

Client: Operating System: Windows NT

Client Legal Entity/Functions: IT Project Manager: HW Platform: Server Compaq NT

IT Client Manager: Data Base: TBD

User Legal Entity/Functions: IT Application Manager: IT Architect:

Impact on other Projects/Applications Notes Operating Costs Forecast

Operational: TBD

Maintenance: TBD

Milestones Issues

Start 28-Feb-01 Initial Budget 40,949

End (Baseline) 31-Mar-03 Actual 19,208 Open Issues 10

End (Estimate to date) 31-Mar-03 Total Cost Forecast 38,489

Expected gap 0.00% Expected gap -6.01% Closed Issues 20

Total Issues 30

Costs (Euro)

actual today

CODE NAME TYPE

ORDER XXX XXX Date 05/17/2001

PROJECT PRGTnnnn Implementation CompulsoryFirmOpportunity

Description: References Architecture

Client: Operating System: Windows NT

Client Legal Entity/Functions: IT Project Manager: HW Platform: Server Compaq NT

IT Client Manager: Data Base: TBD

User Legal Entity/Functions: IT Application Manager: IT Architect:

Impact on other Projects/Applications Notes Operating Costs Forecast

Operational: TBD

Maintenance: TBD

Milestones Issues

Start 28-Feb-01 Initial Budget 40,949

End (Baseline) 31-Mar-03 Actual 19,208 Open Issues 10

End (Estimate to date) 31-Mar-03 Total Cost Forecast 38,489

Expected gap 0 00% Expected gap 6 01% Closed Issues 20

Costs (Euro)

CODE NAME TYPE

ORDER XXX XXX Date 05/17/2001

PROJECT PRGTnnnn Implementation CompulsoryFirmOpportunity

Description: References Architecture

Client: Operating System: Windows NT

Client Legal Entity/Functions: IT Project Manager: HW Platform: Server Compaq NT

IT Client Manager: Data Base: TBD

User Legal Entity/Functions: IT Application Manager: IT Architect:

Impact on other Projects/Applications Notes Operating Costs Forecast

Operational: TBD

Maintenance: TBD

Milestones Issues

Start 28-Feb-01 Initial Budget 40,949

E d (B li ) 31 M 03 A t l 19 208 O I 10

Costs (Euro)

CODE NAME TYPE

ORDER XXX XXX Date 05/17/2001

PROJECT PRGTnnnnImplementation CompulsoryFirmOpportunity

Description: References Architecture

Client: Operating System: Windows NT

Client Legal Entity/Functions: IT Project Manager: HW Platform: Server Compaq NT

IT Client Manager: Data Base: TBD

User Legal Entity/Functions: IT Application Manager: IT Architect:

Impact on other Projects/Applications Notes Operating Costs Forecast

Operational: TBD

Maintenance: TBD

CODE NAME TYPE

ORDER XXX XXX Date 05/17/2001

PROJECT PRGTnnnn Implementation Compulsory FirmOpportunity

Description: References Architecture

Client: Operating System: Windows NT

Client Legal Entity/Functions: IT Project Manager: HW Platform: Server Compaq NT

IT Client Manager: Data Base: TBD

User Legal Entity/Functions: IT Application Manager: IT Architect:

Impact on other Projects/Applications Notes Operating Costs Forecast

Operational: TBD 15000 19108 21356 25130 15020 19208 21531 0 5000 10000 15000 20000 25000 Ge n 0 1 Fe b 0 1 Ma r 0 1 Ap r 0 1 Ma g 0 1 Gi u 0 1 Lu g 0 1 Ag o 0 1 Se t 0 1 Ot t 0 1 N o v 01 D ic 01 Ge n 0 2 Fe b 0 2 Ma r 0 2 Ap r 0 2 Ma g 0 2 Gi u 0 2 Lu g 0 2 Ag o 0 2 Se t 0 2 Ot t 0 2 N o v 02 D ic 02 Ge n 0 3 Fe b 0 3 Ma r 0 3

DOE PVMS (for stimulus projects)

Data Migration and Go-Live Resources Change Management Project Governance High Low High Manageability Project Management Technological Architecture Application Legacy Systems Interfaces Project Documentation

% Open Issues/Total Issues 33.33%

Overall Project Status Best Practice Adherence

Impact: Supplier:

Project Characteristics 50%100%150%200%

total cost forecast

50% 100% 150%200%

total duration forecast y

CRITICAL MEDIUM GOOD HIGHMEDIUMLOW 0 1 2 3 4

Expected gap 0.00% Expected gap -6.01% Closed Issues 20

Total Issues 30

% Open Issues/Total Issues 33.33%

Overall Project Status Best Practice Adherence

Impact: Supplier:

Project Characteristics 50% 100%150%200%

total cost forecast

50% 100%150% 200%

total duration forecast

actual today

CRITICAL MEDIUM GOOD HIGHMEDIUMLOW 0 1 2 3 4

End (Baseline) 31-Mar-03 Actual 19,208 Open Issues 10

End (Estimate to date) 31-Mar-03 Total Cost Forecast 38,489

Expected gap 0.00% Expected gap -6.01% Closed Issues 20

Total Issues 30

% Open Issues/Total Issues 33.33%

Overall Project Status Best Practice Adherence

Impact: Supplier:

Project Characteristics 50%100%150%200%

total cost forecast

50% 100% 150%200%

total duration forecast

actual today

CRITICAL MEDIUM GOOD HIGHMEDIUMLOW 0 1 2 3 4

Milestones Issues

Start 28-Feb-01 Initial Budget 40,949

End (Baseline) 31-Mar-03 Actual 19,208 Open Issues 10

End (Estimate to date) 31-Mar-03 Total Cost Forecast 38,489

Expected gap 0.00% Expected gap -6.01% Closed Issues 20

Total Issues 30

% Open Issues/Total Issues 33.33%

Overall Project Status Best Practice Adherence

Impact: Supplier:

Costs (Euro)

Project Characteristics 50% 100%150%200%

total cost forecast

50% 100%150% 200%

total duration forecast

actual today

CRITICAL MEDIUM GOOD HIGHMEDIUMLOW 0 1 2 3 4

Maintenance: TBD

Milestones Issues

Start 28-Feb-01 Initial Budget 40,949

End (Baseline) 31-Mar-03 Actual 19,208 Open Issues 10

End (Estimate to date) 31-Mar-03 Total Cost Forecast 38,489

Expected gap 0.00% Expected gap -6.01% Closed Issues 20

Total Issues 30

% Open Issues/Total Issues 33.33%

Overall Project Status Best Practice Adherence

Impact: Supplier:

Costs (Euro)

Project Characteristics 50%100%150%200%

total cost forecast

50% 100%150% 200%

total duration forecast

actual today

CRITICAL MEDIUM GOOD HIGHMEDIUMLOW 0 1 2 3 4

PROJECT PRGTnnnn Implementation MONTHLY STATUS REPORT

REF. 1 / 24

MONTH MARZO 2001

PHASE PROTOTIPAZIONE PROJECT STATUS

E’ stato definito il System Integrator. E' stato definito il Piano di progetto.

E' stata impostata la proposta di Struttura Organizzativa di Progetto. E' stata impostata la baseline per i costi di Progetto Sono state attivate le Procedure di Gestione Scope Change Request, di Gestione Issue List e di Gestione della Documentazione. E' stato Definito il tool di gestione della documentazione di Progetto. E' stata impostata l'Analisi del Rischio.

OPEN ISSUES ACTIONS RESPONSILE DUE DATE

1 - L'Ambiente di Prototipazione non è disponibile. Predisporre ambiente prototipazione IT Project Manager 06/04/01

ORDER COMM NameComm BASELINE VS ACTUAL VS FORECAST F.G.P.

PROJECT PRGTnnnn Implementation

COST (Euro)

Cost Type Cost Element Baseline Actual Forecast Notes

Development & Implementation 18,550 2,434 18,550

External Resources 0 0 0 O ti l/A li ti l M t 3 783 3 783 3 783 S yst em v e lop m e nt Back to index

DOE PVMS (for stimulus projects)

Costs Detail

p p p p p j g / /

NEXT STEPS

Ufficializzazione Struttura Organizzativa di progetto. Definizione dei componenti dei team da parte dei Responsabili/Referenti. Verifica profilo di spesa e budget Architettura Tecnologica. Impostazione attività di Quality Assurance.

APPROVED CHANGE REQUESTS

Nr. Description Approval Allocated

Date Contingency

Operational/Applicational Mngt 3,783 3,783 3,783 Total System Development 22,333 6,217 22,333 HW/SW Design & Consultancy 1,572 1,572 1,572

HW/SW Acquisition 6,500 6,500 6,500I costi relativi all'architettura tecnologica saranno dettagliati al termine

SW Licences 3,145 3,145 3,145della fase di definizione dei requisiti

Total HW/SW Mgnt 11,217 11,217 11,217 Total External Costs 33,550 17,434 33,550 Total Internal Resources 4,564 1,674 4,564 Partial Project Total 38,114 19,108 38,114

Contingency 2,835 100 375Sono state attivate 3 Scope Change Request

Overall Project Total 40,949 19,208 38,489

HW /S W M a na g e m e nt S De v Schedule

(11)

Cristin M. Lyons

Partner

2626 Glenwood Ave

ScottMadden, Inc.

Jere (Jake) Jacobi

Sustainability Practice

3495 Piedmont Rd Bldg 10

ScottMadden, Inc.

2626 Glenwood Ave

Suite 480

Raleigh, NC 27608

Phone: 919-781-4191

y

Leader

3495 Piedmont Rd, Bldg 10

Suite 805

Atlanta, GA 30305

Phone: 404-814-0020

Phone: 919-781-4191

Mobile: 919-247-1031

cmlyons@scottmadden.com

Phone: 404-814-0020

Mobile: 262-337-1352

jjacobi@scottmadden.com

References

Related documents

[r]

Chapters on measuring the value of nonmarket goods, cost–benefit analysis, markets for pollution rights, incentives for investment in appropriate technology, the governmental role

These strategies of land policies are in line with the four rationalities suggested by Cultural Theory; active land policy, which fits indi- vidualism, is revenue-driven and

Analysis shows that shooting performance, a player action that requires high precision and tight deadlines, is more sensitive to low frame rates than is navigating turns during

In the Toolbar Settings dialogue box, in the tab for the button used to scan, specify the paper size ( Software Guide ). White lines appear on the left side of

When using the aDM/MDM Dual articulating trials, place the 22.2mm or 28mm trial head onto the neck trial or stem trunnion and place the aDM/MDM Insert trial into the MDM liner.

5.2.2 The contractor shall do nothing to dissuade construction workers from attending such an HIV Awareness Programme and shall take all reasonable steps to ensure that a minimum

On sending a SUBSCRIBER request, the UE populate the header fields with a Request URI set to a SIP URI that contains the public user identity used for