User Manual

Breakdown Maintenance Process

(2)

Contents

OVERVIEW... 5

Business Process Description Overview...5

3(A): Breakdown Maintenance –Internal processing (No external services)...8

1. Create Notification... 8

2. Assign Notification – Assign to responsible person for maintenance...11

3. Re-Assign to responsible person for maintenance...15

4. Acknowledge Notification and “Put in Process” Notification:...18

5) Decision on Maintenance Order Requirement...20

6) Create Maintenance Order from Notification...21

7. Material Planning Against Order...28

9) Check of material availability in storage location...34

10 A) Change in Material Requirement...44

11) Create Reservation for Return of Material to Store (if material issued is not consumed)...45

12) Order Confirmation... 46

13) Complete Order... 50

14) Process Notification... 54

15) Process Notification... 57

16) Complete Notification... 59

17) Maintenance Order Settlement...64

18) Business Completion of Maintenance Order...66

3(B): Breakdown Maintenance by Vendor (Warranty/AMC is Available)...68

1. Create Notification... 68

2. Assign Notification – Assign to responsible person for maintenance...71

3. Re-Assign to responsible person for maintenance...75

4. Acknowledge Notification and “Put in Process” Notification:...78

5) Call the Warranty/AMC Vendor:...79

5) Decision on Maintenance Order Requirement...81

6) Create Maintenance Order from Notification...82

9) Check of material availability in storage location...95

10) Change in Material Requirement...104

11) Create Reservation for Return of Material to Store (if material issued is not consumed)...107

12) Order Confirmation... 108

13) Complete Order... 111

14) Process Notification... 115

15) Process Notification... 118

16) Complete Notification... 120

17) Maintenance Order Settlement...124

(3)

1. Create Notification... 128

2. Assign Notification – Assign to responsible person for maintenance...131

3. Re-Assign to responsible person for maintenance...135

4. Acknowledge Notification and “Put in Process” Notification:...138

5) Decision on Maintenance Order Requirement...139

6) Create Maintenance Order from Notification...140

7A) Material Planning Against Order...146

8) Workflow for Maintenance Order Approval...161

8A) Order Approval... 161

9) Check of material availability in storage location...164

10) Change in Material Requirement...173

11) View Purchase Requisition number...176

12) Purchase Order Process... 180

12B) Change Purchase Order...184

13) Post Down Payment (Optional)...191

14) Call /inform the Vendor:... 193

15) Change in Service Planning against Order...195

16) Service procurement process for new requirement...196

18) Order Confirmation... 196

19) Complete Order... 199

20) Process Notification... 203

21) Process Notification... 206

22) Complete Notification... 207

23) Service Entry sheet Process... 212

23A) Create Service entry sheet with reference to Purchase order...212

24) Maintenance Order Settlement...220

25) Business Completion of Maintenance Order...222

26) Accounting entry verification...223

27) Print SES Document... 225

28) Invoice verification Process...228

28A) Invoice Verification for Service Performed...228

3D: Breakdown Maintenance by Vendor (Need Based Service requirement)...231

1. Create Notification... 231

2. Assign Notification – Assign to responsible person for maintenance...234

3. Re-Assign to responsible person for maintenance...239

4. Acknowledge Notification and “Put in Process” Notification:...241

5) Decision on Maintenance Order Requirement...243

(4)

10) Change in Material Requirement...269

11) View Purchase Requisition number...272

13) Purchase Order Process... 275

13B) Change Purchase Order...279

14) Post Down Payment (Optional)...286

15) Call /inform the Vendor:... 288

16) Change in Service Planning against Order...290

17) Service procurement process for new requirement...294

19) Order Confirmation... 294

20) Complete Order... 298

21) Process Notification... 302

22) Process Notification... 305

23) Complete Notification... 306

24) Service Entry sheet Process... 311

24A) Create Service entry sheet with reference to Purchase order...311

25) Maintenance Order Settlement...319

26) Business Completion of Maintenance Order...321

27) Accounting entry verification...323

28) Print SES Document... 326

Work Certification Process... 329

29) Invoice verification Process...329

(5)

OVERVIEW

Business Process Description Overview

Process Overview: Breakdown maintenance

The Breakdown maintenance process shall consist of the following major activities:

1 Raising of breakdown notification with correct priority by operation group to notify the responsible Maintenance department/ main work centre. Based on effect on

communication, Breakdown notification shall need to be prioritized by assigning correct priority.

a. Breakdown which directly affects the communication will be given ‘1’ priority And required to be attended within 4 hours, it would require planning whatsoever At site

b. Breakdowns which are related to equipments which are indirectly related to Communication and do not cause immediate communication loss shall be given Priority ‘2’, such jobs can be attended within 24 hours.

c. Breakdowns related to equipments which are not directly or indirectly related to Communication but are important otherwise, shall be given priority ‘3’. Such jobs Can be attended within 3 days

The breakdown notification will mostly be raised by operation group but at times it can also be raised by maintenance personnel or planning personnel if required.

(6)

3. Receipt of Breakdown Notifications by Maintenance department for processing.

4. Notification release (Put in process) by assigned person who acknowledges it.

5. Creation of Breakdown Maintenance order by maintenance Department if material or external service (contractual job) is needed to carry out the maintenance.

Planning of operations (activities) Planning of materials required Planning of manpower required

Planning of external service quantity required

6. Release of order by authorized person in maintenance department

7. Issue of materials from store by MM department

8. Execution of work at site by internal manpower and/or external agency.

9. Time confirmation of order operations by maint. Department

10. Entry of technical findings (Damage, cause, activities etc.) and Malfunction end time in the breakdown notification by maint. Department

11. Completion of tasks in notification and Notification completion (NOCO)

12. Creation of service entry sheet for the external operations (done by external agency) by maint. Department

(7)

13. Entry of consumed quantity of external services in the service entry sheet and acceptance of service entry sheet. If service level agreement is breached then penalty is to be imposed as per agreed terms and conditions.

14. Technical Completion (TECO) of order.

(8)

Business Process Procedure: Breakdown maintenance.

3(A): Breakdown Maintenance –Internal processing

(No external services)

1. Create Notification

Purpose

A defect has occurred and you create a Breakdown Notification. You enter a brief description of defect, technical object (Functional Location / Equipment) on which defect has occurred, optionally the detail description in subject long text and task required to be done.

Trigger

Perform this procedure when there is a need for Manpower and material requirement for your Breakdown Maintenance Activities

Prerequisites

Technical Object ( Functional Location / Equipment) Main Work Center

Cost Center HR Employee List

(9)

Procedure

(10)

SAP Menu a) Logistics --- Plant maintenance--- Maintenance processing --- Notification --- Create (General)

b) Logistics --- Plant maintenance --- Maintenance processing Notification Create (Special) ---Malfunction Report

T Code

Type IW21 /IW24 in Command Field and press

User Menu Select corresponding Node for IW21 / IW24 / Notification

(11)

Note :

If known, the equipment no. can directly be entered or equipment can be selected from Equipment field F4 help by giving proper selection criteria like equipment description, Plant, plant section, planner group, Main work center etc. in selection option ‘Equipment

1. Enter short Text

2.Enter Equipment code (or)

Func.Location

3. Select Breakdown

(12)

2. Assign Notification – Assign to responsible person for maintenance

Partner Function “Initiator” is maintained manually by the Notification creator .

“Person Responsible” is either picked from master data (if maintained) or can be maintained manually by Notification creator.

User Status “Assigned” is set by “Initiator”.

Information flow is triggered and information is sent to “Person Responsible” via Email. System will save

this notification with generating an

(13)

(14)

SAP Menu Logistics --- Plant maintenance --- Maintenance processing --- Notification --- Change

T Code

Type IW22 in Command Field and press

User Menu Select corresponding Node for IW22 / Notification

Click here to change the staus

(15)

Select Assigned and proceed.

(16)

CLICK ON SAVE BUTTON. MAIL/SAP MAIL IS SENT TO RESPONSIBLE PERSON SEE IN BOX/ E-MAIL

1. Status updated to ASGD

On saving a mail is triggered in SAP system.

(17)

3. Re-Assign to responsible person for maintenance.

The Mail carries the following details

1.Change the Partner no and press Enter

(18)

New Person Responsible is assigned Click here to change the status

(19)

Select RASG and press ENTER

(20)

Information flow is triggered to all maintained “New Personal Responsible”, and “Initiator” via Email.

4. Acknowledge Notification and “Put in Process” Notification:

Open the Notification in change mode using any one navigation option shown below 1. Check the status

(21)

SAP Menu Logistics --- Plant maintenance --- Maintenance processing --- Notification --- Change

T Code

Type IW22 in Command Field and press

User Menu Select corresponding Node for IW22 / Notification

User Status “ACKD” is set by “Person Responsible”.

Notification is “Put in Process” by “Person Responsible”.

1. Click to change the status ACKD 2. Click here to put the Notification in process 3. Click to save the Notification.

(22)

5) Decision on Maintenance Order Requirement

Decide on the requirement of Maintenance order, based on material to be consumed from stores

5A) Maintenance Order for material to be consumed from stores Follow steps from 6 to 18

5B) Maintenance Order not required as no material consumed/services used Follow steps from 14 to 16

(23)

6) Create Maintenance Order from Notification

1. An Order can be created directly from the Notification screen.

To create an Order directly from the notification screen click create order, as shown in the above screen.

Click here to create an order

(24)

2. On the Create Breakdown order: Central Header Data will get copied from the Notification e.g. Order Header, Planner Group, Maint work center, Reference object etc. If any changes are required it can be done.

(25)

3. According to the planning assign the operations which need to be carried out.

The first operation in the operations screen gets copied from the order header as default by the system as shown below. It can be replaced with some other operation, or if some similar operations are there in some task list then those operations can also be copied directly to the order.

(26)

For copying operation from the task list :

Go to Extras (from Menu bar) --- Task list selection --- General task list or To Reference object (If Equipment or function location task list exists) ---- Select the task list as shown below If you will go for selection of a task list, then system will give a message first (as shown below) that you want to delete the existing operations or want to keep them,

1. First operation get copied from the order header, it can be replaced if

required

2. After entering the operation enter the no of manpower in No field and enter the no of proposed duration in the

duration field, Based on these entries system will calculate the duration

(27)

Click - execute button at top left of the screen.

You will get the list of Task lists fulfilling the above selection criteria.

These fields will become gray based on the

selection

criteria, either Gen task list or

function loc. Or equipment task

(28)

Now system will ask you weather you want to copy the work center from the task list or some other work center you want to choose, if you want to change the work center according to your notification then change it accordingly.

1. Select the task list

2. Click on this button or double click on the task list group

(29)

Now System will ask you weather you want to select all the operations of the task list or only some selected operations you want to select, choose accordingly.

7. Material Planning Against Order

2. Click on all to

copy this work center

If you want to select all the operations then click on all, otherwise if you want to select some selected operations then select those operations

(30)

Enter the material code no if known or select the material from the drop down, and enter the required quantity as per the requirement. Then press enter; now system will ask you for which operation you want to assign this material as shown below, either enter the operation no or click on operation list and select the desired operation.

1. Select the Operation and proceed 2. Press after selection of operation

(31)

Click on General Data

(32)

On saving the order a message will be displayed. Reservation

(33)

7A) Workflow for Maintenance Order Approval (IF REQUIRED)

(34)

SAP Menu Logistics --- Plant maintenance --- Maintenance processing --- Order--- Change

T Code Type IW32 in Command Field and press

User Menu Select corresponding Node for IW32 / Order

Select

Enhancement Tab

(35)

Select Note sheet 1.Enter theSAP ID of the Approver 2.Enter the text and continue 3. Click send mail.

(36)

8A) Order Release

Open the order in the change mode using Transaction code IW32 (or) as mentioned in the earlier steps. Press to release the order and press to save the order.

In Maintenance order system status will be set REL 1. Release

the order

2. Save the order

(37)

(38)

SAP Menu

Materials Management ---Purchasing ---Mater Data ---SUbsequent Settlement ---Vendor Rebate Arrangement ---Environment ---Environment ---Condition /Arrangement ---Environment ---Pricing ---Environment ---Value Assignment ---Inventory Management ---Environment ---Stock ---MB52 --- Warehouse Stock. T Code Type MB52 in Command Field and press

User Menu Select corresponding Node for MB52 / Ware house stock

1. Enter the Plant / Storage Location, Etc 2. Execute

(39)

Material Issue against Reservation (if the material is available in storage location) Material Code / Qty can be checked here

(40)

9A) Material Issue against Reservation (if the material is available in storage location) Prerequisites - Reservation no

(41)

SAP Menu Logistics---Material Management---Purchasing---Purchase Order---Follow On Functions---MIGO

T Code Type MIGO in Command Field and press

User Menu Select corresponding Node for MIGO / Goods Issue

Enter Reservation no and press ENTER

(42)

Click on Material Tab

(43)

Click on Quantity Tab and check the details

(44)

1. Enter the no if Qty to be posted

3. Click on Where Tab and check the details

(45)

2. Click on reservation tab to check the details

1. Check the details like Moment type / Stock type Storage Location Etc.

(46)

After checking all the details press Account Assignment Tab.

(47)

After Posting the material will be posted and document no will be generated. 9B) if the material is not available in storage location

Please refer MM Script of Material Stock transfer or Material Procurement. MB21- CREAT RESERVATION UNDER MOVEMENT 913

MIGO- WITH RESPECT TO RESERVATION FOR TRANSFER & POSTING WHICH 1.Click on

Check

(48)

9C) Display Material Document

(49)

SAP Menu Logistics – Material Management ---Purchasing ---Purchase Order ---Follow on Fuctions ---MIGO

T Code Type MIGO in Command Field and press

User Menu Select corresponding Node for MIGO / Goods Issue

Enter the Material Document no to display the material document.

10 A) Change in Material Requirement

(50)

SAP Menu Logistics --- Plant maintenance --- Maintenance processing --- Order--- Change

T Code

Type IW32 in Command Field and press

User Menu Select corresponding Node for IW32 / Order

CREAT NEW OPERATION ADD MATERIAL

APPROVAL CAN BE TAKEN FROM ENHANCEMENT TAB/NOTESHEET

10 B) Material Issue against Reservation

Add new component and proceed.

(51)

Please refer steps 9 to 9C.

11) Create Reservation for Return of Material to Store (if material issued is not consumed)

Please refer steps 10 to 10B with negative quantity. The quantity in the case of return will be negative.

12) Order Confirmation

SAP Menu Logistics----Plant Maintenance---Maintenance Processing---Completion Confirmation----Entry—IW41 Individual Time Confirmation

T Code

Type IW41 in Command Field and press

(52)

Enter Order no. and press ENTER

(53)

Check the details like Final Confirmation and other details and press ENTER

(54)

Number of confirmation is displayed below.

(55)

13) Complete Order

(56)

SAP Menu Logistics --- Plant maintenance --- Maintenance processing --- Order--- Change

T Code

Type IW32 in Command Field and press

User Menu Select corresponding Node for IW32 / Order

Enter the Order no and press Enter

(57)

(58)

Check the date and time and press ENTER

(59)

Order saved and message is displayed with respective numbers

(60)

14) Process Notification

Open the notification on change mode and set user status as Work Completed in Notification.

User Status “Work Completed” is set by “Person Responsible”.

Information flow is triggered to “Initiator” and all “Person Responsible” about status update via Email and SMS.

SAP Menu Logistics --- Plant maintenance --- Maintenance processing --- Notification --- Change

T Code

Type IW22 in Command Field and press

User Menu Select corresponding Node for IW22 / Notification

Enter the Notification No. and proceed

(61)

Click here to change the status to COMP

(62)

Information flow is triggered to “Initiator” and all “Person Responsible” about status update via Email and SMS.

Set the status to COMP.

(63)

15) Process Notification

Set user status as Confirmed Or Set user status as Rework (follow all the Steps from 3 to 15)

Click to change the User Status

(64)

If the user status is set as Rework (follow all the Steps from 3 to 15) User Status “Confirmed” or “Rework” is set by “Initiator”.

Information flow is triggered to all “Person Responsible” about status update via Email.

User Status “Work Completed” is set by “Person Responsible”.

AFTER USER STATUS CONFIRM BY INITIATOR, RESPONSIBLE PERSON WILL COMPLETE THE NOTIFICATION i.e. WILL FILL CATALOG/END TIME etc.

Status can either be changed to

1. REWK or 2. CNFR

(65)

16) Complete Notification

Open the Notification in change Mode

SAP Menu Logistics --- Plant maintenance --- Maintenance processing --- Notification --- Change

T Code

Type IW22 in Command Field and press

(66)

Fill up the all catalog data – Object Parts & Damage / Causes / Activities etc. Click the Flag to complete the Notif.

(67)

(68)

(69)

Status is updated to NOCO. Check the same and proceed

(70)

17) Maintenance Order Settlement

SAP Menu LOGISTICS---PRODUCTION---SHOP FLOOR CONTROL---PERIOD END CLOSING---SETTLEMENT---KO88 - INDIVIDUAL PROCESSING

T Code K088

User Menu Select corresponding Node for K088 / Settlement.

Enter the following details in the Initial Screen:

 Controlling Area

 Maintenance Order Number  Settlement Period

 Fiscal Year  Processing Type

(71)

EXECUTE TEST RUN OK 1. Enter Controlling are

2. Enter the following a. Settlement period b. Fiscal Year c. Processing Type

(72)

18) Business Completion of Maintenance Order

(73)

SAP Menu Logistics --- Plant maintenance --- Maintenance processing --- Order--- Change

T Code Type IW32 in Command Field and press

User Menu Select corresponding Node for IW32 / Order

(74)

Status is updated to CLSD

(75)

3(B):

Breakdown Maintenance by Vendor

(Warranty/AMC is Available)

Pre-requisite: In case of Breakdown Maintenance by the Vendor through AMC “Annual Maintenance Contract”/P.O which is procured through MM procurement are to be referred

1. Create Notification

Purpose

A defect has occurred and you create a Breakdown Notification. You enter a brief description of defect, technical object (Functional Location / Equipment) on which defect has occurred, optionally the detail. description in subject long text and task required to be done.

Trigger

Perform this pocedure when there is a need for Manpower and material requirement for your Breakdown Maintenance Activities

Prerequisites

Technical Object ( Functional Location / Equipment) Main Work Center

Cost Center HR Employee List

(76)

Procedure

(77)

SAP Menu

a) Logistics --- Plant maintenance--- Maintenance processing --- Notification --- Create (General)

b) Logistics --- Plant maintenance --- Maintenance processing Notification Create (Special) ---Malfunction Report

T Code Type IW21 / IW24 in Command Field and press

User Menu Select corresponding Node for IW21 / IW24 / Notification

(78)

Note :

If known, the equipment no. can directly be entered or equipment can be selected from Equipment field F4 help by giving proper selection criteria like equipment description, plant, plant section, planner group, Main work center etc. in selection option ‘Equipment

1. Enter short Text

2.Enter Equipment code (or)

Func.Location

3. Select Breakdown

(79)

2. Assign Notification – Assign to responsible person for maintenance Partner Function “Initiator” is maintained manually by the Notification creator. “Person Responsible” is either picked from master data (if maintained) or can be maintained manually by Notification creator.

User Status “Assigned” is set by “Initiator”.

Information flow is triggered and information is sent to “Person Responsible” via Email. System will save

this notification with generating an

(80)

(81)

SAP Menu Logistics --- Plant maintenance --- Maintenance processing --- Notification --- Change

T Code

Type IW22 in Command Field and press

User Menu Select corresponding Node for IW22 / Notification

Click here to change the staus Enter the Partner details.

(82)

Select Assigned and proceed. 1. Status updated to ASGD 2. Save

(83)

Information flow is triggered and information is sent to “Person Responsible” via Email.

On saving a mail is triggered in SAP system.

(84)

3. Re-Assign to responsible person for maintenance.

The Mail carries the following details

1.Change the Partner no and press Enter

(85)

New Person Responsible is assigned Click here to change the status

(86)

Information flow is triggered to all maintained “New Personal Responsible”, and Select RASG and press

ENTER

1. Check the status 2. Save

(87)

4. Acknowledge Notification and “Put in Process” Notification:

Open the Notification in change mode using any one navigation option shown below SAP Menu Logistics --- Plant maintenance --- Maintenance

processing --- Notification --- Change T Code

Type IW22 in Command Field and press

User Menu Select corresponding Node for IW22 / Notification User Status “ACKD” is set by “Person Responsible”.

Notification is “Put in Process” by “Person Responsible”.

Information flow is triggered to “Initiator” and all “Person Responsible” about status update.

1. Click to change the staus tp ACKD 2. Click here to put the Notif ication process 3. Click to save the Notif.

(88)

5) Call the Warranty/AMC Vendor:

Enter the Vendor Details in Vendor Docket Screen in Notification.

Enter all the vendor details.

(89)

1. Enter Purchasing Doc. No 2. Communication Details (Filled to inform specific person from vendor side) 3. Click here to change the staus to VEND

(90)

SAVE & Information flow is triggered and information is sent to VENDER VIA MAIL.

5) Decision on Maintenance Order Requirement

Decide on the requirement of Maintenance order, based on material to be consumed from stores

5A) Maintenance Order for material to be consumed from stores Follow steps from 6 to 24

5B) Maintenance Order not required as no material consumed/services used Follow steps from 14 to 16

Select the status to VEND

(91)

6) Create Maintenance Order from Notification

1. An Order can be created directly from the Notification screen.

To create an Order directly from the notification screen click create order, as shown in the above screen.

Click here to create an order

(92)

2. On the Create Breakdown order: Central Header Data will get copied from the Notification e.g. Order Header, Planner Group, Maint work center, Reference object etc. If any changes are required it can be done.

(93)

3. According to the planning assign the operations which need to be carried out.

The first operation in the operations screen gets copied from the order header as default by the system as shown below. It can be replaced with some other operation, or if some similar operations are there in some task list then those operations can also be copied directly to the order.

1. First operation get copied from the order header, it can be replaced if

required

2. After entering the operation enter the no of manpower in No field and enter the no of proposed duration in the

duration field,Based on these entries system will calculate the duration

(94)

Go to Extras (from Menu bar)

Task list selection

General task list or To Reference

object (If Equipment or function location task list exists)

Select the task list as shown below If you will go for selection of a task list, then system will give a message first (as shown below) that you want to delete the existing

(95)

Click - execute button at top left of the screen.

You will get the list of Task lists fulfilling the above selection criteria.

These fields will become gray based on the

selection

criteria, either Gen task list or

function loc. Or equipment task

(96)

Now system will ask you weather you want to copy the work center from the task list or some other work center you want to choose, if you want to change the work center according to your notification then change it accordingly.

Now System will ask you weather you want to select all the operations of the task list or only some selected operations you want to select, choose accordingly.

1. Select the task list

2. Click on this button or double click on the task list group 1. Enter your work center if required 2. Click on all to copy this work center

(97)

7. Material Planning Against Order

Enter the material code no if known or select the material from the drop down, and enter the required quantity as per the requirement. Then press enter; now system will ask you for which operation you want to assign this material as shown below, either enter the operation no or click on operation list and select the desired operation.

If you want to select all the operations then click on all, otherwise if you want to select some selected operations then select those operations

Enter the material code / Qty / Store Location Etc., and proceed.

(98)

Click on General Data

Select the relevant Operation and press

(99)

On saving the order a message will be displayed. Reservation

(100)

7A) Workflow for Maintenance Order Approval ( If Required ) It is before REL OF MAINTAINANCE ORDER

(101)

SAP Menu Logistics --- Plant maintenance --- Maintenance processing --- Order--- Change

T Code Type IW32 in Command Field and press User Menu Select corresponding Node for IW32 / Order

Select

Enhancement Tab

(102)

Select Notesheet

(103)

1.Enter theSAP ID of the Approver 2.Enter the text and continue 3. Click send mail.

(104)

8A) Order Release

Open the order in any one navigation options shown below.

SAP Menu Logistics --- Plant maintenance --- Maintenance processing --- Order--- Change

T Code Type IW32 in Command Field and press

User Menu Select corresponding Node for IW32 / Order

Open the order in the change mode using any one navigation option shown below Press to release the order and press to save the order.

1. Release

(105)

(106)

SAP Menu

Materials Management ---Purchasing ---Mater Data ---SUbsequent Settlement ---Vendor Rebate Arrangement ---Environment ---Environment

Condition/Arrangement Environment Pricing

---Environment ---Value Assignment ---Inventory Management ---Environment ---Stock ---MB52 --- Warehouse Stock.

T Code Type MB52 in Command Field and press

User Menu Select corresponding Node for MB52 / Ware house stock

1. Enter the Plant / Storage Location, Etc 2. Execute

(107)

Material Issue against Reservation (if the material is available in storage location) Material Code / Qty can be checked here

(108)

9A) Material Issue against Reservation (if the material is available in storage location) Prerequisites - Reservation no.

(109)

SAP Menu Logistics---Material Management---Purchasing---Purchase Order---Follow On Functions---MIGO

T Code Type MIGO in Command Field and press

User Menu Select corresponding Node for MIGO / Goods Issue

Enter Reservation no and press ENTER

(110)

Click on Material Tab

(111)

Click on Quantity Tab and check the details

(112)

1. Enter the no if Qty to be posted

3. Click on Where Tab and check the details

(113)

2. Click on reservation tab to check the details

1. Check the details like Moment type / Stock type Storage Location Etc.

(114)

After checking all the details press Account Assignment Tab.

(115)

After Posting the material will be posted and document no will be generated.

9B) If the material is not available in storage location

Please refer MM Script of Material Stock transfer or Material Procurement. MB21-UNDER MOV913

1.Click on Check

(116)

9C) Display Material Document

(117)

SAP Menu Logistics---Material Management---Purchasing---Purchase Order---Follow On Functions---MIGO

T Code Type MIGO in Command Field and press

User Menu Select corresponding Node for MIGO / Goods Issue

Enter the Material Document no to display the material document.

10) Change in Material Requirement

(118)

SAP Menu Logistics --- Plant maintenance --- Maintenance processing --- Order--- Change

T Code Type IW32 in Command Field and press

User Menu Select corresponding Node for IW32 / Order

Add new component and proceed.

(119)

Select Enhancement Tab Select Notesheet

(120)

SAVE& MAIL IS SENT TO APPROVER. HE WILL APPROVE/NOT APPROVE &SENT BACK

10B) Material Requirement change 10C) Material Issue against Reservation

Please refer steps 9 to 9C.

11) Create Reservation for Return of Material to Store (if material issued is not consumed)

Please refer steps 10 to 10C. The quantity in the case of return will be negative. 1.Enter theSAP ID of the Approver 2.Enter the text and continue 3. Click send mail.

(121)

12) Order Confirmation

SAP Menu Logistics----Plant Maintenance---Maintenance Processing---Completion Confirmation----Entry—IW41 Individual Time Confirmation

T Code

Type IW41 in Command Field and press

User Menu Select corresponding Node for IW41 / Completion Confirmation

Enter Order no. and press ENTER

(122)

A pop window will open as mentioned below.

Check the details like Final Confirmation and other details and press ENTER

After entering the time confirmation details ( Actual Work ) SAVE IT.

(123)

Number of confirmation is displayed below.

(124)

13) Complete Order

(125)

SAP Menu Logistics --- Plant maintenance --- Maintenance processing --- Order--- Change

T Code Type IW32 in Command Field and press

User Menu Select corresponding Node for IW32 / Order

Enter the Order no and press Enter

(126)

Check the date and time and press ENTER

(127)

Order saved and message is displayed.

(128)

14) Process Notification

Open the notification on change mode and set user status as Work Completed in Notification.

SAP Menu Logistics --- Plant maintenance --- Maintenance processing --- Notification --- Change

T Code

Type IW22 in Command Field and press

User Menu Select corresponding Node for IW22 / Notification

Enter the Notification No and proceed

(129)

SET USER STATUS COMPLETED BY RESPONSIBLE PERSON & SAVE.SAP MAIL TO INITIATOR 1. Maintain “Vendor Docket Details” 2. Click to change the user status

(130)

User Status “Work Completed” is set by “Person Responsible”.

Information flow is triggered to “Initiator” and all “Person Responsible” about status update via Email.

Set the status to CNFR

(131)

15) Process Notification

Set user status as Confirmed Or Set user status as Rework (follow all the Steps from 3 to 15)

Click to change the User Status

(132)

If the user status is set as Rework (follow all the Steps from 3 to 15) User Status “Confirmed” or “Rework” is set by “Initiator”.

Information flow is triggered to all “Person Responsible” about status update via Email.

Status can either be changed to

1. REWK or 2. CNFR

(133)

16) Complete Notification

Open the Notification in the change mode using transaction code IW22 or from the SAP menu as mentioned in the earlier steps.

Click the Flag to complete the Notif.

(134)

(135)

(136)

IW32

Status is updated to NOCO. Check the same and proceed

(137)

17) Maintenance Order Settlement

(138)

SAP Menu

T Code KO88

User Menu Maintenance Order Settlement

Enter the following details in the next Pop-up window.

Controlling area Settlement period Fiscal Year

(139)

1. Enter Controlling are

2. Enter the following a. Settlement period b. Fiscal Year c. Processing Type

(140)

(141)

SAP Menu Logistics --- Plant maintenance --- Maintenance processing --- Order--- Change

T Code Type IW32 in Command Field and press User Menu Select corresponding Node for IW32 / Order

(142)

19) PO Process

20) Service Entry Sheet

21) Accounting entry verification

22) Debit/ Credit Notes Refer Work MM Manuals

23) Vendor Payment

24) Display Accounting Document

Status is updated to CLSD

(143)

3C: Breakdown Maintenance by Vendor (Need Based Service

and APO is available)

1. Create Notification

Purpose

A defect has occurred and you create a Breakdown Notification. You enter a brief description of defect,

technical object (Functional Location / Equipment) on which defect has occurred, optionally the detail

description in subject long text and task required to be done.

Trigger

Perform this procedure when there is a need for Manpower and material requirement for your Breakdown

Maintenance Activities

Prerequisites

Technical Object ( Functional Location / Equipment) Main Work Center

Cost Center HR Employee List

(144)

Procedure

(145)

SAP Menu

a) Logistics --- Plant maintenance--- Maintenance processing --- Notification --- Create (General)

b) Logistics --- Plant maintenance --- Maintenance processing Notification Create (Special) ---Malfunction Report

T Code Type IW21 / IW24 in Command Field and press

User Menu Select corresponding Node for IW21 / IW24 / Notification

(146)

Note :

If known, the equipment no. can directly be entered or equipment can be selected from Equipment field F4 help by giving proper selection criteria like equipment description, plant, plant section, planner group, Main work center etc. in selection option ‘Equipment by equipment list.

1. Enter short Text

2.Enter Equipment code (or)

Func.Location

3. Select Breakdown

(147)

2. Assign Notification – Assign to responsible person for maintenance Partner Function “Initiator” is maintained manually by the Notification creator .“Person Responsible” is either picked from master data (if maintained) or can be maintained manually by Notification creator.

User Status “Assigned” is set by “Initiator”.

Information flow is triggered and information is sent to “Person Responsible” via Email. Notification can be assigned to multiple “Person Responsible”.

Open the Notification in change mode using any one navigation options shown below. System will save

this notification with generating an

(148)

SAP Menu Logistics --- Plant maintenance --- Maintenance processing --- Notification --- Change

T Code

Type IW22 in Command Field and press

User Menu Select corresponding Node for IW22 / Notification

5. Enter Partner Details

(149)

Click here to change the staus Select Assigned and proceed.

(150)

SAVE & MAIL IS SENT TO ASGNED PERSON

1. Status updated to ASGD

2. Save

On saving a mail is triggered in SAP system.

(151)

3. Re-Assign to responsible person for maintenance.

The Mail carries the following details

1. Change the Partner no and press Enter

(152)

New Person Responsible is assigned Click here to change the status

(153)

Select RASG and press ENTER

1. Check the status 2. Save

(154)

4. Acknowledge Notification and “Put in Process” Notification:

Open the Notification in change mode using any one navigation option shown below.

SAP Menu Logistics --- Plant maintenance --- Maintenance processing --- Notification --- Change

T Code

Type IW22 in Command Field and press

User Menu Select corresponding Node for IW22 / Notification

Note:

User Status “ACKD” is set by “Person Responsible”.

(155)

Information flow is triggered to “Initiator” and all “Person Responsible” about status update.

5) Decision on Maintenance Order Requirement

Decide on the requirement of Maintenance order, based on material to be consumed from stores

5A) Maintenance Order for material to be consumed from stores Follow steps from 6 to 18

5B) Maintenance Order not required as no material consumed/services used 1. Click to change the staus tp ACKD 2. Click here to put the Notif ication process 3. Click to save the Notif.

(156)

6) Create Maintenance Order from Notification

1. An Order can be created directly from the Notification screen.

To create an Order directly from the notification screen click create order, as shown in the above screen.

Click here to create an order

(157)

2. On the Create Breakdown order: Central Header Data will get copied from the Notification e.g. Order Header, Planner Group, Maint work center, Reference object etc. If any changes are required it can be done.

(158)

3. According to the planning assign the operations which need to be carried out.

The first operation in the operations screen gets copied from the order header as default by the system as shown below. It can be replaced with some other operation, or if some similar operations are there in some task list then those operations can also be copied directly to the order.

1. First operation get copied from the order header, it can be replaced if

required

2. After entering the operation enter the no of manpower in No field and enter the no of proposed duration in the

duration field,Based on these entries system will calculate the duration

(159)

Click - execute button at top left of the screen.

You will get the list of Task lists fulfilling the above selection criteria.

These fields will become gray based on the

selection

criteria, either Gen task list or

function loc. Or equipment task

(160)

Now system will ask you weather you want to copy the work center from the task list or some other work center you want to choose, if you want to change the work center according to your notification then change it accordingly.

Now System will ask you weather you want to select all the operations of the task list or only some selected operations you want to select, choose accordingly.

1. Select the task list

2. Click on this button or double click on the task list group 1. Enter your work center if required 2. Click on all to copy this work center

(161)

7A) Material Planning Against Order

If you want to select all the operations then click on all, otherwise if you want to select some selected operations then select those operations

Enter the material code / Qty / Store Location Etc., and proceed.

(162)

Enter the material code no if known or select the material from the drop down, and enter the required quantity as per the requirement. Then press enter; now system will ask you for which operation you want to assign this material as shown below, either enter the operation no or click on operation list and select the desired operation.

Select the relevant Operation and press

(163)

Click on General Data

(164)

Reservation created

(165)

7B) Service Planning against Order

Select

(166)

1. Change the control Key to PM03directly (or) Press F4

2. Click External

(167)

Select the appropriate control key and select Select the control key PM03

(168)

Enter the Available APO ( Agreement ) in the field . The following data will be copied from the contract. 1. Material Group 2. Purchasing Group: 3. Purchasing Organization: 4. Requisitioner: 5. Tracking No:

(169)

(170)

(171)

Then select the Services available in the APO , from “service selection” button at the bottom.

Select

EXTERNAL BUTTON

(172)

Select Service Selection

(173)

CLICK on the SERVICES for ADOPT SERVICES. Select For

Adopt services from APO

(174)

Select For Entering the cost centre

(175)

Cost for the service will appear in the service , is PICKED from APO. On saving the order a message will be displayed .

Continue for service selection

(176)

8) Workflow for Maintenance Order Approval

(177)

SAP Menu Logistics --- Plant maintenance --- Maintenance processing --- Order--- Change

T Code Type IW32 in Command Field and press User Menu Select corresponding Node for IW32 / Order

8A) Order Approval

Select

Enhancement Tab

(178)

APPROVER RECEIVED SAP MAIL.HE APPROVE/ NOTAPPROVE & SENT BACK Select Notesheet 1.Enter theSAP ID of the Approver 2.Enter the text and continue 3. Click send mail.

(179)

8B) Order Release

Open the order in the change mode using Transaction code IW32 (or) as mentioned in the earlier steps. Press to release the order and press to save the order.

1. Release the order

2. Save the order

(180)

(181)

SAP Menu

Materials Management ---Purchasing ---Mater Data ---SUbsequent

Settlement ---Vendor Rebate Arrangement ---Environment ---Environment Condition/Arrangement Environment Pricing

---Environment ---Value Assignment ---Inventory Management ---Environment ---Stock ---MB52 --- Warehouse Stock. T Code Type MB52 in Command Field and press

User Menu Select corresponding Node for MB52 / Ware house stock

1. Enter the Plant / Storage Location, Etc 2. Execute

(182)

Material Issue against Reservation (if the material is available in storage location)

9A) Material Issue against Reservation (if the material is available in storage location)

Prerequisites - Reservation no.

Material Code / Qty can be checked here

(183)

SAP Menu Logistics---Material Management---Purchasing---Purchase Order---Follow On Functions---MIGO

T Code Type MIGO in Command Field and press

User Menu Select corresponding Node for MIGO / Goods Issue

Enter Reservation no and press ENTER

(184)

Click on Material Tab

(185)

Click on Quantity Tab and check the details

(186)

1. Enter the no if Qty to be posted

3. Click on Where Tab and check the details

(187)

2. Click on reservation tab to check the details

1. Check the details like Moment type / Stock type Storage Location Etc.

(188)

After checking all the details press Account Assignment Tab.

(189)

After Posting the material document no will be generated. 9B) If the material is not available in storage location

Please refer MM Script of Material Stock transfer or Material Procurement. MB21- CREAT RESERVATION UNDER MOVEMENT 913

MIGO- WITH RESPECT TO RESERVATION FOR TRANSFER & POSTING WHICH GIVES MATERIAL DOCUMENT NO

1.Click on Check

(190)

9C) Display Material Document

(191)

SAP Menu Logistics---Material Management---Purchasing---Purchase Order---Follow On Functions---MIGO

T Code Type MIGO in Command Field and press

User Menu Select corresponding Node for MIGO / Goods Issue Enter the Material Document no to display the material document.

10) Change in Material Requirement

(192)

SAP Menu Logistics --- Plant maintenance --- Maintenance processing --- Order--- Change

T Code Type IW32 in Command Field and press User Menu Select corresponding Node for IW32 / Order

(193)

Select Enhancement Tab Select Notesheet

(194)

10B) Material Requirement change 10C) Material Issue against Reservation

Please refer steps 9 to 9C.

10D) Create Reservation for Return of Material to Store

If material issued is not consumed, returning is done as per steps 10 to 10C. The quantity in the case of return will be negative.

11) View Purchase Requisition number

(195)

SAP Menu Logistics --- Plant maintenance --- Maintenance processing --- Order--- Change

T Code Type IW32 in Command Field and press User Menu Select corresponding Node for IW32 / Order

(196)

Purchase. Requisition no can be viewed

(197)

(198)

SAP Menu Go to EASY ACCESS Screen by /n

T Code /n

Go to SAP Business Workplace

(199)

Now release the PR as per MM workflow procedure.

12) Purchase Order Process 12A Create Purchase Order.

Maintain Additional information required Double click on INBOX – It

will display the list of Messages .

Open a notesheet for “Purchase.

(200)

T Code ME21N

User Menu Select corresponding Node for ME21N / Create Purchasing Order. Maintain Header text as per Requirement

References

Related documents

In this case, the appropriate exemption statute requires, in relevant part, that the property in question: (a) be owned and operated by a duly qualified home for the

6 Each of the directors confirms that to the best of their knowledge the half-yearly financial statements have been prepared in accordance with the Statement “Half-yearly

income and impairment cycles between our capital markets business and our retail and corporate banking businesses.. This is one of the benefits of running a

A: When the terminal is turned on, press the [MENU] button to access the menu, select [Enroll] → [OK] → User → select registration type, for example, select [Finger] → [OK] →

• Expand the Industry Codes menu, select 2007 from the Code Year menu, then select NAICS/NAICS Based Industry from the Code Type menu, then select 72, Accommodation

An Australian study of HF hospital stay trends ( 15 ) also found that reductions in the HF hospital stay rate was predominately limited to older populations: from 1990 to 1993 to

When the handset is in idle mode, press MENU/ SELECT to enter the main menu6. Press MENU

Operational in korea express waybill tracking malaysia based express tracking status through inland routes within the complexity of your parcels from china daily product