• No results found

Computer Supported Project Management

N/A
N/A
Protected

Academic year: 2021

Share "Computer Supported Project Management"

Copied!
41
0
0

Loading.... (view fulltext now)

Full text

(1)

Computer

Supported Project

Management

(2)

Computer Supported

Project Management

 

 

Overview  of  Project  

Management  So4ware  

 

Market  Review  of  Tools  

and  So4ware  

 

Demo  of  Microso4  

Project  

(3)

Project Management

Software

Benefits

,Pitfalls and Best

Practices

(4)

Project  Management  So4ware  

 

Help  manage    projects  from  start  to  finish      

 

Plan  and  control    the  variables    involved  in  a  

project    

 

Integrate  funcEons  such  as  calendars,  charts,  

etc.    

 

Meet    the  requirements  of  a  project  in  an  

easier  way    

(5)

Benefits  (1)  

 

BeOer  resource  allocaEon  decisions  

 

Make  apples-­‐to-­‐apples  comparisons  

 

Saves  Eme  and  cost  

 

Offers  objecEve  tracking  

(6)

Benefits  (2)  

 

Keeps  great  ideas  in-­‐house  

 

Facilitates  team  communicaEon  

 

Accountability  of  team  members  

 

Transparency  of  project  progress  

(7)

PiWalls  (1)  

 

InsEll  a  fear  of  “messing  things  up”  in  the  

team  members    

 

SEck  to  the  generic  training  materials  and  

help  guides  when  geZng  people  up  to  

speed  

 

Trust  no  one  

(8)

 

Rely  on  the  so4ware  to  solve  the  resource  

management  problems  

 

Keep  using  all  the  other  systems  “in  the  

same  way  we  always  did”  

 

Let  the  team  members  make  updates  “if  

they  feel  like  it”  

PiWalls  (2)  

(9)

Best  PracEces  (1)  

 

Keep  it  modest  and  adaptable  

 

Incorporate  exisEng  sound  project  

management  methods  

 

Limit  the  reporEng  requirements  

(10)

 

Plan  and  track  projects,  not  maintenance  

acEviEes      

 

Implement  an  adequate  set  of  metrics  to  

give  early  warning  of  potenEal  problems  

 

IdenEfy  risks  up  front  &  conEnue  to  assess  

potenEal  risks  throughout  the  project  

Best  PracEces  (2)  

(11)

Market Review of

Project Management

Tools

(12)

Market Review of PM

Tools

Free and Open Source

Software

So4ware  which  can  be  modified  and  

distributed  without  restricEon,  in  contrast  to  

proprietary  or  commercial  so/ware  

Cloud computing

Internet  based  compuEng,  where  

shared  resources,  so4ware,  and  data  

are  provided  through  common  

centers  and  usually  built  on  servers  

(13)

Market Review of PM

Tools

Tools  are  classi+ied  based  on  

these  functions:  

  Portfolio  Management  

  Collaboration  

  Time  Tracking  and  Scheduling  

(14)

Project  PorWolio  Management  

 

methods   for   analyzing   and   collecEvely   managing   a   group   of  

projects.  

 

ObjecEve:   determine   the   opEmal   mix   and   sequencing   of  

proposed  projects  

 

AOributes:    

1.  project's  total  expected  cost,    

2.  resources  (human  or  otherwise)  expected  Emeline  

3.  schedule  of  investment  

4.  inter-­‐dependencies  with  other  projects  in  the  porWolio  

(15)

PPM  So4ware  Requirements  

 

Accurate  tracking  of  investment  status  

 

Graphical  dashboard,  dynamic  comparisons,  what-­‐if  

analysis  

 

Resources  allocaEon  across  investment  porWolio  

 

SimulaEon  of  alternaEve  allocaEon  

 

User  friendly  

 

Avoid  resistance  and  speed  up  the  adopEon  

(16)

PPM  EvaluaEon  Criteria  

Current  offering   Strategy   Market  presence  

PorWolio  management   Product  strategy   Installed  base   Project  management   Cost     Revenue    

Resource  management   Etc     InternaEonal  presence   Financial  management   Etc    

Etc    

 

Current   offering:   59   criteria   that   focused   on   core   and  

advanced  funcEonality  

 

Strategy:   13   criteria   to   determine   vendors´   vision   and  

future  scenarios  

 

Market   presence:   11   criteria   to   evaluate   vendors´  

penetraEon  in  the  current  market  

(17)

Vendor  

Comparison

 

IT-­‐Driven  segment:  

emphasize  what  is   criEcal  for  managing   IT  porWolios  that   affect  IT  investments  

(18)

Vendor  

Comparison

 

Business-­‐Driven   segment:  emphasize  

features  that  are   criEcal  for  business-­‐

driven  project   porWolios  (new  product   development,  strategy   mapping,  program   management)  

(19)

Overview  on  the  market  leaders  

CA  CLARITY  

– 

pragmaEc  features  for  IT  organizaEons  

– 

make  project  management  more  accessible  for  more  resources  

in  the  organizaEon  (deep  training)  

– 

strength  and  dedicaEon  in  applying  PPM  discipline  to  business-­‐

driven  porWolios  

HP  

– 

suited  to  organizaEons  with  complex  IT  management  needs  

– 

IntegraEon  of  features,  such  as  financial  management,  that  

support  IT  management  decisions  

(20)

Overview  on  the  market  leaders  

ORACLE  

– 

Full  menu  of  soluEons  for  mature,  project-­‐focused  organizaEons  

– 

best  suited  to  business-­‐driven  projects  with  extensive  planning  

requirements  

MICROSOFT  

– 

Deliver  PPM  funcEons  from  strategic  planning  all  the  way  

through  to  individual  contributors  on  a  project  

– 

The  most  project-­‐centric  of  the  vendors  

– 

Make  strides  to  make  managing  projects  more  pragmaEc  

(21)

   CollaboraLon/Conferencing  

1.  Basic  Offering  –  low  price  &  low  features  

  Tools  such  as    AcEvecollab,  Assembla,  Basecamp  

  Rudimentary  discussion  forums  for  individual  project,    file  sharing  &  chat     All  web  based,  some  

with  mobile  interface     Focus  is  on  simple  &  

easy  to  use  

  Basic  authorizaEon   levels  

(22)

2.  PPM  Market  Leaders–  premium  price  &  sophisEcated  features  

  Tools  such  as    Planview,  CA,  Oracle  (Primavera),  HP  &  SAP  

  Real-­‐Eme  capabiliEes:  Captures  Workflow  &  monitoring  in  central   locaEon,  discussion  groups  &  message  boards  

  Both    web  and  customer  locaEon  opEon  available,  mobile  interface   available  

  Focus  is  on  other  features  such  as  tacEcal  depth  (not  collaboraEon)  as   target  customers  use  other  means  for  project  collaboraEon  (typically   separate  purchase  of  collaboraEon  tools  needed)  

  Very  customized  authorizaEon  levels  available.  

  Customized  integraEon  with  general  ERP  and  detailed  data   synchronizaEon.  

   CollaboraLon/Conferencing  

(23)

   CollaboraLon/Conferencing  

3.  Medium  level  offerings–  medium  price  &  specialized  features  

  Tools  such  as    AtTask,  Compuware  &  DapEv  

  Key  difference  is  that    it  is    browser,  plaWorm  &  database   independent  

  Captures  Workflow  &  monitoring  in  central  locaEon,  discussion   groups  ,  message  boards  &  feedback  

  Both    web  and  customer  locaEon  opEon  available,  mobile  interface   available  

  Simpler  &  easier  to  use  than  market  leader  offering     Customizable  authorizaEon  levels  available  

(24)

   CollaboraLon/Conferencing  

The  2010  version  of  the  tradiEonal  project  management  

tool  Microso4  Project  is  now  compaEble  with  SharePoint,  

that  allow  limited  collaboraEon  on  team  sites,  blogs  and  

meeEng  areas,  including  features  of  social  systems,  such  

as  labeling  and  news  feeds.  

(25)

   Time  Tracking  /  Scheduling  

 

Control  the  project’s  schedule  resources  used  

 

Hard  to  have  the  same  level  of  control  

without  PM  so4ware  

 

Control  of  tasks  execuEon  and  Eme  tracking  

 

GanO  charts    

 

Assigning  tasks  

 

Resources  leveling  

(26)

   Time  Tracking  /  Scheduling  

 

AlternaEve  opEons  

Redmine,  Conmidworks,  Zoho  projects    

(27)

   Time  Tracking  /  Scheduling  

(28)

   Time  Tracking  /  Scheduling  

(29)

   Time  Tracking  /  Scheduling  

 

Microso4  Project  

 

More  complete  soluEon  

 

AutomaEc  resource  leveling  and  calculaEon  of  task  Emes  

(30)

DEMONSTRATION OF

IMPORTANT FUNCTIONS

IN MICROSOFT PROJECT

(31)

MS P   U Ll iz aL on  

ConcepEon   Development   ExecuEon   CompleEon  

Life  cycle  of  a  Project  and  MSP  usage  

(32)

Microsoft Project 2007

MS P   U Ll iz aL on  

ConcepLon   Development   ExecuEon   CompleEon  

LiOle  use  of  MSP                                          Just  geTng  started  with  Project  

Phase  1:  ConcepLon  

hOp://www.youtube.com/watch?v=P65XuN5sW7I    

(33)

Microsoft Project 2007

MS P   U Ll iz aL on  

ConcepEon   Development   ExecuEon   CompleEon  

   Main  MSP  FuncEons:   •   CreaEng  a  Task  List  

•   SeZng  Up  Resources  

•   Assigning  Resources  to  Tasks  

•   FormaZng  and  PrinEng  Your  Plan  

Phase  2:  Development  

(34)

Microsoft Project 2007

   EsEmate  and  enter  how  long  each  task  should  last.  

   Create  a  milestone  to  track  an  important  event.  

   Organize  tasks  into  phases.  

   Create  task  relaEonships  by  linking  tasks.  

   Record  task  details  in  notes  and  insert  a  hyperlink   to  content  on  the  Internet.  

   Check  a  project  plan’s  overall  duraEon.  

CreaLng  a  Task   List   SeZng  Up   Resources   Assign  Resources   to  Tasks   FormaZng  Your   Plan   Phase  2:  Development   hOp://www.youtube.com/watch?v=ZpYe_rmlFDc     34  

(35)

Microsoft Project 2007

CreaEng  a  Task   List   SeTng  Up   Resources   Assign  Resources   to  Tasks   FormaZng  Your   Plan  

   Set  up  basic  resource  informaEon  for  the  people  who   work  on  project  

   Enter  basic  resource  informaEon  for  the  equipment  that   will  be  used  in  project  

   Enter  resource  informaEon  for  the  materials  that  will  be   consumed  as  the  project  progresses  

   Enter  cost  resource  informaEon  for  financial  tracking  

   Set  up  cost  informaEon  for  work  resources  

   Change  a  resource’s  availability  for  work  

   Record  addiEonal  informaEon  about  a  resource  in  a  note  

Phase  2:  Development  

hOp://www.youtube.com/watch?v=c4uAPl4L6EM    

(36)

Microsoft Project 2007

Phase  2:  Development  

CreaEng  a  Task   List   SeZng  Up   Resources   Assign  Resources   to  Tasks   FormaZng  Your   Plan  

   Assign  work  resources  to  tasks  

   Control  how  Project  schedules   addiEonal  resource  assignment  

   Assign  material  resources  to  tasks  

   Assign  cost  resources  to  tasks  

hOp://www.youtube.com/watch?v=ND41S2pQw1E    

(37)

Microsoft Project 2007

Phase  2:  Development  

CreaEng  a  Task   List   SeZng  Up   Resources   Assign  Resources   to  Tasks   FormaTng  Your   Plan  

   Customize  a  view  and  preview  the  way  it  will  look   when  printed  

   Draw  on  the  chart  porEon  of  a  GanY  Chart  view  

   Change  the  formaZng  of  text  in  a  project  plan  

   Edit  and  print  reports  

hOp://www.youtube.com/watch?v=0oVAzXk6slg    

(38)

Microsoft Project 2007

MS P   U Ll iz aL on  

ConcepEon   Development   ExecuLon   CompleEon  

Phase  3:  ExecuLon  

   Record  progress  on  tasks  through  a  specific  date      Record  a  task’s  percentage  of  compleEon  

   Enter  actual  work  and  duraEon  values  for  tasks  

Main  MSP  FuncEon                                                    Tracking  Progress  on  Tasks  

hOp://www.youtube.com/watch?v=jTP-­‐qVMOQlk    

(39)

Microsoft Project 2007

MS P   U Ll iz aL on  

ConcepEon   Development   ExecuEon   CompleLon   Phase  4:  CompleLon  

Less  use  of  MSP                                              Lessons  Learned,  final  reports  

(40)

Microsoft Project 2007 vs 2010

Major  Changes  

 

Ribbon/  Fluent  User  Interface  

 

Backstage  View  

 

SynchronizaEon  with  SharePoint  

 

Manual  Scheduling  

 

Team  Planner  

 

InacEve  Tasks  

 

Compare  Projects  

(41)

End of presentation

References

Related documents

It is against this generally positive response to engaging in practitioner research that the three issues outlined below are considered; firstly, the degree to which teachers

about technology and engineering” 4 (Bybee, 2000, p.. As school districts adopt and implement the standards for technological literacy increased numbers of pre-college students

Question 7: Petitioner insists that, contrary to the rulings of both the trial court and the appellate court, the photocopies it presented as documentary evidence actually

In order to highlight the cost implications for UK fleet operators we have built up a typical car fleet profile and used the manufacturer mpg of this fleet to measure what the total

In this paper, the authors address one main research question: ”does the combination of pattern based scripting and monitoring collaboration contribute to provide useful

Entering task progress information helps to view task progress and determine if the project and its tasks remain on schedule.. To enter task

BESTOYS is in a position to capitalize on this online marketplace by leveraging existing online technologies, industry best practices, and an aggressive marketing and sales campaign

D Complete the sentences with the Present Simple or Past Simple Passive form of the verbs in brackets.. 1 The