Request for

(2)

Currently we have an unstructured and

inconsistent approach…

Where do I get help for SEO? Where do I get

help for SEO?

What web address should I use? What web address should I use? We need a video for the

School web pages We need a video for the

School web pages

Our School needs a unique

look and feel Our School needs a unique

look and feel We need our video to be available in China We need our video to be available in China We need a site for a research project – where do we go? We need a site for a research project – where do we go?

Our site needs a major redesign Our site needs a

major redesign

We have a site but we would like it

within the CMS We have a site but

we would like it within the CMS

We want to promote something through Facebook – what is the

best way to do this? We want to promote

something through Facebook – what is the

(3)

Provide structure…

Our site needs a major redesign

We need a site for a research project – where do we go?

Where do I get help for SEO?

We need our video to be available in China We need a video for the School web pages

We have a site but we would like it within the CMS We want to promote something through

Facebook – what is the best way to do this? What web address should I use?

(4)

Make it easier for business owners to get meaningful

responses through consistent workflow…

Agree candidates to be put forward as Request for Change / Support and ensure that only relevant and appropriate requests are raised

Submit Request for Change / Support Test & approve changes

Business owners

Change Advisory

Assess change risk Assess change impact

Escalate change request as required Prioritise change request

(5)

Change Sponsor

(Business Unit Manager / BDO)

Change Initiator

(Only approved Change Initiators can initiate a

change) Request a New Site Request a New Site 1 Develop Existing Site or Request for Support Develop Existing Site or Request for Support 2

Through clarifying roles, responsibilities

and processes…

*Non Business as Usual Standard Content Approval Cycle Business as Usual / Standard Change Standard change

(6)

Change Sponsor

(Business Unit Manager / BDO)

Change Initiator

(Only approved Change Initiators can initiate a

change) Request a New Site Request a New Site 1 Develop Existing Site or Request for Support Develop Existing Site or Request for Support 2 Change Category Request logged, analysed & assessed (Minor, Significant, Major) Approved / Rejected Minor Provide more detail: Proposal for development of major redesigns and/or new sites Provide more detail: Proposal for development of major redesigns and/or new sites 3 Change Advisory (Escalated to senior level as required) Major Significant Approved / Rejected High Risk &

High Impact University Digital Board

RFC workflow

overview

RFC workflow

overview

(7)

What might be a typical change

request…

1. Change to an existing core site or request for digital support services.

2. New Core Site - A site built using the standard core University design with a qub.ac.uk URL - e.g. http://www.qub.ac.uk/folder

3. Major redesign A Queen'sbranded website with a qub.ac.uk URL

-e.g. http://www.qub.ac.uk/folder

4. A new non-core Queen's website (incorporating your own logo) with a qub.ac.uk

URL

5. A website for an joint initiative involving external partners where Queen's is the lead partner - this type of website must be Queen's-branded and use a qub.ac.uk URL (e.g. www.qub.ac.uk/folder) or sub-domain (e.g.

(8)

6. A website for a joint initiative involving external partners where all

partners are equal - this type of website can be non-Queen's branded and use a non-Queen's domain (URL).

7. Hosting for a website using technology other than the centrally-managed TerminalFour Site Manager CMS.

8. To migrate an existing website to the centrally-managed TerminalFour Site Manager CMS.

9. Non-core / satellite sites. Note: Business units must work on custom

design solutions only as a last option and where a clear business need has been established.

What might be a typical change

request…

(9)

Change roles & responsibilities…

Change

Sponsor Change Initiator

Change Manager

Change Builder(s) Change

Approver Change Tester

Change Advisory

(10)

Change sponsor…

Change Sponsor

(11)

Change initiators…

Change Initiator

(12)

Change manager…

Change Manager

(13)

Change advisory…

Change Advisory

(14)

Change builder(s)…

Change Builder(s)

(15)

Change tester…

Change Tester

(16)

Change approver…

Change Approver

(17)

Change priority matrix…

Emergency

Needs actioned immediately (emergency change process). Critical business reason for immediate action or issue causing loss of service or severe usability problems to a larger number of Users, a mission-critical system, or some equally serious problem. Immediate action required. Urgent Digital Operations Group Emergency Change Advisory meeting may need to be convened. Resources may need to be allocated immediately to build such authorised changes.

High

Needs actioned within one working week. High priority / strategic business need or issue severely affecting some users, or impacting upon a large number of

users. To be given highest priority for change building, testing and implementation resources. (other than emergency).

Medium

Needs actioned within business requirement, but request . To be allocated medium priority for resources.four working weeks. No severe impact or immediate

Low

Needs actioned by the indicated date. A change is justified and necessary, but can wait until the next scheduled release or upgrade. To be allocated resources accordingly

(18)

Change category matrix…

Change Impact

High Medium Low

Change

Risk

High Major Major Major

Medium Major Significant Significant

References

Related documents

restoration of student grants. Conference welcomes the role of Liberal Democrat MSPs in abolishing the graduate endowment and ensuring that the legal duty on the government to

By and limit the sample letter of request for site uses cookies to date the tenant if the actual inspection on a construction.. Use our inspector cover letter request for site

Purchase Preference to Micro and Small Enterprises (MSEs) for Supply of Goods / Services will be given as per "Public Procurement Policy for Micro & Small Enterprises

Host MCU Application Software LIFT Client LSR Wireless Module Networking Stack LIFT Agent Mobile Device Your Web/ Mobile Apps Your Cloud Server. Your Services Layer LIFT Server

A course delivery schedule has been developed by NSU, along with Dakota State University, to ensure that students have sufficient opportunities to complete the required

South Dakota State University (SDSU) requests authorization to offer the minor in Geography through online delivery. The study of geography is of vital concern to

Change Request Step 0 Submit Change Request Step 1 Initial Approve Change Request Step 2 Process: Enhance Data Part 1 Change Request Step 3 Process: Enhance Data