• No results found

Crister Blixt. Project management: two new implementation projects, four roll-out projects and several smaller logistics projects.

N/A
N/A
Protected

Academic year: 2021

Share "Crister Blixt. Project management: two new implementation projects, four roll-out projects and several smaller logistics projects."

Copied!
7
0
0

Loading.... (view fulltext now)

Full text

(1)

Momsreg: SE556809492301

Consultant Profile

Name: Crister Blixt Company: Caolit AB

Mail: [email protected] Telephone: +46(0)700-917005 Year of birth: 1963

Education: Master of science, industrial

environment, LUTH Luleå Tekniska Universitet

Languages: Swedish (mother tongue), English

Work summary

Twelve years of experience in SAP, ten years as a SAP consultant with focus on warehouse, logistic execution, purchasing, sales and integration with external systems. Worked as a consultant in a wide range of areas, Throughout the years I have gained experience and an understanding of the

magnitude of a “system implementation project” including everything from system setup to

monitoring the economy. Some of my strengths as a consultant are characteristics such as listening, understanding the business as well as the systems, and be able to switch between them, analytical ability and calmness. Branch experience in wholesale, manufacturing, pharmaceutical, chemical and industrial process contributes to my broad experience.

SAP competence

Project management: two new implementation projects, four “roll-out projects” and several smaller logistics projects.

Application consultant: Warehouse management (WM), Logistic execution (LE), Material management (MM), Sales and Distribution (SD), Integration (EDI related to SD, MM, LE, WM, PP), Mobile device warehouse (LE-MOB), Integration with external warehouse system, freight document system and production system (OPC), Authorization, Solution manager, Environment Health and Safety (EH&S)

Experience of projects in the following countries: Sweden, Finland, Norway, Denmark, England, Ireland, Germany, Spain, Portugal, Holland, Belgium, Poland and France.

(2)

Completed SAP projects

Aventis Pharmaceutical

2000 Adjustment and development of MM and SD process.

User education SD and MM.

2001 Upgrade project 4.0B to 4.6C, SD and MM

2002 Authorization.

New purchase process.

Atos Medical Medical devices

2006-2007 Project manager for AiO-implementation.

2007 Roll-out project, QA

2009 – 2010 Roll-out project, Germany, Project manager

Bacou-Dalloz Manufacturing

2001 Euro conversion project, MM 2002 – 2003 Migration project, LSMW

Byggbeslag Wholesaler

2004 New implementation, Warehouse, interfaces to external freight document system

Coca-Cola Manufacturing

2002 Education, update of master data and purchase document

Campbell Soup Manufacturing

2003 WM, SD, LE, MM, Authorization

New implementation, Mobile devices warehouse (LE-MOB).

Campbell Soup Ltd Manufacturing 2004 – 2005 WM, Authorization

(3)

(LE-MOB)

Dafgård AB Manufacturing

2001 Upgrade project 3.1H to 4.6C, WM, MM, QM 2002 Adjustment and development of purchase

process, MM

2003 Pilot study mobile devices warehouse (LE-MOB)

ESMA Wholesaler

2004 New implementation , LE, Interfaces

ESBE AB Manufacturing

2005-2006 New implementation, LE, Interfaces external system, QM, work flow

ESBE GmbH Wholesaler

2006 Roll-out project, Project management and LE Ericsson (EHPT) Telecommunications Industry

2001 Documentations project, MM and HR.

2003 Archive

Emerson AB Manufacturing

2000 Pilot study, WM

GGP AB (Stiga AB) Manufacturing

2000 Adjustment and new implementation of warehouse process, WM.

User education, WM.

Adjustment and development of sales process, SD.

Integration MM-WM Integration PP-WM

(4)

2002 Authorization project

2002 Migration project, roll-out Denmark, LSMW

2003 Warehouse project WM

Mobile devices warehouse (LE-MOB) 2004 Production project, warehouse and product

labeling

2005 Warehouse project, external warehouse Germany

2005 Serial number project

2005 – 2006 Warehouse project, external warehouse Belgium/Trollhättan, Logistics and EDI. 2007 Pilot study, merge project

2008 ASN – project

2008 Test and adjustment, logistic, merge project

Gycom AB Wholesaler

2001 New implementation of 4.6, LE and WM

2001 Roll-out Finland, SD/MM

2002 Roll-out Denmark, SD/MM

2006 Interface to Centiro, LE and EDI Gärdin & Persson Wholesaler

2005 New implementation, Warehouse, Authorization Hilton Food Group AB Manufacturing

2008-2009 Automated warehouse, WM, LE and EDI

Hästens AB Manufacturing

2008 New implementation, Project manager

Octapharma Pharmaceutical

2002 Company split project, SD/MM/Authorization PalmAlmgren Resins AB Manufacturing

(5)

2002 New implementation, EH&S and authorization

Phadia AB Pharmaceutical

2007 Clean-up project (preparation for template project). Project management and logistics 2007 – 2008 Roll-out project, Project management and

logistics

2010 Roll-out project, Spain & Portugal, MM, LE and EDI.

Pharmacia Diagnostics AB Pharmaceutical

2001 Upgrade project to 4.6C, WM

2002 Warehouse project, WM

Salico Manufacturing

2002 New implementation, Authorization 2009 Roll-out project, Öllövgrönt, Project

management

SCA Timber UK Wholesaler

2005 - 2006 New implementation, WM, Mobile devices warehouse (LE-MOB)

Swecoin Manufacturing

2001 New implementation, Authorization VWR (Merck EuroLab /Kebo Lab AB) Wholesaler

2000 Support WM/EH&S/Oracle

2003 Upgrade project 4.0 to 4.6, WM, CS

2004 WM, Mobile devices warehouse (LE-MOB)

Wasabröd AB Manufacturing

2000 Roll-out Holland, SD / MM

(6)

(LE-MOB)

Ziehl-EBM / ebmpapst Wholesaler, Manufacturing

2006 New implementation, 3 countries, LE, Interfaces external system, Product labeling, QM

Former employer

2000/04 – 2010/07 Implema AB, Stockholm Project management,

SAP applications consultant: WM, LE, MM, SD, EDI

1995/01 – 2000/04 VWR / Merck Eurolab / Kebo Lab AB, IT avdelningen, Stockholm.

Internal consultant, SAP, Oracle, Mascot, Cobol , Dangerous goods, Warehouse, Product labeling and catalogue system

1990/08 – 1995/01 Kebo Lab AB, inredningsavdelningen, Stockholm Project manager Project specialist IT responsible Group manager 1989/06 – 1990/07 Maskinteknik, Piteå

Technical conjuncture, AutoCad, Aries

Education

1984/08 – 1989/06 Master of science, industrial environment LUTH Luleå Tekniska Universitet

1983/06 – 1984/08 Military service KA4, Göteborg

1979/08 – 1983/06 4-year technical education, chemistry Kalix/Luleå/Örebro

SAP education

2007 ASAP Focus training

(7)

2005 BIT601 Workflow SAP, Bryssel, Belgium

2002 CA210EDI Interface

SAP , Alvik

2001 CA940 Authorization Concept SAP, Alvik

2001 LO531 WM

SAP, London, England

2001 MY301 Workplace

SAP, London, England

2001 WSED SD Customizing

SAP , Alvik

2000 LO605 Sales

SAP , Alvik

2000 LO610 Delivery process

SAP , Alvik

1998 EH&S Environment health and safety, product safety

Frankfurt, Germany

1998 NAMM2 Material management (Experienced) WM

SAP , Alvik

1998 BC400 ABAP/4 Workbench

SAP , Alvik

1998 BC420 ABAP/4 Data Interfaces SAP , Alvik

1998 BC430 ABAP/4 Dictionary

SAP , Alvik

1997 SAP20 SAP 3/R Overview

SAP , Alvik

Other education

2007/03 – 2007/06 Communication and Leadership Dale Carnegie, Stockholm

2006/08 GMP-education: Validation and computer system

References

Related documents

No seed shall be sold if it carries a transmittable disease. Les normes de pureté pour les principales cultures sont en annexe du présent arrêté. Article 3: Normes de

wrote in Husby (at paras. 1 and other cases have clearly established, is meaningless unless the parties know precisely what aboriginal right or claim is alleged to be infringed

The certificates are categorized as follows: (Amended 7/01/12) Group 1- allows an individual to conduct safety, diesel emissions, OBD II inspections, and low enhanced

The Dräger PentAir uses the Dräger Panorama Nova mask that features the triple seal- ing edge that provides three-sizes-in-one mask and also offers the versatility of using the

With a global sales and service network in more than 40 countries, AVEVA is a leader in engineering design and information management solutions for the plant, power and

• Determination of selling price- cost accounting provides detailed information about the composition of total cost for determining action of the selling price of

Deacon  Let us confess our sins against God and our neighbors.    Please stand or kneel as able 

We have audited the accompanying financial statements of the United Water Conservation District (the District) which comprise the statement of net position as of June 30,