COMMISSIONING MEETING – JULY 2008 - W5

PS/SPD STATUS

Outline/List of activities: Outline/List of activities:

9 Solve configuration problems of SPDCB in crate 6 (again TRIGPGA blocked). The only problem of configuration I saw in the week.

9 Record about 120 k cosmics events. One lesson from the previous week is that if we want (and we do !) to get a large number of cosmics, we have to record them

ourselves outside the global activity ourselves, outside the global activity. 15 Hz. Quite pure.

Runs 2764§ (18k) and 26647 (108k).

9 PRS HV at some point of the calibration runs dropped from 750 V to 400 V (3 boards out of 5).

SPD HV were stable (around 600 V).

Overcurrent Channel 7 of PRS: overcurrent is seen also when there is no HV Overcurrent Channel 7 of PRS: overcurrent is seen also when there is no HV.

(2)

COMMISSIONING MEETING – JULY 2008 - W5

PS/SPD STATUS

9 P d t l i lib ti i l It h d th t LEDTSB C id

9 Pedestal runs: are using calibration signals. It happened that LEDTSB C-side was configured (independantly of my wishes) to deliver signal to LEDs. They actually gave light saturating the electronics (HV = 750 V).

9 Three messages:

9 We’d like the LEDTSB configured on demand and not spontaneously.

9 Is LEDTSB A-side cabled ?

9 I t d t f f A i th t th d

9 I computed a mean current of few nA in the worst case so the concern expressed in my related e-mail does not stand anymore.

9 Side observations:Side observations:

9 Very uniform response of the PRS

9 SPD has holes most likely related to the internal time-alignment (Carlos shall send to me in the next days the results of his calculations.)

(3)

COMMISSIONING MEETING – JULY 2008 - W5

PS/SPD STATUS

9 Trigger Path:

9 Trigger Path:

9 We recorded runs w/ SPD multiplicity larger than 5 as unique trigger. We saw fantastic tracks in SPD and PRS with a rate of few per ten minutes as well as showers (the main part of the statistics).

9 We did our best to get ready w/ PRS TRIGPGA configuration on A-side before Patrick’s vacations Was achieved on Friday’s morning Too late Yet we are ready Patrick s vacations. Was achieved on Friday s morning. Too late. Yet, we are ready to perform the commissioning of the SPD/PRS trigger path in the beginning of August.

(4)

COMMISSIONING MEETING – JULY 2008 – W5

TRIGGER : A-side is fully configured !!

•Updating ECAL input phase values has required to test cable one by one : long process

•Updating ECAL input phase values has required to test cable one by one : long process

24 February 2008 status

BCID values not taken into account

22 July 2008 status

BCID values taken into account Final DAQ configuration

PRS4 Final DAQ configuration

Problem : Problem :

FEB12 @ PRS5 has no allowed phase range for ECAL i t ( t b d

S.Monteil PS/SPD COMMISSIONING 4

PRS4

ECAL inputs (not observed on February 2008)

(5)

COMMISSIONING MEETING – JULY 2008 – W5

TRIGGER : A-side is fully configured !!

• Internal PRS alignment is OK : gain of the foreseen 4 clock cycles

• ECAL latencies are set (according to previous measures)

Æ

All settings are determined for A-side and propagated to PVSS

Æ

All settings are determined for A side and propagated to PVSS

configuration

Next : Next :

• Do the same for C-side ⇒ Access to ECAL&PRS C-side required.

• Confirm the previous ECAL-PRS & PRS-TVB latency measures (a difference of one clock cycle is possible due to input phase value)

S.Monteil PS/SPD COMMISSIONING 5

(6)

COMMISSIONING MEETING – JULY 2008 - W5

PS/SPD STATUS

9 Trigger Path: BCN analysis

(7)

COMMISSIONING MEETING – JULY 2008 - W5

PS/SPD STATUS

9 PRS Cooling:

Don’t know whether it’s significant or not: temperature increases when moving from the Don t know whether it s significant or not: temperature increases when moving from the beginning to the end of the cooling system. First box is < 23 °C.Last is <28°C. Last

report was temperature less than 25 °C everywhere.

(8)

COMMISSIONING MEETING – JULY 2008 - W5

PS/SPD STATUS

9 Pedestal corrections:

1) Stable all along the week.

2) Some cables replugged on PRS_3. Corrections measured. OK. 3) 2 new channels w/ a pedestal larger than 255 (A-side).

4) PSFEB07 i PRS 0 h i d d t l i ti 4) PSFEB07 in PRS_0 shows a weird pedestal variation. 5) Currently corrected <PRS_ADC>=0.

(9)

COMMISSIONING MEETING – JULY 2008 - W5

PS/SPD STATUS

9 Pedestal corrections:

1) 2 new channels w/ a pedestal larger than 255 (A-side).

In total [Feb,Ch]: [23,28], [53,24], [76,11],[82,45],[92,10]

S.Monteil PS/SPD COMMISSIONING 9

[

,

] [

,

], [

,

], [

,

],[

,

],[

,

]

(10)

COMMISSIONING MEETING – JULY 2008 - W5

PS/SPD STATUS

9 Pedestal corrections:

4) PSFEB07 (1/2) in PRS_0 shows a weird pedestal variation. Pedestal corrections such that <PRS> is around 15.

(11)

COMMISSIONING MEETING – JULY 2008 - W5

PS/SPD STATUS

9 Pedestal corrections:

4) PSFEB07 (1/2) in PRS_0 shows a weird pedestal variation.

weird

OK

weird

(12)

COMMISSIONING MEETING – JULY 2008 - W5

PS/SPD STATUS

9 Plans for the week:

9 Smooth restart of the system.

9 Understand/fix the current problems.

9 Include SPD time alignment corrections.

9 Refine trigger path for next week commissioning : GET OUT PRS AND ECAL EACH TIME IT IS POSSIBLE.

9 Record large cosmics statistics

9 Record large cosmics statistics.

9 Few improvements of PRS PVSS project.

References

Related documents

program  that  covered  the  risks  associated  with  the  use  of  PSDs.  The  ANAO  found  that  ITSA  and  Australian  Hearing  could  improve  their  approach 

Three groups of explanatory factors were explored for the structural value-added and output growth of BS industry compared to the rest of the market sector: (i) different growth

To address this gap, the present study has examined what affects the economic performance of recent immigrants in Atlantic Canada and traditional destinations,

FIGURE 42: ANIMATION STUDIOS IN KOREA BASED ON CAPABILITIES FIGURE 43: ANIMATION STUDIOS IN KOREA BASED ON APPLICATIONS FIGURE 44: PEOPLE EMPLOYED IN THE KOREAN ANIMATION INDUSTRY

July 2010       The Value of Retail Search and Position  Implications &amp; Recommendations for Marketers 

Conversion to Surface Water Continues While the West Harris County Regional Water Authority continues pushing pipeline west to more new water districts, equally important work goes

Upon successful completion of the training, the graduate will be able to identify and understand drug nomenclature, dosage forms, routes of administration,

This paper is an introduction to frame the conversation about the “new” personalization – and how delivering content as a contextualized, and personalized platform is really a