• No results found

CEINSA - Construction Company

N/A
N/A
Protected

Academic year: 2021

Share "CEINSA - Construction Company"

Copied!
42
0
0

Loading.... (view fulltext now)

Full text

(1)

CEINSA - Construction Company

ASSAD DESARROLLO Engineering Company . Valencia. Spain -CEINSA Construction Company Madrid. Spain . . .

ASSAD DESARROLLO

Engineering Company

(2)

CEINSA - Construction Company

ASSAD DESARROLLO Ingineering Company . Valencia. Spain

-CEINSA

Construction Company

Spain

ASSAD DESARROLLO

Engineering Company

(3)

• CEINSA is a constructor company active in all areas of construction, including roads and expressways, airports, external works, waterworks and environmental projects, industrial, residential and non-residential buildings, rehabilitation, and infrastructure conservation and maintenance

• Management and construction process innovation makes CEINSA more competitive by the day. The use of new technologies enables the company to plan its resources more efficiently, while its ERP system furnishes detailed and up-to-the-minute information on the state of its works.

• CEINSA collaborates with public and private research and development bodies, such as the University of Zaragoza, the Polytechnic University of Madrid and the Spanish Institute for Energy Savings and Diversification. It contributes to the development of new methods and technologies for project roll-out, not only to lower environmental impact, but also to improve works quality and safety

• CEINSA is committed to protecting the environment and to ensuring safety and quality while meeting its clients’ needs and contributing to social development.

• Efficient management throughout the life of the company has borne fruit in terms of profitability and growth. Its consistently sound financial situation is the result of a policy of profit reinvestment and technical and human resource optimization to reach its quality, safety and environmental objectives and meet the cost targets and deadlines of the works conducted

(4)

• Assad is an engineering company specializing in aeronautical projects. • Services:

• Project , calculate and design of all type of aviation and airport facilities field

• Consultancy, advising and technical assistance in definition for aeronautical services such as maintenance hangars, freight terminals, runways, operation ramps, etc

• Advising for tenders • Projects and briefs writing

• Project Management and on-site technical assistance

• Purchasing/Procurement advising, aeronautic equipment and services update • Training for facilities users

• Assad advises and works with public authorities, airport authorities, airlines and research centers

• Assad collaborates with Engineering University of Valencia in concrete pathologies study, bridges plastic deformation , rehabilitation of stone structures, software for cost control construction.

• Assad collaborates with Aeronautical Engineering University of Madrid in temperature and climate control of large hangars study.

• Assad has worked in more of fifteen countries and designed more of twenty hangars.

(5)

ESPAÑA

28046 Madrid

PERÚ PANAMÁ GHANA

NIGERIA GABÓN ANGOLA

(6)

PROJECTS

AND

TECHNICAL ASSISTANCE

(7)

• Projects design according to international standards both for construction and services .

• Materials and elements used in airport facilities have been manufactured and supplied by worlwide specialized companies.

• Capacity to undertake projects for any type of aircraft (A380) .

• High energetic efficiency projects .

• Design of any required facility for manteinance needs, painting, aircrafts storage etc.

• Aesthetic and technical design solutions fitted to the works to be carried out in the premises .

• Iconic designs and corporative image

Our engineering team is ready to undertake the design of the hangar, maintenance operation, management and supply of building materials

and specific aircraft.

All designed with the latest aviation technology and environmental

Definition Project

Drafting Project Construction Management and Advice

Commissioning Operation We form the use of the facility Training Maintenance Technicians Advice Continuous Maintenance

(8)

HANGAR

Industrial

Development

Increase

Security

Development Airport Traffic Increased use of aeroplane

Mayor

Technology

maintenance

(9)

SOME AERONAUTICAL

PROJECTS

(10)

BIG HANGAR FOR IBERIA DESARROLLO BARCELONA – 17.194 m2

H6 H6 H6 H6

V1

MAINTENANCE HANGAR FOR IBERIA DESARROLLO BARCELONA. This structure has a 155 meter span. Hung from the structure there are going to be four overhead travelling platforms.

IBERIA DESARROLLO BARCELONA is the owner, and it's a society formed by IBERIA and EL CONSORCI DE LA ZONA FRANCA.

(11)
(12)
(13)
(14)

3 B-757

2 A-340 4 A-321

MAINTENANCE POSITIONS

(15)

AIR NOSTRUM - VALENCIA – 10.450 m2

AINTENANCE HANGAR FOR AIR-NOSTRUM.VALENCIA. A single central pillar at the air side that separates two spans of 65 meters each. The roof supporting structure allows an open place inside. Hung from the structure there are two overhead travelling cranes of 3 and 5 Tn. On the pictures the importance of the space truss can be noticed, a structure where the loads distribution can be seen clearly.

(16)

ALZADO PRINCIPAL- Zona Aire A-321 Oficinas y Talleres Oficinas y Talleres Tractor Paso Vehículo PLANTA General Zona Aire

Zona Aire Zona Aire Oficinas y Talleres

PLANTA DE CUBIERTA AMPLIACIÓN HANGAR Superficie: 2.425,92 m2 Superficie: 306,43 m x2 h2 PAINTED HANGAR – DESIGN

(17)

PAINTED HANGAR – DESIGN

(18)

HANGAR-HELIPORT IURRETA- ASTECA. BISCAY

(19)

HELIPORT OVER HOSPITAL- ASTECA

HELIPORT OVER HOSPITAL IN PUERTOLLANO. CIUDAD REAL. For the calculation of this structure more than 1300 hypotheses were considered. The space truss is prepared to support a fibroplastic floor. The combination os space truss plus fibroplastic floor is very suitable for the construction of heliports.

(20)

PAINTED HANGAR – DESIGN

HELIPORTS

(21)

AEROPUERTO DE ALICANTE. AENA

(22)

AEROPUERTO DE ALICANTE. AENA Initial State Final State Initial State Final State

(23)

FINGER TO THE RUNWAY AT IBIZA AIRPORT. This structure has a span that allows traffic beneath it

FINGER TO THE RUNWAY AT IBIZA AIRPORT-ASTECA

CONECTION BETWEEN TERMINALS AT BARAJAS AIRPORT-ASTECA

(24)
(25)

PHASE I - Development

AIRCRAFT MANTENANCE HANGAR BAHRAIN INTERNATIONAL AIRPORT

March 2011 N/E 4 by Meinhard c

(26)
(27)

(3) B-747(400) MAC-AVIATION 9567.600 m² 2.959,40 m² Oficinas y Talleres Planta Baja 1.735,88 m² Oficinas Planta Primera

(28)

4 A-321

(29)

ALZADO PERFIL SOLUCIÓN 3 ALZADO PERFIL ALZADO PERFIL SOLUCIÓN 1 SOLUCIÓN 2

(30)
(31)
(32)

ENVIRONMENTAL ADVANCES

ENERGY EFFICIENCY STUDY

ENVIRONMENTAL IMPACT STUDY

(33)

ENVIRONMENTAL ADVANCES

ENERGY EFFICIENCY STUDY

ENVIRONMENTAL IMPACT STUDY

(34)
(35)
(36)
(37)

VARIANTE DE ALCAÑIZ (TERUEL).

MINISTERIO FOMENTO AUTOVÍA (HUESCA). MINISTERIO FOMENTO ACCESOS A LA PRESA SERENA (BADAJOZ). CONF.HIDR.GUADIANA

PUENTE CASTRELO DO MIÑO (ORENSE).

XUNTA DE GALICIA

OBRAS DE AUTOVÍA MUEDAJAR (HUESCA). MINISTERIO

(38)

TÚNEL NUENO (HUESCA). MINISTERIO FOMENTO OBRAS PUERTO DE CASTELLÓN. EL GRAO (CASTELLÓN). INFINITA RENOVABLES

AZUD DE XERTA (TARRAGONA)

(39)
(40)

Conditioning accesses urban development in “L'Omet”

Picassent. Property : city council

INDUSTRIAL BUILDING OF PRESSES AND STORAGE OF SOLID URBAN RESIDUES. SEGORBE– CASTELLON-VAERSA

Development Project of the office of environmental

information in segorbe vaersa, province of Castellón.

INDUSTRIAL BUILDING OF PLANT OF BIOMETHANISATION OF SOLID URBAN RESIDUES.

1. Afino de talud 2. Colocación de láminas 3. Protección de láminas con tierra 4. Protección de láminas con sacos de terreros

SECUENCIA DE MONTAJE 5. Ejecución de escollera 6. Ejecución de escollera 7. Solape y soldadura de lámina superior 8. Fijación provisional

(41)

LOADING DOCKS FOR THE TIE OF SUBMARINES

INFRASTRUCTURE AND EQUIPMENT

GAS STATIONS- Design

Rehabilitation of the Blast furnace of smelting in Sagunto (Castellón) INDUSTRIAL BAYS

(42)

CEINSA - Construction Company

ASSAD DESARROLLO Ingineering Company

CEINSA

Construction Company

Spain

ASSAD DESARROLLO

Engineering Company

References

Related documents

Use of this author accepted version is subject to the terms and conditions described by the publisher in the LNCS "Consent to Publish" agreement ( https://bit.ly/2MYcrvb

Increasing telephone line capacity and replacing obsolete switching machines under the project, however, greatly contributed to meeting this demand and to improving the quality

Failure to keep boiler area clear and free of combustible materials, gasoline and other flammable liquids and vapors can result in severe personal injury, death or substantial

To this end, and informed by the oeuvre of Arlie Russell Hochschild, which principally includes her seminal piece Emotion Work, Feeling Rules, and Social Structure (1979), and

A natural history study of adolescents and young adults with sickle cell disease as they transfer to adult care: A need for case management services. Factors influencing

ICRA maintains its outlook on the domestic 2W industry with volumes estimated to grow by 8-9% in 2014-15 driven by increasing penetration of scooters even as the larger segment

Moving Forward: The Campaign for Austin PBS is an ambitious and transformational effort to create a new generation of public media with greater community impact.. At the center

ALABAMA A&M AND AUBURN UNIVERSITIES www.aces.edu ANR-1444 Control of Chorioptic Mange Mites on Horses, Donkeys, and Mules S everal types of mange. Chenguo Swot Analysis Of