Overhead line
Design and Research of Overhead Line Fault Monitoring System for Medium Voltage Distribution Network Based on LoRa and NB IoT
6
The Study of Overhead Line Fault Probability Model Based on Fuzzy Theory
5
PHYSICO-TECHNOLOGICAL ASPECTS OF WORK OF LUBRICANT FILMS IN THE TRIBOSYSTEM "OVERHEAD LINE – CURRENT COLLECTOR CONTACT STRIP"
9
Improvement of the sag ampacity carrying level of existing 275 KV overhead line tower by using the re conductoring approach
6
Time-Domain Analysis of Overhead Line in Presence of Stratified Earth
12
Effect Of The Finite Ground Conductivity On The Lightning-Induced Voltage On Overhead Line
5
Power transfer capacity improvements of existing overhead line systems
5
A modelling approach for railway overhead line equipment asset management
22
PHYSICO-TECHNOLOGICAL ASPECTS OF WORK OF LUBRICANT FILMS IN THE TRIBOSYSTEM "OVERHEAD LINE – CURRENT COLLECTOR CONTACT STRIP"
9
Validation of a new model for railway overhead line dynamics
21
Field Problems of Distance Relays with Combined Single/Double Circuit Transmission Lines
6
Fe Coefficient – Development and Application of a Key Figure for Assessing the Efficiency of Alternative Drive Concepts in Trucks
8
European Regional Development Fund UK Regional Development Programme 1986 90 Section 7E: England — South Yorkshire; Section 7F: England — Workington; Section 7G: England — Greater Manchester; Section 7H: England — Greater Merseyside
268
Numerical Evaluation of the Magnetic Field Exposure Near the Transition Tower of an Overhead-Underground Hv Line
15
A Step towards the Detection of Semantic Variants of Terms in Technical Documents
7
Investigating the Impacts of Meteorological Parameters on Electromagnetic Environment of Overhead Transmission Line
9
Investigation Magnetic Field Radiated By 132 kV Overhead Transmission Line
24
SYMMETRICAL FAULT LOCATION IN OVERHEAD TRANSMISSION LINE BASED ON NEURAL COMPUTATION WITHOUT USING LINE PARAMETER.
12
ESTIMATION OF VERY FAST TRANSIENT OVER VOLTAGES ON BUSHING CONNECTED IN GIS
16
A Comparison Between Carson's Formulae and a 2D FEM Approach for the Evaluation of AC Interference Caused by Overhead Power Lines on Buried Metallic Pipelines
10