time overrun
Application of Agile Project Management to Reduce the Time Overrun In the Construction of Infrastructure Project
5
Time overrun in construction projects from the perspective of Project Management Consultant (PMC)
13
Analysis of Factors Influencing Time Overrun in Build Operate Transfer Infrastructure Projects: A Case Study on BOT Road Project in Maharashtra
7
“REDUCING THE IMPACT OF TIME OVERRUN IN ROAD CONSTRUCTION PROJECTS IN ETHIOPIA”
51
Analysis of construction cost and time overrun factors for high rise buildings
5
COST AND TIME OVERRUN IN BUILDING PROJECTS: PROFESSIONAL ATTITUDE AND INCIDENCE RATE IN PRACTICE
8
Modelling the Effect of Time Overrun and Inflation Rate on Completion Cost of Construction Projects in Nigeria
11
Impact of Cost and Time Overrun on Building Construction Projects
6
Alleviating Time Overrun with the Implementation of Critical Chain Project Management in Construction Industry
6
Time Overrun in Transportation Project A Case Study of Mumbai Monorail
10
Assessing the Effects of Construction Delays on MARA Large Projects
6
SYNERGIC IMPACT ON SLIPPAGE, COST AND TIME IN CONSTRUCTION PROJECT
13
IJCSMC, Vol. 7, Issue. 3, March 2018, pg.33 – 42 A SURVEY ON ASSESSMENT OF TIME AND COST OVERRUN OF INDIAN NATIONAL HIGHWAYS PROJECT
10
Risk assessment of time and cost overrun factors throughout construction project lifecycle
47
Web based risk assessment technique for time and cost overrun (WRATTCO) – a framework
7
Improvement of relationship between main contractor and subcontractor for successful construction project implementation
44
Perception Of Non Performing Assets (NPAS) In State Bank Of India
7
Risk Management in BOT PNG Toll Plaza
6
Time and cost performance of construction projects in Southern and Central Regions of Peninsular Malaysia
6
Relevancy of factors and mitigation measures in controlling time and cost overrun towards Malaysian Environment
6