Bug Tracking and Design Release Bug detection was a key status indicator through­

In document dtj v04 03 1992 pdf (Page 46-48)

out the J\1VAX logical verification effort and thus helped to steer the team's work. Hugs were tracked carefu lly with an on-line system and ana lyzed each week to consider trends, successfu l and unsuccess­ ful bug-findi ng techniques, and bug hot spots, which requi red additional attention. The bug detec­ tion rate was fairly constant throughout the project at abou t 22 per month, with the excep tion of the last month in which the rate dropped to nearly zero. An analysis of the bug-detecting effectiveness of each testing tech nique shows that all test tech­ niques were effective and seemed to complement each other. Table 1 shows the percentage of bugs detected by each technique. This table includes data on the ever-valuable, nonsim ulation verifica­ tion tec hnique of simply reviewing, inspecting, and discussing the design and its many representations. The decision to release the design for fabrication of first-pass chips was a consensus decision made by the verification, archi tecture, and design teams. From a verification perspective, the design was ready for release when the bug detection rate remained at zero for several weeks and the majority of the planned tests had been i mplemented . The verification of some areas of the design was defe rred until after the release of the first-pass design . The development team decided that any bugs that m ight be founcl in these areas wo uld not h ave a significant negative impact on the system develop ment schedule, whereas additio nal delay in releasing the design wou ld.

Ta ble 1 Bug Detection Using Va rious Techn iques

Percent of

Techn ique Total Bugs Found

Focused tests 28

Directed, pseudorandom

exercisers 23

Review, i nspection,

observation, thought 20

Detection technique unknown 1 2

AXE 8

MAX 6

HCORE 2

Other

Results and Conclusions

Only 15 logical bugs were fo und i n the first- pass NVAX CPU chip design, a ll of which were either eas­ i ly worked aroun d or did not impact normal system operation . The n an1re of the bugs fo u nd in the first­ pass design ranged from stra igh tforward bugs that escaped detection tor clear-cut reasons to extremely complex bugs that required h o u rs or weeks of rig­ ormJs prototype system test ing to u ncover. Some of the bugs escaped detection during s i m u l ated verifi­ cation for cl assic reasons such as:

• Tes t i ng of the function was pe rformed just before release, in a hurried man ner.

• Sim u l ation performance proh i b ited r u n n i ng a cert a i n type of test case.

• A test was n o t run i n a certa i n mode due to the difficu l ty of running it i n all possible modes.

• It took an exerciser r u n n i ng on a simu l ator a

long time to encou n ter the conditions that wou ld evoke the bug.

• A test was i nadvert e ntl y dropped from the set of exercisers that were run contin uously

Det a i l s abou t five of the more i nterest i ng hugs fou nd in the first -pass design fol low. Included is i n fo rmation about how the hug was detected, a hypothesis on why the bug e luded detection before first-pass c h ips were fabricated , and les­ sons lea rned from the detection and e l i m i n ation of the bug.

Digital Tecbuica/ journal liJI. ·I .Vo ..i S111nml!r l')')l

Logical Veri(ica tiun of the NVAX CPU Ch ip /Jeslj{ll

1 . One simple bug was detected by r u n n i ng the HCORE test su ite o n the pro totYpe system with the floati ng-point unit ( F- box) ll isable d . This bug could have been fo u nd i n the same way through simu latio n , but the test suite was n o t run as a fin a l regression test w i th the F-box d isabled . I n ge nera l , focused tests l i ke

HCORE

were n o t run wit h varied chip/system configu rati ons. The ver­ ification team concl uded that a l l foc used tests sho u ld be r u n with d ifferent chip/system con fig­ u rat i o ns. At the m i n i m u m , a configuration that disables all possible fu nctions s hou ld be H::sted.

2. Another hug was discovered because the Cl' l l

c h i p generated spurious writes to memory in the protot ype system. The exercisers prolx1bly did generate the conditions necessary to evoke thi s bug; however, the spurious wri tes wen t un no­ ticed . It is extremely diffi cult to verify that a machine does everyt h i ng i t is supposed to do and noth ing more. Ad ditional assertion checkers or m o n i tors in t h e models might detect such bugs in the fu t ure.

3. A third bug was evoked when a prototype system exerciser executed a translation bu ffer inva l idate a l l ( TBIA) i nstruct i o n u nder certa i n con d i t i o ns. On a rea l system, the TBI A instruc­ tion is used o n ly by the operating system. I n our verificat ion effort, the TIIIA instruction was l i ttle used by the exercisers that were simu lated. Operations that are performed o n ly by the oper­ ating system should not be underem phasized in exercisers.

4. One first -pass bug was related to the halt in ter­

rupt, which i s used o n l y d u ring debugging oper­ ations. The h a l t i nterrupt receivecl m i n i m a l testing a n d was not tested a t a l l i n a n y t y p e of exerciser. Discovering this bug was especia l l y ann oying beca use a similar bug h a d escaped detection by t he i nitial logical verification effort

fo r a previous VAX i m rlementation. This turn of

events reinforces the be.l ief th at there is va l u e i n reviewing t h e escaped b u g l ists from other proj­ ects. Also, dur i ng the veri ficat i o n effort, there

seemed to be a natural, but erro neous, tendency

to u mlertest fu n ctions used i n frequent l y or not at a l l during normal system operation. Such fu nctions sometimes require extra ::tttent i o n , because they may b e qu ite complex a n d may have been given less carefu l thought d ur ing the design process.

NVAX-rnicroprocessor VAX Systems

5. A state bit that needed to be i ni t ia l ized on power­ up was not. This problem was not iced during i n i t ia l ization simu lation but erroneously ratio­ nalized as being acceptable. Design assu mptions and assertions about i n itial ization should be ver­ ified through simu lation or other means.

Overa l l , the 1\f\/AX Cl'll chip logical verification effort was a su ccess. The pseudorandom testing strategy detected several complex and subtle logi­ cal bugs that otherwise probably wou ld not have been detected by simu lation. The extensive simula­ tion performed on the schematics-derive(! model of the chip prov ided a h igh degree of confidence in the design .

The goals of producing h igh ly functional first­ pass chips and bug-free, second-pass chips were both met. Neither the bugs in first-pass chips nor their work-arounds impeded prototype system debugging in any sign i ficant way. and first-pass chips with work-a rounds were used in prepro­ d uction, field-test systems. The verification team corrected the 15 first-pass design bugs fo r second­ pass chips, which were shipped to customers i n revenue-producing systems.

Acknowledgments

The NVAX logical verificati o n effort was performed by a team of engineers from the SEG microproces­ sor verificati o n group . Members of this tea m included Wa l ker Anderson, Rick Calcagn i , Sanjay Chopra, and Joh n St. Laurent. 1\f\/A.,.'( archi tects M i ke Uhler and Debra Bernstein provided extensive tech­ n ical d irec t ion and assistance to the verification rea m . The SEG

CAD

group helped by i ts cont inual

46

development and support of too ls. 'l'he CHA GO simu lator wou l d not have been possible without the significant co ntribu ti o ns of Kev i n Lack l . Will Sherwood provided h igh-qua l itv, top- level gu id­ ance th rough a l l phases of the project. 'fhe system development groups performed system - level simu­ lations and rigorous p rototype test i ng. The VAX

Arch itecture G ro u p A..'<:E/�LAX team, once again, prov ided a nd supported a n effect ive verification tool. Lastly, the success of the project and the final qual i ty of the NVAX chip l ogical design are as much a tribute to the work of the '\f\IAX arch i tecture a nd design teams as they are to the work of the verifica­ tion team.