• No results found

Program Manager Combat Support Systems. Mr. Jack Cave

N/A
N/A
Protected

Academic year: 2021

Share "Program Manager Combat Support Systems. Mr. Jack Cave"

Copied!
23
0
0

Loading.... (view fulltext now)

Full text

(1)

1

Planning Brief to Industry 2015

DISTRIBUTION A. Approved for public release: distribution unlimited.

1

Program Manager

Combat Support Systems

22 SEPTEMBER 2015

(2)

2

DISTRIBUTION A. Approved for public release: distribution unlimited.

2

DISTRIBUTION A. Approved for public release: distribution unlimited.

Staff

PEO Land Systems

PM Medium & Heavy

Tactical Vehicles PM Mine Resistant Ambush Protected

MARCORSYSCOM

PM Enterprise IT Services PM GCSS PM Naval Enterprise Networks

JPM Protection

Staff

- PdM Combat Support Equipment - PdM Engineer Systems

- PdM Expeditionary Power Systems

- PdM Test, Measurement and Diagnostics Equipment - PdM Unmanned Ground System (joint with Army)

PM

Advanced Amphibious Assault

PM Air Command Control

and Sensor Netting

PM

Ground Air Task Oriented Radar / Ground Based Air Def

PM Towed Artillery Systems PM Light Tactical Vehicles

PEO EIS

PMM 116 Ammunition PMM 118 Training Systems PMM 117 Light Armored Vehicles

PMM 113 Infantry Weapons

PMM 111 MAGTF C3

PMM 110 Information Systems and Infrastructure PMM 112 Marine Intelligence PM 114 Armor & Fire Support

PMM 115 Combat Support

Systems Assistant Commander Contracts Assistant Commander Programs Assistant Commander Acquisition Logistics &

Product Support

Commanding Officer MCTSSA Camp Pendleton, CA

Deputy Commander SIAT Deputy Commander Resource Management

(3)

3

Planning Brief to Industry 2015

DISTRIBUTION A. Approved for public release: distribution unlimited.

Program Manager

Mr. Jack Cave

Deputy Program Manager

Mrs. Deborah Olsen

Operations Manager

Mr. Michael LeMorta

Product Managers

PdM Combat Support Equipment

Mr. Tim McLaughlin

PdM Engineer Systems

Mr. Joseph Klocek

PdM Expeditionary Power Systems

Mr. Warren Clare

PdM Test Measurement & Diagnostics Equipment

Mr. Edgar Howell

PdM Unmanned Ground Systems (Joint w/ Army)

Mr. Lou Anulare

Assistant Program Managers

Business Manager

Mr. Michael Gallagher

Life Cycle Logistics

Mrs. Kathy Embrey

Contracts Management

Ms. Dorinne Rivoal

Financial Management

Mrs. Diana Wyatt

Engineering

Mr. Brad Cobb

(4)

4

DISTRIBUTION A. Approved for public release: distribution unlimited.

4

DISTRIBUTION A. Approved for public release: distribution unlimited.

($M)

FY16

FY17

FY18

FY19

FY20

FY21

Engineer Systems – RDT&E

$00.6

$00.6

$00.5

$00.5

$00.5

$00.5

Engineer Systems – PMC

$17.7

$29.4

$37.0

$38.5

$39.7

$40.5

Combat Support Equip – RDT&E

$02.9

$01.8

$01.7

$02.2

$01.9

$01.9

Combat Support Equip – PMC

$01.0

$08.0

$01.3

$01.4

$01.4

$01.4

TMDE – RDT&E

$01.2

$01.1

$01.0

$00.9

$00.9

$00.9

TMDE – PMC

$21.6

$17.0

$15.8

$17.3

$13.1

$13.4

Expeditionary Power – RDT&E

$09.2

$07.3

$02.5

$04.0

$04.1

$04.1

Expeditionary Power – PMC

$11.9

$20.1

$14.8

$36.2

$32.1

$32.7

PM Combat Support Systems

(5)

5

Planning Brief to Industry 2015

DISTRIBUTION A. Approved for public release: distribution unlimited.

Product Manager

Combat Support Equipment

(6)

6

DISTRIBUTION A. Approved for public release: distribution unlimited.

Combat Support Equipment Portfolio:

• Family of Rigid & Soft Walled Shelters

• Family of Field Medical Equipment

• Family of Combat Feeding Systems

• Family of Cargo Containers

(7)

7

Planning Brief to Industry 2015

DISTRIBUTION A. Approved for public release: distribution unlimited.

7

Planning Brief to Industry 2015

DISTRIBUTION A. Approved for public release: distribution unlimited.

Production & Deployment Engineering Manufacturing

& Development Technology Maturation

& Risk Reduction

2018

2019

2020

2016

2017

Combat Support Equipment Business Opportunities

Dental Sterilizer

Blood-borne Pathogen Test Kit

(8)

8

DISTRIBUTION A. Approved for public release: distribution unlimited.

Title

Funding

Planned RFP

Blood-borne Pathogen Test Kit (BPTK)

RDT&E

3Q FY16

Dental Sterilizer

O&M

3Q FY18

(9)

9

Planning Brief to Industry 2015

DISTRIBUTION A. Approved for public release: distribution unlimited.

Product Manager

Engineer Systems

(10)

10

DISTRIBUTION A. Approved for public release: distribution unlimited.

Engineer Systems Portfolio:

Family of Route Reconnaissance & Clearance

Family of Explosive Ordnance Disposal

Family of Bridging Equipment

Family of Mine Clearance Equipment

Family of Material Handling Equipment

Family of Construction Equipment

(11)

11

Planning Brief to Industry 2015

DISTRIBUTION A. Approved for public release: distribution unlimited.

11

Planning Brief to Industry 2015

DISTRIBUTION A. Approved for public release: distribution unlimited.

Production & Deployment Engineering Manufacturing & Development Technology Maturation & Risk Reduction

2018

2019

2020

2016

2017

Engineer Systems Business Opportunities

Airfield Damage Repair Kit

TRAM: TRACTOR, RUBBER-TIRED, ARTICULATED STEERING, MULTI-PURPOSE EOD: Explosive Ordnance Disposal SLEP: Service Life Extension Program

TRAM SLEP

Rough Terrain Cargo Handler SLEP

Expeditionary Matting System

Vibratory Compactor Replacement

Medium Crawler Tractor SLEP

EOD Tool Kit Replacement

(12)

12

DISTRIBUTION A. Approved for public release: distribution unlimited.

Title

Funding

Planned RFP

TRAM SLEP

PMC

2Q FY16

Expeditionary Matting System

PMC

2Q FY16

Airfield Damage Repair Kit

PMC

3Q FY16

Rough Terrain Cargo Handler SLEP

PMC

2Q FY17

Vibratory Compactor

PMC

2Q FY17

EOD Tool Kit Replacement

PMC

3Q FY17

Medium Crawler Tractor SLEP

PMC

2Q FY18

(13)

13

Planning Brief to Industry 2015

DISTRIBUTION A. Approved for public release: distribution unlimited.

Product Manager

Expeditionary Power Systems

(14)

14

DISTRIBUTION A. Approved for public release: distribution unlimited.

Expeditionary Power Systems Portfolio:

Family of Mobile Electric Power Generation

Family of Environmental Control Equipment

Family of Advanced Power Sources

Family of Battery Management Systems

Family of Bulk Fuel Systems

(15)

15

Planning Brief to Industry 2015

DISTRIBUTION A. Approved for public release: distribution unlimited.

15

Production & Deployment Engineering Manufacturing & Development Technology Development

2020

2021

2015

2016

2017

2018

2019

AMMPS – Advanced Medium Mobile Power Sources

STEP – Small Tactical Electrical Power

LAMPS – Large Advanced Mobile Power Sources

AMMPS

2022

Micro Grid

Grid Storage

Intelligent Power Management

Autostart Upgrade

Individual Water Purification

Platoon Water Purification

LAMPS

(16)

16

DISTRIBUTION A. Approved for public release: distribution unlimited.

16

SPACES – Solar Power Adaptor for Communications Equipment System (30 Watt continuous) MHEES – Medium Hybrid Expeditionary Energy System GREENS – Ground Renewable Expeditionary Energy Network System (300 Watt continuous) MEHPS – Mobile Electric hybrid Power System

Production & Deployment Engineering Manufacturing

& Development Technology

Development

MEHPS

MHEES

GREENS

Product Improvement

Procurement

Advanced Battery Charger

Sustainment Programs – RPA, SPACES, Battery Management, Power Supplies, etc.

Procurement

Technology Refresh

(17)

17

Planning Brief to Industry 2015

DISTRIBUTION A. Approved for public release: distribution unlimited.

17

Title

Funding

Planned RFP

Mobile Electric Hybrid Power System (MEHPS)

RDT&E

Now

Energy Storage for Micro Grids

RDT&E

2017+

Advanced Battery Charger

PMC

Fall 2015

Platoon Water Purification System

PMC

2017+

Individual Water Purification System

PMC

Summer 2017

Renewable Energy in Covered Locations SBIR

RDT&E

Now

Light Weight Hybrid Systems SBIR

RDT&E

Now

Small Light Weight Water Purification SBIR

RDT&E

Now

Battery Maintenance Capability

PMC

Summer 2018

MEHPS Production

PMC

Fall 2017

Tech Refresh of Systems

RDT&E

Various 2017+

(18)

18

DISTRIBUTION A. Approved for public release: distribution unlimited.

Product Manager

Test Measurement & Diagnostic

Equipment

(19)

19

Planning Brief to Industry 2015

DISTRIBUTION A. Approved for public release: distribution unlimited.

Test Measurement & Diagnostics Equipment Portfolio:

Family of General Purpose Tools & Test Systems

Family of Automatic Test Systems

Family of Calibration and Maintenance Program Systems

(20)

20

DISTRIBUTION A. Approved for public release: distribution unlimited.

20

DISTRIBUTION A. Approved for public release: distribution unlimited.

Production & Deployment Engineering Manufacturing

& Development Technology Maturation

& Risk Reduction

2018

2019

2020

2016

2017

APS– Application Program Set VIPER/T – Virtual Instrument Portable Electronic Repair/ Tester

AN/PSM-126 APS

AN/PSM-112 APS

AN/PSM-125 APS

AN/TSM-220 APS

HAND-HELD RADIO TEST SET

VIPER / T Systems

TOOL KIT, AIR CONDITIONER

(21)

21

Planning Brief to Industry 2015

DISTRIBUTION A. Approved for public release: distribution unlimited.

TMDE Business Opportunities

Title

Funding

Planned RFP

AN/TSM-220 PSAPS Application Program Set (APS)

PMC

4Q FY15

VIPER/T (FMS) Systems

PMC

2Q FY16/

2Q FY17

AN/PSM-123 (FMS) LAV 25A2 Turret APS

PMC

2Q FY16/

2Q FY17

AN/PSM-126 VSAT APS

PMC

1Q FY17

AN/PSM-112 LAV-AT APS

PMC

1Q FY17

AN/PSM-125 LAV-ITSS APS

PMC

2Q FY17

Hand-Held Radio Test Set

PMC

3Q FY18

Tool Kit, Air Conditioner

PMC

2Q FY19

(22)

22

DISTRIBUTION A. Approved for public release: distribution unlimited.

Product Manager

Unmanned Ground Systems

(23)

23

Planning Brief to Industry 2015

DISTRIBUTION A. Approved for public release: distribution unlimited.

Product Manager – Unmanned Ground Systems:

Joint Product Manager with Army PM Force Projection

Stationed at Selfridge, MI

USMC Portfolio:

Route Reconnaissance & Clearance Increment I

Throwable Robot / Recon Scout XT

Small Unmanned Ground Vehicle 310

Advanced EOD Robotic System

References

Related documents

Lung cancer was similar to skin cancer on personal responsibility, avoidance, and policy opposition, but attracted higher stigma in the domains of awkwardness,

Most importantly, the GlobCom experience exposed students to the realities of cross cultural, international communication in a real life context and exposed them to working

The annual report of the Company is prepared in accordance with the Capital Market Legislation and the Corporate Governance Principles of the Capital Markets

Accordingly, this work plans to investigate the mechanical behavior of sandwich panels made of recycled plastic/Nano reinforced composites under tension, compression, and bending

In c the XDM collection is projected onto these three different basis vectors and reshaped into images, while d shows the corresponding evolution of these independent

It also references this range to validate caller entries from the Automated Attendant menu or from custom mailbox menus, when the Default action for the menu is Transfer

For example, game system experience methods are concerned with func- tional testing of the game; player experience methods ideally use sensor technology (or usability and

Some interesting research and development efforts are underway in Clark County School District (Las Vegas) and Charlotte-Mecklenburg (North Carolina) that could pave the way