Fuzzy VIKOR (FVIKOR)
Group decision-making approach for flood vulnerability identification using the fuzzy VIKOR method
12
EFQM Excellence Model Based On Multi-Criteria Processes Fuzzy AHP, Fuzzy DEMATEL, Fuzzy TOPSIS, And Fuzzy VIKOR; A Comparative Survey
13
Fuzzy VIKOR Optimization for Designing High Performance Hydroxyapatite/Polycaprolactone Scaffolds for Hard Tissue Engineering
20
A New Fuzzy AHP- Fuzzy VIKOR Approach in Control and Management of The Angiography Procedure to Prevent Disruptions: A Case Study
13
A Model Proposition for Prescreening Candidates in Recruitment Process Using Fuzzy Vikor Method
23
A hybrid method of Fuzzy DEMATEL/AHP/VIKOR approach to rank and select the best hospital nurses of a Years: A case study
17
Integrated Fuzzy Data Analytic Models to Evaluate Influencing Factors of Blood Bank Supply Chain
10
Fuzzy multi criteria decision making for carbon dioxide geological storage in Turkey
30
Online Full Text
6
Evaluating high risks in large-scale projects using an extended VIKOR method under a fuzzy environment Pages 463-476 Download PDF
14
Solving robot selection problem by a new interval-valued hesitant fuzzy multi-attributes group decision method
10
Group Decision Making For Safe Disposal of Commercial Fish Waste
6
Solving New Product Selection Problem by a New Hierarchical Group Decision-making Approach with Hesitant Fuzzy Setting
10
Selection of Phase Change Material using Shenon Entropy and Vikor Method
5
A Comparative Performance Evaluation on Bipolar Risks in Emerging Capital Markets Using Fuzzy AHP-TOPSIS and VIKOR Approaches
12
Material Selection in Manufacturing Environment Using Compromise Ranking and Regret Theory based Compromise Ranking Methods: A Comparative Study
9
A fuzzy linear fractional programming problem with fuzzy homogeneous constraints in trapezoidal fuzzy numbers
5
An integrated Fuzzy AHP-VIKOR method for Gold Potential Mapping in Saqez prospecting zone, Iran
13
INDUSTRIAL ROBOT SELECTION USING VIKOR AND TOPSIS TECHNIQUES
12
Group decision making process for early stage evaluations of infrastructure projects using extended VIKOR method under fuzzy environment
14